Loading...
HomeMy WebLinkAbout20241344.tiffUSRs Aerial WELD COUNTY, CO WELD COUNTY, CO Aerial I Site s. 4 ♦ 1 r f Closest Residences WELD COUNTY, CO Fruition Village — Town of Keenesburg • Master Plan Zoning Map 8 (RI M4 *I•supdhil N w r�«�.ro. 1i —••s a Witt es -UMW /0264 IR 44 i a......***06........a I —..-_-_— r� FrAl rt2P.:.�saws. 1 II.? !sq<.v ei an 1M16 — _ 1 NA W0.��I 1 Alai '4 4 , „ado 010114140 .IL1 Ns r. •-.stag\ toes rz 7tio wen -se "we peak ty.... 1.111.!.- S t 0# ;4,4. it tan 4Ka* ' *l 1 R!al ISO 1 PA ti • e RJ�1Vbiw Ins pp�'V 1t 2 AM"a 6420401044r .14 a. ADC 0EJ0lli $1 Sawa* f1M(Y A:sate TW fT 2 TeX &W*I ' RCM! 401AL I4! 1!isn nayfl[Irociis.x min towerAsa motile/It 11 uwn.f9UETTK mitotr IW.t mml*ta1 ar Puelt tz4-411 sr, JEW Psi *IONS SV MM Lai • Zoning 9etw Ile s -f _sw.a s s wsa f. ps t --DSO 1 ay pcnall '171.+.. I t..• P7• D O VMS T'.uD 4 t'1 "Mire • FRUITION KEEN ESBURG COLOMADO .. • Mountain Peak Power, LLC Mountain Peak Power Project Attachment 29 11041 Submittal Application Attachment 29 1041 USR Map (Vicinity Map & Plot Plan) & Area Map Mountain Peak Power Weld County 1041 Application Stanley Consultants Mountain Peak Power, LLC Mountain Peak Power Project Attachment 341 1041 Submittal Application Attachment 34 Pioneer Village Sketch Plan Map Mountain Peak Power Weld County 1041 Application Stanley Consultants Mountain Peak Power, LLC I Mountain Peak Power Project Attachment 26 11041 Submittal Application Attachment 26 Planned Site Access Mountain Peak Power Weld County 1041 Application Stanley Consultants Mountain Peak Power, LLC I Mountain Peak Power Project Planned Site Access 11041 Submittal Application Planned Site Access Background Mountain Peak Power, LLC is proposing construction of a supplemental, natural gas fired power plant in Weld County off County Road 55 northwest of the Town of Keenesburg. The site will be co -located with the existing United Power Tesla Substation. Refer to Site Plan drawing 31324-GG 101 located in Attachment 3 for sign locations described herein. Site Access The current site access is off County Road 55, just north of intersection of Count Road 22. This provides access to the existing Tesla Substation and Battery Energy Storage System (BESS). The Project will not require an alternate or new site access point and will utilize this existing site access point. Applicant worked with United Power and BESS Contractor's engineer to create a Combined Site Plan (contained herein) that shows access to and around the site from existing site access point off County Road 55. The Combined Site Plan shows existing and planned internal site roads around the site providing access to the Tesla Substation, the BESS, and Applicant's planned project area and structures. The Combined Site Plan was created to ensure emergency responders have across the site to all structures, both existing and new. This includes access during Applicant's planned construction period. Applicant will ensure planned site roads are open and accessible during construction and will not be impeded by construction laydown, construction trailers, and contractor parking. Should an emergency occur, emergency responders will be able to access the site as needed. Please see the Emergency Response Plan in Attachment 22 for more information. The Combined Site Plan was prepared and sealed by engineers registered in the State of Colorado by both Ameresco's engineer and Applicant's engineer. Ameresco is the BESS Contractor, their engineer is Barr Engineering. Applicant's engineer is Stanley Consultants, Inc. e Stanley Consultants Mountain Peak Power, LLC I Mountain Peak Power Project Attachment 3 11041 Submittal Application Attachment 3 Project Site Plan Mountain Peak Power Weld County 1041 Application Stanley Consultants Mountain Peak Power, LLC Mountain Peak Power Project Attachment 3211041 Submittal Application Attachment 32 Site Survey Mountain Peak Power Weld County 1041 Application Stanley Consultants Hello