Loading...
HomeMy WebLinkAbout20243081.tiffRESOLUTION RE: APPROVE AGREEMENT FOR RELOCATION OF ELECTRIC POWER LINES, CONSTRUCTION DEPOSIT AGREEMENT, AND PRIVATE FACILITIES LOCATE FORM FOR COUNTY ROAD 41 AND STATE HIGHWAY 52 INTERSECTION IMPROVEMENTS PROJECT, AND AUTHORIZE CHAIR TO SIGN - UNITED POWER, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Agreement for Relocation of Electric Power Lines, Construction Deposit Agreement, and Private Facilities Locate Form for the County Road 41 and State Highway 52 Intersection Improvements Project between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and United Power, Inc., commencing upon full execution of signatures, with further terms and conditions being as stated in said agreements and form, and WHEREAS, after review, the Board deems it advisable to approve said agreements and form, copies of which are attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Agreement for Relocation of Electric Power Lines, Construction Deposit Agreement, and Private Facilities Locate Form for the County Road 41 and State Highway 52 Intersection Improvements Project between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and United Power, Inc., be, and hereby are, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreements and form. c c : pc.) (c /ora/EG/nom/s$) 01/21/25 2024-3081 EG0082 AGREEMENT FOR RELOCATION OF ELECTRIC POWER LINES, CONSTRUCTION DEPOSIT AGREEMENT, AND PRIVATE FACILITIES LOCATE FORM FOR COUNTY ROAD 41 AND STATE HIGHWAY 52 INTERSECTION IMPROVEMENTS PROJECT - UNITED POWER, INC. PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 20th day of November, A.D., 2024. BOARD OF COUNTY COMMISSIONERS WELD COUNTY GOLORPQO ATTEST: ��.� Gl ���.,' _ . • �,. Weld County Clerk to the Board taut() Lk Deputy Clerk to the Board APP: • ED AS County Att.'"ey Date of signature: ll G-.11 Z Ke ' Ross, Chair tait erry L. Bk, Pro-Tem ike F eeman on Saine �M 2024-3081 EG0082 Co n 1-KtcilDtk385k BOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW PASS -AROUND TITLE: Utility Relocation Agreement (United Power) (WCR 41 / SH 52 Intersection Improvements) DEPARTMENT: Public Works DATE: 11/12/24 PERSON REQUESTING: Erich Green / Don Dunker / Curtis Hall Brief description of the problem/issue: Weld County is contracting construction of roadway intersection improvements at WCR 41 and SH 52 in 2025. Once our project is completed, CDOT plans to install a traffic signal at the intersection under their own contract and management (utilizing the same roadway configuration). United Power (UP) owns and operates existing overhead power lines along the east side of WCR 29 and the south side of SH 52. A total of 3,975 linear feet of these power lines must be relocated to accommodate the proposed intersection improvements, and 2,490 linear feet of this total will be undergrounded to improve roadway safety. United Power has estimated the total construction cost of the relocation work to be $919,414.65, however, since all of the affected 3,975 linear feet of relocation is within the existing/new road right-of-way (not within private easements), only the cost difference from relocated overhead power to relocated underground power will be the responsibility of Weld County. Therefore, the total amount payable to UP for the power line relocation is $449,239.07 and UP has signed the agreement as attached. The County Attorney's Office has reviewed the Utility Relocation Agreement and finds it acceptable. What options exist for the Board? 1. Allow the Utility Relocation Agreement to be placed on the next available BOCC Agenda. 2. Ask for a work session and additional information. Consequences: If the Utility Relocation Agreement is not placed on the BOCC Agenda and approved for signature, the project timeline may be lengthened. Impacts: This Utility Relocation Agreement directly impacts the project timeline. It allows relocation of existing United Power utilities to be completed in early 2025 to keep roadway improvements on schedule for the 2025 construction season. Costs: Costs will not exceed $449,239.07 and are accounted for in the Public Works 2024 fiscal year budget. These are one-time costs so subsequent fiscal year budgets will not be affected. Recommendation: Public Works staff recommends placing the Utility Relocation Agreement on the next available BOCC Agenda for consideration. Suooglt lommendation Schedule Place on BOCC Agenda Work 4ession Other/Comments: Perry L. Buck, Pro-Tem Mike Freeman Scott K. James Kevin D. Ross, Chair Lori Seine d -S 2024-3081 u/zo EG002 AGREEMENT FOR RELOCATION OF ELECTRIC POWER LINES BETWEEN UNITED POWER AND WELD COUNTY FOR THE WELD COUNTY ROAD 41 AND STATE HIGHWAY 52 INTERSECTION IMPROVEMENT PROJECT THIS AGREEMENT, made and entered into this 7b ' day of OVIPYYlk7C / , 2024, by and between UNITED POWER, INC., a Colorado cooperative association whose address is 500 Cooperative Way, Brighton, Colorado, 80603, hereinafter referred to as "United" and WELD COUNTY, a political subdivision of the State of Colorado, by and through the Board of County Commissioners of Weld County, whose address is P.O. Box 758, 1150 O Street, Greeley, CO 80632, hereinafter called "County". WITNESSETH: WHEREAS, to promote the safety of the citizens of County and other members of the travelling public, County has undertaken the construction of a public improvement project for the WCR 41 and SH 52 Intersection, hereinafter referred to as "the Project", and WHEREAS, to construct the Project, County has acquired property rights from private property owners to utilize as right-of-way for WCR 41 and SH 52, hereinafter referred to as "New Project ROW", and WHEREAS, United owns electric power distribution lines, fiber optic lines, and utility poles located in the existing WCR 41 Right -of -Way ("Existing WCR 41 ROW) and the existing SH 52 Right -of -Way ("Existing SH 52 ROW'), and WHEREAS, United is willing to remove the existing facilities located in the Existing WCR 41 ROW and the Existing SH 52 ROW, and construct new facilities within the New Project ROW to facilitate the construction of the Project, and WHEREAS, in recognition of United's facilities located in the existing ROW along WCR 41 and SH 52, United must relocate its facilities along WCR 41 and SH 52 at its cost, and WHEREAS, County requires that certain portions of United's relocated facilities be placed underground as depicted in Exhibit A for the safety of the travelling public, and WHEREAS, where County requires United's relocated facilities to be placed underground, County agrees to reimburse United for those reasonable differences in expense from relocating the facilities overhead to relocating the facilities underground as depicted in Exhibit B, and WHEREAS, United has the experience and expertise needed to relocate said facilities and is willing to do so subject to an agreed amount of reimbursement by the County for the justifiable portion of the costs incurred for said relocation. NOW, THEREFORE, for and in consideration of the mutual covenants and agreements hereinafter contained, the parties hereby agree as follows: 4997281 Pages: 1 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO iii lM'YNilehfll'RItI III 007 - 30f/ I. UNITED RIGHTS and RESPONSIBILITIES 1. United Power Lines Relocation: United shall relocate the existing power lines and poles as depicted on the Project Engineering Drawings, (copies of which are attached hereto as Exhibit A and by this reference made a part hereof). The exi§ting facilities shall be removed. The relocated facilities will be located within the New Project ROW. All work necessary to accomplish the United facilities relocation shall be performed in accordance with United specifications, in accordance with the professional standards governing such work and the provisions of this Agreement and shall conform to the performance standards and requirements set forth herein and in all Exhibits. 2. Relocations Not to Conflict with Improvements: United shall relocate its facilities as described and shown on Exhibits A and B, so that they can accommodate the common use of the property with the proposed roadway improvements or other utility locations and/or relocations. To ensure there are no conflicts, United shall be responsible for survey staking the locations and elevations of their new facilities. 3. Timing of Facilities Relocation: United shall commence the work upon receipt from the County of a fully executed copy of this Agreement; and receipt of the Deposit as defined below. United shall use commercially reasonable efforts to complete the work in a timely and efficient manner prior to January 27, 2025, provided that each party has fulfilled its obligations for work to commence the first week of December, 2024. 4. United Responsible for Traffic Control: Throughout the relocation process, United agrees that it shall be responsible for coordination of traffic control as established by the most recent version of the "Manual on Uniform Traffic Control Devices" (MUTCD). 5. United Shall Obtain Riaht-of-Wav Permits: United shall obtain all necessary permits from County required for its facilities relocation work. II. COUNTY RIGHTS and RESPONSIBILITIES 1. Estimates of Relocation Expenses: County has agreed to reimburse United for the expenses incurred in fulfillment of its obligations under this Agreement as set forth in Exhibit B. 2. Increases/Decreases In Estimated Expenses: United has estimated the County portion of the total cost of said relocation to be $449,239.07 which includes specific work outlined in the Exhibits A and B. Prior to United commencing the work, the County shall deposit the sum of $449,239.07 with United (the "Deposit") which represents 100% of the United Engineering Project Estimate. If the costs (after construction, project review, and reconciliation) shown in Exhibit B are less than the amount paid by the County, United shall refund the amount remaining to the County. If the final relocation costs exceed the amounts set forth in the attached Exhibit B, County shall pay those reasonable additional expenses incurred. County shall pay the balance within thirty (30) days of receipt of an invoice from United. 2 4997281 Pages: 2 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO 11111INFAv 4ili:tl NMA1vr ILt6.iWimIrA 1I II 3. County to Stake Right -of -Way: County shall establish and stake the County right-of-way within the work area prior to relocation of the United facilities. County shall verify the relocation to confirm that said relocation is sufficiently clear of Project construction work. 4. County's Right to Terminate: County may terminate this Agreement at any time prior to United's commencement of work. In such an event, the County shall pay United for all expenses which were incurred by United for engineering and for materials and equipment purchased or ordered and paid for by United, which cannot be returned for a refund, prior to the date of termination. III. MISCELLANEOUS 1. Board of County Commissioners of Weld County Approval: This Agreement shall not be valid until it has been approved by the Board of County Commissioners of Weld County or its designee. 2. Agreement Binding: This writing, together with the exhibits, constitutes the entire Agreement between the parties hereto with respect to the subject matter herein, and shall be binding upon said parties their officers, employees, agents, and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 3. No Third Party Beneficiary: It is expressly understood and agreed that the enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly reserved to the undersigned parties, and nothing in this Agreement shall give or allow any claim or right of action whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be an incidental beneficiary only. 4. Time of the Essence: Time is of the essence in each and all of the provisions of this Agreement. 5. Fund Availability: Financial obligations of the Board of County Commissioners of Weld County payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. By execution of this Agreement, County does not warrant funds will be available to fund this Agreement beyond the current fiscal year. 6. Severability: If any term or condition of this Agreement shall be held to be invalid, illegal, or unenforceable, this Agreement shall be construed and enforced without such provision, to the extent that this Agreement is then capable of execution within the original intent of the parties. 7. Attorney Fees/Legal Costs: In the event of a dispute between County and United, concerning this Agreement, the parties agree that neither party shall be liable to or responsible for the payment of attorney fees and/or legal costs incurred by or on behalf of the other. 3 4997281 Pages: 3 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO VIII I ��l�'M'4l� Il�4Ct l'hliLr M lit �l '�!'��h:�W�W�h 11111 8. Governmental Immunity: No term or condition of this contract shall be construed or interpreted as a waiver, express or implied, of any of the immunities, rights, benefits, protections or other provisions, of the Colorado Governmental Immunity Act §§24- 10-101 et seq., as applicable now or hereafter amended. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, two duplicate originals of this Agreement, each of which shall be deemed an original, on the date first written above. UNITED POWER, INC. By: f.Arnoxva Date: 1VO ,i (,.67A Title:,\Ipandey t oi4ex i41 scut - SUBSCRIBED AND SWORN to before me this jday of ‘ANt nk , 2024, By � �P M A WITNESS my hand and official seal Not My commission expires: ATTEST: 4rift.tei,) „to Weld County Clerk to the Board BY: �U�� UmII Deputy Clerk to the Board 4 4997281 Pages: 4 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO AM P0LLACK NOTARY ROUX OF COLORADO NOTARY ID 20224013362 MY COMMISSION EXPIRES APRIL 4, 2026 BOARD OF COUNTY COMMISSIONERS WELD COUNTY G in D. Ross, Chair MI 2 0 2024 Zo2--scV VIII l41l�.rL'�i��:16l;�M��I� �'IF'�11�k'��'«'�IrY�Y4 II II I 0 r-► a (13 I2DC 13 -05 � -E ish a); - n N J it= at 73 0 En -) 4g ram I --co _J C2- 4%. C7 - O ■i -n = O SAKATA LAND COMPANY EXHIBIT A ''` II 8" STEEL OIL LINE 12" STEEL GAS LINE (WESTERN MIDSTREAM) (WESTERN MIDSTREAM) 20" PVC WATERLINE WATERLINE FIBER OPTIC LINE (WESTERN MIDSTREAM) (WESTERN MIDSTREAM) (LEVEL 3)(LUMEN) (1 >m D Q) m m z tri o cnoo m rn m -I D OF 14) 11.11r - I KEYMAP NTS 6" HP STEEL GAS LINE (DCP MIDSTREAM) �� tn. N,, r� l) tt H_O _ �•,`• I IV. W:' !? W.: Q O O W2 W2 V/2- ----O- W2 vv., ROW ROW, :HLINE STA: 15+00. 1 ROW OW ROW..— ROW ROW ROW ROW ROW ROW R - :. VI - ROW W ROW. ROW RO 4 r, (. • r-: n SO.? . CD fry 11123 = EOA EOA —` - 00 . A EOA t.'. .:,A - EOA EOA EOA EOA EOA EC.A E0A EOA E A A WA EOA WA E04 -+ P TH� SECTION LA 0 »•�� 11+,r,, i WCR 41 XO0- _ _ _ _ _ _ A -...-1-—t - - - - 14 r 00 I I I__ TH02A I --I --1 - f _o ' -A A r`'" f. c J EOA EOA EA WA Fr.A epq,� EOA We MA EOA OA E EC WA EOA EOA ---r- WI 1 c 1. TH01 � L � Nooks• 4 111 ! a a a to a ono �.l,a t / / 4,1-s�� l a a �i# W �L4� Ll e�v�,l ill 'Mont c,�W'ea -a, ,, Imo^ I Pr Pr—" vi Pr Pr „ r?'. �� „ � . —ROW -ROW -ROW t.' Pr -R W Pr -ROW Pr -, A Pr -ROW Pr —ROW 11-1 12" WATERLINE Pr —ROW OVERHEAD ELECTRIC AND MARKER (TOWN OF HUDSON) (UNITED POWER) 30.00 r PROPOSED i 2 WESTERN GAS MIDSTREAM LINE EASE ENT TELEPHONE AND FIBER ROADWAY I CENTERLINE ;i,,i,.: ,.: h.=,. Lii. 4., OPTIC LINES (CENTURYLINK/LUMEN) EXISTING ROW 50.00 WESTERN MIDSTREAM NEW PROJECT ROW AS LINE EASEMEN1 ii SEPTIC SYSTEM LEACH FIELD SEPTIC SYSTEM MANHOLE la* HP GAS LINE HP GAS LINE EXISTING UNITED (WESTERN MIDSTREAM) / (WESTERN MIDSTREAM) POWER OH FACILITIES L J i TO BE REMOVED _ (REFER TO PROPOSED I UTILITY SHEETS FOR RELOCATIONS) DARWIN & ARLA NESTER D 50 100 Feet ROBERT& BARBARA RUEGGE Computer File Information - Index of Revisions WELD COUNTY . As Constructed WCR WCR 41-HWY 41 EXIST 52 INTERSECTION UTILITY (S HT 1) Project No./Code Creation Date 5/10/2024 Initials: CLW Date _ Comments Initials PUBLIC WORKS DEPARTMENT 1111 No Revisions AOC C030-086 (25008) LBSI Modified Date 5/10/2024 Initials: CLW - - �� �� H. STREET - P.O. BOX 758 r" j GREELEY, CO. 80632-0758 Fill Petri M tPitoJECT9 DF.SIGMWCR 41 AND HWY 52 IN1ERS I14flfSPR0DUGrioNDINGS Revised Designer. CLW GR-69 Drawing File Name WCR 41_EXST UTIL.DWG Detwiler CLW PHONE (970) 356-4000 - FAX (970) 304-6497 Void Sheet Number 27 of 130 AutoCAD Version 2021 Scale AS NOTED Units English Sheet Subset Sheet Subset rim N.„ _ su TJ M Q nts) .• _ 73 CD cn 740 a. TE• 1..a - (D O al- arm O 0 IR- NUE SAKATA COMPANY LAND EXHIBIT A II II „ - WATERLINE (WESTERN MIDSTREAM) D m ern 12' STEEL GAS LINE (WESTERN MIDSTREAM) (2 OF 8' STEEL OIL LINE (WESTERN MIDSTREAM) 20' PVC WATERLINE (WESTERN MIDSTREAM) 14) KEYMAP , mr m z cm NTS rn DKo EnO mN A W1 -� 6' HP STEEL GAS LINE Z D m 3 WATERLINE MARKER (WESTERN ,. l (DCP MIDSTREAM) MIDSTREAM) / ABOVE GROUND GAS PIPING Yv2 w2 -Q W. �._ (DCP MIDSTREAM) 0 'C --/ `\`� ` TH2O FIBER OPTIC LINE (LEVEL 3)(LUMEN) O - W' p W2 4r cr T H08 4— ' tOW RO • RO 'Nff -ROME �QV14- l� #ZO,INC R41[ •1�—ROW ROW ROW ROW ROW iY1F--ROW1— WH ?OW ROW ROW ROW t,O . in + e- `EGA -- LOA EGA WA A WA EGA EGA WA EGA WA [OA EGA WA EOA WAWAWA EOA E0A WA :OA Q WCR 41 — — N i-- o — — — — — — — —16_I — — TH04 17+00 !$�0� (n ,_- 1x;00 )— �_ 20+00 TH09 L�f+00 I OA E0 WA EOA VOA EO t�A _FpA E f EOA EC/ [" [OA rip, —1--EUA— TOA FOR f!) �. W, �, t�� ,� �e w1 — e. R ? c ., r .4ai rLLI _G1"40.e .. w•■ . t■"/�",.-,' ■ RIM �.� ■IIsln■_ II.�.. It_IIII-RII MIA *II NIi� II II /ell-IlinISRISIMON ill I 'l/IIR I I 1.118) tell I 114-11Z V ,1III■I MI jefit ill "�� , FIBER OPTIC LINE U F- OVERHEAD ELECTRIC TELEPHONE LINE AND MARKER SECTION LINE UNITED POWER t ) AND PEDESTAL , Pr -ROW O Q Pr -ROW (CENTURYLINK/LUMEN) Pr ROW Pr -ROW Pr-ROW(CENTURYLINK/LUMEN) 0 H Pr- w PRIVATE TELEPHONE L'� -.. P; "'' - OW Pr -ROW Pr ROW - •0w PROPOSED IRRIGATION LINE PEDESTAL Pr _R0W Pr 12" WATERLINE -ROW (CENTURYLINK/LUMEN \ ROADWAY OF HUDSON) (TOWN CENTERLINE EXISTING UNITED EXISTING ROW POWER OH FACILITIES NEW PROJECT ROW TO BE REMOVED (REFER TO PROPOSED UTILITY SHEETS FOR RELOCATIONS) DARWIN & ARLA NESTER 0 50 100 ROBERT & BARBARA RUEGGE Feet Computer File Information Index of Revisions WELD COUNTY As Constructed WCR W C 41-HWY R 41 EXIST 52 UTILITY INTERSECTION (S HT 2) Project No./Code Creation Date 5/10/2024 Initials: CLW Date _ Comments Initials PUBLIC WORKS DEPARTMENT No Revisions AQC C030-086 (25008) Last Modified Date 5/10/2024 Initials CLW _ Full Paln. M'r'RdJrCTS, OCSIGMWCR 41 AND vVY 52 IN1ER5ECILONIPRQDUCTIDNDWG5 a" 1, t 1 I� 'fi 1111 H. STREET RCViSCd Designer 9 CLW s' � I P.O. BOX 758 GREELEY, CO. 80632-0758 DrawingFdeName WCR41_EXST UTIL.DWG f` _ I PHONE (970) 356-4000 FAX (970) 304 6497 Retailer. CLW j Vo,d Sheet Number 28 of 130 AitoCAD Version 2021 Scale AS NOTED Units English Sheet Subset. Sheet Subset o 01- O 1 1 SAKATA LAND `/ t"` COMPANY / EXHIBIT A (3 OF 14) 0 12" STEEL GAS LINE (WESTERN MIDSTREAM) KEYMAP w umi 8" STEEL OIL LINE 0 r- m (WESTERN MIDSTREAM) / m z (ft o m K O 20" PVC WATERLINE / m 0 • (WESTERN /f MIDSTREAM) l NTS / j m m TH05 ii-- THO6 .,, TH07 , ' 6" HP STEEL GAS -4`' .• LINE AND MARKER / STORM (DCP MIDSTREAM) CULVERT !J GAS SERVICE 4 (ATMOS LINE ENERGY) CD / FIBER OPTIC LINE r_ AND MARKER O © CD W2 .- (LEVEL 3)(LUMEN) - ROW 4 i6W-*t=ROW :•ROW ROW ROW ROW ROW RUW ROW ROW RO ROW R ROW ROW t IIATCHLINE STA: 27+E 5 + EOA N EOA E0A E0A - LOA EOA E0A E0A EOA WA EGA LOA LOA LL,A EOA EO A EOA - - WCR 41 T}i25 OA EOA EOA - - - _ - - - - - I- 0 22+00 —•t��-1— 23+00 24+00 25+00 - - - 00 27+00 — -4, E EA - t -f- �o i VA TA ED - - A --i-- 44Ct QA (7A EGA 7 A EOA EOA E0A4rgy ZL1 t -J W1 tq q .1 . go :) , W� Ll.( ti l t tit I/ I I^ II ell I I I I ��� WV I I I I II II 1I -I -t ■ II1.1411 ���W� LI I / I 11,11! I I I I Ih�,rk �wI ! ILA! rJ� -� I V b OVERHEAD ELECTRIC SECTION LINE TELEPHONE AND TH26 t H27 caAND FIBER OPTIC FIBER OPTIC LINES 12" WATERLINE PROPOSED ROADWAY HUDSON) Q 2 • Pr —ROW Pr Pr—ROWI O (UNITED POWER) (CENTURYLINKJLUMEN) (TOWN OF CENTERLINE —ROW Pr --ROW Rood Pr Row Pr --P ;W Pr —ROW Pr —ROW Pr -ROW Pr P, ROW Pr Pr -ROW —ROW 3" PVC GAS LINE (ATMOS ENERGY) EXISTING UNITED EXISTING ROW I POWER OH FACILITIES TO BE - REMOVED (REFER TO PROPOSED NEW PROJECT ROW UTILITY SHEETS FOR RELOCATIONS) ROBERT DARWIN & & ARLA BARBARA NESTER o 50 RUEGGE 100 Feet Computer File Information Index of Revisions WELD COUNTY As Constructed WCR WCR 41-HWY 41 EXIST 52 UTILITY INTERSECTION (SHT 3) Project No./Code Creat.on Date 5/10/2024 Initials: CLW Date Comments Initials li, PUBLIC WORKS DEPARTMENT No Revisions AQC C030-086 (25008) Lest Modified Dale 5/10/2024 Initials CLW _ t ; ��tli ! L ....{. t� - 1111 H. STREET � ` BOX 758 - P.O.; GREELEY. CO- 80632-0758 Full Path M kpiw rcTs D@SIGMWCR 41 AND rHWY 5z itilsEcitQmPRl�ucrtoNDwcs Revised Designer. CLW i GR�9 Drawing File Name WCR 41_EXST UTIL.DWG Detailer CLW PHONE (970) 3564000 FAX (970) 304 6497 Vold Sheet Number 29 of 130 AulOCAD Version. 2021 Scale. AS NOTED Units English -• Sheet Subset Sheet Sut:set -S t orv00 � N N al m NW= 73 I-. Qm o (D fb -.1 E • (D r9 s � Q ve �' �' I 1 I MICHAEL & DORIS EXHIBIT A DREILING I ��, o > I rnn le • �al . Is • IN TELEPHONE FIBER I a PEDESTALS a D AND fr/IGASLINE(DCP 6' HP STEEL MIDSTREAM) 4" HP STEEL GAS LINE (XCEL ENERGY) FIBER OPTIC AND ,n ABANDONED ,� I m m f I so rn 0 "' r� Ti v r' '1 v I I u m W r- m m z- m ; 9' N O �'- 3 514 m -+ (4 > to E m m z w • 12" STEEL GAS LINE - (WESTERN MIDSTREAM) A OF 14) .'r. HWY ,. KE .YMAP I II II NTS (CENTURYLINK/LUMEN) a a a as I 6" HP STEEL TELEPHONE LINE (CENTURYLINKILUM I ) T z 8" STEEL OIL LINE -i ; (WESTERN MIDSTREAM) GAS LINE (DCP t 1-4 1.i TELEPHONE LINES 20" 12" WATERLINE AND PEDESTAL PVC WATERLINE TH 10-__ MIDSTREAM) ` ,;,(WESTERN -).-/ STORM LINE GOWN OF HUDSON) (CENTURYLINK/LUMEN) --(4L)--) MIDSTREAM) tr PFl -�>. w STORM LINES � TH13A TH13B w7 r W2 0 ., TH21 W?--- i A'? ) W2 OO I /p I TH15 t TH22 PE PE PE t (• r Pr_ OW Pr-R4W ROW kOW — I: -'-- EII'• ' T. MATCHLINE STA: 27+5t ROW ROW ROW ROW altOVI W ROW ROW EOW--0- ROWRQM ROW RO -- LO TH K, tyt I ' wit «� 0 O `� r r ' r i H _ (, + D D 8 r !rte F.OATT T 9UA CO WA EGA ibA I _ ta EOA EGA EOA EOA Ef1rC EOA + EOA EOA WA WCR 41 WA r. OA — _TH2sA Q TH12 ' 00 R, rn 2940 30+00 31+00 32+00 33*00 H --MA—)— I-Eoa L— CO A toA Fo L� A I ,, <<, A —�b�L0A , , j _ 5555 ... W • �, • !' , r v ♦ r<. s r. I ll r i '. IN t I m + �� f� J r, }. I 4 o _l..11 . o ,n- 11 OO A ` ri TH TH29 :iQ it iE� tkidli � i' 8 = \"I —x --.<—X -x —X —X —x -X ` TH33 CO X x —x —x —x —x 3" 3" PVC GAS LINE FIBER OPTIC LINE SECTION LINE x —x —X — U I - FIBER BOX, ft (ATMOS ENERGY) (LEVEL 3)(LUMEN) O7 * Q ' 'r TELEPHONE PEDESTAL TH 16 -7 TH34 Pr -ROW -ROW Pr -ROW Pr -R Pr -ROW TELEPHONE 3" ABANDONED OVERHEAD ELECTRIC - W Pr -ROW PROPOSED Pr -ROW (CENTURYLINK/LUMEN) TH17 PEDESTAL STEEL GAS LINE AND FIBER OPTIC LINES (ATMOS ENERGY) (UNITED POWER) ROADWAY _ CENTERLINE (CENTURYLINK/LUMEN) it EXISTING X-- ROW k ---r-, X— . - -J( `" o rn O D i t x -4 EXISTING UNITED --x x 1 4" HP STEEL GAS XCEL ENERGY GAS EASEMENT POWER OH FACILITIES LINE MARKER TO BE REMOVED NEW PROJECT ROW (XCEL ENERGY) D b Pr Pr TO PROPOSED -ROW -ROW (REFER UTILITY SHEETS FOR :- ABANDONED TELEPHONE RELOCATIONS) + rn D I > I rn' t x BOX AND PEDESTALS (CENTURYLINK/LUMEN) l 6" HP STEEL GAS LINE I (DCP MIDSTREAM) A I D HUGO D 50 100 VILLFt A-PORTll..LO - Feet • Computer File Information Index of Revisions WELD COUNTY WCR WCR 41-HWY 41 EXIST 52 INTERSECTION UTILITY (S HT T 4) As Constructed Project No./Code Creation Date 5/10/2024 Initials: CLW Date Comments Initials f r , r. --- � PUBLIC WORKS DEPARTMENT 1111 H. STREET P.O. BOX 758 GREELEY. CO. 80632 0758 PHONE (970) 356-4000 FAX (970) 30x 6497 No Revisions , AOC C030-086 (25008) Last Modified Date 5/10/2024 Initials: CLW _ M PI�bJFCTSDFSIGMWCRai AND HWY Full Path.4 52 INTERSECIION1PRQDuCTQN DINGS Revised Designer CLW GR-69 Drawing File Name: WCR 41_EXST UTIL DWG [Mailer CLW Void Sheet Number 30 of 130 AAJtcCAD Version: 2021 Scale AS NOTED Units Erglish Sheet Subset Sheet Subset — cam N� o N S N 00 71 l" Ila') a _ :AN) � _ m� -O X; W tie �a vi xi 0m0 ■ i ®W IFS (D its a —10 SI- O — C MC 0 O ipe misa— MICHAEL & DORIS EXHIBIT A DREILING (5 OF 14) KF:-YMAP 12" STEEL GAS LINE 20' PVC WATERLINE (WESTERN (WESTERN MIDSTREAM) MIDSTREAM) 12" WATERLINE - r AND VALVE (TOWN 2 0 OF HUDSON) - 8' STEEL OIL LINE TELEPHONE LINE (WESTERN (CENTURYLINK/LUMEN) MIDSTREAM) D o o* rn DCn m w m r xn m c r- m m z cr rn - 0 P ZmW"7tJ z m(� W: K O Al Q w? Q via I) Wi ® VN_' W2 C O PE 1— rH18 ROW ROW ROW 'OW ROW OW ROW c t tf7 ROW : • . v -f— R ROW ROW ROW ROW ROW ROW ROW ROW RO R• - 0 g b r I".- Wl E Ai 8 T1 WI r 1 + + r' 1— CO E0A EGA —._l 8 l r 'f c.:;", O 'Cr w3 - EOA WA EOA t. t-•"��• i .A ,a •A EGA EOA EOA EOA EOA EOA - EGA EGA - - - _ 8 WCR 41 ELJA LOA t OA - — — - - — )' Al 36+00 37+04 38+ +(57 '?�•Gt al1` 34+00 35+00 (0 I r:i-1- O - EGA -- ESA EtA 1.070 Eta iA EOA EGA EOA t '_ ' EOA Ft - WA E0A - EGA EGA EGA 7 i. i.-OA-• ail - Z�. 31 ' Z "• ., A?i J st"d ; 1 3'� Iil/ii!/ •,.vas,ua, i;-.�l-?i•.,R, ts■� i ant Mili J _, I-' U SECTION LINE -X -X U - -X -X A A , -X -X X -X -X -X -X --X -X --•X i- -X -X -X --X --x -X STORM Pr -ii h. Q Q ::_xTr'L CULVERTS Pr -ROW Pr -ROW Pr -Row Pr -ROW S`Pr-ROW Pr Pr OW 3' PVC LINE -ROW OW -R FIBER OPTIC LINE (LEVEL 3)(LUMEN) Pr-' = OVERHEAD ELECTRIC AND FIBER OPTIC GAS Pr -ROW Pr -ROW Pr -ROW PROPOSED (ATMOS ENERGY) ROADWAY CENTERLINE (UNITED POWER) 3" ABANDONED STEEL GAS LINE EXISTING ROW (ATMOS ENERGY) EXISTING UNITED POWER OH FACILITIES NEW PROJECT ROW TO BE REMOVED (REFER TO PROPOSED UTILITY SHEETS RELOCATIONS) FOR VILLELA-PORTILLO HUGO o 50 - Ioo a Feet Computer File Information Index of Revisions WELD COUNTY As Constructed WCR WCR 41-HWY 41 EXIST 52 INTERSECTION UTILITY (SHT T 5) Project No./Code ~ Creation Date 5/10/2024 Initials: CLW Date Comments Initials g6,, , PUBLIC WORKS DEPARTMENT No Revisions AUG C030-086 (25008) Last Modified Date 5/10/2024 Initials CLW _ _ - FLiII Path. sz INI ,ecrs-IOWRnWCaa1 AND rwry 52 INIEB3EOI10IlSPRODUCIlOflI_pSpCGg ,t " I F r 1111 H. STREET Revised: Designer CLW GRf9 - ` * r GREELEY,, CO X80632-0758 PHONE: (970) 356 4000 FAX: (970) 304-0497 Drawing File Name WCR 41 EXST UTIL-DWG g Detailer CLW Void Sheet Number 31 of 130 AU'oCAD Version 2021 Scale. AS NOTED Units. Ergksh - - Sheet Subset Sheet Subset ~ ~ '< � J � I. °NOO ---ro 0 N -U xt —tow 7 3 (4 N omm Qm ei SW roe rusi CS) RIM —NE O C f r+ IIIIi O E u 1 MICHAEL & DORIS EXHIBIT A DREILING (6 OF 14) 1 a KEYMAP N IS It :tE 12' STEEL GAS LINE (WESTERN MIDSTREAM) F t ''t ''L i'i t• 8' STEEL OIL LINE (WESTERN MIDSTREAM) r D m cn TELEPHONE LINE 12" (CENTURYLINK/LUMEN) (TOWN WATERLINE 20" PVC WATERLINE OF HUDSON) MIDSTREAM) m z v, m D o D m c., mcn cno K r x m o o z m A- m ca DD3 z — ----- aE PPe---- t;.t -_-, ---;----41:- _., _ `' m z T H CD O .4 • FE r r. pi: PE Pi d - ROW - ._ -,U Q JP $nw - @pW. ROW - PAy�-129W ROW — = ROW R ROW ROW IMW ROW ROW R0-( - N,fRQW - _ - 7: O U - TI B B e, .. F 'c EOA EOA EOA EOA LOA EOA EOA EOA E0A E0A EOA EOA £0A --0-- EOA EOA EOA E0A ECM E0A 'Z 1— WCR — — -1+OQ 41 43+00 t00 LOA E0A Ec: 8 44.00 45.00 46+00 Kfti — — _I —I- _ __`--�-- — �. — — — + I ) --- —I —I -F (r 0 ' LLj -- EOA EPA EOA NA E0A EOA EOA EOA E0A WA WA WA - WA EOA EOA OA EGA ; ; EOA EO EOA WA Z f O. r '—TH19 - _ :, -co taw a,l Rift.. c .,'R0 t f u tR , t r.: I IPr—ROW O Pr —ROW PROPOSED ROADWAY Pr -ROW x _ Pr Pr -ROW CENTERLINE Q —x nr_ —ROW = -X O Pr -OW -x X x 7i -�k I:: --�( _ -jt -x --c x -x -x 2 3- PVC GAS LINE OVERHEAD ELECTRIC FIBER (ATMOS ENERGY) AND FIBER OPTIC (LEVEL 3" ABANDONED (UNITED POWER) STEEL GAS LINE OPTIC LINE SECTION LINE WATER VALVE 3)(LUMEN) EXISTING IRRIGATION PUMP AND ELECTRIC ENERGY) PANEL TO REMAIN (ATMOS EXISTING ROW I EXISTING UNITED NEW PROJECT ROW POWER OH FACILITIES TO (REFER UTILITY RELOCATIONS) BE REMOVED TO PROPOSED SHEETS FOR HUGO 0 50 100 VILLELA-PORTILLO Feet Computer File Information Index of Revisions WELD COUNTY As Constructed WCR 41-HWY WCR 41 EXIST 52 UTILITY INTERSECTION (SHT 6) Project No./Code Creation Date 5/10/2024 Initials CLW Date Comments Initials `- ,M,,i 1 r:: -- '� PUBLIC WORKS DEPARTMENT 1111 H. STREET P.O. BOX 758 No Revisions, AOC C030-086 (25008) Last Modified Date 5/10/2024 Initials CLW FA Path M `r'nojrcys_ioNte wCR 41 AND r WY a21NTERSEGi1QMPRODUG?I9fVDWGS Revised: Designer CLW GR-09 GREELEY. 80632-0758 Drawing File Name WCR 41_EXST UTIL.DWGjil Detailer CLW - PHONE' (970) 356-4000 FAX (970) 304-6497- Void Sheet Number 32 of 130 AutcCAD Version 2021 Scale: AS NOTED Units Erglish Sheet Subset Sheet Subset MICHAEL & DORIS i' 3" PVC GAS LINEDREILING I I i',e: 75.00' WESTERN MIDSTREAM .4 Cl (ATMOS ENERGY) HUGO GAS LINE EASEMENT 1 .. I F W w I x VILLELA-PORTILLO EXHIBIT A 12" STEEL GAS LINE lu I 4 �j 3" STEEL ABANDONED GAS (WESTERN MIDSTREAM) o_ a`� w V .- x a i LINE (ATMOS ENERGY) G) (7 8" STEEL OIL LINE 30.00 3 W I OVERHEAD ELECTRIC (WESTERN T WESERN MIDSTREAM AND FIBER OPTIC II KEYMAP MIDSTREAM) GAS LINE EASEMENT Q cn t (UNITED POWER) TH3 PE PE rE MOM-�d 20' PVC WATERLINE (WESTERN ) �3t Ip p • _ MIDSTREAM) HI _ •' `'1 ; < TH34 NTS PE P£ F' Ht -r-r— ei EI TELEPHONE LINE H _ _Et - TH29 1 \ . 1 AND PEDESTAL (CENTURYLINK/LUMEN) ,ti zd- :iiE PE PE Pi HP STEEL ABANDONED 12" WATERLINE TELEPHONE LINE (TOWN OF HUDSON) H 4" HP STEEL GAS LINE AND PEDESTAL TH2 (XCEL ENERGY) (CENTURYLINK/LUMEN) Ix TH15 FIBER OPTIC ' I fi si • x TH;i5 O . TH:43 / 4" GAS LINE MARKER (XCEL ENERGY) I ABANDONED LINE I - x ft TELEPHONE LINE 6" HP STEEL GAS LINE AND PEDESTAL (DCP MIDSTREAM) (CENTURYLINK/LUMEN) TH13B • co i I STORM LINE 1 AND PEDESTALS 6" HP STEEL GAS LINE (CENTURYLINK/LUMEN) (DCP MIDSTREAM) Pt Pc. Pt PL ►'! rL :. • CI'X •, —X V 11121 X X TH13A , •X --X Y. CD r � `' — EUA EOA�" EOA -COA EOA tUA ECM ECM ---=----1 •A— LU.•% "=• rook-- EQA'. EO EO TH14 JJ 10+00 11+00 12+00 r-- EQA ( EOA 13+00. 0,1 * EQA EOA EOA EGA TH17 HWY 52 TH16 14+00 15+W 16 ►00 1 I— I I STORM LINE 8 rim+---- S '_ EQA - - EGA • EOA EOA EOA LUA LuH - 4r EOA EOA — LOA [OA EOA EOA EQA EOA EOA EQA EOA EQA [UP. OA EOA EOA WA I 1,- .� r .. t? FO -f TH10 (4j ,.. o \iuiiufltiiu.u' lint-r!'t nteiiillrtT oil ,-t um P'Y1pi i ff .... - tin FIBER OPTIC LINE OVERHEAD ELECTRIC AND TELEPHONE LINE EXISTING ..c ROW FIBER OPTIC (UNITED CENTURYLINK/LUMEN ( ) 0 '4 FIBER POWER) •L'TM12 4 BOX. LEPHONE PEDESTAL EXISTING UNITED EXISTING ROW I 1:;,. ENTURYLINK/LUMEN) POWER OH FACILITIES TELEPHONE AND FIBER PEDESTALS a 3" PVC G '\INE TO BE REMOVED W NEW PROJECT ROW (CENTURYLINK/LUMEN) g I ;o (ATMOS EN Y) (REFER TO PROPOSED TELEPHONE AN UTILITY I ST FOR GAS SERVICE LINE -�/ � 3 & FIBER OPTIC LINE ' (CENTURYLINK/LUM• RELOCATIONS)EETS (ATMOS GAS) S. < 0 TH21 12" WATERLINE 6' STEEL HP GAS (TOWN OF HUDSON) NEW PROJECT ROW) LINE (DCP MIDSTREAM) r al OVERHEAD ELECTRIC x �t t O eq� W I < Q a I p Wo �r a AND FIBER OPTIC (UNITED POWER) FIBER OPTIC DARWIN (LEVEL 3)(LUMEN) & ARLA NESTER ROBERT & BARBARA RUEGGE IL I SAKATA LAND COMPANY STORM CULVERT ;: t a o is . S .". '' 0 50 100 Fee: Computer File Information Index of Revisions WELD COUNTY As Constructed WCR HWY 41-HWY 52 EXIST 52 INTERSECTION UTILITY (S HT 7) Project No./Code Creator Date 5/10/2024 Initials. CLW Date Comments Initials No Revisions AQC C030-086 (25008) Last Modified Date 5/10/2024 Initials CLW - - PUBLIC WORKS DEPARTMENT 1111H STREET Full Pain M \PROJECT3_DESIGMWCR 41 AND'riWY �• , - P.O BOX 758 Revised Designer CLW GR-69 52 'NJEfl3ECTiONIPRODUCTION DGS W - - - N File GREELEY, CO. 80632-0758 r_ Detailer CLW Drawing Name: HWY 52_EXST UTIL.DWG PHONE' (970) 356-4000 Void Sheet Number 33 cf 130 v AJtoCAD Version 2021 Scale AS NOTED Units Erglish - - - FAX (970) 304-6497 Sheet Subset Sheet Subset 0 �- ,C N� �-'o Nat 13 N u' IIIII ON =am N - ET tO -am ?3(ID •. Err o i1 IV .r • -1 • -el m w Q0 - 0 O c- C O SAKATA LAND � r COMPANY EXHIBIT A (8 OF WATERLINE, PROTECT IN PLACE (WESTERN MIDSTREAM) 12" STEEL GAS LINE, 20" PVC WATERLINE, PROTECT IN PLACE PROTECT IN PLACE (WESTERN MIDSTREAM) (WESTERN MIDSTREAM) 8" STEEL OIL LINE, 6" STEEL GAS LINE, PROTECT IN PLACE PROTECT IN PLACE (WESTERN MIDSTREAM) (DCP MIDSTREAM) 14) n to m 2 • O g D C m u, o z m o m Z II KEYMAP NTS UTILITY NOTES IN THE EVENT UNITED POWER ACQUIRES A UTILITY EASEMENT FROM ROBERT RUEGGE, POWER SHOWN WITHIN ROW WILL BE CONSTRUCTED PER UNITED POWER PLANS WITHIN EASEMENT. 2. CDOT SIGNAL POLES TO HAVE 36"-DIA CAISSONS AT 14' DEPTH (TYP). 3. PROPOSED UTILITY LINES SHOWN ON THIS PLAN BEEN GRAPHICALLY SPACED SO THAT THEIR LINETYPES ARE LEGIBLE. ACTUAL PLACEMENT OF THE RELOCATED UTILITIES SHALL BE AS TO THE ROW LINE AS POSSIBLE AND SHALL HORIZONTALLY / AVOID ALL VERTICALL(CENTURYLINK/LUMEN) PROPOSED IMPROVEMENTS INCLUDING BUT NOT LIMITED TO ROADWAY SUBGRADE PREPARATION, STORM CULVERTS AND PROPOSED TRAFFIC SIGNAL POLE CAISSONS FE PL E -' i , - w2 r.! 2 H , V W2 FIBER OPTIC LINE, O PROTECT IN PLACE O --0 �' O (LEVEL 3)(LUMEN) W.'?- 6 -ROW-E- ROVE R091I1�-�tOtllE- ROYI��OYIE ME -NF • �� h ROW v Ww w R. O , w �t ,Y ROW.ROR ROW CO •- EOA EOA EOA - E0A EOA EOA E0A LOA LUA Ltalk LUA '-00 8+00 9100 ( of Ll:A LEA - $ 10i ,..u1t„ WCR 41 •HAVE Q + ( ( f - - - - -1 A I I- I :• O rj co Qf--___-F A E EOA EOA EOA EOA A EOA LOAWI W WI ® - ® Z F O F F O F F O F!O F/0 /0 F/0 T T T JILT !Ilia) F/0 — F O - -- T T _Ea_ T T T T T F/f1 - - - - J N ROW RI7& - --ROW/ w O,HROW-- — W--- **sr —RO ' T ROW- • - -i_ Rb 0 F O - F O ---_CLOSE I ' --L- F O F O fits F 0 F 0 RELOCATED BEGIN OVERHEAD 0 Pr—ROA •W r -R� W Pr . TELEPHONE AND ELECTRIC RELOCATION FIBER OPTIC LINES STA. N PROPOSED ELECTRIC POLE OFFSET. 27.87' R ROADWAY N=271.948.99 CENTERLINE _ E=230,838.99 I,- OVERHEAD ELECTRIC 12" WATERLINE AND LINE (UNITED POWER) WATER MARKER, RELOCATED OVERHEAD ELECTRIC LINE (BY PROTECT IN PLACE UNITED POWER) (TOWN OF HUDSON) RELOCATED EXISTING ROW TELEPHONE AND FIBER NEW PROJECT ROW PROPOSED UNITED OPTIC LINES (BY POWER OH FACILITIES CENTURYLINK/LUMEN) I 30.00' --n- (380 LF) MIDSTREAM MIDSTREAM GAS LINE EASEMENT WESTERN MIDSTREAM GAS LINE TO REMAIN 50.00' WESTERN MIDSTREAM WESTERN -\ • MIDSTREAM GAS LINE TO REMAIN L GAS LINE EASEMENT DARWIN & ARLA NESTER ROBERT & BARBARA RUEGGE o 50 100 Feet WELD COUNTY As Constructed WCR WCR 41-HWY 41 PROP 52 UTILITY INTERSECTION (SHT T 1)( Computer File Information Index of Revisions Project No./Code Creation Date 5/10/2024 Initials: CLW Date Comments Initials ' ; Yixat , I -.. I t = PUBLIC WORKS DEPARTMENT 1111 H. STREET P.O. BOX 758 No Revisions. AQC C030-086 25008 ) Last Modified Date 5/10/2024 Initials. CLW - - - Full Path: M \P OJrets orsion\WCR 41 AND HWY 52 INTtd25LL'IIQNIPRDDUCT(QN DN(GS Revised. Designer CLW GR-69 - ` ; GREELEY. CO. 80632-0758 _ Drawing File Name. WCR 41_PROP UTIL.DWG - - Detaiter CLW PHONE (970) 356-4000 C = FAX (970) 304-6497•Sheet y Void Number 34 of 130 Au'oCAD Version 2021 Stale AS NOTED Units English Sheet Subset: Sheet Subset _ C7�431 <N� k--oNO3 7 m f"a -u- to net ta �i N WATERLINE, PROTECT IN PLACE (WESTERN MIDSTREAM) 12" STEEL GAS LINE, PROTECT IN PLACE (WESTERN MIDSTREAM) 8" STEEL OIL LINE, - PROTECT IN PLACE (WESTERN MIDSTREAM) TRANSITION FR7M OVERHEAD TO I UNDERGROUND ELECTRIC STA: 13+61.36 I OFFSET 35.16' lit SEPTIC LEACH 1 FIELD TO REMAIN PROPOSED UNITED POWER OH FACILITIES (60 LF) Computer File Information Creator Date 5/10/2024 Last Modified Date 5/10/2024 Initials CLW Initials CLW Full Path M kPROJECTS_DESIGMWCR 41 AND HWY 52 INTI=NSFCTIOMPROD;JCTION DWGS Drawing File Name: WCR 41_PROP UTIL.DWG GR-69 AutoCAD Version 2021 Scale. AS NOTED Units. English 20" PVC WATERLINE. PROTECT IN PLACE (WESTERN MIDSTREAM) 6" STEEL GAS LINE. PROTECT IN PLACE (DCP MIDSTREAM) 12" WATERLINE, PROTECT IN PLACE (TOWN OF HUDSON) MANHOLE FOR SEPTIC SYSTEM TO REMAIN Date Index of Revisions Comments SAKATA LAND COMPANY FIBER OPTIC LINE PROTECT IN PLACE (LEVEL 3)(LUMEN) WATERLINE MARKER (WESTERN MIDSTREAM) W2 14O . RQ ROB ?QC" -ROINc -- ��-pgtr WCR 41 16+7r RELOCATED TELEPHONE PEDESTAL (BY CENTURYLINK/LUMEN) Initials PROPOSED STORM CULVERT PROPOSED UNITED POWER UG FACILITIES (590 LF) DARWIN & ARLA NESTER ROBERT & BARBARA RUEGGE WELD COUNTY PUBLIC WORKS DEPARTMENT 1111 H. STREET P.O. BOX 758 GREELEY, CO. 80632-0758 PHONE (970) 356-4000 FAX (970) 304-6497 Revised: 7— SECTION LINE ABOVE GROUND GAS PIPING (DCP MIDSTREAM) ROW ROW ROW to , iz tI PROPOSED ROADWAY CENTERLINE RELOCATED UNDERGROUND ELECTRIC (BY UNITED POWER) RELOCATED TELEPHONE AND FIBER OPTIC LINES (BY CENTURYLINK/LUMEN) NEW PROJECT ROW As Constructed No Revisions Va EU 100 Feet WCR 41-HWY 52 INTERSECTION WCR 41 PROP UTILITY (SHT 2) Designer Detailer Sheet Subset CLW CLW KEYMAPS' NTS UTILITY NOTES. 1 IN THE EVENT UNITED POWER ACQUIRES A UTILITY EASEMENT FROM ROBERT RUEGGE. POWER SHOWN WITHIN ROW WILL BE CONSTRUCTED PER UNITED POWER PLANS WITHIN EASEMENT 2. CDOT SIGNAL POLES TO HAVE 36"-DIA CAISSONS AT 14' DEPTH (TYP). 3. PROPOSED UTILITY LINES SHOWN ON THIS PLAN HAVE BEEN GRAPHICALLY SPACED SO THAT THEIR LINETYPES ARE LEGIBLE. ACTUAL PLACEMENT OF THE RELOCATED UTILITIES SHALL BE AS CLOSE TO THE ROW LINE AS POSSIBLE AND SHALL HORIZONTALLY / VERTICALLY AVOID ALL PROPOSED IMPROVEMENTS INCLUDING BUT NOT LIMITED TO ROADWAY SUBGRADE PREPARATION, STORM CULVERTS AND PROPOSED TRAFFIC SIGNAL POLE CAISSONS Project No./Code AQC C030-086 (25008) Sheet Subset Sheet Number 35 of 130 _ N N m N-0 S to Q- 3 (1) (U -.0 lies wag;wag . an-moN ;ElmQ° C7 O infr wit O !hr SAKATA LAND / T II 12" STEEL GAS LINE. COMPANY PROTECT IN PLACE• EXHIBIT At _ (WESTERN MIDSTREAM) (10 OF 14) II 8" STEEL OIL LINE, PROTECT IN PLACE 12" STEEL GAS LINE. - (WESTERN MIDSTREAM) PROTECT IN PLACE (WESTERN MIDSTREAM) _ I 20" PVC WATERLINE, PROTECT IN PLACE (WESTERN MIDSTREAM) 8" STEEL OIL LINE, / �. II PROTECT IN PLACE II (WESTERN MIDSTREAM) / KEYMAP 20" PVC WATERLINE.( ) NTS PROTECT IN PLACE _ w2 ' MIDSTREAM) 9 - (WESTERN UTILITY NOTES. FIBER OPTIC LINE AND MARKER, 1. IN THE EVENT UNITED POWER ACQUIRES A T PROTECT IN PLACE r PROPOSED UTILITY EASEMENT FROM PROPOSED (LEVEL 3)(LUMEN) a a / )( ) \ m Ch g DRIVEWAY - ROBERT RUEGGE, - POWER SHOWN WITHIN -J�` STORM CULVERT c,, \ Pin o / ROW WILL BE / O 6" STEEL GAS LINE. PROTECT IN PLACE m m o K x m z - CONSTRUCTED PER UNITED POWER PLANS WITHIN O (DCP MIDSTREAM) W2 �_‘ 00 EASEMENT. - ROW RO+'1 RUW R 2. CDOT SIGNAL POLES TO 0 RU W ROW k,1* ---ROW .. ROW ROW Row --*t- ROW-, ... ROW -r.-- ROW ROW ROW ROW ROW ROW 'W 0 LO� HAVE 36"-DIA CAISSONS - 1 O �� ,• , ® + a7•-_ AT 14' DEPTH - �- (TYP). - -- Q - - WCR 41 SECTION LINE N 3. PROPOSED UTILITY LINES SHOWN HAVEB OE THIS PLAN N - - - - - - - - - - - - - f 20 .0.i; TUC 2 i 23FC1� i4�,1L St00 to f— H GRAPHICALLY SPACED _ I __ I `-- -� I --I [n SNETYPES Wi t.. ® ,,,,,,....---4-aart W t w //�� '� Ll.i ARE LEGIBLE. Z o PROPOSED ROADWAY Z ACTUAL PLACEMENT OF J o CENTERLINE J THE RELOCATED SHALL _ UTILITIES BE AS _ lo U — — v CLOSE TO THE ROW LINE AS SSIBLE SHALL /O F/0 F /n r r.rn / 'n Q rF/O Tf __ F/0 _ 1n _ /n r n r F f ,/0 r 0 Q HORIOZONTALLY / l� .. pp,a}ggyY t - UGE• CF t ; UGF. tgr-J lIGE .��.. t tt UGE UGE +, f VERTICALLY AVOID ALL r�r- .ettneit 1-- _ R�w tic . - -,R- 4JG 1 ,--:._-- .Uhr t !� ...r- - . . ~' 12" WATERLINE. PROTECT IN PLACE (TOWN OF HUDSON) o , RELOCATED RELOCATED UNITED POWER TELEPHONE AND FIBER UNDERGROUND ELECTRIC BEGIN BORE OPTIC LINES (BY AND FIBER OPTIC LINES STA: 26+00.09/46.95' R CENTURYLINK/LUMEN) (BY UNITED POWER) N=273,368.02 E=230.857.08 r 1JNC� � 'ECU* OPT!' UNI' I PROPOSED IMPROVEMENTS INCLUDING BUT NOT LIMITED TO ROADWAY SUBGRADE PREPARATION, STORM CULVERTS AND PROPOSED TRAFFIC NEW PROJECT ROW T SIGNAL POLE CAISSONS. PROPOSED UNITED POWER UG FACILITIES (650 LF) p DARWIN ROBERT & ARLA & BARBARA NESTER o 50 100 RUEGGE Feet Computer File Information Index of Revisions WELD COUNTY As Constructed WCR 41-HWY 52 INTERSECTION Project No./Code Creation Date 5/10/2024 Initials: CLW Date Comments Initials , ' r: ,. PUBLIC WORKS DEPARTMENT 1111 H. STREET No Revisions WCR 41 PROP UTILITY (SHT 3) AQC C030-086 (25008) Last Modified Date 5/10/2024 Initials CLW _ _ _ M:1PROJECTSM _DESIGWCR 41 AND FIWY Full Path. r52 INTERSECTIONIPROXCTION OWLS Revised: Designer: CLW R 69 j P.O. BOX 758 "'� �''' �L,lG GREELEY, CO. 80632-0758 Drawing File Name. WCR 41 PROP UTIL.DWG — - - - Detailer CLW PHONE (970) 3564000 Void FAX (970) 304-6497 AutoCAD Version 2021 Scale. AS NOTED Units: English - - _ Sheet Subset: Sheet Subset Sheet Number 36 of 130 (76 N �salON CO M_ 78 m a-- 1-a - I-.. sistq{VmiCi Wow Cu lig IMPoo 2:3 -21 rar n ne O m Ir a ri tti N mD O Mir mw E • Li) So Q mem a --n �: O re- • mri — O IOU 6" HP STEEL GAS RELOCATED LINE, PROTECT IN PLACE (DCP MICHAEL & DORIS EXHIBIT A DREILING UNDERGROUND ELECTRIC AND FIBER OPTIC LINE (BY UNITED POWER) t > I MIDSTREAM) 4" HP STEEL GAS (11 OF 14) LINE, PROTECT - " �x SAKATA LAND COMPANY x IN PLACE (XCEL ENERGY) X (` ? F/0 FIBER OPTIC LINE (CENTURYLINK/LUM N) II F/T 12" STEEL GAS LINE, KEYMAP -+IPROTECT IN PLACE 10 I' o RELOCATED (WESTERN MIDSTREAM) NTS 11 I ,, CDOT SIGNAL POLE TELEPHONE AND 8" STEEL OIL LINE. FIBER OPTIC LINES PROTECT IN PLACE (CENTURYLINK/LUMEN) (WESTERN MIDSTREAM) r m r RELOCATED o O 36" DIA, 19' DEEP CAISSON x UTILITY NOTES aF ;> z TELEPHONE AND FIBER OPTIC LINES _ N=273.653.00 E=230.737.97 t7 * 20" PVC WATERLINE, D 0 m N W wo PROTECT IN PLACE m z D 1. IN THE EVENT UNITED POWER ACQUIRES A CENTURYLINK/LUMENI K r x m a (WESTERN MIDSTREAM) m O_ •a - UTILITY EASEMENT FROM z m > ROBERT RUEGGE. CDOT SIGNAL POLE O K z z POWER SHOWN WITHIN , - 36"-DIA, 19' DEEP CAISSON ' , �- - -1 D ROW WILL BE BEGIN GAS LINE N=273,554.85 +' _ _ `,-,� n OCONSTRUCTED PER / RELOCATION E=230,757. ' STA: 27+17.27 �% PE % W.' PE PE O UNITED POWER PLANS WITHIN EASEMENT O OFFSET 2.15' R 1 , I' f � I . PE i'E F'E t. O2. � CDOT SIGNAL POLES TO O ROW',- ROW ROW r w RG , 1°0,p5� _ �0 jOftOW O � HAVE 36"-DIA CAISSONS O �, T jLO rg - 4- , - -' ELECTRI LINE ` _ } AT 14' DEPTH (TYP). (.O N Q 12" WATERLINE AND FIBER OPTIC, _ PROTECT IN P t TO SIGN STORM L POLES STORM LINE WCR 41 12 WATERLINE AND FIBER " OPTIC. PROTECT IN PLACE TELEPHONE. FIBER PEDESTAL CV Q 3. PROPOSED UTILITY LINES SHOWN ON THIS PLAN HAVE BEEN F- U7 D.P. (TOWN OF HUDSON �) _ 8_ LINE _ _ (TOWN Cif HUDSON 30 f(�� LEVL AND 3. LUMEN) ;2*,lU H GRAPHICALLY SPACED AND LEVEL! 31LUMV1ENVt-- -I I- I L' ~ (I) SINE THAT W' ---C) (+7›. - ARE LEGIBLE. ll.l o ® j �i W� PROPOSED Z �' ---___- RELOCATED 3 o PLACEMENT OF \ACTUAL -' PVC GAS LINE o ROADWAY THE RELOCATED _J ►� )- I SPTORM CULVERT CENTERLINE I UTILITIES SHALL BE AS _ D i _ _ _ ' I r[tATMOSENERGY) /j * • CLOSE TO THE ROW LINE F ,. •. if-, _ AS POSSIBLE AND SHALL QF 0 F F/0 ' • '` 'ra < :,► : , . _ _ �'�.� 'N GL�. {�6E.a. — tl JJC VERTICALLYAVOIDALL s ., ,_ RELOCATED Al\ I r•Tr PROPOSED AND FIBER ,36"IA, SIGNAL POLE 19' DEEP CA •SON x RELOCATED TELEPHONE 8 o RELOCATED UNITED UNDERGROUND ELECTRIC END AND FIBER OPTIC LINES -IMPROVEMENTS POWERDOT N-�INCLUDING BOREELECTRIC E=2LIMITED BUT NOT TO ROADWAY z N=273 664.884 t STA: PEDESTAL 31+50.04 46.96' R\t\ SUBGRADE UNITED POWER) PROPOSED TRAFFIC RELOCATED SIGNAL BY OTHERS, I I r _ E=230.863.41 4" HP STEEL GAS LINE MARKER x $ (BY UNITED POWER) N=273,918.02 E=230,856.47 OUTLINE OF EXISTING XCEL PREPARATION, STORM CULVERTS AND PROPOSED TRAFFIC TELEPHONE AND FIBER TYP OF 4 (CDOT) I (XCEL ENERGY) FACILITY EW PROJECT ROW SIGNAL POLE CAISSONS OPTIC LINES (BY ' 80.00' 15.00' --- CENTURYLINK/LUMEN) CDOT SIGNAL POLE PROPOSED ACCESS 36"-DIA, 19' DEEP CAISSON ' 110.00' NEW PROJECT ROW t 1 FOR XCEL FACILITY N=273.56616 t PROPOSED UNITED E=230,883.36 POWER UG FACILITIES RELOCATED XCEL GAS FACILITY (BY (650 LF) XCEL ENERGY) END FIBER OPTIC LINE RELOCATION •. STA: 28+01.82 OFFSET: 154 03' R n I ' ZS AMH I I I I I f? x I N X 6" HP STEEL GAS LINE. PROTECT IN PLACE (DCP MIDSTREAM) - DARWIN & ARLA NESTER I HUGO 50 100 ROBERT & BARBARA RUEGGE 1 VILLELA-PORTILLO Feet Computer File Information Index of Revisions WELD COUNTY As Constructed WCR 41-HWY 52 INTERSECTION Project NoJCode Creation Date 5/10/2024 Initials: CLW Date Comments Initials ' 1 ' r; ! PUBLIC WORKS DEPARTMENT 1111 H. STREET -- � P.O. BOX 758 No Revisions. WCR 41 PROP UTILITY (S HT 4) AOC C030-086 (25008) Lest Modified Dale. 5/10/2024 Initials CLW _ _ Full Path M \PROJECTS_DFSIGMWCR 41 AND HWY 52 INTERSECT DWGS Revised: Designer CLW GR 69 ` i r _ GREELEY, CO. 80632-0758 PHONE 356.4000 Drawing File Name. WCR 41_PROP UTIL.DWG _ _ _ Detailer CLW Void (970) FAX (970) 304-6497 Au:DCAD Version: 2021 Scale. AS NOTED Units. English Sheet Subset Shee: Subset Sheet Number 37 of 130 v- .� O 1h �N �O NO3 a- m sa :--cn w y --t 0 N Nam (D N -0 -� Iy --IPaN —moo 710► . �-= N 0 Ilk -o _rO C e Ir WT. —� o Noma ° MICHAEL DREILING EXHIBIT A (12 OF 14) -r. 12" STEEL GAS LINE, PROTECT IN PLACE I: t. ll KEYMAP (WESTERN MIDSTREAM) NTS 8" STEEL OIL LINE, PROTECT IN PLACE EXISTING (WESTERN MIDSTREAM) 'L rn rn r' rn UTILITY NOTES Nc2 TELEPHONE LINE, 12" WATERLINE, 20" PVC WATERLINE, t PROTECT IN PLACE IN PLACE PROTECT IN PLACE CENTURYI_INK/LUMEN ( ) (TOWN OF HUDSON) (WESTERN MIDSTREAM) 70 m z m a u m o m D m w HPROTECT m cn cn o K r m mo IN THE EVENT UNITED POWER ACQUIRES A UTILITY EASEMENT FROM ROBERT RUEGGE, K Ti m z m Z POWER SHOWN WITHIN cif uE u4. z A: 39+00.00 • =-k.E—=-'E, -PE Nt -- PE r - --•-. PC.. ----- - - .>t_ `'' W2 ^ ROW WILL BE CONSTRUCTED PER Q w_ W2- W2 0 W2- PE 't_ pE --��-� W2 O W2- UNITED POWER PLANS WITHIN EASEMENT. i. PE PE - _ PE t L t _.___ ^ - ROW ROW ROW pE -----,. i- PE PE t. Pi: I.. 7. CDOT SIGNAL POLES TO p V : . ROW ROW W ROW ----ROW ROW- ROW ROW ROW ROW ROW ROW ROW ROW HAVE 36"-DIA CAISSONS WI d WI lel WI WI B ,-+ AT14'DEPTH(TYP). + s — -, _ -- -- ---- - J N MCENTERLINE WCR 41 SECTION LINE ROADWAYSHOWN 3. PROPOSED UTILITY LINES ON THIS PLAN HAVE BEEN VIS 3N RM O PROPOSED UNITED , j 35+00 o RELOCATED 3" GRAPHICALLY SPACED - 1 I _ 1 +PVC SO THAT THEIR POWER UG FACILITIES o GAS LINE (ATMOS ENERGY) i LINETYPES ARE LEGIBLE. o STORM CULVERTS Z ACTUAL PLACEMENT OF (60 LF) 9 ,,:•L, : , a J THE RELOCATED —1 I s. UTILITIES SHALL BE AS V- - 0 CLOSE TO THE ROW LINE -E I- AS POSSIBLE AND SHALL f— O--/.H-E A H �--`Ol < - - - J ti -E c► - C:0_1: HORIZONTALLY / Q ,.r.. • ply �I:. a n F - �; ri4 AA cow t -r._ H -E E E ' {; �'u.'" K n w -ROW 'Pr Ow U/t, ,FL--- O .M-1? OM- „_ - "' �:V f Pc 2-440W s, t�1FC-� �_-r�14+- .7 1Wr= F2 R'OW �W i F�� -RW -ROW r- VERTICALLY AVOID ALL - r Pe •ar PROPOSED ELECTRIC POLE TRANSITION FROM ELECTRIC POLE N=274,076.37 UNDERGROUND TO N=274,376.37 E=230,856.28 OVERHEAD ELECTRIC RELOCATED E=230,855.81 AND FIBER OPTIC OVERHEAD ELECTRIC ELECTRIC POLE N=274,626.22 E=230,849.56 IMPROVEMENTS INCLUDING BUT NOT LIMITED TO ROADWAY STA: 33+08.40 AND FIBER OPTIC LINES (BY UNITED POWER) SUBGRADE PREPARATION, STORM OFFSET. 47.01' R (AT SOLE OPTION/COST OF UNITED POWER, UGE AND EXISTING FIBER OPTIC NIT PROPOSED UNITED POWER CULVERTS AND PROPOSED TRAFFIC SIGNAL POLE CAISSONS UGF MAY CONTINUE NORTH LINE, PROTECT IN PLACE TO THE END OF RELOCATION (LEVEL 3)(LUMEN) NEW PROJECT ROW OH FACILITIES (590 LF) AT STA. 43+57-14) HUGO o 50 1OO VILLELA-PORTILLO Feet Index of Revisions WELD COUNTY As Constructed WCR 41-HWY 52 INTERSECTION Project No./Code Computer File Information Creation Date 5/10/2024 Initials: CLW Date Comments. Initials y.: PUBLIC WORKS DEPARTMENT No Revisions- WCR 41 PROP UTILITY (S HT T 5) AQC C030-086 (25008) Lest Modified Date 5/10/2024 Initials: CLW _ PAPROJECTS 41 AND HWY Full Path. 52 INTERSECTIONWRODUCTION_DWGS 1 F r ' .: 1111 P.O BOX7 58T A - - Revised: Designer CLW I GR 69 r. ' GREELEY. 3 6-4000 PHONE: (970) 356 4000 FAX. (70) 304-6497 Drawing File Name. WCR 41_PROP UTIL.DWG - - I Void Detwiler CLW AutoCAD Version 2021 Seale: AS NOTED Units. English Sheet Subset. Sheet Subset Sheet Number 38 of 130 x, "Irtut •r- O ,Z rom 0 — -3 "h imr Ora Ilmaw =arm AC O 7 te tom' n —r WE MICHAEL DREILING & DORIS EXHIBIT A v x (13 12" STEEL GAS LINE, PROTECT IN PLACE (WESTERN MIDSTREAM) OF 14) i.. KEYMAP NTS UTILITY NOTES - PE F E PE - DE FE 12" WATERLINE, 8" STEEL OIL LINE, _— PROTECT IN PLACE PROTECT IN Pt ACF r l (TOWN OF HUDSON) (WESTERN MIDSTREAM) ran E m E K 1. IN THE EVENT UNITED POWER ACQUIRES A UTILITY EASEMENT FROM ROBERT RUEGGE, POWER SHOWN WITHIN ROW WILL BE CONSTRUCTED PER UNITED POWER PLANS WITHIN EASEMENT. 2. CDOT SIGNAL POLES TO HAVE 36"-DIA CAISSONS AT 14' DEPTH (TYP). 3. PROPOSED UTILITY LINES SHOWN ON THIS PLAN HAVE BEEN GRAPHICALLY SPACED SO THAT THEIR LINETYPES ARE LEGIBLE. ACTUAL PLACEMENT OF THE RELOCATED UTILITIES SHALL BE AS CLOSE TO THE ROW LINE AS POSSIBLE AND SHALL LY / VERTICALLYHORIZOLAVOID ALL PROPOSED IMPROVEMENTS INCLUDING BUT NOT LIMITED TO ROADWAY SUBGRADE PREPARATION, STORM AND PROPOSED TRAFFIC SIGNAL POLE CAISSONS PE PE EXISTING 20" PVC WATERLINE. z TELEPHONE LINE PROTECT IN PLACE m , J m m ca (CENTURYLINK/LUMEN) (WESTERN MIDSTREAM) _ > o o m cDn m cn o - K K X --Ii z Z a c r rt. 3 c- r- © H K -i 0 O t U WI — P: !''. PE PE s'E Pt: PE PI rL pi O PE E H - ROW ROW R. RnW Rpw -0W . O+ ROW Ow p'�— t4 --0.-r r — ROW ROW ROW RO __ :caw ROW h t<Uw yy� byt 0 4 -� byi 8 El ® - _ _ _ M PROPOSED ROADWAY [OA EOA Q WATER VALVE WCR .1+ 41 SECTION LINE CENTERLINE A4+0U EOA EOA 4`++OG - - - - - — — _ -I- -i-i _ I— — I to F- �_ t _ I I w _-�►� EOA OA EOA _t;,; _ _ �_ t../CL! Z _ _ __ .__ _ — __ =:.h. --mgrs- e,,+ "'•'°'"-' — — - _J , - Ci, •R% -Flt: f1'-'�^"' A@114 FGr► -sow qfl row ,0y*f ;, I 0460 --' _ -_ (� Pr -ROW E 4 '- F�----"— Hr -ROW --E Pr '6 Pr -NOW }— iH_ a ,�;t� — 0.4- ,. H - Pr -ROW ply =�MyQ�i� i •-� n1N nW Q k W __ PV -ROW - - -X r -- .. X k -X r J 2 RELOCATED 3" PVC GAS LINE (ATMOS ENERGY) ELECTRIC POLE RELOCATED OVERHEAD ELECTRIC END GAS LINE N=274,876.03 OVERHEAD ELECTRIC IRRIGATION AND FIBER OPTIC LINES RELOCATION E=230,840.45 AND FIBER OPTIC LINES STRUCTURE TO BE (UNITED POWER) STA: 45+00.71 (BY UNITED POWER) CONSTRUCTED UNDER 17.72' R END OVERHEAD EXISTING FIBER OPTIC LINE, PROTECT IN PLACE PROPOSED UNITED POWER OH FACILITIES VET: SEPARATE CONTRACT (BY OTHERS) ELECTRIC AND FIBEROPTWATER VALVE IRELOCATION STA. 43+57C 14 (LEVEL 3)(LUMEN)CULVERTS OFFSET. 27.94' R EXISTING ROW NEW PROJECT ROW (455 LF) VILLELA-PORTILLO HUGO 0 50 100 Feet Computer File Information Index of Revisions WELD COUNTY As Constructed WCR WCR 41-HWY 41 PROP 52 UTILITY INTERSECTION (SHT 6) Project No./Code Creation Date- 5/10/2024 Initials: CLW Date. Comments Initials .. Imo ,`.: PUBLIC WORKS DEPARTMENT No Revisions. AQC C030-086 (25008) Last Modified Date 5/10/2024 Initials CLW _ Full Path.M_'Pf0JECTS_DESIGNWCR 41 AND HWY 52 INTERSECTIQMPRODr1CTIONDWGS 1 / r I .: IN -- Mil 1111 H. STREET P.O. BOX 758 GREELEY, CO. 80632-0758 Revised: Designer CLW I GR-69 Drawing File Name: WCR 41_PROP UTIL.DWG Detailer CLW L w i PHONE' (970) 356-4000 FAX. 970 304-6497 ) Void: Sheet Number 39 of 130 !wloCAD Version 2021 Scale: le: AS NOTED Units: English _( Sheet Subset' Sheet Subset IMIr --1 1=1'p aim o J C MP re- �F <7 CD C- 0) (D J IV NJ o -0 m N m N CAA i--% N t'D N A' tQ J 3 a.. (D o OD �m (0 L W �m Q if PE Pf MICHAEL & DORIS DREILING PE 12" STEEL GAS LINE. PROTECT IN PLACE (WESTERN MIDSTREAM) Pi 8" STEEL OIL LINE, PROTECT IN PLACE (WESTERN MIDSTREAM) 20" PVC WATERLINE. PROTECT IN PLACE (WESTERN MIDSTREAM) PE n PF PE 4" HP STEEL GAS LINE, PROTECT IN PLACE (XCEL ENERGY) 6" HP STEEL GAS LINE, PROTECT IN PLACE (DCP MIDSTREAM) Wr2 PE 75.00' WESTERN MIDSTREAM GAS LINE EASEMENT 30.00' WESTERN MIDSTREAM GAS LINE EASEMENT 1 cc 12" WATERLINE, PROTECT IN PLACE (TOWN OF HUDSON) - i r FIBER OPTIC LINES (CE NTURYLINK/LUMEN) Fit -L EOa. RELOCATED TELEPHONE AND FIBER OPTIC LINES (CE NTURYLINK/LUMEN) CDOT SIGNAL POLE 36"-DIA, 19' DEEP CAISSON N=273,653.00 E=230,737.97PL 1 .0A WA 11+00 - Pc TRANSITION FROM OVERHEAD TO UNDERGROUND ELECTRIC STA: 10+67.15 OFFSET 51.78' R 121 r I L 011 BEGIN TELEPHONE AND FIBER OPTIC RELOCATION STA. 11+96 63 OFFSET: 51.32' NEW PROJECT ROW -X. 1Z 1 I I 1 COOT SIGNAL POLE 36"-OIA, 19' DEEP CAISSON N=273,554.85 E=230,757.58 SAKATA LAND COMPANY Computer File Information Creation Date 5/10/2024 Initials: CLW Lest Modified Date 5/10/2024 Initials. CLW Full Path MtPROJECTS_DFSIGMWCR 41 ANb HWv Sa 1NTERSECTIOMIPRODUCTION DWGS Drawing File Name: HWY 52_PROP UTIL.DWG AutOCAD Version 2021 Scale AS NOTED Units English GAS SFRVI - IN PROPOSED UNITED POWER UG FACILITIES (540 LF) Index of Revisions Date Comments In Iials I I ELECT C LINES T SIGNAL POLES WELD COUNTY A,- RELOCATE 3" PVC GAS LINE (ATMOS ENERGY) RELOCATED FIBER OPTIC AND UNDERGROUND ELECTRIC LINE (UNITED POWER) 12" WATERLINE AND FIBER OPTIC. PROTECT IN PLACE (TOWN OF HUDSON. LEVEL 3, LUMEN) MON-Ad OUTLINE OF EXISTING XCEL FACILITY o RELOCATED XCEL �j GAS FACILITY Gt. O cc 4" HP STEEL GAS ct LINE MARKER (XCEL ENERGY) 1d HUGO VILLELA-PORTILLO CDOT SIGNAL POLE 36"-DIA, 19' DEEP CAISSON N=273,664.84 E=230,863.41 1d EXHIBIT A (14 OF 14) 6" HP STEEL GAS LINE. PROTECT IN PLACE (DCP MIDSTREAM) -X --a( -X x 1d 1J 1J 1 PROPOSED STORM LINES EOA HWY 52 CDOT SIGNAL POLE 36"-DIA. 19' DEEP CAISSON N=273.566.16 E=230,883.36 FUTURE TRAFFIC LIGHT OCATION (BY CDOT, TYP) RELOCATE 3" P"� • S K LINE (ATMOS ENER 12" WATERLINE AND FIBER OPTIC, PROTECT IN PLACE (TOWN OF HUDSON. LEVEL 3, LUMEN) RELOCATED UNDERGROUND ELECTRIC AND FIBER OPTIC LINES (UNITED POWER) RELOCATED TELEPHONE AND FIBER OPTIC (CENTURYLINKlLUMEN) END FIBER OPTIC RELOCATION STA 14+53.78 OFFSET 39.23' R NEW PROJECT ROW) DARWIN & ARLA NESTER ROBERT & BARBARA RUEGGE 0 50 E DA TRANSITION FROM UNDERGROUND TO OVERHEAD ELECTRIC, TERMINATE UG-FO STA: 15+76.49 OFFSET: 49.19' R 100 Feet , PUBLIC WORKS DEPARTMENT 1111 H. STREET P.O. BOX 758 GREELEY, CO. 80632-0758 PHONE (970) 356-4000 FAX (970) 304-6497 As Constructed No Revisions Void WCR 41-HWY 52 INTERSECTION HWY 52 PROP UTILITY (SHT 7) Sheet Subset Sheet Subset e HWY 52 KEYMAP NTS UTILITY NOTES 1 IN THE EVENT UNITED POWER ACQUIRES A UTILITY EASEMENT FROM ROBERT RUEGGE, POWER SHOWN WITHIN ROW WILL BE CONSTRUCTED PER UNITED POWER PLANS WITHIN EASEMENT 2 CDOT SIGNAL POLES TO HAVE 36"-DIA CAISSONS AT 14' DEPTH (TYP), 3 PROPOSED UTILITY LINES SHOWN ON THIS PLAN HAVE BEEN GRAPHICALLY SPACED SO THAT THEIR LINE TYPES ARE LEGIBLE ACTUAL PLACEMENT OF THE RELOCATED UTILITIES SHALL BE AS CLOSE TO THE ROW LINE AS POSSIBLE AND SHALL HORIZONTALLY r VERTICALLY AVOID ALL PROPOSED IMPROVEMENTS INCLUDING BUT NOT LIMITED TO ROADWAY SUBGRADE PREPARATION, STORM CULVERTS AND PROPOSED TRAFFIC SIGNAL POLE CAISSONS Project No./Code AQC C030-086 (25008) GR-69 Sheet Number 40 of 131J Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA EXHIBIT B October 30, 2024 Weld County 1150 O Street Greeley, CO 80632 iNrrm DOWER Your Touchstone Energy' Cooperative 10)( Re: Construction Deposit Agreement WO# 202212038 — WCR 41 & HWY 52 Intersection Relocation United Power, Inc. ("United Power" or any reference to "our") has completed the design and cost estimate for the relocation of electric power lines for Weld County (herein, the "Applicant" or any reference to "you" or "your") public improvement project located at WCR 41 & HWY 52. The design is provided in Attachment A to this Agreement. This letter, including all attachments, constitutes the "Construction Deposit Agreement" between United Power and the Applicant. The estimated cost to design/engineer, construct, and install the electric service is $449,239.07 (the "Construction Deposit"), as further detailed below and in Attachment B. The Construction Deposit includes United Power's best estimate at this time for the labor, material, administrative, and general expense required to install the electric service as designed. That estimate can change if the installation of the electric service is delayed due to inclement weather, traffic control constraints, permitting requirements, or if the installation requires change orders that were not included in the initial estimate. This list of anticipated expenses is not meant to be all-inclusive, but to serve as notice that this initial Construction Deposit is a best estimate. Full payment of the Construction Deposit is required before work will begin pursuant to United Power's Rules and Regulations, and specifically Sections XVII. Construction Deposit Requirements and XXVI. Permanent and Indeterminate Service Line Extensions. This estimate is valid for ninety (90) days, per Section XXI. Cost Estimate Expiration of United Power's Rules and Regulations. United Power's Rules and Regulations are available on our website at https://www.unitedpower.com/bylaws-rates-tariffs. The enclosed $449,239.07 invoice includes the following items: Estimated Construction Cost Plant Investment Fee Automated Meter Reading or CT/PT Metering Charge Proportionate Share for (Original Customer Name) Less United Power Expense, if applicable Less Application/Design Fee Net Construction Deposit Invoice $ 919,414.65 $ (470,175.58) $ 449,239.07 In accordance with United Power's Rules and Regulations, United Power will analyze the final cost and compare it to the estimated Construction Deposit when the associated work order is closed. If the actual cost is less than the Construction Deposit, United Power shall refund the difference to the Applicant. If the actual cost to United Power proves to have been greater than the Construction Deposit, the Applicant shall pay the difference to United within thirty (30) days following written notice of such excess amount. UNITED POWER, INC. 1500 Cooperative Way • Brighton, CO 80603 1303-659-0551 • fax 303-659-2172 www.unitedpowercom Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA Page 2 In the event of a dispute between County and United, concerning this Agreement, the parties agree that neither party shall be liable to or responsible for the payment of attorney fees and/or legal costs incurred by or on behalf of the other. The Applicant shall complete the "Private Utilities Form" included in Attachment C, indicating any private utilities in the project area. You may return the signed and completed Private Utilities Form, a signed copy of this Construction Deposit Agreement, and your payment in the envelope provided. The Applicant, or its agent responsible for this Construction Deposit must also return the signed final design for the underground distribution and the streetlight design, if applicable, before any work will begin. Any subsequent revised designs must also be signed and returned to United Power. Payment in full and receipt of the signed Construction Deposit Agreement, design, and Private Utilities Form are required prior to construction. Remittance of the signed and dated Construction Deposit Agreement and payment of the Construction Deposit implies the Applicant's acknowledgement and agreement with the terms provided in United Power's Rules and Regulations and specific terms stated below: The Applicant grants to United Power and its subcontractors the right to enter the location listed above to construct, operate, and maintain the electric distribution facilities, together with full right of ingress and egress. The Applicant shall perform all right-of-way clearing required for the construction of the facilities described above consistent with United Power's specifications. United Power, or its subcontractors, shall perform all trenching and backfilling, including any rock removal and backhoe work, in accordance with United Power's specifications, except street crossing. The Applicant shall establish and stake all easements of rights -of -way on land owned by the Applicant for installation of United Power's facilities. The Applicant shall assume all responsibility for proper location thereof and shall reimburse United Power for any expense due to subsequent changes and for any damage claims against United Power, including full reimbursement for damages established and expenses incurred in regard thereto, plus reasonable attorney's fees and court costs. If the Applicant requests United Power to provide the staking of easements and rights -of -way, the Applicant will provide the current site plan in AutoCAD format and reimburse United Power for the additional expenses. United Power or its subcontractors shall install the facilities described herein in accordance with good engineering practice after the Applicant has established said right-of-way, cut easements to final grade, and prior to the paving of any streets or the construction of any curbs, gutters, or sidewalks. The Applicant shall reimburse United Power for any expense due to subsequent changes by the Applicant. The Applicant shall be responsible for coordinating all construction activities within the project area, including, but not limited to, the installation of telephone, gas, and cable TV. The installation crew(s) for such other utilities or communications equipment must be on -site the day United Power, or its subcontractor digs the trench. United Power and its subcontractors will not leave the trench open overnight and will close it at the end of each working day. The Applicant shall UNITED POWER, INC. 1500 Cooperative Way • Brighton, CO 80603 1303-659-0551 • fax 303-659-2172 ! www.unitedpower.com Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA Page 3 reimburse United Power for any expenses incurred by United Power to repair damages to its facilities caused by the Applicant or other parties during the construction period. The Applicant will be responsible for accurately locating and visibly marking all private underground utilities, (including but not limited to water, telephone, sewer, septic, cable TV, fiber, and gas) prior to the construction of any facilities by United Power or its subcontractors. Any damages to unmarked underground utilities by United Power or United Power's subcontractors will be at the Applicant's expense and responsibility to repair. The Applicant shall be responsible for all service laterals in residential subdivision and underground commercial/industrial services. See approved service lateral contractor list on our website at www.unitedpower.com under the New Construction tab and click on the hyperlink for Metering/Laterals/Inspections or call the construction hotline at 303-637-1323. Electric service will be provided to the Applicant at United Power's applicable rates and upon the terms and conditions now in effect or at the rates and upon such terms and conditions as may hereafter be lawfully adopted by United Power for such service. The excavator will be responsible for exposing located public utilities identified through Colorado 811 as required by Colorado law. The Applicant may terminate this project at any time prior to or during the actual construction of electric facilities. In such an event, United Power shall use the Construction Deposit and any other amounts paid by the Applicant to reimburse and pay United Power for all expenses or liabilities which may have been incurred by United Power for engineering, materials, and equipment purchased or ordered, and any other labor or construction costs incurred prior to the date of termination; with the balance of the Construction Deposit, if any, to be refunded to the Applicant. Thank you for the opportunity to provide this service. If you have questions, please call me at 720-685- 5608. Sincerely, 5Signed br A,IAfess A1690509770E4E4... Andy Ross Senior Project Manager ADR:cv [Remainder of Page Left Intentionally Blank] 4997281 Pages: 21 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO UNITED POWER, INC. 500 Cooperative Way • Brighton, CO 80603 1303-659-0551 • fax 303-659-2172 www.unitedpower.com Docusign Envelope ID: 1907F2FE-4O10-405O-A64F-C74C16273ABA Page 4 [Signature Page to Construction Deposit Agreement] By signing this Signature Page, the Applicant's signatory below acknowledges that the Applicant has had sufficient time to review and consider this Construction Deposit Agreement and has read and understands the terms of this Construction Deposit Agreement and the Applicant's obligations hereunder. Execution of this Signature Page by the Applicant may be in the form of an electronic, manual, or similar signature, and such signature shall be treated as an original signature for all purposes. WELD COUNTY WO# 202212038 - WCR 41 & HWY 52 Intersection Relocation By: �L Name: Kevin D. Ross Title: Chair, Board of Weld County Commissioners Date: NOI 2 0 2024 ATTEST: �f-,10 441/0 Clerk to the Board B Deputy Clerk to the BBoard 4997281 Pages: 22 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO mr.drrriakwoormiothicomiringiu 11111 UNITED POWER, INC. 1500 Cooperative Way • Brighton, C0 80603 1303-659-0551 • fax 303-659-2172 j www.unitedpower.com 2oZ�-3ogl 4997281 Pages: 23 of 31 11/27/2024 12:21 Pty R Fee:$0.00 Carly Koppes, Clerk and Recorder; Weld County ; CO III IV.? I rult IlifitA KIN !al 11,1 UI III Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273A6A INITED Proj Coord: Andy Ross PC Cell: 970-231-7518 Revised By: Kevin Ellerby Date: 9/25/2024 Const. Coord: Randy Rule CC Cell: 3036245354 poDesigned By: Kevin Ellerby ROW Agent: Chris Roberts Energy' Qiop l Nir Touchstone. Energy* _�.}. tarive Designer Cell: 970-219-9731 Design Comp Date: 2/22/2023 WELD COUNTY ROAD 41 dada Imam.* I ICINITY MAP Stir; r• •,.w.. ••. •Y STATE HIGHWAY 52 0 Disclaimer: The design and map print is not survey grade, nor set to a specific scale. Sub/Circuit/Phase: Right of Way (All): Spec. Equipment: Primary/CT Metering: Locates Req'd: 20-2 ii fl ABC Work Order: Service Order: Project Name: Description: 202212038 2022064881 WCR 41 & HWY 52 INTERSECTION RELOCATION WELD COUNTY PUBLIC WORKS/RELOCATION Equipment Loc: Service Loc: Contact Ph: 4705 970-304-6496 Svc Address: City: County: Sec/Twn/Rng: COUNTY RD 41 & HWY 5 UNINCORPORATED 4 1N 65W Conductor Summary Conductor Size Status Placement Type # Wires Span (Ft) Total Bore/Trench Summary COMMENTS Inspection By: Reviewed/Approved By: COVERSHEET Date: Construction By: Date: Date: 10/1/2024 Page 1 of 1 4997281 Pages: 24 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes; Clerk and Recorder: Weld County , CO III 11111 Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA SN ED DOWER Your Touchstone Energy' )0r,it Work Order: 202212038 Service Order: 2022064881 Project Name: WCR 41 & HWY 52 INTERSECTION RE Description: WELD COUNTY PUBLIC WORKS/RELO Service Loc: 4705 Customer: WELD COUNTY PUBLIC WORKS Svc Address: COUNTY RD 41 & HWY 52 City: UNINCORPORATED County: Proj Coordinator: Andy Ross PC Cell: 970-231-7518 Designer: Kevin Ellerby Designer Cell: 970-219-9731 Design Comp Date: 02/22/2023 STRUCTURES 3 P V Poles Junction Cab Pedestal Switch Cab Vault Pull Box LOCAI IONS Fiber Ea'a q• UG 0 Consumer TRANSFORMERS > OH 1PH W OH 2PH OH 3PH UG 1PH UG 3PH VV MITIR i'EDISIALS M Single Legend Multi DE DICES 0 a C 0 1 Switches Fuses Regulators Capacitors Sectionalizers Step Trans Oil Reclosers Elec. Reclosers Sub. Reclosers MISCELLANEOUS • - Open Points Lights Anchors CONDUCTOR / OH Prim es UG Prim • / OH Sec UG Sec • Reviewed/Approved By: Date: LAYOUT 10/1/2024 Page 1 of 5 • _, ' WL2 WL4 IN( •I CULVERT / ACCESS or w .I to WL 1 .._ WL5 130' WLG 135' V `, 13S WL 9 WL 10 RELOCATE REG BANK WL 11 195' i Disclaimer: The design and map print is not r et C Q 0 O O LU 15 14 16 I WL 13 CAPACITOR BANK • ' 195' 3 WL 17 KNIFE BLADES . „survey,grade. nor set to a specific scale. OH 1PH OH 2PH 4997281 Pages: 25 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County . CO j Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA IN TED POWER Your Touchstone Energy' Cooperative gar __ Work Order: 202212038 Service Order: 2022064881 Project Name: WCR 41 & HWY 52 INTERSECTION RE Description: WELD COUNTY PUBLIC WORKS/RELO Service Loc: 4705 Customer: WELD COUNTY PUBLIC WORKS Svc Address: COUNTY RD 41 & HWY 52 City: UNINCORPORATED County: Proj Coordinator: Andy Ross PC Cell: 970-231-7518 Designer: Kevin Ellerby Designer Cell: 970-219-9731 Design Comp Date: 02/22/2023 STRUCTURES ID P I S V a Poles Junction Cab Pedestal Switch Cab Vault Pull Box LOCATIONS mope wn• 'U Fiber UG © Consumer TRANSFORMERS D G1X> OH 3PH UG 1PH UG 3PH METER PEDESTALS M Single Legend Multi DEVICES ® Switches a O O 1 Fuses Regulators Capacitors Sectionalizers Step Trans Oil Reclosers Elec, Reclosers Sub. Reclosers MISCELLANEOUS • E - Open Points Lights Anchors CONDUCTOR / OH Prim •i� UG Prim / OH Sec UG Sec Reviewed/Approved By: Date: LAYOUT 10/1/2024 Page 2 of 5 i . 0 WL ` 17 KNIFE BLADES0 I__ . . 200' 18 j 41 WL 18.1 /I I � IIIP Cr 0 ! I Q 0ce iI I �! I Z f l D O ;I U l II II ! .I.___ :ABC -850' I � i 19 ' I I l / / �' / I I Source uisciaune=r. 1iie design and map print is not survey grade, nor set to a specific scale. Esri Maxar Earthstcd .3t±t ...w.„uT, Wile hid uio'j ;I Luinniun!ty. 4997281 Pages: 26 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes; Clerk and Recorder, Weld County ; CO III 117,I ihYli I II IM in N. cla, ill 5 !fill Ili?), 11111 Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA SN EID DOWER Your Touchstone Energy" Cooperative 4411 Work Order: 202212038 Service Order: 2022064881 Project Name: WCR 41 & HWY 52 INTERSECTION RE Description: WELD COUNTY PUBLIC WORKS/REL0 Service Loc: 4705 Customer: WELD COUNTY PUBLIC WORKS Svc Address: COUNTY RD 41 & HWY 52 City: UNINCORPORATED County: Proj Coordinator: Andy Ross PC Cell: 970-231-7518 Designer: Kevin Ellerby Designer Cell: 970-219-9731 Design Comp Date: 02/22/2023 STRUCTURES 41) P S V O Poles Junction Cab Pedestal Switch Cab Vault Pull Box LOCAL IONS ... Fiber UG © Consumer TRANSFORMERS D I>A> OH 3PH A OH 1PH OH 2PH UG 1PH UG 3PH MUIR PEDISIALS M Single Legend Multi DEVICES O a C O 1 C9 Switches Fuses Regulators Capacitors Sectionalizers Step Trans Oil Reclosers Elec. Reclosers Sub. Reclosers MISCELLANEOUS • Open Points Lights Anchors CONDUCTOR / OH Prim • • UG Prim • / OH Sec UG Sec Reviewed/Approved By: Date: LAYOUT 10/1/2024 Page 3 of 5 RELOCATE OCR Wt 38 • 4 165' HWY 52 WL 37 --� r _ 47054926002 EXISTING FIBER SPLICE. VAULT AND CONTROL PANEL WILL NEED RD se RELOCATED INTO NEW ROW fpc WL 23.3 BORE 6' Is 2 - Willi FIBER WL 23.2 NEW SERVICE p1 FROM UKi J: LIFT POLE V&23.1 Apr -- 4 UK5 BORE 4' CONDUIT F ,4( QUARDOPLEX 23,E U 50 ABC - 850' BORE 611 & 2" CONDUIT WITH FIBER MUST BE 10' IN DEPTH TO CROSS XCEL p WI. 21.1 FINER SPLICE VAULT & PATCH PANEL Airmommi 1 1 MIL 21 - PME-1I 1 i:".r/ 1 1 •� _ 4twutua WI. 22 - PME-11 WI. 21.2 3PH SEC CAB 4NJIQu* *J 21.3 4 120/240 XFMR RACKS -40F IF POSSIBLE UYSE.111E (PINE 111 wl v_21 STATE HIGHWAY 52 75' - WL 41 WL40 Ott ABC 410 EPRC I Deer ABC j1NQMCM EE`RC. 5 S to SEC CAB 847040024003 30. S to PME-11+470400240f' 14 i I 11 I 11 12 pew.ABC 1 l00MCM„ ARC ___ Doc ABC llOOMCIM EPRC I Nt4w to R104105492600IA 11110" S to RP84/040012003' BACKHOE IF POSSIBLE UM3E-1.11E (PME 111 Ufl 1 22 IDtsc 1100MCM L1.Ri. )1' N to PMr : I r4%'14ff1'4^��: IA VACANT I 1 11 I 11 Ike• ABC 1100MCM EPR_,_ 1715' N to RP 847040042001 Out: ABC 11RrjMCM EPRC 505' N&W to RPg4705497r,Utl Disclaimer: The design and map print is not �•cy��. a tr�a:.'.rr +:t,•If..survey grade, nor set to a specific scale. 4997281 Pages: 27 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO i II kirdP:741111Ylire,01104diiiiciiivoirfity,i, tot Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA SN Ep POWER Your Touchstone Energy" Cooperative 411.> Work Order: 202212038 Service Order: 2022064881 Project Name: WCR 41 & HWY 52 INTERSECTION RE Description: WELD COUNTY PUBLIC WORKS/REL0 Service Loc: 4705 Customer: WELD COUNTY PUBLIC WORKS Svc Address: COUNTY RD 41 & HWY 52 City: UNINCORPORATED County: Proj Coordinator: Andy Ross PC Cell: 970-231-7518 Designer: Kevin Ellerby Designer Cell: 970-219-9731 Design Comp Date: 02/22/2023 STRUCTURES J S V Q Poles Junction Cab Pedestal Switch Cab Vault Pull Box LOCATIONS 1. ... ... Fiber UG CQ Consumer TRANSFORMERS D OH 1PH W OH 2PH Ci OH 3PH UG 1PH UG 3PH A METER PEDESTALS M Single Legend Multi DEVICES a C a Q 1 Switches Fuses Regulators Capacitors Sectionalizers Step Trans Oil Reclosers Elec. Reclosers Sub. Reclosers MISCELLANEOUS • E - Open Points Lights Anchors CONGUCTOF; / OH Prim /' .UG Prim • / OH Sec UG Sec Reviewed/Approved By: Date: LAYOUT 10/1/2024 Page 4 of 5 i I 26 103 1 1 I I I 1 1 t 1 1 1 1 I C1- 0 1 t Q 1 O I CC 1 1 t I Z D ! I 0 I U I I I 1 1 1 27 I I 1 WL 27.1 - LG SPLICE VAULT 47040016001 WL 27.2 - FIBER VAULT 47040016002 1 I I .- a O CC > z o o o I I W 1 , , likt asBORE & 2" CONDUIT 6" not I Disclaimer: The design and map print is :-.,-- survey grade, nor set to a specific scale. Source: Esri, Maxar. Earthstar L.:,,:t..drdpIIics, drat the hic user LAlnunwlnTty 4997281 Pages: 28 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Cle,-k and Recorder, Weld County , CO III kirstill11 hal4�tWd fib}L��FrI'+14k�lilMllF'.?�W���� �I III Docusign Envelope ID: 1907F2FE-4D 10-405D-A84F-C74C 16273ABA E R Your Touch tone Energy' Cooperative ICS Work Order: 202212038 Service Order: 2022064881 Project Name: WCR 41 & HWY 52 INTERSECTION RE Description: WELD COUNTY PUBLIC WORKS/RELO Service Loc: 4705 Customer: WELD COUNTY PUBLIC WORKS Svc Address: COUNTY RD 41 & HWY 52 City: UNINCORPORATED County: Proj Coordinator: Andy Ross PC Cell: 970-231-7518 Designer: Kevin Ellerby Designer Cell: 970-219-9731 Design Comp Date: 02/22/2023 STRUCTURES 3 P V Poles Junction Cab Pedestal Switch Cab Vault Pull Box EOCAT IONS Fiber I! UG Consumer TRANSFORMERS D OH 1PH OH 2PH CAX> OH 3PH UG 1PH UG 3PH II. 'U A MtILRP f ,IALS M Single Legend Multi DEVICES 0 Switches a 0 11 L Fuses Regulators Capacitors Sectionalizers Step Trans Oil Reclosers Elec Reclosers Sub. Reclosers MISCELLANEOUS • Open Points Lights Anchors CONDUCTOR / OH Prim .` UG Prim / OH Sec UG Sec Reviewed/Approved By: Date: LAYOUT 10/1/2024 Page 5 of J BORE 6" & 2" CONDUIT WL 18.1 - NEW OCR LOCATION N, Disclaimer The design and map Cs tearer £ergo Geoq ems: survey grade, nor set to a specific I E print is scale. I not BORE 2" CONDUIT 28 WL 28.1 1PH XFMR 47040014001 . 43/4P te -:•.•:. 1 WL28.3 ' W128.2 r ' I I I ' I ' 1 ' ' ; BORE UNDER LEACH FIELD I1 W L 29 47040012002 • WL 29.1 47040012003 55' - r r, O o IX Z 0 O o w I 30 I 32 \\WL 31 - 1PH RISER 200' WL 32.1 , --k: '► e4 — _ _ •r" 120 WL 33 .;its11 rti 04 120' Si s r sox I WL 34 ,;,>.000'. i NEUTRAL HIGH Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA UNITED 3/U Cooperative Way POWERBrighton, CO 80603 303.659.0551 Your Tuucluhme Enure Coopamtive Kt. WELD COUNTY PUBLIC WORKS 1111 H STREET P O BOX 758 GREELEY, CO 80632 Invoice Account 17773 Order Date 10/8/24 Order 610067 Order Type Standard Terms Construction will be scheduled after payment and all required documents are received. Map/Sec: 4705 Contact: ERICH GREEN District Rep: AR Description WO 202212038 - ESTIMATED COST OF CONSTRUCTION FOR THE INTERSECTION RELOCATION LOCATED AT WCR 41 & HWY 52. THIS INVOICE IS VALID FOR 90 DAYS. UNITED POWER WILL NOT ACCEPT ANY CHECK WITH LIEN WAIVER LANGUAGE. CATALOG ITEM DESCRIPTION I QUANTITY UOM UNIT PRICE AMOUNTITAX 1418194 NON REFUNDABLE CONST COST 1.000 EA 449,239.0700 449,239.07 (ESTIMATED MATERIAL AND LABOR COST $919,414.65 LESS UNITED POWER COST $470,175.58) TOTAL ORDER AMOUNT: 4997281 Pages: 29 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO II III $ 449,239.07 Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA Private Facilities Locate Form CUSTOMER NAME: PHONE/CELL NUMBER: SERVICE ADDRESS: OTHER CONTACT INFO: WELD COUNTY PUBLIC WORKS (970) 400-3742 WCR 41 & HWY 52 Erich Green PRIVATE FACILITIES: YES NITED POWER Your Touchstone Energy' Partner Oalr WORK ORDER: 202212038 LOCATE DATE: NO MARKED SKETCHED TRAFFIC SIGNAL WIRE WATER SEWER/SEPTIC/LEACH IRRIGATION/BURIED PIPE PROPANE/GAS/OIL/PETROLEUM SPRINKLER/CONTROL WIRE PRIVATE COMMUNICATION LINES (Phone/Alarm, etc.) FIBER OPTIC PRIVATE ELECTRIC OTHER DESCRIPTION: A known nearby septic leach field is shown on the drawings and its approximate west end has been marked by the owner in the field with T -posts. This leach field is located near the south end of the United Power relocation. This form is to inform United Power of any utilities installed by 'private parties' that Colorado 811 (UNCC) will not notify for locates either as a tier 1 or tier 2. United Power will NOT be responsible for any damage to private facilities which are not clearly marked in the field or with a sketch of location, including footages and depth, prior to the start of construction. A SIGNED FORM RETURNED WITH NO CHECKMARKS OR SKETCH, IS CONSIDERED NOTICE THAT THE SITE IS ALL CLEAR. I acknowledge receipt of this document and a Customer Signature: 0 • Date: �e OV 2 G 2024 vin . Ross, Chair, Board of Weld County Commissoners United Power Representative: Date: REV'D 04/08/19 Page 1 of 2 UNITED POWER, INC. 500 Cooperative Way • Brighton, CO 80603 303-659-05S1 www.unitedpower.com 4997281 Pages: 30 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO 11111 2.02,4 -3oFs1 Docusign Envelope ID: 1907F2FE-4D10-405D-A84F-C74C16273ABA Private Facilities Locate Form POWER Your Touchstone Energy Partner O7A United Power will provide notification of the scheduled locate date at the contact number provided. If there is no answer, a message will be left at the contact number provided. The land/private facility owner is responsible to mark the location of all facilities AND provide a sketch to United Power by the locate date or before. CONSTRUCTION WILL NOT BEGIN UNTIL A SIGNED FORM IS RECEIVED. COMMUNICATION: YES NO Date: CUSTOMER NOTIFIED VOICE MESSAGE REV'D 04/08/19 Page 2 of 2 UNITED POWER. INC. 500 Cooperative Way • Brighton, CO 80603 303-659-0551 www.unitedpower.com 4997281 Pages: 31 of 31 11/27/2024 12:21 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO 1111 11111 Contract Form Entity Information Entity Name" UNITED POWER, INC Contract Name * UTILITY RELOCATION AGREEMENT Contract Status CTB REVIEW Entity ID* @00001683 Contract ID 8851 Contract Lead* EGREEN Contract Lead Email egreen@weld.gov Contract Description * AGREEMENT FOR RELOCATION OF ELECTRIC POWER LINES Contract Description 2 Contract Type* AGREEMENT Amount* $449,239.07 Renewable" NO Automatic Renewal Grant IGA Department PUBLIC WORKS Department Email CM- PublicWorks@weld.gov Department Head Email CM-PublicWorks- DeptHead@weld.gov County Attorney ADRIA SCHIEL County Attorney Email ASCHIEL@WELD.GOV If this is a renewal enter previous Contract ID If this is part of a MSA enter MSA Contract ID New Entity? Parent Contract ID Requires Board Approval YES Department Project # GR-69 Requested BOCC Agenda Due Date Date* 11/16/2024 11/20/2024 Will a work session with BOCC be required?* NO Does Contract require Purchasing Dept. to be included? NO Note: the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in OnBase Contract Dates Effective Date Termination Notice Period Contact Information Contact Info Review Date * 11/13/2024 Committed Delivery Date Renewal Date Expiration Date* 11/20/2124 Contact Name Contact Type Contact Email Contact Phone 1 Contact Phone 2 Purchasing Purchasing Approver Purchasing Approved Date Approval Process Department Head .CURTIS HALL DH Approved Date 11/14/2024 Final Approval BOCC Approved BOCC Signed Date BOCC Agenda Date 11/20/2024 Finance Approver CHERYL PATTELLI Legal Counsel BYRON HOWELL Finance Approved Date Legal Counsel Approved Date 11/15/2024 11/15/2024 Tyler Ref* AG 112024 Originator EGREEN Hello