Loading...
HomeMy WebLinkAbout20242712.tiff7u.61 c-aguo ;zit) oItte) COLORADO Department of Public Health ft Environment Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 October 10, 2024 To Whom It May Concern: RECEIVED OCT 10 2024 WELD COUNTY COMMISSIONERS On October 10, 2024, the Colorado Air Pollution Control Division will begin a 30 -day public comment period for Noble Energy, Inc. - FAULKNER CECIL FARMS USX T7N-R64W-S30 L01. A copy of this public notice is enclosed. Thank you for assisting the division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public comment period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director CCi' PL Lt Ma) Fl Lt i>S �-�-� 2024-2712 (CA4 CKIDT) (Df.1155),Db(3KAI)3C, 10107.4 Air Pollution Control Division CD l�l�/M `Y�v �- Notice Of A Proposed Title V Operating Permit Warranting Public Comment Website Title: Noble Energy, Inc. - FAULKNER CECIL FARMS USX T7N-R64W-S30 L01 - Weld County Notice Period Begins: October 10, 2024 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Noble Energy, Inc. Facility: FAULKNER CECIL FARMS USX T7N-R64W-S30 L01 Well production facility SWSW quadrant of Section 19, Township 7N, Range 64W Weld County The proposed project or activity is as follows: Initial permit request for low pressure (LP) gas venting to enclosed combustion device. The facility is located in the severe ozone nonattainment area and is synthetic minor for VOC NANSR, PSD, and TV -OP programs. The division has determined that this permitting action is subject to public comment requirements under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The division has made a preliminary determination of approval of the application. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director A copy of the application, the division's analysis, and a draft of construction permit number 24WE0665 are available on the division website: Air Permit Public Notices The division hereby solicits submission of public comments from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the commission. The division will receive and consider written public comments for thirty (30) calendar days after the date of this notice. Comments may be submitted using the following options: • Submit comments via web form: Form for Public Comment on Draft Permit • Submit comments via email: cdphe apcd_airpermitcomments@state.co.us • Submit comments via mail: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, CO 80246-1530 NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comment(s) and the division's response(s) are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comment(s). 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director Hello