Loading...
HomeMy WebLinkAbout650388.tiffR-1,6; Jtdiabc FREEWAY AGREEMENT WITH STATE HIGHWAY DEPARTMENT REGARDING PROJECT F 006-1(2): BE IT RESOLVED, by the Board of County Commissioners of Weld County, Colorado, that they sign Freeway Agreement, currently known as Project F 006-1(2) for the purpose of improving a portion of relocated State Highway Number 3, which passes through Weld County, Colorado, with the Colorado Department of Highways dated June 9, 1965, copy of said agreement hereto attached and made a part of this resolution. The above and foregoing resolution was, on motion duly made and seconded, adopted by the following vote: AYES: THE BOARD OF COUNTY COMMISSIONERS DATED: JUNE 9, 1965 WELD COUNTY, COLORADO APPROVED:6G :roe+ County Attorney TORN C. 0.$. IB-4 CHAS. E. SHUMATE CHIEF ENGINEER co O1Y. A D v: DEPARTMENT OF HIGHWAYS DISTRICT NO. 4 1420 2ND STREET GREELEY, COLORADO JULY 13, 1965 BOARD OF COUNTY COMMISSIONERS WELD COUNTY COURT HOUSE GREELEY, COLORADO GENTLEMEN: F 006-1(2) (WELD COUNTY) GREELEY - NORTH GLEN MCELDOWNEY 114'"ND{{# DISTRICT ENGINEER ATTACHED IS ONE FULLY EXECUTED COPY OF FREEWAY AGREEMENT BETWEEN WELD COUNTY AND THE DEPANRTMEIGHWAYS, DATED FEBRUARY 1, 1965, IN CONNECTION WITH --PI JECT F 006-1(2),, EELEY - NORTH. THE ATTACHED AGREEMENT IS FOR YOUR FILES. DSM/LA/DS cc: G. MCELDOWNEY F. K. MERTEN VERY TRULY YOURS, GLEN MCELD0WNEY DISTRICT ENGINEER 7l� D. S. MOORE Q. DISTRICT CONSTRUCTION ENGINEER gOaSSS February 1, 1965 F 006-1(2) Weld County FREEWAY AGREEMENT THIS AGREEMENT, dated this 1st day of February, A. D. 1965, by and between the DEPARTMENT OF HIGHWAYS of the State of Colorado, hereinafter called the "Department", and the COUNTY OF WELD, herein- after called the "County", WITNESSETH: WHEREAS, under authority of the laws of the United States and of the State of Colorado, by and with the concurrence and approval of the United States Bureau of Public Roads, certain State and Federal funds have been allocated for the purpose of improving portions of relocated State Highway No. 3, which passes through the County, said improvements being known as Project F 006-1(2), the route and general plan of such project being shown on Exhibit A, which is attached hereto, and by reference incorporated as a part hereof, and WHEREAS, by reason of the volume and speed of traffic on said highway and the particular danger to the safety of the traveling public by collisions between vehicles proceeding in opposite directions thereon or between vehicles at intersections of said highway with other public highways or at approaches to said highway from private property abutting thereon, the State Highway Commission has designated said portions of said highway to be a Freeway in accordance with the Statutes of the State of Colorado duly made and provided, and M February 1, 19.65 F 006-1(2) Weld County WHEREAS, the parties hereto have previously entered into a certain Freeway Agreement and Modification of Freeway Agreement captioned under F 006-1(2) and pertaining to State Highway No. 3 as shown on Exhibit A, the terms of which the parties hereto desire to supersede, and WHEREAS, pursuant to said statutes, the County having jurisdiction over the County highways to be affected, desires to agree upon the character and extent to which said County highways are to have ingress to and egress from the arterial lanes of said highway. NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements herein contained and the faithful performance thereof, the parties hereto promise and agree as follows: I. The Department agrees: A. To make plans and specifications for the project designated as F 006-1(2) and will let the contract for and supervise the construction of the project, all with funds allocated by the State and Federal Governments and without any expense to the County for such construction. Construction of Project F 006-1(2) has been completed. II. The County agrees: B. That when and to the extent requested by the Depart- ment, it will assist the Department in procuring the necessary rights of way and access rights required for Project F 006-1(2) by either purchase or con- demnation; provided, however, that payment for said right of way and access rights is made from State and Federal funds. All rights of way for Project F 006-1(2) have been acquired. - 2 February 1, 1965 F 006-1(2) Weld County III. The Department and County mutually agree: A. That upon execution of this instrument, the Freeway Agreement dated November 24, 1948 and the Modi- fication of Freeway Agreement dated November 17, 1958, captioned under Project F 006-1(2), become null and void. B. That public ingress to and egress from the arterial lanes on said Freeway to and from County highways to be affected shall be permitted only at the following locations shown on Exhibit A. 1. At the intersection of the County Road (proposed new street on West) and the approach to the industrial area (on East) in the Sigh Section 32, T. 6 N., R. 65 W., Sixth Principal Meridian (Freeway Survey Station 277±) to and from both sides of the Freeway. 2. At the intersection of the County Road on or near the section line common to the SW4 Section 29 and the NWi Section 32, T. 6 N., R. 65 W., Sixth Principal Meridian (Freeway Survey Station 305-) to and from both sides of the Freeway. 3. At the intersection of the approach to the County Road (11th Avenue extended) in the NW4 Section 29, T. 6 N., R. 65 W., Sixth Principal Meridian (Freeway Survey Station 348-) to and from the West side only of the Freeway. 4. At the intersection of the County Road on or near the section corner common to Sections 19, 20, 29 and 30, T. 6 N., R. 65 W., Sixth Principal Meridian (Freeway Survey Station 360_) to and from both sides of the Freeway. 3 • February 1, 1965 F 006-1(2) Weld County C. All other County highways, streets, avenues, boulevards, alleys or other public ways under County jurisdiction presently in existence and use within said County which may be affected will be closed at or near the point of their inter- section with the Freeway. D. Except as may be provided by law, no city street, County highway, or other public way of any kind shall hereafter be opened into or connected with said Freeway, unless the Chief Engineer, with the approval of the Governor and the approval and concurrence of the Bureau of Public Roads consents in writing thereto. IV. That public ingress to and egress from the arterial lanes of said Freeway to and from other State Highways to be affected, subject to modifications by the Department, shall be permitted only at the following locations shown on Exhibit A. A. At the intersection of State Highway No. 3 (Bypass Route) in the NW4 Section 32, T. 6 N.., R. 65 W., Sixth Principal Meridian (Bypass Survey Station 20±) ingress to the northbound travel lanes of the Freeway from the East side only and egress from the southbound travel lanes of the Freeway to the East side only. V. Ingress to and egress from the arterial lanes of the Freeway as described above in this Paragraph III and Paragraph IV has reference only to public ingress and egress with respect to County and other State highways under County and Department jurisdiction. The matter of private access to the arterial lanes of the Freeway from private property abutting thereon will be taken care of either by providing a local service road, outer highway, or frontage road leading to points of public access, by providing a private access or by acquisition of the access rights, as may be found most expedient by the Department. VI. All of the covenants and agreements herein contained shall be binding upon and inure to the benefit of the successors and assigns of the parties hereto respectively. 4 February 1, 1965 F 006-1(2) Weld County : N;WITNESS WHEREOF, the parties hereto have caused the foregoing .-:Agreement-to be executed the day and year first hereinabove written. a7;111 di -ante -11-1 eyCount Clerk /i peputy County Clerk APPROVED AS TO FORM: DUKE W. DUNBAR Attorney Ge eral By eputy Attorn-y eeneral • STATE CONTROLLER THE DEPARTMENT OF HIGHWAYS of the STATE OF C O Chief Engineer THE COUNTY OF WELD BY THE BOARD OF COUNTY COMMISSIONERS Chairman Commissioner e.i2 ggCommissioner APPROVED: State Purchasing Agent 144,. Governor 5 FEDERAL R0h0 —• snEFF loin. DIVISION PROJ NONO INDEX OF SHEETS SHEET NOS. 2, 2A, 28, 2C, 20, AND 2E 3-30 TITLE SHEET TABULATION OF PROPERTIES PLAN AND PROFILE -SHEETS SHOWING RIGHT OF WAY 31-33 OWNERSHIP MAP SHOWING CLAIMANTS WITH REGARD TO NIGHT OF WAY 148 8 25A (DELETED] BEGIN U 006-1(22) R.O.W. 49. B I Ah. P. I. 6+14.1 'TN" LINE L Es w ! earth SIA:0'25+8C.0 BEG( TO.\PRO'sl cT STA 323+90.0 F00 1(2) 811- "0'35405.28K.. le TS 3403,9 API 5±".19 P TS15t44R‘h c, L #o L lNE "P'. NCO" STA'b'37+63.4 END APPROACH TO PROJECT= STA:O'' 37t6I.7 BEGIN F 006-1(20.' STA 312+08.33 F 006-I (2} .. E 2NA.. J COLORADO DEPARTMENT OF HIGHWAYS PLAN AND PROFILE OF PROPOSED FEDERAL AID PROJECT NO. U 006-1(22) STATE HIGHWAY NO. 3 WELD COUNTY RIGHT OF WAY sE S. ALL,. CITY LIMIT _ ti• 1 END AF)pAOACH TO PfSOJF '.T .5T,6'i 4+6,1.77 STA 28 .3 F006 -I (2)Ah. • $TA."O"53+500 END CONSTR. L. STA X96+200 F006 -I 2]'-- u IA SCALES •OF ORIGINAL DRAWINGS ON PLAN JN PROFILE I IN 50 FT I IN 50 FT HORIZONTAL , I IN 5 FT VERTICAL GRADE LINE ON PROFILE IS SHOWN AS GRADE OF FINISHED ROAD GROSS LENGTH OF PROJECT 3O,O71 9 L F _ 5 696 MI NET LENGTH OF PROJECT 3O,O719 L F - 5696 MI C-' 0±+ GREE LE Y ' FA RT 6 END APPROACH TO PROJECT "30268+66 O _ 109+42 8 F006-I(61Ah. CITY LIMIT- LINh'A" EQUATION STA 226+99.6 Bk." A"T,5.227+41.1 Ah • TS c '9-A❑ = t-le-EIH {,, 4 COLORADO ' U 006-1122) RIGHT OF WAY GREELEY BYPASS CONVENTIONAL SIGNS n /LM SI[ET TITLE 2 SHEET REVISIONS ¶-.E-E 1.•- 'nn'r•.R-' Nc 14S X25_5 .,... r. _e' •,. 254 CENTER LWE + I RIGHT OF WAY LINE -- • -', D r MINIMCOUNTY LINE TOWNSHIP OR RANGE LINE — — — ^ — — — — — LAND LINES wN "Id !0 +LUM EwE !, 11cL4.a,. LORI rme MOT ___rFN snot. RAILROAD BARBED WIRE FENCE COMBINATION WIRE FENCE SNOW FENCE TELEPHONE a TELEGRAPH LINES 4 POWER LINE • • • OETOUR :•� _—� PRENNT ROAD (Pion Sheets) Property or Tract Line --. - C,ty Limits Barrier Fence -- --ii Guard Fence WIISECABLE AAP"TYPE ter` C of A Line (Control of Access) -- - Access Points (Freeways) OP. OPENING Ou1Flle 24 OP -IE'OP Access denied by Deed ,O.Rf.Li0'16 _— A —�f A Frantic'', Road (Present Corsi) N.A. %HEFT TITLE a"EET 16 ft Driveway Gate H Protected By (VIr01n Location)— - Fr eeway Law Grade Crossing + TITLE SHEET Barricade •v . LSN ■SN■r/EET TITLE SHEET • /sir rr. rY _ rr g9P Ps• !ItEl-WE 11'252.680 BEGIN APPROACH TO PITOJECT END U 006-1(22) R. O. W. 456' Ah. P.I. 264+11.8 17A1' LINE r. c 1 STA.A 292+89 3 and 5TA:'B" 268+ 10 END -U006-42) Bk" STA. 70t28.6 F 006-I 16) Ah ENO CONSTRUITION State Hwy #3 Proj F 006-1(2) Freeway agrmt apprvd 6/9/65 Ma 33:313 Hello