Loading...
HomeMy WebLinkAbout620121.tiffTHE HARTFORD STEAM BOILER INSPECTION AND INSURANCE COMPANY HARTFORD CONNECTICUT JOHN R. CLINE MANAGER G. F. WARD CHIEF IN.PECIOR DATE OF INSPECTION DENVER OFFICE GIG GAG AND ELECTRIC BUILDING DENVER 2. COLORADO February 16, 1962 REPORT OF INSPECTION 2-5-62 INSPECTOR. R. S. Swanson County Jail, 918 9th Streeti_Greeleyi Colorado LOCATION 3 Star Water Tube Boilers Nos. 1/Colo. 6056, 2/Colo. 6057 and 3/Colo. 6058 Inspected externally while in service. These boilers were carefully examined for signs of leakage, over- heating and other defects. The safety valves and the various other safety appliances were also carefully examined. No conditions were observed that reouire attention at this time. We note that recommendations contained in our previous report have had attention and your co-operation is appreciated. Yours very truly, JLO/dg PTO 7 Board of County Commissioners, Weld County, Colorado Greeley, Colorado ief Insp/X_),0 ector FORM NO. 356 � ..'C i2/ 0 '-I O U m N N H N FI -+ U O FO • i) 1 !n C O i-' .r1 Y 0) — • H N am to C M W -) O h +' T +' C O C cC O U February 16, 1962 Hello