Loading...
HomeMy WebLinkAbout620189.tiffTO SIGN COOPERATIVE AGL _ANT WITH STATE HIGHWAY DEPARTMENT REGARDING PROJECT S-0024(15): erh BE IT RESOLVED, that the Board of County Commissioners, Weld County, Colorado, does and hereby approves a certain agreement with the State Highway Commission of Colo- rado, a public corporation, for the use and benefit of the Department of Highways of the State of Colorado, dated August 29, 1962, whereby the County has reviewed and approved the Geometric Standards designated to govern the construction of a Federal Aid Secondary Project to consist of improvements on State HighwayiNo. 14, beginning at the East end of Project S-0024(12); East of Ault :. East Briggsdale, as per terms of said agreement, attached and made a part of this resolution, on behalf of Weld County. The above and foregoing resolution was, Onlmotion dulysmadedand seconded, adopted by the following vote: AYEs1)�t+s- / t.// < —es j -THE BOARD OF C• Y COMMISSIONER DATED: AUGUST 29, 1962 WELD COUNTY, COLORADO File No. 907. 9/5/62 ADDRESS ALL COMMUNICATIONS TO COLORADO DEPARTMENT OF HIGHWAYS 4201 E. ARKANSAS AVE. DEPARTMENT OF HIGHWAYS DENVER 22, COLORADO F y U0,2V('/S, MARK U. WATROUS CHIEF ENGINEER September 5, 1962 Board of County Commissioners Weld County Greeley, Colorado Gentlemen: Attached is your completed copy of the Cooperative•Agreement for Project S 0024(15), beginning at the east end of Project S 0024(12), east of Ault -East Briggsdale, signed by you on August 29; 1962. Please accept our thanks for your splendid cooperation in this matter. Very truly yours, MARK U. WATROUS Chief Engineer By _ REL:WHL:mm Attachment cc: M. U. Watrous C. E. Shumate L. C. Bower R. E. Livingston Planning and Research Engineer WELD CO. COMMISSIONERS GREELEY, COLO. RECEIVED SEP 61962 A.M. P.M. 6!7!�19!1O,11I12111213141�li3 .Fnrci k2 -c- H .-(Rev. '12/12760) ect S 0024(15) County Weld Date COOPERATIVE AGREEMENT THIS AGREEMENT entered into this 29th day of August 19 62 , by and between the County of Weld party of the first part, and THE STATE HIGHWAY COMMISSION OF COLORADO, a public corporation for the use and benefit of the STATE OF COLORADO, party of the second part, WITNESSETH that WHEREAS, The Department has constructed, or proposes to construct, or provide for the construction of, a project known as Project S 0024(15) approximately 9.148 miles long, beginning at East end of Project S 0024(12) east of Ault - East Briggsdale on State_Highway No. in the County, and WHEREAS, the said State Highway is part of the Federal Aid Secondary System, NON, THEREFORE, in accordance with the Federal Aid Act of 1950; the Parties have jointly reviewed the Geometric Standards governing the type of construction for said Project and have agreed as follows: That, the 19 62 Annual Average Traffic Volume, as determined from actual vehicular count, by the Planning and Research Division of the Department is found to be 810 vehicles per days therefore, in accordance with approved and established practices, the traffic volume twenty years hence is estimated to be 1860 vehicles per day. Consequently, the type of construction shall be that designated as Type C of the Geometric Standards dated August 1, 1952, more fully described as follows: The surface shall consist.of Plant Mix Asphalt , 30. ,I/ feet wide on a roadway 30 ±/ feet wide. The maximum grade shall be 3.5 percent and the curvature shall not exceed_ 0 'degrees and 30 minutes. The rights of way shall be less than 98 feet in width,-axaaRftxthsaugbucthextawzx(cs):xakxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxwhexaxthaxestahixshadxs-tusetmictthscxahakk pctzx ec. Bridges and Separations shall have a design load. of 2/ Those structures having a length less than sixty (60) feet shall have a fear roadway width, between curbs or wheel guards, of 2/ feet and those having a length of sixty (60) feet and over shall have a clear roadway width_of 2/ feet. This Agreement shall be binding upon and inure to the benefit of the Successors and assigns of the Parties Thereto. This Agreement is executed with reference to the signatories on behalf of the County by virtue of a Resolution passed at the meeting of the Board of County Commissioners held on August 29, 1962,a certified copy of which is attached herete. Paved Shoulders ai Bridges previously constructed. SEAL ATTEST: /2- County Clerk / BY://e-t- e.� 1%i . c- .? �n�a/ Deputy County Clerk BOARD OF COUNTY CGMMISSIONERS WELD -Chairman - - ' Member THE STATE HIGHWAY CC MISSION OF COLORADO, a public corporation, for the use and benefit of the DEPARTMENT OF HIGHWAYS of the STATE OF COLORADO ���� 1�7Aj �G C/� e r GG LlGi t r. Form PR-4a-SH 3/2/61 CERTIFICATE Greeley August 29 Colorado 19 62 This is to certify that at a regular meeting of the Board of County Commissioners of Weld County, held on August 29 19 62 , the following resolution was adopted: "RESOLVED, that this Board hereby approves a certain Agreement with THE STATE HIGHWAY COMMISSION OF -COLORADO, a public corporation, for the use and benefit of the DEPARTMENT OF HIGHWAYS of the STATE OF COLORADO, dated August 29 , 19 62 whereby the County has reviewed and approved_the Geometric Standards designated to govern the construction of a Federal -Aid Secondary. Project to consist of improvements on State Highway No. 14 , beginning at East end of Project S 0024(12) E of Ault — East Briggsdale , as per terms of said Agreement on behalf of Weld County by signatures of the entire Board". S E A L r1/2144.4 -ton: -::41 Goay Clerk BY: Deputy -County -Clerk"` ` --- Co Attorney to join Bd Comsnr as peter w/ State r w action as party defnd in CA #14984 et al 8/29/62 MB 32:28 Hello