Loading...
HomeMy WebLinkAbout610167.tiffTO SIGN COOPERATIVE AGREEMENT WITH STATE HIGHWAY DEPARTMENT REGARDING PROJECT BE IT RESOLVED, by the Board of County Commissioners of Weld, County, Colorado, that they hereby approve a certain agreement with the - State Highway--Commission-of Colorado, a public corporation, for the use and benefit of the Department of Highways of the St to of Colorado, dated December 13 , 19 61, whereby the Count; has reviewed and ap- proved the Geometric Standards designated to govern'the construction of a Federal Aid Secondary Project S 0074 (1) of improvements approximately 4.183 miles long, beginning about 0.5 miles East of Berthoud, East toward I-25 Interchange on State Highway No. 56 in the County, as per tei'ms of said Agreement on behalf of Weld County by signatures 'of the.Board, as per attached Agreement, and made a part of this resolution. AYES: /7 tJlbA t 2"/L� THE BOARD OF COUNTY CODG09ISSIONERS WELD COUNTY, COLORADO DATED: December 13, •19 61 ColOIV7 4•1 H F � W a 41 H CC Cci • F H 04 Q ffl 1 4 Q O ti ;O CO V H n a zs� H W W Wi CoS H O H a w H to r -I 'O ro -Prn • •ri W � N TS CO a Y H O N W N cri w O CO U Y • H W + • H v N E 1 a. a File No. 907. 12/19/61 �FORTA. C:Ij:H. IS y! ADDRESS ALL COMMUNICATIONS TO COLORADO DEPARTMENT OF HIGHWAYS 4201 E. ARKANSAS AVE. cOT'©A. 4t o DEPARTMENT OF HIGHWAYS DENVER 22, COLORADO Board of County Commissioners _ _Weld County Greeley, Colorado Gentlemen: et/ :Jr /L4,-9 et) GY 11 Do December 19, 1961 Attached is your completed copy of the Cooperative Agreement for Project S 0074(1), beginning about 0.5 Miles East of Berthoud East toward I-25 Interchange, signed by you on December 13, 1961. Please accept our thanks for your splendid cooperation in this matter. Very truly yours, MARK U. WATROUS Chief Engineer R. ingston/ �ii37s� Planning and Research Engineer REL:WHL:mm Attachment cc: M. U. Watrous C. E. Shumate L. C. Bower SARK ��lv}! Wp7'Rp{JS CHICF ENGINEER (Rev': .12/12/6b) F=_Gect S 0074(1) County Weld Date COOPERATIVE AGREEMENT THIS AGREEMENT entered into this 13th day of DECEMBER 19 61 , by and between the County of Weld party of the first part, and THE STATE HIGHWAY COMMISSION OF COLORADO, a public corporation for the use and benefit of the STATE OF COLORADO, party of the second part, WITNESSETH that WHEREAS, The Department has constructed, or proposes to construct, or provide for the construction of, a project known as Project S 0074(1) approximately 4.183 Al miles long, beginning at about 0.5 Miles East of Berthoud East toward I-25 Interchange on State Highway No. 56 in the County, and WHEREAS, the said State Highway is part of the Federal Aid Secondary System, NOW, THEREFORE, in accordance with the Federal Aid Act of 1950, the Parties have jointly reviewed the Geometric Standards governing the type of construction for said Project and have agreed as follows: That, the 190 Annual Average Traffic Volume, as determined from actual vehicular count, by the Planning and Research Division of the Department is found to be 1000 vehicles per day. Therefore, in accordance with approved and established practices, the traffic volume twenty years hence is estimated to be 2100 vehicles per day. Consequently, the type of construction shall be that designated as Type B of the Geometric Standards dated August 1, 1952, more fully described as follows: The surface shall consist of Plant Mix Asphalt , 24 feet wide on a roadway 44 2/ feet wide. The maximum grade shall be 3.49 percent and the curvature shall not exceed 0 degrees and 45 minutes. The rights of way shall be less than 60 feet in width, eotza}x'cxtl ou¢}fxx2d:ecxcomtx(Onxs xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxzM ecxttfecw sated d:otattl c xxxisaMAx Bridges and Separations -shall —Have- a design load of 3 Those structures having a length less than sixty (60) feet shall have a clear roadway width, between curbs or wheel guards, of 2/ feet and those having '�a length 4/ of sixty (60) feet and over shall have a clear roadway width of feet. This Agreement shall be binding upon and inure to the benefit of the Successors and assigns of the Parties Thereto. This Agreement is executed with reference to the signatories on behalf of the County by virtue of a Resolution passed at the meeting of the Board of County Commissioners held on 12/13/61 a certified copy of which is attached hereto. Weld County - 3.683 Miles Larimer County - R 0 W only 0.500 Miles J Seal Coat' on Shoulders Igo Major Structures SfE AL ATTEST: BY: ii EJ:erk BOARD OF CCUNTY COMMISSIONERS WELD Member ,%l/r2e, X Member COUNTY THE STATE HIGHWAY COMMISSION OF COLORADO, a public corporation, for the use and benefit of the DEPARTMENT OF HIGHWAYS of the STATE OF COLORADO WATRCUSf" �� ee;. vf� Deputy County Clerk aft Form PR-4a-SH 3/2/61 CERTIFICATE Greeley Colorado ig 61 This is to certify that at a regular meeting of the Board of County Commissioners of Weld County, held on December 11 19 61 , the following resolution was adopted: "RESOLVED, that this Board hereby approves a certain Agreement with THE STATE HIGHWAY COMMISSION OF COLORADO, a public corporation, for the use and benefit of the DEPARTMENT OF HIGHWAYS of the STATE OF COLORADO, dated , 1961_ whereby the County has_reviewed and approved the Geometric Standards designated to govern the construction of a Federal Aid Secondary Project to consist of improvements on State Highway No. 56 ,-beginning xvix about 0.5 Miles East of Berthoud East -toward I-25 Interchange , as per terms of said Agreement on behalf of Weld County by signatures of the entire Board". S E A L :- BY: County Clerk 4J ---Deputy—County—Clerk------ — Hello