Loading...
HomeMy WebLinkAbout660328.tiffRpS • COOPERATIVE AGREEMENT WITH STATE HIGHWAY DEPARTMENT PROJECT S 0034 (8) BE IT RESOLVED, by the Board of County Commissioners of Weld County, Colorado, that they hereby approve a certain agreement with the State Highway Commission of Colorado, a public corporation, for the use and benefit of the Department of Highways of the State of Colorado, dated July 6, 1966, whereby the County has reviewed and approved the Geometric Standards designated to govern the construction of a Federal Aid Secondary Project S 0034 (8) of improvements approximately 0.989 miles long beginning at the East End of Project S 0034 (6) East to Windsor on State Highway Number 392, as per terms of said agreement on behalf of Weld County by signatures of the Board, as per agreement attached hereto and made a part of this resolution. The above and foregoing resolution was on motion duly made and seconded, adopted by the following vote: AYES: t�,<r.,`7. DATED: JULY 6, 1966 APPROVED: ounty Attorney THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO f (4o3z8 File No. 907. FORM C.O.N. IS DEPARTMENT OF HIGHWAYS STATE OF COLORADO 4201 E. ARKANSAS AVE. DENVER. COLORADO 130222 „pm' t 4(11174.?s, STATE OF COLORADO Board of. County Commissioners Weld County Greeley, Colorado Gentlemen: Project S 0034(8) Windsor - West July 13, 1966 CHAS. E. SHUMATE CHIEF ENGINEER Attached is your completed copy of the Cooperative Agreement for Project S 0034(8), beginning at East End of Project S 0034(6) - • East to Windsor, signed by you on July 6, 1966. Please accept our thanks for your splendid cooperation in this matter. Very truly yours, CHAS. E. SHUMATE Chief Engineer C, By T. Reseigh 9 Planning and Research Engineer WHL:mg Attachment cc: Glen McEldowney R. F. File Form PR -4 -DOH Rev. 6/1/65 Project S 0034(8) COOPERATIVE AGREEMENT Weld County Date July 6, 1966 THIS AGREEMENT entered pt�dthis 6th day of July 19 66 by and between the County of party of the first part, and THE DEPARTMENT OF HIGHWAYS, STATE OF COLORADO, party of the second part, WITNESSETH that WHEREAS, The Department has constructed, or proposes tpg 6stft, or provide for the bonstruction'of, a project known as Project approximately 0.989 miles long, beginning at Bast Bud aProject S Ou3u(6),—.nasx'to Windsor aciaon State Highway No. in the County and WHEREAS,,' The said State Highway is part of the Federal Aid Secondary System, NOW, THEREFORE, in accordance with the Federal Aid Act of 1950, the Parties have jointly reviewed the Geometric Standards governing the type of construction for said Project and have agreed as follows: That, the l.9 65 Annual Average Traffic Volume, as determined from actual vehicular count, by the Planning and Research Division of the Department is found 750 to be vehicles per day. Therefore, in accordance with approved and estfEoihshed praojtices, the traffic volume twenty years hence is estimated to be vehicles pe day. Consequently, the type of construction shall be that designated as Type of the Geometric Standards dated February, 1963, more fully described as follows: The surface shlia sist of Bituminous Surfacing 38 36 feet wide on a roadway feet wideb The maximum grade3bpall be percent and the curvature shall not exceed • degrees and _minutes_ The rights of wa shall note less than —feet in width' Bridges and Separations shall have a design load of 'f Those structures having a length less than sixty (60)tet shall have a clear roadway width, between curbs or wheel guards, of feet and those hag3/ng a length of sixty (60) feet and over shall -have a clear roadway width of feet. ree This Agreement shall be binding upon and inure to the benefit of the Successors and assigns of the Parties Thereto. This Agreement is executed with reference to the signatories on behalf of the County by virtue of a Resolution passed at the meeting of the Board of County Commissioners held on July�6,'1966 a certified copy of which is attached hereto! 1/ Paved Shoulders 2/ No Bridges SEAL' ATTEST: --County Clerk Deputy BOARD OF COUNTY COMMISSIONERS WELD C irman ieeig COUNTY THE DEPARTMENT OF HIGHWAYS STATE OF COLORADO CHAS SH MATE C 'e eer Form PR -4a -DOH Rev. 6/1/65 CERTIFICATE Greeley , Colorado July 6 19 66 This is to certify that at a regular meeting of the Board of County Commissioners of Weld County, held on July 6 19 66 , the following resolution was adopted: "RESOLVED, That this Board hereby approves a certain Agreement with THE DEPARTMENT OF HIGHWAYS, STATE OF COLORADO, dated July 6 , 1966 whereby the County has reviewed and approved the Geometric Standards designated to govern the construction of a Federal Aid Secondary Project to consist of improvements on State Highway No. 392 , beginning at East End of Project S 0034(6) - East to Windsor as per terms of said Agreement on behalf of Weld County by signatures of the'entire Board." CoppaCountfiClerk SEAL 7/Z%�m.1� ,a/14--1- 0-42,1 Deputy Hello