Loading...
HomeMy WebLinkAbout680402.tiff2 Jan 68 FROM: CONSC SUBJECT: Cable Crossing TO: Board of County Commissioners, did County, Colorado 1. The 90th Communications Squadron has the prime responsibility for maintaining the Minuteman Missile Hardened Intersite Cable System (HICS), and is the focal point for coordination of all proposed cable crossings. 2. If you are planning any construction on or near our cable area, furnish the 90 CONS, attention Cable Affairs Office, three copies of your construction plans, and a request for consent to cross our cable easement. Request for consent and construction plans must be received by the Cable Affairs Office no later than 60 days prior to proposed construction date. Copies of your request and plans Will be forwarded to the US Arny Corps of Engineers, Omaha, Neb., and they will grant the license to cross our cable easement. 3. It is vitally essential that your firm and/or contractor, coordinate closely with the Cable Affairs Office to ensure the integrity of the HICS. I catmot over -emphasize the adverse effect that unauthorized cable damage and/or cuts will have on our natinnal security. b. Headquarters, Strategic Air Command has established the following mini- mum requirements: optimum separation of HICS and buried utilities must be 36 inches, except in rock formation where it can be 12 inches. Costs of making RIGS cable adjustments will be borne by the party and/or parties not having the superior easement. Understanding of this by all parties concerned will expedite future coordination and agreement to this in initial corres- pondence is recommended. 5. In addition, request you advise the Cable Affairs Office telephone number, area code 307, 775-2700, 48 hours in advance of actual excavation. This is necessary to ensure scheduling of on -site USAF observers. Feel free to call upon us for any additinna_l information desired. ROBERT E. MORRIS, Lt Colonel, USAF C-ommauder Copy to Mr. Werner and to Mr. Dunbar Jan 4, 1968 680402 DEPARTMENT OF THE AIR FORCE HEADQUARTERS 90TH STRATEGIC MISSILE WING (SAC) FRANCIS E. WARREN AIR FORCE BASE, WYOMING, 82003 R(PLY TO •TTN OP. 9000M3M ,u.,ccTs Cable Crossings TO8 il�li L0 C0lif•rt`i C��,aaaJ This office has the prime responsibility through the Commander, 90TH STRA- TEGIC MISSILE WING, F. E. Warren AFB, Wyoming, to maintain the cable system and is the focal point for all proposed cable crossings by other parties. If you are planning any construction in our cable area, please furnish three copies of your construction plans. Also a letter requesting consent to cross our cable easements required by this office from you. Letter and construc- tion plans must be received 60 days prior to construction. A copy of your request and one copy of your plans will be forwarded to the Corps of Engineers, Omaha Branch, to furnish you with a license to cross the United States Air Force cable easement. It is a must that you or your contractor coordinate closely with this office, to insure that the integrity of the cable network is maintained. I cannot over emphasize the adverse effect cable cuts may have on the defense effort. As soon as your plans are received, a study will be made to determine the necessary cable adjustment required to clear your construction. Cost of mak- ing any cable adjustments will be the responsibility of the party not having the superior easement. Request the construction agency advise this office of actual excavation in the cable easement area !,8 hours in advance. This is necessary in order to sche- dule on -site observers during actual excavation. If any additional information is required, please do not hesitate to contact this office, phone Area Code 307, 775-2700. If at any time you should obtain information of construction which may effect the Minuteman cable easement, please contact this office. Thank you for your assistance in this matter. WILLIAM S. MACE, Lt Col, USAF Commander, 90th Communications Squadron • Peace . . . . is our Profession Hello