HomeMy WebLinkAbout680328.tiffJune 10, 1053 Project No. G6 -L-012
board of County Commissioners
E1cld County Courthouse
Greeley, Colorado S0631
4cu taO:Gar I
J
In accordance with your I egues t, we have con ducted an il'ea i - tiOn of the
foundation conditions and structural stability of the e4st wail or t:.e c-:
i
'Lull -ding at Island Grove Park. We have esta lashed whe t:1e believe to be
the
cause O. ua progressive - Vo failure of ar �rilL v 4' Ceveloped a cslution
for correcting teas structural deficiency. As we have vernally advised you,
the foundations under this wall are +.- t:4+ -s c:ne very We*C\mt1.r a_' s. These
materials arc fully saturated and arc gable\Or supporting..2ne weight o:
;:he cast wall without modification.
if
.n accordance with our verbal discuKons, we -ve contacted (•r. Robert o neon
of-Iensel Phelps Construction Company\i, and outlined a repair prca,_
to him, which includes the drilling of" o inch diameter caissons, to bey
filled with concrete, and.irre`-'',:`? re ced concrete haunch under the
footings ngs at each pilasto ./On this ≥tncr, \ tai wedges will be inserted,
cry packed, and forced 96,getner in sue \a Inane that it will pick uJ C
hd
weight of this east wale f i'r. ointoa 111 iris asked to develop a total a "uL
•
.ion cost proposal for ^ e repair of thli(s structure, as outlined by this offics.
Se have received Mr. to ° :Ys cost po al for the complete removal and
replacement of the canoe on the east y d of the building, the comp' to re ova .
•of the existi si ' l k an_` p ,: mss with ti approximately 633 square
of new side,, -the cril in,'c.- oncreting of tea caissons, the construction
of the cojcr-ete haunches e placing and adjusting of meta an
d
rrs
iecludint/r11 excavation backfill and other miscellaneous work.
''
senael Ph 1ps Construct O Company is prepared to undertake this work poi
order of tr County Con.O:,esaoners and complete the work in accordance with t::a
+'lructic the Cp*ty Commissioners and their designated representatives
(Nelson, Hale���\��<<:' So n, and Quirk) for a total rims fixed price of $6,300.
This price includes all labor, materials, insurance, and other miscellaneous
expense. The work can brtiwould be done by Hensel Phelps Construction Company
within a forty-five day period, commencing at the discretion of the County
Commissioners.
.
This office stands ready to work witt:: the Hensel Phelps Construction Company
and the County Commissioners in the proper completion of this project upon
elvisod to proceed by the Commdscionc_r's office..
680328
Scam of County Comsissicner3
Hold County Courthouse
;;c i
::e hope that this answers the „kajo':ity of your questions; •toH'3ver, n ouie .'ner:
c need for additional consultation or development of additional information,
ease do not hesitate to call on us.
uuii �lit]i
Very truly yours,
raJu.\ , HALEY, ' JO:e q and Ali:.'vxy _.;C.
John _,,,,..„7„+,
ioL. :3ley, P.:«
cc: Mr. Robert Tointon, Hensel Phelps
Mr. Stanley Boyes, Weld County
Hello