HomeMy WebLinkAbout972068.tiff CHANGE ORDER CHANGE ORDER NO. 1 DATE: 7/29/97 PROJECT: CONSTRUCTION OF WELD COUNTY BRIDGE WEL 061.0-054.OA TO (CONTRACTOR) : Les Matson Construction Inc. JUSTIFICATION: During the course of the project, some minor additions have been made to the contract Quantities that have increased the contract price by the amount listed below. The contract time for Project 61/54A should also be increased because of bad weather, high water conditions, utility work delays and slow pile driving conditions. You are directed to make the following changes in the work. All other terms and conditions of the contract not expressly modified hereby shall remain in full force and effect. Item No. Description Original Qty. Adjusted Qty. Unit Cost Amount 207 Top Soil 0 300 C.Y. +$3300.00 420 Silt Fence 200 300 L. F. +$310. 00 502 Conc. Piling 6050 6055 L.F. +$149. 50 502 Steel Piling 1980 2589 L.F. +$13854 .75 620 Sanitary Fac. 1 2 Each +$800.00 Total +$18414.25 The original contract sum was $ 1, 555, 883.00 Net change by previous change orders $ 0. 00 The contract sum will be (incree.$ed) (decreased) or (unchanged) by this Change Order $ 18, 414 .25 The contract sum including this Change Order will be $ 1, 574, 297.25 The new contract time will be (increased) (decreased) or (unchanged) by eighteen (18) days. The date of completion as of the date of this Change Order is therefore August 22, 1997 . ACCEPTED BY: ORDERED BY: Les Matson Construction, Inc. THE BOARD OF WELD COUNTY COMMISSIONERS Contractor Weld County, Colorado Name pC e s 4 A r6oN / y/ (Please Print) By �4yer ! _ BY �i� / G:.rge E. Baxter, Chair ��' `'7�y��+,.� �Y�'.G ✓�-=• Date c 1 , ,lv� Date../ i _ / '� si ( 1r✓i}a�' r (Seal) k /r A �`� K1/ y/. ATTEST: ATTEST: jard �A soY,1, N �, sionws Wel County Clerk Board B`}r n .f�BY . (Please print) ////// Deputy Clerk to the Sc TITLE My Commission Expires Feb. 12, 2001 EGoo3&. 972068 6 ni fi 1 4,115A7 mEmoRAnDum To Clerk to the Board Data August 21, 1997 = <' COLORADO From Wayne Howard, Civil Engineer II at— Subject: Agenda Item Please place the following item on the Board's next agenda for approval and the Chair's signature. Change Order No. 1 for Bridge Project 61/54A with Matson Construction. The appropriate documentation is attached. cc: Bridge file 61/54A m:wpfiles\engineer\agenda I Hello