Loading...
HomeMy WebLinkAbout990574.tiff RECEIVED DEC 0 3 1998 WELD COUNTY PUBLIC WORKS DEFT ' Weld County Referral C. December 2, 1998 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Moriah Estates/Jim Scott Case Number Z-520 Please Reply By December 23, 1998 Planner Scott Ballstadt Project Planned Unit Development Change of Zone for 24 Estate zoned lots on 64 88 acres. Legal Part of the SW4 of Section 4, T6N, R67W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to WCR 72 and approximately 1/4 mile east of Hwy 257. Parcel Number 0807 04 000001 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) January 19, 1998 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. pi See attached letter. Comments: Signature „ha �ee a ( Date / _ I3. Agency p � �I oot2a/J .cif +Weld County Planning Dept. 4.1400 N. 17th Ave. Greeley, CO. 80631 +(970)353-6100 ext.3540 e(970)352-6312 fax 990574 rs tiEsH" : MEMORANDUM TO: Scott Ballstadt, Planner DATE: January 14, 1999 I Q FROM: Donald Carroll, Engineering Administrator W"-i COLORADO• � SUBJECT: 48(�Moriah Estates/Jim Scott The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the purview of the Weld County Planned Unit Development Standards. In the development guide requirements, the applicant has chosen Option lwhich involves a Specific Development Guide submittal. Our requirements are as follows: 1. WCR 72: WCR 72 is designated on the Transportation Plan Map as a local paved road and is maintained by Weld County. North Shores at Windsor, directly south of this PUD, has been annexed by the City of Windsor. Shiloh Estates, the adjacent subdivision directly east, is still within the County. A traffic count taken on June 12, 1998, at both ends of the mile, reflect approximately 900 vehicles in a 24 hour period. This count shall change the existing status from a local paved road to a Collector Status road. This will be noted and changed on the updated version of the Transportation Plan Map. 2. Storm Water Drainage Plan: A statement describing how the applicant intends to handle storm water drainage was supplied by Foundations Engineering at the sketch plan stage. Additional calculations, signature, and a stamp will be required prior to recording the plat. 3. Signs: The applicant shall supply a designated street sign and stop sign at the appropriate location adjacent to WCR 72. 4. Easements: The Utility Board usually requires a 15-foot perimeter easement around the proposed PUD. The applicant may be asked to place an easement adjacent to WCR 72 and the property line abutting Shiloh Estates. All these other items may be discussed and resolved at the utility board meeting. 5. Acceleration Lane: Due to the additional amount of traffic on WCR 72, the change of status from a local road to a collector, and the additional traffic created from the PUD, a paved acceleration lane shall be required. This shall be placed on the plat prior to recording. cc: S-464 Weld County Planning Dept. plan10 JAN 15 1999 RECEIVED • EXHIBIT ()coj 24/ `oZ '07/28/98 TUE 11':31-`FAX 970 86 7180 TOWN OP WINDSOR n . Idjool. Weld Count y Referral • June 5, 1998 �i COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Mortah Estates names Scott Case Number S-464 Please Reply By June 29, 1998 Planner Scott Ballstadt Protect Planned Unit Development Sketch Plan for 24 residential lots on 64.88 acres Legal Part of the SW4 of Section 4,T6N, R67W of the 6th P.M.,Weld County,Colorado Location North of and adjacent to Weld County Road 72 and approximately 1/4 mile east of Highway 257 Parcel Number 0807 04 000001 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application,/ request / please call the Current Planner associated with the 06 We have reviewed the request and find that it does e.. ply with our Comprehensive Plan O The Town of Windsor Planning Commission recommends that Weld County denies this application and refers the landowner to apply for annexation into Con the Town of Windsor. The parcel is within Windsor's Growth Management Area. Note that the development as proposed would not conform to our - - Comprehensive Plan since the proposed lots are approximately 1 acre yet would not be served by municipal sewer even though the proposed _ i development is.gene ily compatible with the adjoining subdiviskinet. _ Signature t � Date 7� Y Agency AeJe✓i.✓1. 1),n.o?. Tom. of ur/JoSf.e, 0-Weld County Planning Dept 41400 N.17th Ave.Greeley,CO.a0631 41970t 3536100 ext3540 0t970)3526312 fax EXHIBIT 07/28/98 10:35 TX/RX NO.1811 citalfi -7111 : ti ti '-� >li �, •-, ,_,. . i Pie iti'a�. a' h. - n TOW-WOE' SEVERANC iteii*k 336 1st STREET,P.O.BOX 122 SEVERANCE, COLORADO 80546 ph.(970)686-1218 fox(970)686-6250 June 29, 1998 Mr. Scott Ballstadt, Planner VIA FACSIMILE AND WELD COUNTY DEPARTMENT FIRST CLASS MAIL OF PLANNING SERVICES 1400 N. 17th Avenue Greeley, Colorado 80631 RE: Case Number S-464 Dear Mr. Ballstadt: The Town of Severance Board of Trustees has decided that approval of the aforementioned Recorded Exemption is not in the best interest of the Town. First, it conflicts with the Town's long-term growth plan; and second, the property is situated in close proximity to the Town's urban growth boundary. Therefore, the Town of Severance recommends disapproval of RE-2223. If you have any questions or concerns, please do not hesitate to contact the. Very trulyly yours, , ry kedia-c- Nicholas J. Meier, Town Clerk xc: Keith Kline, Mayor 7/2-0/ 6,8 — St'cp - o 1MIZ• ?de l , WE ltib'GA'Mdd -cwt.( rots& KID aec melAel) bells - of &opt (LC 01;a3 - '1(9`i • EXHIBIT I a= "1 C As stated previously, the applicant has not submitted evidence that public water can be obtained from North Weld County Water District, or that the District has any knowledge of this proposal. The applicant shall provide evidence of public water prior to proceeding with a change of zone application. In a referral response received June 30, 1998, the Weld County Health Department indicated that the application materials were not adequate to make a complete referral response. As stated in a letter dated June 29, 1998 and the Health Department referral, the applicant shall submit additional information prior to submitting a change of zone application. A change of zone application will not be accepted until the Health Department has received adequate sketch plan information. Each of the aforementioned environmental concerns shall be addressed in future applications. Section 6.3.5.2.7 of the PUD Ordinance states, "All PUD's containing a residential element shall provide for a 15% common open space allocation, unless otherwise stated in'the MUD Ordinance. Departure from this standard will be considered and may be approved by the Department of Planning Services' staff as long as the intent of this Ordinance and the MUD Ordinance have been met." The application proposes 49.8% of the site to be dedicated to open space, the majority of which (27.55 acres) is to be planted in grass hay. The application indicates that 4.1 acres (6.32% of the entire site)will be dedicated to walking/jogging trails, however, details pertaining to landscaping and maintenance are not addressed. Future applications shall address trail landscaping and maintenance. Section 4.2.5.13 also states, "A general landscaping plan for the PUD describing the general species type, size and location of existing and proposed planting materials and amenities. The estimated percentage of landscaping areas in the PUD shall be included, along with the location of parks and common open space." Future applications shall address the landscaping and maintenance of the open space area should farming operations cease. Section 6.3.6 specifies that signage within a PUD shall adhere to all requirements in the PUD, Zoning and MUD Ordinances. All permanent signs and sign structures shall be delineated on the plat and shall require building permits. The remaining major components include Service Provision Impacts, Landscaping Elements, Site Design, Common Open Space Usage, MUD Impacts and Intergovernmental Agreement Impacts which have been addressed elsewhere in these comments. SUMMARY Due to several substantial concerns, the Department of Planning Services has determined that, as proposed, the application as proposed clearly does not meet the intent of the Weld County's adopted plans and ordinances. Staff recommends that the applicant continue to pursue annexation to the Town of Windsor. Should the applicant wish to proceed through the Weld County PUD process, it should be clear that staff will not recommend approval of urban scale development in a non-urban area. If the applicant makes the required changes to address staff concerns, this would undoubtedly constitute a substantial change and will necessitate beginning with a new PUD Sketch Plan application. EXHIBIT Service,Teamwork,Integrity,Quality 99a5-2 y Also, prior to proceeding any further, the applicant shall submit evidence that a commitment for all public water taps has been obtained from North Weld County Water District and submit the required information to the Weld County Health Department. Please review the enclosed materials and then call to schedule an appointment if you desire a meeting time. The purpose of the meeting will be to familiarize you with the PUD District application procedure and discuss any problems or concerns identified in this letter. Once again, comments made during the Sketch Plan phase of the PUD and agency referral responses may not be all inclusive,.as other concerns or issues may arise during the remaining application processes. . Sincerely, . C, Scott Ballstadt Planner II - - • • Service,Teamwork,Integrity,Quality 01/18/99 MON 10:40 FAX 970 888 7180 TOWN OF WINDSOR Z 001 Post-IC Fax Note 7671//�� Oat/�Y�.jJ►mod(► v To ( 11ST di From '�71 Co �7n1 a _/ dw e-f /44A��v/ Coosa. co. Phone a Mom,/ Fax• rap NOTE TO APPLICANTS: This agenda is considered tentative and may be revised at any time prior to the meetin.. A II.Scants are advised to be .resent at 7.00 ..in. Final _endas will be available at the meetin WINDSOR PLANNING COMMISSION TOWN HALL, 301 WALNUT STREET WEDNESDAY,JANUARY 20,1999 REGULAR MEETING BOARD ROOM 7:00 P.M. Chairman Bob Frank, presiding. 1. Call to Order. 2. PUBLIC INVITED TO BE HEARD. 3. Consent Calendar: Approval of the Minutes of January 7,1999. 4, Weld County Referrals: a. Weld County Referral—Moriah Estates P.U.D. Rezoning Request—James Scott. b. Weld County Referral—Development Plan(Private Airstrip)—William Willcutt. 5. Staff Presentation—Pelican Lakes Golf Course— Club House. 6. Communications from the Planning Commission. 7. Communications from the Staff. 6. Adjourn1 7c18" 01/18/99 09:45 TX/RX NO.4147 P.001 ■ Srio57Li 01/18/99 MON 10:41 FAX 970 686 7180 TOWN OF WINDSOR @j002 Item No. 4a TO: Windsor Planning Commission FROM: Joseph P. Plummer, AICP, Director ofPlannigg� DATE: January 15, 1999 SUBJECT: WELD COUNTY REFERRAL—REZONING REQUEST FROM A,AGRICULTURAL TO E, ESTATE- PLANNED UNIT DEVELOPMENT—JAMES SCOTT LOCATION: North of and adjacent to WCR 72, approximately ''a mile east of SIT 257 LAND USE PLAN DEPICTION: Very Low Density Single-family Residential located with the Town's Growth Management Area Boundary RECOMMENDATION: Recommend denial of Rezoning Request based upon the comments outlined below DISCUSSION: The Applicant, James Scott, is requesting approval of a rezoning request to have approximately 65 acres rezoned from Agricultural to Estate—Planned Unit Development in order to develop a 24-estate lot subdivision north of the North Shores Subdivision and west of the Shiloh Subdivision. Per the enclosed copy of the July 2, 1998 Windsor Planning Commission minutes, the Applicant had requested approval of this proposed subdivision, with the subdivision being allowed to be developed in Weld County. At the July 2, 1998 meeting, the Windsor Planning Commission recommended that this proposed subdivision request be denied since the property is located within the Town's Growth Management Area Boundary, and that the Applicant should be required to file an annexation petition with Windsor for possible annexation to the Town. Since (a) the proposed subdivision lies within the Town's Growth Management Area Boundary, and (b) the proposed lot sizes and the proposed septic tank layout of the subdivision still do not meet the Town's minimum standards for estate lots, staff recommends that the Windsor Planning Commission recommend to the Weld County Department of Planning Services denial of this rezoning request. 01/18/99 09:95 TX/RX NO.9147 P.002 01/18/99 MON 10:41 FAX 970 686 7180 TOWN OF WINDSOR @J 003 Planning Commission Memorandum January 15, 1999 Page 2 Finally, in addition to the two items outlined above, staff has also determined that the following deficiencies are also present with this proposal: 1. There aren't any trails or park land shown for the project; 2. There needs to be a street light at the intersection of WCR 72; 3. Show right-of-way width as fifty feet (50') south of Section Line on WCR 72 as North Shores had previously dedicated the additional twenty feet(20')of right-of-way. 4. The Town would like to discuss the extension of the south end of the proposed water main in Moriah Estates south across WCR 72 into the North Shores Subdivision. It could be connected to the existing water main in North Shores for reinforcement of the water supply; and 5. Recommend that a water main be constructed between lots 18 and 19 in Moriah Estates and connected to the existing water main in Shiloh Estates fin reinforcement of the water supply for the two subdivisions. pc: James Scott, Applicant Scott Ballstadt, County Planner 01/18/99 09:45 TX/RX NO.4147 P.003 ■ 990.E 79 ian-16-99 09: 66A Town of Severance 970-696-6250 P-01 • Weld County Referral "gig e December 2, 1998 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Morish Estates/Jim Scott Case Number Z-520 Reese Reply By December 23. 1998 Planner Scott Dallstadt Project Planned Unit Development Change of Zone for 24 Estate zoned lots on 84.88 acres. Loyal Part of the SW4 of Section 4, TeN, R87W of the 0th P.M., Weld County.Colorado. Location North of and adjacent to WCR 72 and approximately 1l4 mile east of Hwy 257. Parcel Number 0807 04 000001 , ., The application Is submitted to you for review and recommendation Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed mate so that we may give full consideration to your recommendation. Any response not receiver) before or nn this dale may no deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request Weld County Planning Commission Hearing(if applicable) January 19, 1998 U We have reviewed the request and find that It does/does not comply with our Comprehensive Plan 0 We have reviewed the request and find no conflicts with our interests. O See attached letter Comments: Signature ( t(L/ti-Mx/Y1GZ4ti Date )t(iLLtU t /3, Tin Agency .-- -TA ,tI re: `'-�c`a,.::.r'.4nr r.4 4-Wald County Planning MM. 4-1400 N. r7th Ave.Wesley,CO.00031 41070)3534100 ail 3540 v1a70)352.0312 fax 99c5'2 V BOARD OF DIRECTORS '114 GARY SIMPSON elks#14 .. NORTH WELD COUNTY WATER DISTRICT ERNEST ROSS �� Oft- a IIIGHWAY 65 • LUCERNE,COLORADO 80646 W.M. McKAY CHARLES ACHZIGER , I 11 I / DON POSSELT,MGR. RosERTARNBRECHT4-4' P.O.BOX 56 • PHONE 970-356-3020 • FAX 970-395-0997 Iauvember 4 , 1998 eagle". RE: Water Service Dear Sirs, This letter is in response to your inquiry regarding water service to the following described property: S114 , Section 4-6-67 Moriah Estates P . U . D . I, Water service is presently being provided to the above described property. 2. X Water service can be made available to the above described property and provided all requirements of the District are satisfied. Yes,North Weld County Water District can provide water service to the above mentioned property with approximately ft. of line extension and provided all requirements of the District are satisfied. If contracts have not been completed with North Weld County Water District within one year from the date of this letter, this letter shall become null and void. Additional comments: • Si eerely, et., Don Posselt, Manager North Weld County Water District Jim Scott • qciUA 7`/ NORTH WELD COUNTY WATER DISTRICT 33247 Hwy 85, PO 56,Lucerne Co 80646 970-356-3020 Don Posseit,District Manager Water Supply Summary As of January 1999 Water Shed Poudre River Basin Big Thompson River Basin • Water Rights Owned Colorado Big Thompson 3877 Units (1 AF/Unit) 3877 AF North Poudre Irrigation Co. 547.5 Shares (4 AF/Share) 2190 AF Total Acre Feet Owned 6067 AF Average and Dry Year Yit d Average Year Yield Colorado Big Thompson 60%of an Acre Foot North Poudre Irrigation Co 80% of a Share Dry Year Yield Colorado Big Thompson 100% of an Acre Foot North Poudre Irrigation Co 100% of a Share Present System Demand (19981 NWCWD Customers 1,164.66 mg 3,572.48 AF Towns thru master meters 589.34 mg 1,807.74 AF Water Supplied by Towns ( 589.34 mg) (1,807.74 AF1 Total 3.572.48 AF Anticipated Demand Due to Commitments The District purchases water as necessary to meet demand requirements of growth. Uncommitted Firm Supply 2,494.52 Acre Feet 991)s7y EXHIBIT I T.to VA Ti �t g Water Engineers, Inc. 2490 Wet 26th Ave.Site 1017A www.wrehtwea'.corr✓wwe/ Denver,Colorado a021 I emalL•'r'•"KIhtewrtgrammercom (30314804 700 TEL (303)480-1020 PAX January 18. 1999 Mr.Jim Scott Integrity Builders,LLC 35325 Cornerstone Way Windsor,CO 80550 Re: Moriah Estates Water Budget Dear Mr. Scott: Wright Water Engineers, Inc. (WWE) has completed its evaluation of the predevelopment and postdevelopment groundwater budget associated with the proposed Moriah Estates subdivision. This analysis was requested by you in response to issues raised by the Colorado Geological Survey(COS) in their standard review of your subdivision plan. In a letter from the CGS to the Weld County Planning Department on December 14, 1998, they indicated the usefulness of preparing a water budget to estimate bow much the hydrologic system would be affected by the change from irrigated agricultural land to residential subdivision with individual septic systems. This report has been prepared to address this issue. ANALYSIS Using information available to WWE, including more than thirty-five years of corporate experience, a groundwater budget was prepared and compared for both the predevelopment and postdevelopment scenarios. The predevelopment land use has historically been irrigation of approximately 40 acres of pasture grass, alfalfa, and corn. The postdevelopment groundwater budget was developed based on the Moriah Estates topographic survey map dated April 17, 1998 prepared by Intermill Land Surveyors, Inc. of Loveland, CO. This map shows twenty-four 1±- acre lots within an area totaling approximately 65.0 acres. This development includes approximately 30 acres of open space with the remaining approximately 10 acres consumed in roadway and ditch right-of-way and easements. Predevelopment Water Budget WWE estimates that approximately 40 acres of pasture grass, alfalfa, and corn were historically irrigated on the subject parcel. Using the modified Blaney-Criddle consumptive use analysis with an altitude correction factor, WWE determined that the potential evapotranspiration associated with the average year irrigation of the three equally distributed crop types is approximately 1.8 acre-Set per acre. GLENWOOD SPRINGS DURANGO 1970j 445.7755 TEL 1970)995.9210 FAX (9701 259-7411 TEL (9701 259.8758 FAX Mr. Jim Scott January 18. 1999 Page 2 According to information provided by you, the property has water rights which typically yield approximately 91.3 acre-feet per year (29,741,760 gallons). Assuming a 70 percent irrigation efficiency, this equates to an average year water supply available for consumptive use supply of approximately 1.6 acre-feet per acre. This available water supply (1.6 acre-feet/acre) is less than the estimated potential evapotranspiration of irrigation water, therefore, the available supply controls the historic consumptive use. From this, WWE has calculated that the historic consumptive use on the 40 acres averages approximately 64 acre-fret per year. If the subject property has water rights totaling 91.3 acre-feet per year and has historically provided an average consumptive use of approximately 64 acre-feet per year, an excess amount of 27.3 acne-feet has been generated. It is assumed that 50 percent of this excess was attributable to groundwater recharge(13.65 acre-feet per year)while the remainder was lost to runoff. If this amount of groundwater is evenly distributed over the growing season (May 1 through September 15), the average daily contribution to the groundwater system of approximately 0.1 acre-feet per day. Postdevelopment Water Budget The proposed residential development consists of 24 lots of 1.0+-acre size for single family home construction estimated at approximately 2500+ square-feet. According to information provided by you, the subdivision east of the property (Shiloh Estates) is of similar design with each resident maintaining approximately 12,000 square-feet of lawn and garden area. Water supplied to the proposed subdivision is by municipal sources and wastewater disposal will be by individual sewage disposal systems at each lot location. The proposed Moriah Estates subdivision has approximately 30 acres of open area which is planned to be planted In native pasture grass. Current plans are to get one cutting from the open areas, but that no irrigation will occur there. Assuming an average of 350 gallons per day per resident for in-house water usage, WWE estimates that approximately 128,000 gallons per year per lot(0.39 acre-feet per year per lot)will be used. As a result, the 24 lot subdivision will use approximately 9.4 acre-feet per year. These inside household uses are assumed to be evenly distributed over the entire year. It is generally assumed that individual septic tank and leachfield systems return approximately 90 percent of the in-house water uses into the subsurface. Therefore, approximately 8.5 acre-feet per year of the 9.4 acre-feet of annual use will become recharge to the groundwater system. Dividing this amount by 365 days produces an average daily contribution to the groundwater of approximately 0.023 acre-feet per day. Additional water uses in the proposed subdivision will be for irrigating lawns and gardens. The estimated potential evapotranspiration associated with turf grass is approximately 2.1 acre-feet per acre on average. Using this value, it is estimated that approximately 0.59 acre-feet of water 99Osig Mr. Jim Scott January 18, 1999 Page 3 per residence per year will be used by irrigated plants and grasses (i.e., approximately 14.1 acre- feet per year total)resulting in a total water use for lawn and garden irrigation. Assuming an irrigation efficiency of 80 percent, it is estimated that about 17.6 acre-feet per year will be diverted for lawn and garden purposes. Subtracting 14.1 from 17.6 produces an excess water diversion of approximately 3.5 acre-feet per year. It is again assumed that approximately 50 percent of this value (1.75 acre-feet per year) will recharge the groundwater system. Using the same number of irrigation days as in the calculations for the predevelopment water lfudget (138 days), a per daily irrigation contribution to groundwater recharge is estimated at approximately 0.013 acre-feet per day. SUMMARY The summarization of the predevelopment and postdevelopment water budget analysis can be found in the attached Table I. This table shows the average daily, average monthly, and yearly groundwater recharge contribution from each scenario. A comparison of these numbers on an annual basis shows that the postdevelopment groundwater recharge is less than 75 percent of the total annual contribution to groundwater from the predevelopment irrigation. In addition, this groundwater recharge occurs under the postdevelopment scenario over a twelve month period versus approximately four and one-half months under the predevelopment scenario. This difference in values is further borne out by comparing the potential monthly groundwater recharge during the irrigation season where the maximum postdevelopment value is less than half of that for the predevelopment value. It should be noted that in conducting this analysis, WWE used conservative values for predevelopment irrigation efficiencies to minimize the amount of potential groundwater recharge under that scenario. Conversely, WWE used a conservatively small irrigation efficiency for landscape irrigation to maximize the potential amount of groundwater which may recharge the groundwater under the postdevelopment scenario. Lastly, it should be noted that the West Branch of the Chaldgren Lateral on the western edge of the property will be lined with a concrete channel as part of the site development. Insufficient information was available from geotechnical analysis for WWE to make an assessment of the amount of potential recharge to the groundwater from irrigation ditch losses. However, the lining of the irrigation ditch in this portion of the property can only reduce the potential recharge to groundwater under the postdevelopment scenario. Mr. Jim Scott January 1g, 1999 Page 4 CONCLUSIONS WWE's comparison of the predevelopment and postdevelopment groundwater recharge potential for the Moriah Estates property indicates that the postdevelopment scenario will contribute on average a smaller average daily, average monthly, and average annual recharge contribution to the groundwater system than that historically occurring from the predevelopment irrigated cropland. Should you have any questions or comments regarding the information contained in his report, please contact me. Sincerely, WRIGHT WATER ENGINEERS,INC. By J6/ Gary i .G. Hydro to ject Manager C:w91-013%000.eiUt epos.dec 9.(?�5 7V 1?z_go 66 g 4I nn l $ b ti E F OO4O O d = = = = d OO G im gitelgIRMEgRalQ I .19 •-% d o e e o e e o o d a . u l li O III t 1 1 1 1 1 e o o g n I I I • o d d e a OM O E , 111 3 / C+I S �. i t + I 1 1 1 .:c � ;i g „n I I I I- 1111E .E i � yam+ y Y l"I �' W g 0 l M- 1 I I 1 0 o d d a 1 1 1 ? it O 1 . r ! tam 2 y ` Q w1 N M M t to g A fl M in M ] U ,FG[l. IAA/ 1 1 e 1 < < . I . flflnnfflfl , • LL JO g 8 V 1 g s_ a Ci' N o' PL1290 990574 EXHIBIT 26 IS A MAP (LOCATED IN FILE) Hello