HomeMy WebLinkAbout971107.tiff CHANGE ORDER CHANGE ORDER NO. 1 DATE: -C/07/9-- PROJECT: Design of Weld County Bridge 19.5/36B TO (Engineer) : Harding Lawson Associates JUSTIFICATION: Changes in Scope of Work You are directed to make the following changes in the work. All other terms and conditions of the contract not expressly modified hereby shall remain in full force and effect. Lump sum change order for additional survey work that was requested by Weld County for the purpose of reviewing different roadway configurations and for the addition of a concrete box design for the project The original contract sum was $ 31,350. 00 Net change by previous change orders $ 0.00 The contract sum will be (iitir swit) (decreased) or (unchanged) by this Change Order $ 9, 500. 00 The contract sum including this Change Order will be $ 35, 850. 00 The new contract time will be (increased) (decreased) or (a t&i SS.) by ( ) days. ACCEPTED BY: I ORDERED BY: ra rat�� Law-eti 4ssoc,a -1-es THE BOARD OF WELD COUNTY COMMISSIONERS Contractor rr Weld County, Colorado Name S11-&ti ,t P. yG y n e- 4' (Please Pri( t) By �.ff� 4orge E. Baxter, Chair BY _ & Date 05//9/97 Date 7/17 /2, / 9 7 7 (Seal) / i�Ct�[�— (Seal) Le jda ATTES ✓//, /� /I.+Jv ATTEST: CONTRACTOR: 1 4 infras /rre /ec Weld Ff.unty Clerk to the Board BY (latrv47iI _ 5/(o/a( BYO PYg-e7AL` . .Q (Please• }} printt) ' Deputy a lerk to the Board TITLE Ps _A SSi,SY.ct)1+- GC4 5-7/9 /97 a M 971106 7 c BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: Realignment of Road to Bridge Project 19.5/36B DEPARTMENT: PUBLIC WORKS � DATE: April 16, 1997 PERSON REQUESTING: Wayne Howard, Civil Engineer II ib,n Brief description of the problem/issue: Weld County hired HLA Infrastructure to design Weld County Bridge 19.5/36B across the St. Vrain Creek. During the preliminary design of the bridge, it was determined that we could create a safer situation at the bridge site by moving the bridge and roadway to the east and straighten the road. To verify that this was possible, we needed additional survey data to the east at a cost of$2,227.50. This cost included 7.5 hours of surveying, 12 hours of engineering and 7 hours of drafting. By straightening the roadway, we also lengthened the project limits, and we were able to replace an old timber box that is collapsed. This added $2,280.00 to the design phase. The total change order for HLA Infrastructure would be $4,500. The bridge grant would cover $3,600 and $900 would be paid by Weld County. This change order would not put us over budget for the project. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) 1. Approve or deny the additional costs for the project. Recommendation to the Board: I recommend approval for the additional fees that were needed for the project.. Initial: Approve Schedule Recommendation Work Session Other Kirkmeyer Harbert Hall (/ Baxter Webster cc: Drew Scheltinga, County c:\wpfiles\engmeer\work7 971197 T ' MEMORANDUM C. COLORADO TO: Clerk to the Board DATE: May 14, 1997 FROM: Wayne Howard, Civil Engineer II SUBJECT: Agenda Item Please place the following items on the Board's next agenda: Change Order to Harding Lawson Associates for the Design of Weld County Bridge 19.5/36B, which has been approved by the Board. The appropriate documentation is attached. board.mem 'u 971107 Hello