Loading...
HomeMy WebLinkAbout990758.tiff HEARING CERTIFICATION DOCKET NO. 99-21 RE: APPROVE SITE SPECIFIC DEVELOPMENT PLAN AND SPECIAL REVIEW PERMIT #1215 FOR OPEN CUT GRAVEL MINING IN THE A(AGRICULTURAL)ZONE DISTRICT- WELD COUNTY PUBLIC WORKS DEPARTMENT,ON BEHALF OF DARRELL BEARSON A public hearing was conducted on April 7, 1999, at 10:00 a.m., with the following present: Commissioner Dale K. Hall, Chair Commissioner Barbara J. Kirkmeyer, Pro-Tem Commissioner George E. Baxter Commissioner M. J. Geile Commissioner Glenn Vaad Also present: Acting Clerk to the Board, Esther Gesick Assistant County Attorney, Lee Morrison Planning Department representative, Sheri Lockman Health Department representative, Jeff Stoll Public Works representative, Don Carroll The following business was transacted: I hereby certify that pursuant to a notice dated March 19, 1999, and duly published March 24, 1999, in the Fort Lupton Press, a public hearing was conducted to consider the request of the Weld County Public Works Department, on behalf of Darrell Bearson, for Open Cut Gravel Mining in the A (Agricultural) Zone District. Lee Morrison, Assistant County Attorney, made this a matter of record. Sheri Lockman, Department of Planning Services, presented a brief summary of the proposal and entered the favorable recommendation of the Planning Commission into the record as written. Ms. Lockman gave a brief description of the location of the site, which is approximately 74 acres in size. She stated surrounding uses consist of agricultural activities including a tree farm and sand and gravel mining, as well as residential sites located on reclaimed gravel pits. Ms. Lockman stated six referrals were received in favor of the proposal, four did not respond, and two surrounding property owners submitted letters of concern. In response to Commissioners Geile and Kirkmeyer, Don Carroll, Department of Public Works, stated trucks will head south on Weld County Road 25 to Weld County Road 18, both of which are paved. In response to Commissioner Kirkmeyer, Greg Nelson, Public Works Department representative, the number of trucks will vary throughout the year based on the weather conditions, but on the average, there will be approximately twelve to fifteen trucks daily. Responding to Commissioner Vaad, Mr. Nelson explained there is a 100-foot buffer between the holding ponds and the South Platte River as required by the Division of Minerals and Geology. In response to Commissioner Geile, Mr. Nelson reiterated truck activity will not be constant and will vary as trucks are needed for projects in other parts of the County. He explained a large amount will be stockpiled and operations will stop until more materials are needed to haul off-site. Mr. Nelson stated the mining will be done in phases and as one phase is completed, that area will be reclaimed. Commissioner Baxter commented Leo Butler, surrounding property owner, submitted a letter of concern regarding increased traffic. Mr. Nelson stated the Butler property is located approximately one-half mile from /� 990758 cc; !1� PL1298 HEARING CERTIFICATION - WELD COUNTY PUBLIC WORKS DEPARTMENT, ON BEHALF OF DARRELL BEARSON (USR #1215) PAGE 2 the site west of Interstate 25 and the haul route does not go that direction. Mr. Morrison stated the lease will be for five years with the term to begin six months after the date of signature which will be in May to allow the Use by Special Review process to be completed. Responding to Commissioner Vaad, Ms. Lockman stated the concern raised in the Planning Commission hearing regarding mosquitos was not addressed. Commissioner Vaad commented there is a lot of water in the area that is not a result of the mining operation. No public testimony was offered concerning this matter. Commissioner Baxter moved to approve the request of the Weld County Public Works Department, on behalf of Darrell Bearson, for a Site Specific Development Plan and Special Review Permit #1215 for Open Cut Gravel Mining in the A (Agricultural) Zone District, based on the recommendations of the Planning staff and the Planning Commission, with the Conditions of Approval and Development Standards as entered into the record. The motion was seconded by Commissioner Geile, and it carried unanimously. This Certification was approved on the 12th day of April, 1999. 'e APPROVED: ATTEST i BOARD OF COUNTY COMMISSIONERS r Uq€i�COUNTY C0LI 'ADO Weld ouiity Clerk to the t3 r s J �14 rii�� Dal K. Hall, Chair Li V BY: £ thrd lei /1; G� � Barbara Kirkmeyer, Pr -Tem 7 TAPE #99-11 7 • eorge . axter DOCKET#99-21 /9 J. eile Glenn Naad`t 4 990758 PL1298 EXHIBIT INVENTORY CONTROL SHEET Case USR#1215 -Weld County Public Works Department, on behalf of Darrell Bearson Exhibit Submitted By Exhibit Description A. Planning Staff Inventory of Items Submitted B. Planning Commission Resolution of Recommendation C. Planning Commission Summary of Hearing (Minutes) D. Clerk to the Board Notice of Hearing E. F. G. H. J. K. L. M. N. O. P. Q. R. S. T. U. V. W. ATTENDANCE RECORD HEARINGS ARE AS FOLLOWS ON THIS 7TH DAY OF APRIL, 1999: DOCKET#99-21 - WELD COUNTY PUBLIC WORKS DEPARTMENT, ON BEHALF OF DARRELL BEARSON DOCKET#99-20 - TONY DILLER, BRUCE VICTOR, AND JEFF GIACOMINO, CIO TONY DILLER PLEASE legibly write or print your name and complete address and the DOCKET # (as listed above) or the name of the applicant of the hearing you are attending. NAME AND ADDRESS(Please include City and Zip Code)— DOCKET#OF HEARING ATTENDING / ��67+9 �7 42-yagl1nizeC -7 «eT L wp7/3") --( /n� .Bruce Vic±or / 7 a Den Vee Art- Lupo 8pQI__ 1a) �5 04jiv2 ..Cr y./Z (n f:iE,tic LlE'IC76, 163-7 cc- /5 '/ 4%7c7c2 - 04 ,e , I3 e c /do 16 �: 3 - You— - , Hello