Loading...
HomeMy WebLinkAbout971064.tiff RESOLUTION RE: GRANT SITE SPECIFIC DEVELOPMENT PLAN AND PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN, S #422, FOR REDESIGN OF RADEMACHER BUSINESS PARK PUD (26 LOTS) -ZEEK PROPERTIES, LTD., C/O LANDMARK ENGINEERING, LTD. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, a public hearing was held on the 4th day of June, 1997, at 10:00 a.m. for the purpose of hearing the application of Zeek Properties, Ltd., do Landmark Engineering, Ltd., 3521 West Eisenhower Boulevard, Loveland, Colorado 80537, requesting a Site Specific Development Plan and Planned Unit Development (PUD) Final Plan, S #422, for redesign of Rademacher Business Park PUD (26 lots) for a parcel of land located on the following described real estate, to-wit: Part of the NW1/4 of Section 23, Township 3 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS, the applicant was represented at said hearing by Don Leffler, Landmark Engineering, Ltd., and WHEREAS, Section 28.14 of the Weld County Zoning Ordinance provides standards for review of such a PUD Final Plan, and WHEREAS, the Board of County Commissioners heard all the testimony and statements of those present, studied the request of the applicant and the recommendations of the Weld County Planning Commission, and, having been fully informed, finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 28.9 et seq., of the Weld County Zoning Ordinance. 2. The request is in conformance with Section 28.14 of the Weld County Zoning Ordinance as follows: A. The proposed PUD Final Plan is consistent with the Weld County Comprehensive Plan and is compatible with the future development, as permitted by the existing PUD District, and plans of affected municipalities. This proposal is an amendment to case S #241 which was approved on November 28, 1984, for a Final Planned Unit Development Plan for a commercial and industrial subdivision. This proposal is located within the referral area of the Town of Mead. 971064 CC,• PG,Pcd, RSA 2664,9dOM RK j f 61/2) PL0381 PUD FINAL PLAN, S #422 - ZEEK PROPERTIES, LTD., CIO LANDMARK ENGINEERING PAGE 2 B. The PUD Final Plan conforms to the approved PUD District. The Utility Coordinating Advisory Committee reviewed and conditionally approved the PUD utility plan at its March 13, 1997, meeting. The concerns of the Utility Coordinating Advisory Committee have been addressed by the applicant. C. The uses, buildings, and structures shall be compatible with the existing and future development of the surrounding area as permitted by the existing zoning, and with the future development projected by the Comprehensive Plan or Master Plan of affected municipalities. D. The proposed PUD Final Plan conforms with the performance standards in Section 35.3 of the Weld County Zoning Ordinance. E. The proposed PUD Final Plan will be in compliance with the Weld County Zoning Ordinance, Section 50, Overlay Districts. The site is not located within any Overlay Districts. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Zeek Properties, Ltd., do Landmark Engineering, Ltd., requesting a Site Specific Development Plan and Planned Unit Development (PUD) Final Plan, S #422, for redesign of Rademacher Business Park PUD (26 lots) on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. Prior to recording the PUD Final Plan plat: A. The Board of County Commissioners shall review and approve the subdivision improvements agreement for on-site improvements and the form of collateral. The security for the agreement shall be tendered and accepted by the Board of County Commissioners for the subdivision improvements agreement. B. The applicant shall submit written evidence to the Department of Planning Services that the concerns of the Colorado Geological Survey as listed in the letter from Celia Greenman, dated February 25, 1997, have been addressed. 971064 PL0381 PUD FINAL PLAN, S #422 - ZEEK PROPERTIES, LTD., CIO LANDMARK ENGINEERING PAGE 3 C. The applicant shall submit written evidence for review and approval by the Department of Planning Services that the residential use of Lot 10 and the existing access were on site prior to the PUD Zone Change in 1984. If a non-conforming use file can be established for the existing use of Lot 10 once the use of the property changes, the existing access to Weld County Road 9.5 shall be removed and the uses on Lot 10 shall conform with the PUD Zone District and the PUD Final Plan. 2. The following notes shall be placed on the PUD Final Plan plat prior to recording: A. The uses permitted within the PUD Final Plan for the redesign of Rademacher Business Park are commercial and industrial uses which comply with the PUD Zone District requirements and are as described in the application materials. B. Approval of this plan may create a vested property right pursuant to Section 90 of the Weld County Zoning Ordinance. C. Little Thompson Water District shall provide domestic water service to all commercial and industrial uses within the PUD Zone District. D. Individual septic systems will provide sewage disposal for each lot. At the Site Plan Review stage, the applicant and/or property owner shall designate an appropriate area on each lot for a replacement septic system. The area shall be based on the approximate hydraulic flows considered for the proposed use, as well as any further expansion. E. Any operation which will produce a non-domestic sewage wastewater must submit a plan of disposal with the Site Plan Review for review and approval by the Weld County Health Department. The plan must describe the process which creates the wastewater, proposed method of treatment, and any additional information as determined necessary by the Weld County Health Department. F. Installation of all utilities shall comply with Section 10 (Design Standards) of the Weld County Subdivision Ordinance. G. All uses within the PUD Final Plan shall attempt to comply with the requirements of the Mountain View Fire Protection District. H. Access to the development shall be from Weld County Road 9.5 and the 1-25 Frontage Road. 971064 PL0381 PUD FINAL PLAN, S#422 - ZEEK PROPERTIES, LTD., CIO LANDMARK ENGINEERING PAGE 4 Street signs and lot identification shall be in place prior to release of building permits. J. Exterior illumination of structures, yards, and driveways shall be restricted as follows: (1) Sources of light shall be shielded so that beams of light will not shine directly onto adjacent properties. (2) Neither the direct nor reflected light from any light source shall create a traffic hazard to operators of motor vehicles on public or private streets. K. All liquid and solid wastes shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. L. No permanent disposal of wastes shall be permitted at this site. M. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. N. Fugitive dust shall be controlled on this site. O. Interior lot line utility easements shall be required only when needed by the utility or service company. P. No structures shall be permitted on the gas pipeline easement as shown on the PUD Final Plan plat. Q. The site shall maintain compliance with the requirements/standards of the Colorado Department of Transportation. R. Prior to any development of lots within the Rademacher Business Park PUD, a Site Plan Review application shall be submitted, reviewed, approved and all conditions met. The Site Plan Review shall include landscape design which meets the intent of the landscaping requirements of Ordinance No. 191. S. Once the non-conforming use of Lot 10 changes, Lot 10 shall conform with the existing PUD Zone District and the PUD Final Plan. 971064 PL0381 PUD FINAL PLAN, S#422 - ZEEK PROPERTIES, LTD., CIO LANDMARK ENGINEERING PAGE 5 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 4th day of June, A.D., 1997. BOARD OF COUNTY COMMISSIONERS ra..1 LU42&eat WELD C UNTY, COLORADO eorge E. Baxter, Chair '�' St IPA: ;•=,,�i.0 my Clerk to the Board stance L. Harbert, Pro-Tem S ,�► A / /P . ®� _: it i /, �, . �....►'�Deputy Cler o the Board Dale K. Hall AP AS TO RM: arbara J. Kirkmeyer t Attor e b 1 0 ),e-e Q,_, W. H. Webster 971064 PL0381 Hello