Loading...
HomeMy WebLinkAbout960539.tiff �1,. AGREEMENT/ 6t44'1 THIS AGREEMENT, made thisAa /' 7 day of ' , 19 76, by and between THE BOARD OF WELD COUNTY COMMISSIONERS, and WESTERN FASICK SEALCOAT, INC. doing business as WESTERN FASICK SEALCOAT, INC. hereinafter called "Contractor" . WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The Contractor will commence and complete the phased construction of 1996 RUBBERIZED CRACK FILLING PROJECT 2. The Contractor shall furnish all material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the project described herein. 3 . The Contractor shall commence the work required by the Contract Documents in accordance with the date stated in the Special Conditions and shall complete the work within the time stated in the Special Conditions unless the period for completion is extended otherwise by the Contract Documents. 4. The Contractor agrees to perform all of the work described in the Contract Documents and comply with the terms of herein for the sum of: Fifty-nine thousand, six hundred and fifty dollars (B59,650) for the project: 1996 RUBBERIZED CRACK FILLING PROJECT -16- `naUrt+ a-aatM141,-- 960539 u c 03/2,0 /9� 3S 5 . The term "Contract Documents" means and includes the following: (A) Advertisement for Bids (2) Information for Bidders (C) Non-Collusion Statement (D) Bid (E) Bid Schedule (F) Bid Bond (G) Notice of Award (H) Acceptance of Notice (I) Agreement (J) Performance Bond (K) Payment Bond (L) Insurance Requirements (M) Notice to Proceed (N) Change Order (0) Notice of Contractor's Settlement (P) Final Receipt and Guarantee (Q) Drawings prepared by Weld County Engineering Department, numbered (R) Specifications prepared or issued by Weld County Engineering Department (S) Addendum No. , dated , 19 No. , dated , 19 No. , dated , 19 (T) Other none 6. The County will pay the Contractor in the manner and at such time as set forth in the General Conditions such amounts required by the Contract Documents. 7 . This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. • -17- IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement, each of which shall be deemed an original on the date first written above. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO CONTRACTOR BY49-- 1 Iv4 44.------- NAME 93�.�o/9rA NAME LAI iO4 L, &1.3 Sc, ..� Barbara J. Kirkmeyer, Chair (Please Type) TITLE GfI N/�'YIfFA�- wr57r2n1 CA-Sic tic S�e'4:c .4t ��� ADDRESS 10�.� ii m 1)LLiSY fide% i 02'T CcCc,,u7s c o t! US-aV Hr, 11861 i\ n11, (SEAL) °Altng, i '( .„ ATTEST: Weld County Clerk to the Board BY: 73rl L QO ' NAME Deputy Clerk 4- the Board (Please Type) TITLE STATE OF COLORADO ) ) ss. COUNTY OF FIELD The foregoing was acknowledged before me on this 18th day of March, 1996, by David L. Gibson. My commission expires: 2/9/98 -18- 6Z mEmORAnDUm WII'Dc To Barbara J. Kirkmeyer, Chair March 18, 1996 Dot COLORADO From Drew Scheltinga, County Engineer U Subject: Contract Agreement Enclosed is the Agreement for the 1996 Rubberized Crack Filling Project between Weld County and Western Fasick Sealcoat, Inc. The Agreement has already been approved by the Board. Please sign both original agreements and return to me at your earliest convenience. \wpfiles\sign Hello