Loading...
HomeMy WebLinkAbout660229.tiffINDUSTRIAL COMMISSION OF COLOKADO SAFETY INSPECTION DIVISION, CAPITOL ANNEX DENVER, COLORADO 80203 INSPECTOR DATE Dan E. Larimer Qctober 2n, 1966i Weld County Library 2127 -23d Ave. Greeley, Colorado 90 days COUNTY UNIT ':ti eld INSPECTION NO1 3261 Weld County Library RETURN COPY SEE NOTE BELOW 1. Remove obstacles from in front of exit doors on south side of library. 2. Install exit signs above all exit doors in both front library and new back room. 3. Remove thumb bolt locks from front exit doors and replace them with lock that cannot be inadvertently locked as with panic hardware. 4. Replace locks on all other dorrs with panic hardware. 5. Repair all broken -out openings in walls and ceiling in boiler room. 6. Have boiler inspected by insurance carrier and post such certi- cation. 7. Repair eled•rical circuit to compressor in boiler room. 8. Remove all storage from boiler room. 9. Install closer on boiler room door. 10. Install fire damper in original return air duct to furnace rorm. 11. The installation or use of an incinerator in a garage is not permitted unless completely enclosed in a two hour fire resistive rated en- closure extending 3 ft. above the roof line and having all openings in the enclosure closed with class "At doors. ('Enclosure must be masonry) The existing incinerator is declared a hazard and shall not be used until it is made to conform to minimum safety standards. 12. Install a one -hour fire resistive rated ceiling in the garage or con- tinue the $" masonry wall to the underside of the roof between the ceiling joists. 13. Install handrails on the stairway in the garage. [� WELD CO. Ct?i•''".!QcIfNERS (COD) GREELEV, ! '. REV (DATE) Signature _ our ,;1966 OIWI10!11112!0014i51 ; RC: boo Title or Official Capacity INDUSTRIAL COMMISSION OF COLORADO SAFETY INSPECTION DIVISION, CAPITOL ANNEX DENVER, COLORADO 80203 Dan L. Larimer field INSPECTOR COUNTY DATE INSPECTION NO 13261 October 204_ 1966 UNIT Weld County Library !Feld County Library 2<27 -23d Ave. Greeley, Colorado 90 days RETURN COPY SEE NOTE BELOW Page 2 14. Rehan door betsan old and new library rooms so that t:!3 doer s,:ings in the direction of egress from the nee, room. 15. The front !single door may be replaced with a window a there lG suffi- cient width of exiting provided elsewhere. 16. The passage door between the ch L_drens reLd°_ng r c.om s%,,A.1 either be removed or provided with hardware that cannot be lockedfrom the reading room side. 17. All storage of excess booi<:s and readin,: 'iaterial if, the g2r: Te shall bw ►ocd into the library and the garage shall not be used as storage room for reading raaterial. (Books, e tc. ,norn.ily carried inside the library vans are exempted provided the doors are kept closed when the vans are not being loaded) (DATE) Signature Title or Official Capacity Hello