Loading...
HomeMy WebLinkAbout991389.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant Lance Messinger Case Number USR-1216 Submitted or Prepared Prior to At Hearing Hearing 1 Planning Commission Resolution 2 Staff Comments X 3 Memo for continuance dated 3/09/99 X 4 Department of Planning Services field check form X 5 Letter to Applicant X 6 Legal Notifications (2 pages) X 7 Application (7 pages) X 8 Referral list X 9 Platteville Planning Commission referral received 02/16/99 X 10 Weld County School District RE-1 referral received 02/03/99 X 11 Weld County Public Works Dept. referral received 02/18/99 X 12 Weld County Health Department referrals received 02/18/99 and X 03/16/99 13 Weld County Building Inspection Department referral rec'd X 2/23/99 14 Colorado Department of Transportation referral received X 02/08/99 15 Weld County Code Compliance referral received 1/29/99 X 16 8 1/2 X 11 maps submitted by applicant(5 pages) X 17 Deed (2 pages) X 18 Certificate of Conveyance (29 pages) X 19 Surrounding Property Owners (10 pages) X 20 Colorado Division of Water Resources well permits X 21 Weld County Septic Permit X 21 Items submitted at planning commission EXHIBIT 991389 US/2 #/.2//2 I hereby certify that the 21 items identified herein were submitted to the Department of Planning Services at or prior to the scheduled Planning Commission hearing. I further certify that these items were forwarded to the Clerk to the Board's office. � r Julie A. Chester • Current Planner STATE OF COLORADO ) COUNTY OF WELD ) / SUBSCRIBED and SWORN TO BEFORE ME THIS � day of 19 7'/ . SEAL NOTARY PUBLIC b a MY COMMISSION EXPIRES - . ,_Q C o J #7**.; Wink LANDSUMMARY SHEET ION COLORADO Case Number: USR-1216 Hearing Date: April 6, 1999 Applicant: Lance Messinger Address: 12619 WCR 25 1/2 Ft. Lupton, CO 80621 Request: A Site Specific Development Plan and a Special Review Permit for Mineral Resource Development facilities including Oil and Gas Support and Service (Storage and Repair of downhole oil field tools) in the A (Agricultural) Zone Legal Description: Lot B of Recorded Exemption 2235, being a portion of the E2 of Section 31, T3N, R66W of the 6th P.M., Weld County, Colorado Location: West of and adjacent to U.S. Highway 85, approximately 1/4 mile east WCR 25 1/2, between WCR 26 and WCR 28 Size of Parcel: 9.068 acres POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit is listed in Section 24.3 of the Weld County Zoning Ordinance. The Department of Planning Services' staff has received responses from the following agencies: • Town of Platteville, referral received 02/16/99 • Weld County School District RE-1, referral received 02/05/99 • Weld County Planning Department, Code Compliance, referral received 01/29/99 • Weld County Health Department, referral received 02/18/99 and 03/16/99 • Weld County Public Works Department, referral received 02/19/99 • Weld County Building Inspection Department, referral received 02/23/99 • Colorado Department of Transportation, referral received 02/08/99 EXHIBIT USR-1216, Messinger, Page 1 ( tt SPECIAL REVIEW PERMIT I ADMINISTRATIVE REVIEW WLDc. COLORADO Case Number: USR-1216 Planner: Julie A. Chester Applicant: Lance Messinger Hearing Date: April 6, 1999 Address: 12619 WCR 25 1/2 Ft. Lupton, CO 80621 Request: A Site Specific Development Plan and a Special Review Permit for Mineral Resource Development facilities including Oil and Gas Support and Service (Storage and Repair of downhole oil field tools), in the A (Agricultural) Zone Legal Description: Lot B of Recorded Exemption 2235, being a portion of the E2 of Section 31, T3N, R66W of the 6th P.M., Weld County, Colorado Location: West of and adjacent to U.S. Highway 85, approximately 1/4 mile east WCR 25 1/2, between WCR 26 and WCR 28 Size of Parcel: 9.068 acres PARCEL NUMBER: 1211-31-000044 THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 24.7 of the Weld County Zoning Ordinance, as amended. 2. It is the opinion of the Department of Planning Services's staff that the applicant has shown compliance with Section 24.3 of the Weld County Zoning Ordinance, as follows: a. Section 24.3.1.1 --This proposal is consistent with the Weld County Comprehensive Plan. A.Goal 1. states "preserve prime farmland for agricultural purposes which foster the economic health and continuance of agriculture. This parcel is designated prime farmground on the U.S.D.A. Soils map, however, the Recorded Exemption (RE-2235) which was approved June 1, 1998, created a 9.068 acre parcel. Prior to the recorded exemption the parcel was 11 acres. The size of the parcel would not be farmable, therefore no prime farmground is being taken out of production. b. Section 24.3.1.2-- This proposal is consistent with the intent of the A (Agricultural) zone district. Section 31.4.1 allows for Oil and Gas Support and Service facilities as a Use by Special Review in the Agricultural zone district. c. Section 24.3.1.3 -- The proposal is consistent with Section 24.3.1.3 of the Weld County Zoning Ordinance, as amended, and will be compatible with future USR-1216, Messinger, Page 2 development of the surrounding area. The surrounding area consists of existing agricultural uses and several residences. Conditions of approval and Development Standards ensure that the proposed use will remain compatible with surrounding land uses. d. Section 24.3.1.4-- The proposed uses will be compatible with future development of the surrounding area as permitted by the A (Agricultural) zone district and with the future development as projected by the Comprehensive Plan or Master Plan of affected municipalities. The use is located within the three mile referral area, but not within the Urban Growth Boundary of the Town of Platteville. The Platteville Planning Commission stated in a referral response that they had no conflicts with their interests. e. Section 24.3.1.5 -- The proposal is not located within the Overlay District Areas identified by maps officially adopted by Weld County. f. Section 24.3.1.7—The Design Standards (Section 24.5 of the Weld County Zoning Ordinance, as amended), Operation Standards (Section 24.6 of the Weld County Zoning Ordinance, as amended), Conditions of Approval, and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and county. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services' staff recommendation for approval is conditional upon the following: 1. The attached Development Standards for the Special Review Permit shall be adopted and placed on the Special Review Plat prior to recording the plat. The completed plat shall be delivered to the Department of Planning Services and be ready for recording in the Weld County Clerk and Recorder's Office within 30 days of approval by the Board of County Commissioners. 2. Prior to recording the plat: A. The applicant shall submit a landscaping and screening plan to the Department of Planning Services for review and approval. The landscaping plan shall indicate location and species of all plant materials, planting implementation schedule and landscape maintenance plan. The screening plan shall include type and height of the fence and materials to be used. (Dept. of Planning Services) B. The plat shall be amended to delineate the following: 1) The approved landscaping and screening plan. (Dept. of Planning Services) 2) The approved drainage and retention area. (Public Works) 3) 75' from the centerline for U.S. Highway 85 for right-of-way. (CDOT) USR-1216, Messinger, Page 3 C. The applicant shall submit a waste handling plan to the Environmental protection Services Division of the Weld County Health Department. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this shall include expected volumes and types of waste generated). (Health Dept.) 2) A list of the type and volume of chemicals expected to be stored on site. (Health Dept.) 3) The waste handler and facility where the waste will be disposed (including the facility name, address, and telephone number). (Health Dept.) D. The applicant shall submit a drainage plan, with a reshaped retention area, to the Department of Public Works for review and approval. Evidence of the submittal shall be forwarded to the Department of Planning Services. (Public Works) E. The applicant shall submit traffic information to the Colorado Department of Transportation, as indicated in a referral response dated 02/08/99. Evidence of the submittal shall be forwarded to the Department of Planning Services. (CDOT) F. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Dept. Of Planning Services) G. The building permit application shall include foundation and structural drawings prepared by an engineer or architect licensed by the State of Colorado. (Building Inspection Department) H. The sign located on the structure must be brought into compliance with Section 42.2 of the Weld County Zoning Ordinance. (Dept. of Planning Services) USR-1216, Messinger, Page 4 SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Lance Messinger USR-1216 1. The Site Specific Development Plan and Special Use Permit for Mineral Resource Development facilities including Oil and Gas Support and Service (Storage and Repair of downhole oil field tools), in the A (Agricultural) Zone, as indicated in the application materials on file in the Department of Planning Services and subject to the Development Standards stated hereon. (Planning Dept.) 2. Approval of this plan may create a vested property right pursuant to Section 90 of the Weld County Zoning Ordinance, as amended. (Planning Dept.) 3. The hours of operation are from 7:00 a.m. to 5:00 p.m., Monday through Friday, as indicated in the application materials. (Dept. of Planning Services) 4. The facility will consist of one metal building and screened outside storage. (Dept. of Planning Services) 5. All proposed or existing structures will or do meet the minimum setback and offset requirements for the Agricultural zone district (Dept. of Planning Services). 6. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-101, C.R.S., as amended) shall be stored and removed for the final disposal in a manner that protects against surface and groundwater contamination. (Health Dept.) 7. No permanent disposal of wastes shall be permitted at this site.(Health Dept.) 8. Waste materials shall be handled, stored, and disposed of in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. (Health Dept.) 9. Fugitive dust shall be controlled on this site. (Health Dept.) 10. The maximum permissible noise level shall not exceed the residential limit of 55 db(A) as measured according to 25-12-102, Colorado Revised Statutes. (Health Dept.) 11. The facility shall utilize the existing septic system (SP-9800292) for disposal of sewage. There shall be no washing of vehicles or tools that will result in a discharge to the on-site septic system. (Health Dept.) 12. Adequate toilet facilities shall be provided for the employees. (Health Dept.) 13. The facility shall utilize the existing well(Permit#210958 and #210981). (Health Dept.) 14. The metal building shall meet all building and fire codes. (Dept. of Planning Services) 15. All outside storage must be screened from adjacent properties and public rights-of-way. (Dept. of Planning Services) 16. A trash receptacle must be provided and must be screened from all adjacent properties and public rights-of-way. (Dept. of Planning Services) USR-1216, Messinger, Page 5 17. Any proposed signage shall require appropriate building permits and be constructed in accordance with Section 42.2 of the Weld County Zoning Ordinance. (Dept. of Planning Services) 18. The property owner or operator shall be responsible for complying with the Design Standards of Section 24.5 of the Weld County Zoning Ordinance, as amended. (Planning Dept.) 19. The property owner or operator shall be responsible for complying with the Operation Standards of Section 24.6 of the Weld County Zoning Ordinance, as amended. (Planning Dept.) 20. Personnel from the Weld County Health Department and Weld County Department of Planning Services shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated hereon and all applicable Weld County regulations. (Planning Dept.) 21. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Planning Commission before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. (Planning Dept.) 22. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Planning Dept.) USR-1216, Messinger, Page 6 / �* MEMORANDUM TO: Weld County Planning Commission March 9, 1999 COLORADO From: Julie A. Chester, Current Planner SUBJECT: USR-1216, Lance Messinger`/ The Department of Planning Services' staff is recommending a continuance of USR-1216, to the April 6, 1999 Planning Commission, for the following reasons: 1. Several referrals are pending, due to lack of information from the applicant. 2. Several issues must be addressed after receiving the referrals and staff requires adequate time to incorporate referral information into a recommendation. The applicant is aware of and in agreement with the continuance. Thank you for your consideration in this matter. EXHIBIT ' 3 1;.%* DEPARTMENT OF PLANNING SERVICES rat PHONE (970) 353-6100, EXT.3540 FAX (970) 352-631252-6312 WELD COUNTY ADMINISTRATIVE OFFICES lig 1400 N. 17TH AVENUE GREELEY, COLORADO 80631 e COLORADO January 26, 1999 Lance Messinger 12610 WCR 25-1/2 Ft Lupton, CO 80621 Subject: USR-1216 - Request for a Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development facilities Including Oil and Gas Support and Service (Storage and Repair of downhole oil field tools) on a parcel of land described as Lot B of RE-2235; being part of the E2 of Section 31, T3N, R66W of the 6th P.M., Weld County, Colorado. Dear Mr. Messinger Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for March 16, 1999, at 1:30 p.m. This meeting will take place in Room 101, Commissioner's Hearing Room, Weld County Centennial Center, 915 10th Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the policy of Weld County to refer an application to any town or municipality lying within three miles of the property or if the property is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the Platteville Planning Commission for its review and comments. Please call Town of Platteville 970-785-2245 for further details regarding the date, time, and place of this meeting. It is recommended that you and/or a representative be in attendance at the Platteville Planning Commission meeting to answer any questions the Commission members may have with respect to your application. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four(24) hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services' office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully, d EXHIBIT Julie A. Chester Planner Hello