Loading...
HomeMy WebLinkAbout952485.tiff Qcy.nc C 1:::.1D COEITY 11195 FJ9 13 Al 10: 36 CLERK TO THE En'RD November 6, 1995 Weld County Commissioners 915 10th Street Greeley, CO 80631 Dear To Whom It May Concern: RE: Notification of Class 1 Modification of the Kodak Colorado Division RCRA Part B Permit Attached please find a Notice to modify the Kodak Colorado Division(KCD)RCRA Part B Permit to build a covered loading and unloading truck pit at our Permitted Drum Storage Facility. This notice is being mailed to you in accordance with 6CCR-1007-3, Part 100, Section 100.63(a)(1)(ii). If you have any question regarding this matter, or you would like a copy of the drawing referenced in the modification, please contact Mr. David C. Andre' (970) 686-4498. Sincer y, ezzieepe(4467 .,„ David C. Andre' Senior Environmental Engineer Kodak Colorado Division 9952 Eastman Park Drive Windsor, CO 80551-1510 Attachment 9)(kV / 9524a5 EASTMAN KODAK COMPANY • WINDSOR,COLORADO 80551 Y CI -777a4 September 29, 1995 zio 9 6737s6e Mr. Gary W. Baughman,PE. /0/33/97 Chief-Facilities Section Hazardous Materials and Waste Management Division Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South Denver, CO 80222-1530 Re: Class I Permit Modification General Permit Provisions Attention: James Hindman Dear James, Following the direction given during our phone conversation on September 26, 1995, Kodak Colorado Division(KCD) is submitting a Class I permit modification to our RCRA Part B permit. The modification involves constructing a covered loading and unloading truck pit equipped with secondary containment at our permitted drum storage facility. This request is consistent with the regulations found in 6CCR 1007-3 Part 100 Section 100.63 Appendix I Classifications of Permit Modifications. Section A of Appendix I states, Equipment replacement or upgrading with functionally equivalent components(e.a pipes, valves, pumps, conveyors, controls) is a Class I modification. KCD currently has a truck loading and unloading area. Presently it has no containment or cover. Secondly, the area does not allow for ground level loading or unloading of delivery trucks. We feel the proposed modifications,one, constructing a concrete truck pit equipped with a secondary liner and containment trench, and two, covering this facility fall under the category of upgrading functionally equivalent components. The plan for upgrade allows for the containment of 100 gallons of material. Should a spill of less than 100 gallons that is contained in the truck pit occur, KCD personnel will immediately contact Plant Protection to coordinate the clean-up. KCD's Plant Protection Personnel have emergency response training. Should a spill in excess of 100 gallons occur, KCD personnel will immediately call 911 and Plant Protection will employ the KCD Contingency Plan.. Precipitation found in the trench will be removed following steps described in KCD's Part B permit application Part 100.41(6)(1)Removal of Liquids from Containment System[6CCR 1007-3 Part 100.41(b)(1)(i)(E)] dealing with precipitation. EASTMAN KODAK COMPANY • 9952 EASTMAN PARK DRIVE • WINDSOR• COLORADO 80551 OKodak A copy of the engineering drawing for the modification is included. This drawing should be attached to the drawing labeled Figure 1V located in KCD's Contingency Plan found in our Part A application and again in Part 100.41(a)(7) of our Part B application. A copy of the new drawing should also be attached to Figure IV located in Part 100.41(b)(1) of the Part B application. The last section of the Part B application effected by this modification is Part 100.41(a)(4)& (5) dealing with inspections. KCD procedure KCD- 6204 deals with how KCD inspects the drum storage facility. The procedure was modified to included inspection of the trench in the truck pit. A copy of the modified procedure is included and should replace the copy found in the previously mentioned section. KCD feels this modification is a significant improvement to they way we currently perform loading and unloading operations at our drum storage facility. This modification reduces risk to our employees along with reducing risk to the environment. KCD will begin construction shortly after we have received confirmation the Colorado Department of Public Health and Environment has received this letter. Also, in compliance with section 100.63(a)(1)(ii), KCD will send copies of this Class I permit modification to all persons on the facility mailing list. Please contact me if you need additional information. Sin ly, c de..gs4 David C. Andre' Senior Environmental Engineer Kodak Colorado Division 9952 Eastman Park Drive Windsor, CO 80551-1510 - Attachments Engineering Drawing Procedure KCD-6204 EASTMAN KODAK COMPANY • 9952 EASTMAN PARK DRIVE • WINDSOR, COLORADO 80551 Hello