Loading...
HomeMy WebLinkAbout982691.tiff 00 +0 )(ra IT SITE PLAN REVIEW Administrative Review COLORADO Case Number: SPR-291 Parcel Number: not established Applicant: The Eaton Bank Legal Description: Lot 3, Block 1, Western Dairymen Cooperative Subdivision Zoning: PUD (C-3/I-1) Proposed Use: Temporary and Permanent Bank Facilities Site Plan Review Standards Meets the Intent of the Weld County Zoning Comments Ordinance&MUD Plan Site Plan Certification Included in Application YES Retention Facilities Engineering Approved by Public Works, 11/17/98 YES Dept.Approval Date Off street Parking See Conditions of Approval #I.c.13& I.c.14 YES Loading Areas See Conditions of Approval #I.c.13& I.c.14 YES Access Approved in Memo from Don Carroll,Weld Co. PublicWorks,l0/22/98 YES Setback Requirements 25 feet YES Offset Requirements 10 feet YES Landscaping See Conditions of Approval #I.b& I.c.I I YES Trash Collection and Storage See Conditions of Approval #I.c.4, I.c.5 & 1.c.6 YES Potable Water Left Hand Water District,See Conditions of Approval #I.c.10& I.e YES Sewage Disposal St.Vrain Sanitation District,See Conditions of Approval #I.c.8& I.f YES 96e, Is 9/ %L :7/D5 •� Environment Standards Noise See Condition of Approval #I.c.7 Section 23.2.1.21.1 YES Air Quality See Conditions of Approval #I.c.5 & I.c.6 23.2.1.21.2 YES Water Quality See Conditions of Approval #I.c.3, I.c.B, I.c.9& I.c.IO 23.2.1.21.3 YES Radiation See Conditions of Approval #I.c.l3 & I.c.14 23.2.1.21.4 YES Heat See Conditions of Approval #I.c.13 & I.c.14 23.2.1.21.5 YES Light See Conditions of Approval #I.c.13& I.c.14 23.2.1.21.6 YES Property Maintenance See Conditions of Approval #I.b.2, I.c.13 & I.c.14 23.2.1.21.7 YES This site plan review is approved with the attached conditions: 1. Prior to recording the Site Plan Review plat, the applicant shall address the following to the Department of Planning Services' satisfaction: a. The plat shall be amended to delineate the following: I) The applicant shall place signs at the entrance to the temporary bank facility to identify one way in and one way out traffic. (Public Works) 2) A rendering or written description of the directional sign to be placed on the temporary bank site which identifies parking,commercial access,and pull-up window access. b. The applicant shall include in the Landscape Plan the following information: 1) An installation schedule which specifies when the landscaping will be installed on site. (Dept. of Planning Services) 2) A landscape maintenance schedule which specifically states who will perform maintenance and that maintenance is on-going and shall not end upon final acceptance by the Department of Planning Services. (Dept. of Planning Services) c. Prior to recording the plat: 1) The applicant shall complete Improvements Agreements with Weld County for the purpose of ensuring the timing and completion of on-site access and landscaping improvements for both temporary and permanent facilities. These agreements shall be reviewed and approved by the Weld County Department of Planning Services, Public Works Department,and the Board of County Commissioners. Upon approval of the agreement, the applicant shall submit adequate collateral which equals the amount of the improvements to be completed. (Dept. of Planning Services) •� d. The following notes shall be placed on the plat: 1) In accordance with the Weld County Zoning Ordinance, no land, building or structure shall be changed in use or type of occupancy, developed, erected, constructed, reconstructed, moved or structurally altered or operated in the commercial or industrial zone districts until a Site Plan Review has been approved by the Department of Planning Services. (Dept. of Planning Services) 2) In the event that a portion of the building is proposed to be leased to another party in the future, the applicant shall submit a copy of the lease agreement or other appropriate evidence/information regarding the proposed use of the leased portion to the Weld County Weld County Department of Planning Services for review. This review may involve the Weld County Attorney's office, Weld County Building Inspection Department,Mountain View Fire Protection District or other appropriate referral entity. Based upon the proposed use and/or impacts of the leased portion,the Department of Planning Services may require a new Site Plan Review application. (Dept. of Planning Services) 3) All liquid and solid wastes shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Health Dept.) 4) No permanent disposal of wastes shall be permitted at this site. (Health Dept.) 5) Waste materials shall be handled, stored and disposed of in a manner that controls fugitive dust,blowing debris and other potential nuisance conditions.(Health Dept.) 6) Fugitive dust shall be controlled on this site. (Health Dept.) 7) The maximum permissible noise level shall not exceed the commercial limit of 60 db(A), as measured according to 25-12-102, Colorado Revised Statutes. (Health Dept.) 8) The facility shall utilize the St.Vrain Sanitation District for sewage disposal.(Health Dept.) 9) Adequate toilet facilities shall be provided for the public and employees. (Health Dept.) 10) The facility shall utilize the Left Hand Water District for domestic water service. (Health Dept.) 11) Landscaping materials as indicated in the approved landscape plan shall be maintained at all times. Dead or diseased plant materials shall be replaced with materials of similar quantity and quality at the earliest possible time. (Dept. of Planning Services) 12) All structures, including signs, on site must obtain the appropriate building permits. (Dept. of Planning Services) 13) The site shall maintain compliance with the Weld County Mixed Use Development 00 (MUD) standards at all times. (Dept. of Planning Services) 14) The site shall maintain compliance with the Weld County Planned Unit Development (PUD) standards at all times. (Dept. of Planning Services) 15) The temporary bank facility shall exist for a period not to exceed twelve (12) months. Six(6)month extensions beyond that time may be granted after review and approval by the Board of County Commissioners. The temporary structure and all on-site amenities shall be removed from the site not more than sixty(60)days after the issuance of the Certificate of Occupancy for the permanent facility. (Dept. of Planning Services) e. The applicant shall submit evidence to the Department of Planning Services that final approval has been received from the Mountain View Fire Protection District.(Mountain View Fire Protection District). f. The applicant shall submit evidence to the Department of Planning Services that all Left Hand Water District conditions and requirements as indicated in the district's letter dated September 21, 1998 have been met and service to the lot has been obtained.(Dept.of Planning Services) g. The applicant shall submit evidence to the Department of Planning Services that all St.Vrain Sanitation District requirements as indicated in the district's letter dated August 25, 1998 have been met and service to the lot has been obtained. (Dept. of Planning Services) h. The applicant shall supply a typical cross-section, or shall provide a note on the plat for the permanent bank facility which describes depth of base and asphalt or full-depth asphalt to be utilized for the drive-through and off-street parking area. Section 10 of the Weld County Subdivision Ordinance shall be utilized to calculate these standards. (Public Works) 2. Prior to the release of building permits: a) In conjunction with the requirements of the Final Plan of the Western Dairymen Cooperative P.U.D., all street signs and lot identification shall be in place. (Dept. of Planning Services) b) Upon approval by the Department of Planning Services, the Site Plan Review plat shall be recorded. (Dept. of Planning Services) c) The applicant shall submit two sets of blueprints, including engineered foundation and structural design plans,for review to the Building Inspection Department upon submittal of building permit applications for the permanent facility. (Building Inspection) 3. Prior to the release of the Certificate of Occupancy: a) A final inspection of the occupancy for the permanent facility will be required by a member of the Mountain View Fire Protection District. Evidence of fire district approval shall be forwarded to the Weld County Department of Planning Services. (Mountain View Fire Protection District) •• • • iS,Site Plan Review conditionally approved by: /J -6-1 Date: December 1, 1998 Ben Patton, Planner I MEMORANDUM TO: SPR-291 Referral Respondent IYi`P�. FROM: Ben Patton, Planner COLORADO SUBJECT: Case number You may recognize the application number for this Site Plan Review. Recently you may have reviewed SPR-291--a temporary bank facility in the MUD. The application included in this packet, also labeled SPR-291, is for the permanent bank facility on the same site. For some reason the applicant chose not to submit them concurrently, even though they had been given permission to do so. I will review the temporary facility first, but will not proceed with staff approval until referrals have been received for the entire site. I just wanted to let you know why you were receiving two different applications listed under the same number. Ben Patton SERVICE.,TEAMWORK,INTEGRITY,QUALITY DEPARTMENT OF PLANNING SERVICES ce'tie; PHONE (970)353-6100, EXT 3540 FAX (970) 352-6312 WELD COUNTY ADMINISTRATIVETIVE OFFICES 1400 N. 17TH AVENUE 111k. GREELEY, COLORADO 80631 COLORADO October 13, 1998 The Eaton Bank 100 Oak Avenue Eaton, CO 80615 Subject: SPR-291 -Site Plan Review for the Eaton Bank main facility as well as the temporary facility on a parcel of land described as Lots 1 &2, Block 1, Western Dairymen Cooperative, Weld County, Colorado. Dear Applicant: Your application and related materials for the request described above are complete and in order at this time. Our Department will be processing the Site Plan within 45 days or upon receipt of recommendations from the referral agencies. You will be notified by this office at the end of the review period regarding the site plan. It is the policy of Weld County to refer an application of this nature to any town or municipality lying within three miles of the property in question or if the propertyunder consideration is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the Dacono, Firestone, and Frederick Planning Commission for their review and comments. It is -recommended that you and/or a representative be in attendance at the Dacono, Firestone, and Frederick Planning Commission meeting to answer any questions the Commission members may have with respect to your application. Please call City of Dacono at 303-833-2317; Town of Firestone at 303-833-3291; and Town of Frederick at 303-833-2388, for further details regarding the date, time, and place of these meetings. If you have any questions concerning this matter, please feel free to call or visit our office. Sincerer Ben Patton Planner pc: Jerry Miller • J.W. Miller Associates 203 S. Main Street, Suite D Longmont, CO 80501 ! • SITE PLAN REVIEW APPLICATION Application Fee Receipt Number Case Number Recording Fee Receipt Number Application Checked By Planner Assigned to Case TO BE COMPLETED BY APPLICANT: (Please print or type, except for necessary signature). LEGAL DESCRIPTION OF PROPERTY: Lc — 1/1.; Blrr k I• WES- M tAtnwAEtt1 Ccvvw VcI+x-• (Attach separate sheet if necessary) W Ko Cookr e,CDLD. PARCEL NUMBER: (12 digit number found on Tax I.D. Number or obtained in the Assessor's Office. PROPERTY ADDRESS (if available) 3551 Sta ecoac4k Enact NO2TH CanAINIO COLO. PRESENT ZONE I- I /C3 OVERLAY ZONES M .U.D. TOTAL ACREAGE Z .71 AC ets PROPOSED USE Ban k Fac-i ( i 5 PROPERTY OWNER: Name: I he. Ca-For, AQa JV Address: IcC OAlc AVLUUL City Fa^*DN / Cow. Zip ceO&,IS Home Telephone N/Pc Business Telephone('-}p' y 94- 3H Stan APPLICANT OR AUTHORIZED AGENT(if different than above): Name: Jae? VJ M i LLc,L ,, JAIL 1. M i LL.4At- A sSoc i a}4.-s Address: 203 Soj+h Main Ok'./Su;}e b City I bnymont cow Zip WS01 Home Telephone N/Pt Business Telephone (303) r+71 ..1-I I1% I hereby depose and state under the penalties of perjury that all statements, proposals and/or plans submitted with or contained within the application are true and correct to the best of my knowledge. Signatu : owner JaiA147t O� /1Ia. 9 ult APPLICATION FLOW SHEET COLORADO APPLICANT: Eaton Bank/JW Miller &Assoc. CASE #: SPR-A I REQUEST: SPR for Eaton Bank main facility as well as the temporary facility LEGAL: Lots 1 & 2, Block 1, Western Dairymen Cooperative LOCATION: South of and adjacent to HWY 119 & east of and adjacent to WCR 7 '/ & north of and adjacent to North Stagecoach Road PARCEL ID #: ACRES: 2.71 Date By Application Received 10/5/98 SL Application Completed 10/7/98 SB Referrals listed 10/7/98 SB Design Review Meeting (PUD) n/a File assembled in ILI og 04 Letter to applicant mailed a .IL 041 Vicinity map prepared f Referrals mailed I al(_i-QJ I r l Chaindexed n Field check by DPS staff I Q-(c r_ g ch\ Administrative Review decision:G1,KNIM,C f II Date By County Commisioners Hearing Date (if applicable) Surrounding property owners notified Air photo and maps prepared CC action: CC resolution received Recorded on maps and filed Overlay Districts Zoning PUD (I-1 & C-3 uses)Western S-431 Airport Yes No_X_ Geologic Yes No_X_ Flood Hazard Yes No_X_ Panel#080266 0850C • • APPLICATION REQUIREMENTS FOR A SITE PLAN REVIEW The purpose of the application is to give the applicant an opportunity to demonstrate through written and graphic information how the proposal complies with the standards of the Weld County Zoning Ordinance, as amended. The following supporting documents shall be submitted as a part of the application: 1. Site Plan Review application form (included in this packet); • 2. A signed and notarized Site Plan Review certification form (included in this packet); 3. A copy of a deed or legal instrument identifying the applicants interest in the property under consideration; 4. A party wall agreement and legal description for duplex or triplex uses where units are held in separate ownership; 5. A condo declaration and legal description for the condo, if applicable; 6. A detailed description of the proposed use; 7. The applicant shall submit evidence that the use in the zone district shall have an adequate source of potable water and meet the requirements of the zone district; 8. The applicant shall submit evidence that the use in the zone district shall have adequate sewage disposal facilities and meet the requirements of the zone district. If there is an existing septic system located on the site, the applicant shall include in the application a copy of the septic permit. This information can be obtained from the Weld County Health Department; 9. A completed Weld County Road Access Information Sheet(included in this packet); 10. The number of employees associated with the use. 11. A statement indicating that the proposed use meets the required setback and offset requirements of the zone district; 12. A generalized sketch of building elevations depicting the style, size and exterior construction materials of the buildings proposed in sufficient detail to exhibit the relative compatibility of the proposed site with the character of the surrounding land uses; 13. A plan describing any proposed signage, drawn to an appropriate scale which shall include specifications of the proposed sign(s) and sign structure along with the method of construction and attachment to the building or ground. The position and distance of the sign(s) in relation to property lines and buildings and structures on the property shall be shown on the Site Plan Review map. All proposed signs shall apply for and receive a building permit; 14. Statements describing that the landscape requirements listed below have been meet: A. The lot shall adhere to the Maximum Lot Coverage requirements of the zone district in which it is located in, as shown in the Bulk Requirements in the Weld County Zoning Ordinance. Land shall not be deemed covered if it is used for growing grass, shrubs, trees, plants or flowers or if it is otherwise suitably landscaped; B. That portion of a LOT in the zone district which abuts a public or private street right-of-way shall have a minimum fifteen (15) foot wide landscape setback, unless the LOT is governed by a more restrictive landscape setback contained in an overlay district. The landscape 2 • setback is measured at a right angle from the existing or planned future right-of-way to any parking lot, fencing, storage area, or structure. Sidewalks and driveways may pass through the required LANDSCAPE setback. C. Landscaping techniques shall be utilized in design of parking lots to aid in buffering parking lots from roadways; D. The applicant shall submit to the Department of Planning Services a detailed landscaping plan delineating the existing and proposed trees, shrubs, ground covers, natural features such as rock outcroppings, and other landscaping elements. The plan shall show where landscaping exists or will be located along with planting and construction details, species name and size. Where existing plantings are to be retained, the applicant shall include in the plans proposed methods of protecting the plantings during construction; E. The applicant shall submit to the Department of Planning Services a maintenance plan for the proposed landscaping on the site; 15. A statement accompanied by evidence explaining how the storm water runoff will be handled. If physical changes to the site are proposed (grading, paving, increased roof areas, etc.)then evidence, maps, and calculations explaining how storm water retention facilities are designed to retain the storm water runoff in excess of the historic flow from the undeveloped site shall be designed for a 100 year storm and release retained water at a rate not to exceed a five year storm falling on the undeveloped site; 16. A statement explaining that the proposed use, building or structure meets the Off-Street Parking Requirements listed in Section 41 of this Ordinance. Sufficient screened, off-street, paved parking areas shall be provided in all districts; 17. A statement explaining that the loading/service areas in all districts shall be located, designed, and constructed in a manner that is in conformance with the standards below: 18. Sufficient space shall be provided in loading/service areas to accommodate the vehicles being loaded or unloaded without encroachment upon neighboring property or rights-of-way. Loading/service areas shall be paved; 19. Loading areas located within the I-1 and 1-2 Districts shall be designed to comply with the appropriate use regulations under either Section 34.2 or Section 34.3 of this Ordinance; 20 A statement explaining that the lot shall have safe access to an approved public or private street. The design designation of a street or highway as to type shall be in conformance with that shown on the Weld County Transportation Plan and/or the Master Plan of the affected municipality; 21 A statement explaining that new accesses to public rights-of-way shall be constructed using the minimum standards below. Designs exceeding these minimums may be required by the Weld County Public Works Department depending upon the number and type of vehicles generated by the use proposed; A. Size of drainage structure- 15 inches minimum in diameter; B. Length of drainage structure -20 foot minimum; • C. Depth of cover over pipe - 12 inches; D. Width of access - 10 - 15 feet for a one-way single access, 24 foot minimum for two-way traffic; 3 • E. Maximum grade of access- 15 percent; F. Flare radius-20 foot minimum in a residential zone district, 40 foot minimum in commercial and industrial zone districts; G. Depth of surfacing - per engineered design and subject to approval by Weld County Public Works Department; 22. A statement explaining how acceleration/deceleration lanes, when required by the Weld County Public Works Department or the Colorado Department of Transportation, will provide safe, efficient access to arterial or collector streets; 23. A statement explaining that the trash collection areas or facilities are located, designed, and used in a manner that shall meet the requirements of the zone district; 24. A statement explaining that the use conforms with the following operation standards to the extent that they are affected by location, layout, and design prior to construction and operation. Once operational, the use shall conform to the standards listed below: A. Noise. uses and structures in the Commercial and Industrial Districts shall be located, designed, and operated in accordance with the noise standards as established in 25-12-101 C.R.S.; B. Air Quality. USES in the Commercial and Industrial Districts shall be located, designed, and operated in accordance with the air quality standards established by the Colorado Air Pollution Control Commission; C. Water Quality. USES in the Commercial and Industrial Districts shall be located, designed, and operated in accordance with in the standards established by the Colorado Water Quality Control Commission; D. Radiation and Radioactive Materials. The handling, use, storage, and processing of radioactive materials shall be in accordance with the applicable regulations of the State of Colorado and the United States Government; E. Heat. Uses located within the Commercial and Industrial Districts shall not emit heat in such an amount sufficient to raise the temperature of the air or of materials at or beyond the lot line more than five (5)degrees Fahrenheit; G. Glare. Any lighting used to illuminate an off-street parking area, outside storage area, outside activity area, sign or other structure shall be arranged as to deflect light away from any adjoining residential zone and from county roads. Any lighting, including light from high temperature processes such as welding or combustion, shall be designed, located, and operated in such a manner as to meet the following standards: sources of light shall be shielded so that beams or rays of light will not shine directly onto ADJACENT properties; neither the direct or reflected light from any light source may create a traffic hazard to operators of motor vehicles on PUBLIC or private STREETS; no colored lights may be used which may be confused with or construed as traffic control devices; H. Property Maintenance. All property shall be maintained in such a manner that grasses and weeds are not permitted to grow taller than twelve (12) inches. The property owner,shall not allow the growth of NOXIOUS WEEDS. 4 �I,0111 i /c" 7; a' ) A � l ,L a ! �.4 ► `, 1-'w lE� 411� (,0 .1 r , / . F EATON BANE V September 23, 1998 To Whom It May Concern: This letter is an authorization for our architect, Mr. Jerry Miller to be a signor on any application necessary with the Weld County Planning Department for The Eaton Bank project in the Milky Way Subdivision in Longmont at the Del Camino exist on State Highway 119. This would be for the temporary site on lot 3 as well as the permanent site on lots 1 and 2. The Eaton Bank branch in Longmont will be operated under the name of Centennial Bank of the West. Sincerely, William R. Farr President WRF/gc 100 OAK AVENUE/EATON,CO 00615/BUS(970)151-3456/FAX(970)454-2457 930 11TH AVENUE/GREELEY,CO 80631/BUS(970)356-3456/FAX(970)353-4973 2700 17TH AVENUE/GREELEY,CO R0634/BUS(970)339-3456/FAX(970)339-3906 • ip SITE PLAN CERTIFICATION I hereby certify that the uses, buildings, and structures located on: Lod I,2i Block. I1 WEST Da,gidmioCCOPIP itx-t +y,lttc_ WabCoiw Cola• are (legal description) designed and will be constructed and operated in accordance with the applicable performance standards and district requirements for the_ Actin ri a.-1 a--() T rUmceru a I (c-3 zone district as stated in the Weld County Zoning Ordinance and in accordance with any conditions imposed by the Board of County Commissioners at the time the property was zoned or rezoned. I understand my failure to comply with the performance standards and/or any conditions could result in the County initiating a compliance action against me. Signature of P�?peA7" ►&horizcb Aber The foregoing instrument was subscribed and sworn efore me this J day of �4-, , 199! , by A YGe2w WITNESS my hand and official seal. My Commission expires: ri —7-0/ Z. Notary Public �..„� ..q. 4 r vs C 1 m: OTA ..\ 1 ate." Nam' PUBLIC_10 i rr'9Tlc ! c- , F COL 10 • • • J.W. MILLER ASSOCIATES Architecture • Planning • Urban Design 203 South Main Street,Suite D,Longmont,Colorado 80501 303 / 772-4118 FAX: 772-1262 2 October, 1998 RE: CENTENNIAL BANK of the WEST Site Plan Review Project No: 9806 Lots 1 &2,Block 1,Western Dairymen Cooperative,Inc.Subdivision Weld County,Colorado Monica Daniels-Mika,AICP Director Department of Planning Services 1400 N. 17th Avenue Greeley,CO 90631 Dear Monica, This application is for the main bank facility for Eaton Bank, d.b.a. Centennial Bank of the West,located in Del Camino on the above referenced site. Per our meeting of 23 September, we are submitting this with the understanding that it and the application for the temporary will be processed together. As a result,we have not included an additional application fee. We have,however, included all other required documentation, even though it may be redundant, in order to lessen any confusion. I also want to thank you, on behalf of my client, for the expeditious processing of the building permit for the temporary building. It is much appreciated. The following written statements are in support of the Site Plan Review application for tlg,above referenced project. Accompanying this letter are: • The original and nine(9)copies of the application form; \I • "�,. • The original Site Plan Review Certification Form; c1c-k • A copy of the warranty deed for the subject property; • Three(3)copies of application requirements; • Three(3)copies of a letter for service from Left Hand Water District; • Three(3)copies of a letter for service from Saint Vrain Sanitation Distri >,.._ • The original and one copy of the Road Access Information Sheet; • Ten(10)copies of the site plan; • Ten(10)copies of the landscape plan; • Ten(10)copies of the schematic building elevations; • Ten(10)copies of the grading plan; • The original and nine(9)copies of the drainage letter and calculations, and The project is located on Lots I &2, Block 1,Western Dairymen Cooperative, Inc. subdivision, Weld County, Colorado. This development is currently zoned Light Industrial(I-1)and Commercial(C-3)in Weld County. Based on the use and operation as a Financial Institution owned by Eaton Bank, it appears that the building use is consistent with uses allowed by right in either the Industrial or Commercial districts. As is the case with any project,time is of the essence. We will appreciate anything you can do and any suggestions that you may make to expedite the site plan review and approval process. Proposed Use: The Eaton Bank is the owner and principle occupant of the proposed building and will be doing business as Centennial Bank of the West. The proposed building will be a two story structure with Centennial Bank of the West occupying the main floor of the building,while the second floor will house additional toilet rooms, an employee lounge,the banks board room and approximately 3,085 square feet of leaseable space. This space will be leased to office type tenants until • 4 . . Page 2 such time as the bank expands into it. Parking needs were calculated with this area used as general office use, as indicated on the Site Plan. Centennial Bank of the West is a branch of Eaton Bank and is the name to be used for their branches along the front range. In addition to this facility,there are two additional branches to be located in the Fort Collins area. It is anticipated that there will be a total of twelve employees for Centennial Bank of the West. The employee count for the leaseable space was determined using the Uniform Building Code occupant load for the gross leaseable area. We believe that this will be an exciting addition to the Del Camino area, as it will be the first bank to be located in the area and along the Highway 119 corridor. Storm Water runoff(Drainage): Please refer to the attached Grading Plan, drainage letter and calculations prepared by Pickett Engineering Co.,dated 30 September, 1998. On-site drainage will be conveyed to the existing subdivision drainage system. Off-Street Parking: Applicable Weld County off-street parking requirements(Section 41.1.3) are as follows: • Bank,Business Professional(first floor)-one(1)space for each 300 sq. ft. of gross floor area and public offices. • Office area(second floor)-one space for each two(2)employees,plus one(1)space for each 500 sq. ft. of office space. As indicated on the Site Plan,there is a total gross building area of 5,786 sq. ft on the first floor. As a result, 20 spaces are required by the building area(5,786/300= 19.2). On the second floor there is a total gross rentable office area of 3,085 sq. ft. as a result,7 spaces are required by the building area(3,085/500=6.2). Also there is an estimated occupancy of 31(per UBC occupant load of 100),therefore, 16 spaces are required(31/2= 15.5). As illustrated on the Site Plan,we have provided a total of 43 spaces(20+7 + 16=43) for the proposed facility,which meets the requirements. The Site Plan also indicates the location of two(2)spaces dedicated as a handicapped accessible parking space near the main entrances to the building,as required by the Americans with Disabilities Act(ADA). These spaces are included in the total parking count and are designed as ADA"universal"spaces,which accommodate both vehicles and vans. Loading Areas: Loading areas are not applicable to the proposed use. However, a 10-foot by 24-foot service space is provided to the rear of the building. Since building storage and mechanical spaces are located toward this side of the building, we felt it was appropriate to provide a space for service type vehicles in this area. Access: The Site has direct access to North Stagecoach Road via one(1)access drive(two-way access onto&off of site)as shown on the Site Plan. In addition,there is a one-way out exit drive from the drive-up banking area onto North Stagecoach toward the easterly edge of the property. North Stagecoach Road accesses directly onto Weld County Road 71/2 which, in turn,has direct access onto Colorado State Highway 119. Engineering Access Standards: The width of the main access drive to the Site are 24 feet as requested by Mountain View Fire Protection District to accommodate Fire Truck Access. One-way drives are generally 12 feet wide except for the drive to the commercial window which is 10 feet wide. All drives and parking will be paved either with asphaltic concrete or Portland cement pavement(depending on budgetary constraints) and will be designed in accordance with the recommendations of a Geotechnical Engineer. It should also be noted that the Site Plan indicates grass paver"drives"completing a loop around the building. While these could serve as additional emergency vehicle access,they are primarily designed to accommodate the banks • • • Page 3 stagecoach which is used for promotional events. The grass pavers enable the stagecoach to give rides to customers around the building without providing hard surface pavement which would detract from the landscape intent. Acceleration/Deceleration Lanes: Based on the use and potential traffic generation and the above discussion,we do not believe that acceleration/deceleration lanes are required for the access drive to the site. Setbacks and Offsets: Weld County standards require a setback of 25 feet from road rights-of-way and side and rear yard offsets of 10 feet. The proposed structure is located in excess of 25 feet from all property lines, as indicated on the Site Plan. Landscaping: As summarized on the Site Plan,the total lot coverage equals approximately 32.2%of the site,which leaves a total area for landscaping of about 67.8%. The 32%lot coverage is less than the maximum allowable of 85%. The Landscape Plan indicates proposed landscaping around the building. Trash: The Site Plan indicates a trash enclosure located just south of the building. The enclosure is sized for one(1)3-yard trash dumpster(per calculations from Western Disposal)which should be adequate to serve the needs of the facility users for trash disposal. The trash enclosure structure will also be designed to provide storage for site maintenance equipment and will have a compatible architectural style o that of the main facility. / (, Water Service: Water will be supplied by the Left Hand Water District. As indicated on the Site Plan,there are two water lines stubbed into the site from North Stagecoach Road. This proposal will only use one. We have performed calculations which indicate that a 1" tap and meter will adequately serve the facility. The line size will be increased to 11/2"after the meter to minimize pressure losses. In addition,the building is proposed to be equipped with a fire sprinkler system. This will be served with a 4" fire line to the sprinkler system and the adjacent fire department connection(FDC). Sewage Disposal: Sewer services will be supplied by St. Vrain Sanitation District. There is an existing sewer line and an existing manhole at the Northeastern corner of lot 1 in a 20'utility easement that is of adequate size to serve the facility. We are proposing a 4"sanitary sewer line from the building to the manhole. Operation Standards: Noise: The proposed use generates minimal noise during operation. If applicable,the facility will operate in accordance with OSHA and Colorado State requirements for generated noise and abatement. Air Quality: The facility will not discharge any pollutants to the atmosphere, so air quality standards are not an issue. Water Quality: There will not be any discharge of industrial wastes into the sanitary sewer system. Radioactivity: There will not be any radioactive materials used in any process on this site. Heat: There will not be any process or activity which will effect the ambient air temperature on this site. 0 • Page 4 Light: There will not be any high temperature process or welding procedure on the site that would produce light sources visible from adjacent properties. Any site lighting will utilize cut-off shields to prevent light from falling on adjacent properties and minimize glare. Property Maintenance: The site and property will be maintained by the owner, in accordance with Weld County Regulations, as well as the covenants for the subdivision. Signage: We are proposing a 25-foot maximum height pole mounted, freestanding sign at the northern side of lot 1, and a "monument",freestanding sign at the main entrance of the property as indicated on the Site Plan. This sign will be relocated from the temporary bank building location. In addition,there will be a freestanding directional sign at junction of drives. All signage will be designed by others, in accordance with the Weld County M.U.D. Sign District Regulations and the Subdivision Design Guidelines. I trust you will find this application complete. If you have any questions or comments,please do not hesitate to contact either myself or Pamela Coonrod at the above address and phone. Since ely, Jerry W. iller Architect CSI • • PICKETI" ENGINEERING COMPANY 210 Bank One Plaza, 822 7th Street, Greeley Co 80631 October 1, 1998 Mr. Jerry Miller JW Miller Associates Architect&Planner 203 South Main Street, Suite D Longmont, Colorado 80501 Re: Permanent Bank Facility Drainage Design, Lots 1 & 2,Block 1 Western Dairymen Coop erative, Inc. Subdivision PEC #98-041 Dear Jerry: I have reviewed the site plan for the above referenced lots, as prepared by you, dated September 1998. Western Dairymen Cooperative, Inc.'s subdivision provides detention for the entire subdivision located along the western boundary of Weld County Road 7 1/2. Therefore, individual lot owners are not required to provide detention on their property but are to collect and convey their stormwater through the storm drainage pipe and area drains located in the front part of the lots just north of Stagecoach Road North. We estimate that the 5-year storm and the 100-year storm peak runoff rates will be 3.6 cfs and 6.7 cfs, respectively, for Lot 1 and 2.7 cfs and 5.04 cfs, respectively, for Lot 2. It appears that the northern portion of the site will discharge into grass swales just north of the driveway that circles the building. The grass swales will carry 6.7 cfs based on a 0.75%slope. See attached Triangular Channel Annalysis and Design. Velocities of approximately 2 ft/sec may be anticipated and will not cause any erosion. The remainder of the water, being on the east and west of the bank building, will run in a swale directly toward the inlets located at the southwest corner of Lot 1 and the southeast corner of lot 2, immediately behind the sidewalk. The swales need be only 2 feet in depth with 1 foot of freeboard. The area inlets, which are CDOT type C inlets, can adequately receive the water from this site with minimal ponding. Should you have any other questions, or if the engineers at the Weld Countaiiblic Works Department %have any questions,please do not hesitate to call upon us. °°°°°°,0O F /r',�s Sincerely, ^ v off^' pi,.Pic4 �•per'• ' PICKETT ENGINEERING COMPANY �' • 27783177 Al 1 . . sQ K ' A. P' kett, P�L a`S'^ AL Art ur F. Uhrich, P.L.S. `°•'enaee,• Project Manager Principal Engineer AFU/jz Phone 970/356-6362 • Fax 970/356-6486 Calculations for Stormwater Runoff Lot 1, Block 1, Western Dairymen Cooperative, Inc. Calculate "C" Factor: Total Area Draining to Southwest Corner of Lot 1 = 1.32 acres Impervious Area= 0.87 acres @ C = 0.9, CA= 0.79 Pervious Area= 1.32 - 0.87 = 0.45 acres @ C=0.3, CA= 0.13 Total 0.925 Weighted C=0.925/1.32 = 0.70 Time of Concentration (Ta = Ti + Tr, T; (sheet flow) = 100' @ 0.73% Fig. 3-1 Urban Drainage, Vol. 1 Ti (Fig. 3-1)= 7 min. T,=L/60(V) Where L= 375 V = 1.8 ft/sec =375/60(1.8) =3.5 min. T. = 7 + 4 = 11 Calculate Runoff I5 = 3.90 in/hr 125 = 5.49 in/hr I,00 = 7.28 in/hr Q5 = 0.7(3.90)1.32 = 3.6 cfs Q25 =0.7(5.49)1.32 = 5.07 cfs Qua =0.7(7.28)1.32 = 6.7 cfs Use a 2.0 foot deep V-ditch with 3:1 sideslopes (H:V) • Calculations for Stormwater Runoff Lot 2, Block 1, Western Dairymen Cooperative, Inc. Calculate"C" Factor: Total Area Draining to Southeast Corner of Lot 2 = 1.90 acres Impervious Area= 0.28 acres @ C = 0.9, CA= 0.25 Pervious Area= 1.90 - 0.28 = 1.62 acres @ C=0.3, CA= 0.49 Total 0.74 Weighted C =0.74/1.90 = 0.39 Time of Concentration (T =T; + Tr, T; (sheet flow)= 100' @ 1.87 Fig. 3-1 Urban Drainage, Vol. 1 Ti (Fig. 3-1) = 12 min. =L/60(V) Where L= 140 V = 2.8 ft/sec = 140/60(2.8) = 0.8 min. To= 12 + 0.8 = 12.8 Use 13 min. Calculate Runoff 15 = 3.65 in/hr 125 = 5.14 in/hr hot) = 6.81 in/hr Q5 = 0.39(3.65)1.90 = 2.7 cfs Q25 = 0.39(5.14)1.90=3.8 cfs Quo =0.39(6.81)1.90= 5.04 cfs Use a 2.0 foot deep V-ditch with 3:1 sideslopes (H:V) 411 Triangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name : CENTENNIAL BANK Comment : GRASS SWALE Solve For Depth Given Input Data : Left Side Slope 3 . 00 : 1 (H:V) Right Side Slope 3 . 00 : 1 (H:V) Manning' s n 0 . 035 Channel Slope 0 . 0075 ft/ft Discharge 6 . 70 cfs Computed Results : Depth 1 . 00 ft Velocity 2 . 24 fps Flow Area 3 . 00 sf Flow Top Width 6 . 00 ft Wetted Perimeter 6 . 32 ft Critical Depth 0 . 79 ft Critical Slope 0 . 0261 ft/ft Froude Number 0 . 56 (flow is Subcritical) Open Channel Flow Module, Version 3 .42 (c) 1991 Haestad Methods, Inc . * 37 Brookside Rd * Waterbury, Ct 06708 0 REFERRAL LIST NAME: Eaton Bank/JW Miller and Associates CASE NUMBER: S-291 REFERRALS SENT: October 13, 1998 REFERRALS TO BE RECEIVED BY: November 3, 1998 COUNTY TOWNS and CITIES Attorney _Ault _X Health Department Brighton _Extension Service Broomfield Emergency Management Office _X_Dacono _Sheriffs Office Eaton X _Public Works Erie _Housing Authority Evans Airport Authority _X_Firestone _X Building Inspection Fort Lupton X Frederick STATE Garden City _X Division of Water Resources Gilcrest Geological Survey Greeley Department of Health Grover _X Department of Transportation _Hudson _Historical Society _Johnstown _Water Conservation Board _Keenesburg _Oil and Gas Conservation Commission _Kersey La Salle FIRE DISTRICTS _Lochbuie Ault F-1 Longmont _Berthoud F-2 _Mead _Briggsdale F-24 _Milliken Brighton F-3 _New Raymer Eaton F-4 Northglenn _Fort Lupton F-5 _Nunn Galeton F-6 _Pierce Hudson F-7 _Platteville Johnstown F-8 _Severance La Salle F-9 Thornton _X_Mountain View F-10 Windsor _Milliken F-11 _Nunn F-12 COUNTIES Pawnee F-22 _Adams Platteville F-13 Boulder Platte Valley F-14 _Larimer _Poudre Valley F-15 Raymer F-2 FEDERAL GOVERNMENT AGENCIES _Southeast Weld F-16 US Army Corps of Engineers Windsor/Severance F-17 _USDA-APHIS Veterinary Service Wiggins F-18 Federal Aviation Administration Western Hills F-20 Federal Communication Commission OTHER SOIL CONSERVATION DISTRICTS Central Colo.Water Conservancy Dist. Brighton Panhandle Eastern Pipe Line Co. _Fort Collins _Tri-Area Planning Commission _Greeley _X Longmont West Adams COMMISSION/BOARD MEMBER 6 fWeld County Referral 11, 0 October 13, 1998 • COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Eaton Bank/JW Miller and Case Number S-291 Associates Please Reply By November 3, 1998 Planner Ben Patton Project Site Plan Review for Eaton Bank main facility as well as the temporary facility Legal Lots 1 &2, Block 1, Western Dairymen Cooperative, Weld County, Colorado. Location • South of and adjacent to Hwy 119 and east of and adjacent to Weld County Road 7-'/and north of and adjacent to North Stagecoach Road. For a more precise location, see legal. Parcel Number The application is submitted to you for review and recommendation. Ari' comments or recommendation you consider relevant to this request would be appreciated Please reply by the above listed date sb that we may give full consideration to your recommendation Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. • Comments: I') n - • -C-gS /9/^ 199 /�/Q-2K-2 I f a1-/4�fr /�J er49/Ve.0r_E / [0C// 4/(n///1 Qntl SlYt/CT)t( li,D,c KJ 5/Q7/ �nvvj/D//4/1 41h11n fovm7T js ftp/ia ' ✓ /his is fo. rh-e Morn fQadtry Signature 75/Oil 0 -a/-26 Agency U//f///. Ti'l/v/ Tlof--) Date 4-Weld County Planning Dept. 41400 N. 17th Ave.Greeley, CO 80631 4(970)353-6100 ext.3540 •:(970)352-6312 fax • • - f ice 4404143' • Weld County Referral t ' 0 October 2, 1998 COLORADO' The Weld County Department of Planning Services has received the following item for review: Applicant The Eaton Bank Case Number SPR-291 Please Reply By October 26, 1998 Planner Ben Patton Project Site Plan Review for Centennial Bank of the West Legal Lot 3, Block 1, Western Dairymen Cooperative Subdivision, Weld County, Colorado. Location 3601 Stagecoach Road North. For a more precise location, see legal. Parcel Number The application is submitted to you for review and recommendation Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request • ❑I We have reviewed the request and find that it does/does not comply with our Comprehensive Plan U We have reviewed the request and find no conflicts with our interests ❑ See attached letter Comments &I//d/64 &it/� lL j"-v r-ed To L. Qccos , G7e 77) PnvSotS (4 /7-4 IJ/Scrbt // Ti4s ro,ytCli-P /-/AO,- i0/4ry rA-e 60//0(I;2y ✓/oPV/ snT/ FOr Yeul e /Fo r/c�/nf /S S-e T on a. F 6u/1deT/o.n You / y-e QJL &/79//vty1,0d /oV//d4T/o.o . Signature ��� ��_ IJ ! CJ Agency F R �d/ G 2/0SQcTea.et Date 4-Weld County Planning Dept. 4-1400 N. 17th Ave. Greeley,CO.80631 4.(970)353-6100 ext.3540 •t(970)352-6312 fax 6)5uiovv -t- VII)) Ocuto ' )-(-3 / 0 .) c6\dc) , e (kCiuL) T.1-;cp /45-b-7j-cn a�/US�so ( 1 °Miy\ ( D id-3 9 (?y3(ce) 'cAorc-*'0-Th (L) sit 4 , 0 (4c af? (4 .110-7 ( rAyv-\ g147 - lit1 Jo-4s —sJc\ tJ AsyL)42 rcvl\-/LN-e JAcckAiNcr A-6-tt (so , g(k 1'� ‘A\- Q S-kas Weld County Planning Dept. ctie a NOV 0 3 1999 aatwwED Weld Count. Referra willOctober 211998 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant The Eaton Bank Case Number SPR-291 Please Reply By October 26, 1998 Planner Ben Patton Project Site Plan Review for Centennial Bank of the West Legal Lot 3, Block 1, Western Dairymen Cooperative Subdivision, Weld County, Colorado. Location 3601 Stagecoach Road North. For a more precise location, see legal. Parcel Number l • The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may • give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. - ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan aWe have reviewed the request and find no conflicts with our interests. U See attached letter. Comments: • • Signatuf 4/ o t / 0' 'J Agency ���y� > /� S: CH7-7 Date :•Weld County Planning Dept. 4-1400 N. 17th Ave. Greeley, CO. 00631 4-(970)353-6100 ext.3540 4-(970)352-6312 fax • • 6 Weld County Planning Dept. rfOCT 141998 Weld County Referral • • VED 0 October 2, 1998 • COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant The Eaton Bank Case Number SPR-291 • • • Please Reply By October 26, 1998 Planner Ben Patton • Project Site Plan Review for Centennial Bank of the West • • Legal Lot 3, Block 1, Western Dairymen Cooperative Subdivision, Weld County, • Colorado. • Location 3601 Stagecoach Road North. For a more precise location, see legal. Parcel Number The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan 2k We have reviewed the request and find no conflicts with our interests. U See attached letter Comments- • Signatufe Agency 7 ei7-7 Date •Weld County Planning Dept. •?1400 N. 17th Ave. Greeley,CO. 80631 :•(970)353-6100 ext.3540 <-(970)352-6312 fax 10/1t/98 THIJ 18:58 • FA% l ]001 • 40 . • • Weld County Referral 0 September 22, 1998 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Greg Tuttle • Case Number RE-2348 Please Reply By October 14, 1998 Planner Ben Patton Project Two-Lot Recorded Exemption Legal Parcel 1; Part of the SE4 of Section 9, TON, R67W of the 6th P.M., Weld County, Colorado. Location West of and adjacent to Weld County Road 19; approximately '%mile north of Weld County Road 70. For a more precise location, see legal. Parcel Number 0807-09-000006 ll • The application is submitted to you for review and Recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not receivedIfServices. you havereor on any thisfurt date er aq may be be deemed to be a positive response to the Department regarding the application, please call the Planner associated with the request. U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan Er We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: • • Signature �. - • i n f l ho Agency hO bS Gt) Date 6Wedd County Planning Dept 01400 N.17111 Ave-Greeley.GO.89631 4,(970)353-6100 ef43540 s(970)352-6312 f%X • 10/15/98 15:43 TX/RX NO.2845 P.001 10/15/98 THU 16:30 FAX • . 'Th002 3 jN L weer wc- ts44-7143 Weld County Referral September 23, 1998 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Doris and Leonora Wilson Case Number RE-2346 Please Reply By October 14, 1998 Planner Julie Chester • Project Recorded Exemption Legal Part of the NE4 and part of the SE4 of Section 15,T6N, R65W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to Weld County Road 70 and west of Weld County Road 45. For a more precise location, see legal. Parcel Number 0803-15-000049 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated_ Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to The Department cif Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan Ine have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: Signature j')-L---4 1 1 p }t{)Ct,g Agency h� r C�' . • Date 1 W Weld County Planning Dept. +1400 N.17th Ave,Greeley.CO.80531 O(970)353-6100 ext.3590 a(970)352-6312 fax • • • 10/15/98 15:43 TX/RX NO.2845 P.002 • 10/16,99 09:23 TOWN C-AVT 4 19703526312 • NO.144 P01 • 6 • • Weld County'Referral o • October 2; 1998 COLORADO - The Weld County Department of Planning Services has received the following item for review: Applicant The Eaton Bank Case Number SPR-291 Please Reply By October 26, 1998 Planner • Ben Patton Project Site Plan Review for Centennial Bank of the West Legal Lot 3, Block 1. Western Dairymen Cooperative Subdivision, Weld County, • Colorado. • Location 3601 Stagecoach Road North. For a more precise location, see legal. • • Parcel Number • The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. .Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. • ❑ See attached letter. Comments: • • Signature /�` Agency `ak d f 1-VP.dr11-t/Jr iL ate e *Weld County Planning Dept. 4-1400 N. 17th Ave. Greeley,Co.80631 4(970)353-6100 ext.3540 0(970)352-6312 tax • • 10/16/98 08:27 TX/RX NO.2859 P.001 • 9703502198 •OT,RFFIC • P02703 JRN 22 '99 11:09 MP • . ,: County Referral• �. October 2, 1998 The Weld County Department of Planning Services has received the fotowing Rem for review: Applicant The Eaton Bank Case Number SPR-291 Please Reply By October 28, 1998 Planner Ben Patten Proiect Site Plan Review for Centennial Bank of the West Loge! Lot 3, Stock 1, Western Dairymen Cooperative Subdivision,Weld County, Colorado. LoCaton 3601 Stagecoach Road North. For a more precise location, see legal. Parcel Number • The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give NH consideration to your recommendation: Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Sennoes. If you have any further question4' regarding the application, please call the Planner associated with the request. We have reviewed the request and find that it does/does not comply with our Comprehensive Plan la We have reviewed the request and find no conflicts with our interests. d Sae attached letter. --�^ fir xn �,nr� -4�tts ,Vl il � !► ic7Prrnhdb��t -I,rfo lee. rna-in+ osid l A t - tit pr�nsof �..t ►)nMc.. knpne+ on us. ►nlhe.b k ' did 4i�t� perrvtrl- 1nienkrn t main LUL' ►eok€c.d o. -M k.i of uses. Sao - v b Cnvv1✓Mc.►t-� . '"rrtavr (ra So t2�Y Signature ,. 1 f,?Y3194 Agency ,,M► o-r o / •Wela County Planning Dept 01400 N. 17th Ave.Gmetey,CO.90631 0(970)953-9100 ext3540 i(970)352-6112 fax 01/22/99 11: 15 TX/RX NO.4223 P.002 9703502196 C iToPFFIC 1 P03/03 SRN 222 '99 11: 10 • Q 001111111404 Off st 41 Cts*411,111 roo eld County Referral it pc w1' 6�r41 October 13, 1998 Iroessoo COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Eaton Bank I.1W Miller and Case Number S-291 Associates Please Reply By November 3, 1998 Planner Ben Patton Project Site Plan Review for Eaton Bank main facility as well as the temporary facility Legal Lots 1 &2, Block 1,Western Dairymen Cooperative,Weld County, Colorado. Location South of and adjacent to Hwy 119 and east of and adjacent to Weld County Road 7-Y2 and north of and adjacent to North Stagecoach Road. For a more precise location, see legal. Parcel Number The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: i e- no/ s of) (iS• 2, in g' r/ fI -/ral Signature ✓/,�{ n c.itt /Jt.4 _ 4 _ Agency actor Date +Weld County Planning Dept. +1400 N. 17th Ave.Greeley,CO.50631 +(970)353-6100 ext.3540 +(970)352-6312 fqx 01/22/99 11: 15 TX/RX NO.4223 P.003 • RECEIVED 6 OCT 0 6 1998 WELD COUNTY PUBLIC WORKS DEPT f 41111.11 Weld County Referral • • 1 ' 0 • October 2, 1998 • COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant The Eaton Bank Case Number SPR-291 Please Reply By October 26, 1998 Planner Ben Patton Project Site Plan Review for Centennial Bank of the West Legal Lot 3, Block 1, Western Dairymen Cooperative Subdivision, Weld County, • Colorado. Location 3601 Stagecoach Road North For a more precise location, see legal. Parcel Number The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. 0 See attached letter Comments: Signature ;PUS � � (� 9Agency /c l Date •Weld County Planning Dept. •1.1400 N. 17th Ave.Greeley,CO 80631 4(970)353-6100 ext.3540 4-(970) 352-6312 fax , • MEMORANDUM WIlDTO: Ben Patton, Current Planner DATE: October 22, 1998 CFROM: Donald Carroll, Engineering Administrator W • COLORADO SUBJECT: SPR-291; The Eaton Bank S-291; Eaton Bank/JW Miller and Associates The Weld County Public Works Department has reviewed the Eaton Bank temporary and permanent facilities and has the following comments: TEMPORARY BANK FACILITY: LOT 3, BLOCK 1, WESTERN DAIRYMEN COOPERATIVE SUBDIVISION COMMENTS: There will be a circle drive to access onto North Stagecoach Road with one way in and one way out. The internal road system has been paved and has curb, gutter, and sidewalks. This subdivision is maintained by Weld County. Pickett Engineering has supplied a drainage design for Lot 3, Block 1. The calculations have been reviewed and I have no conflict with the design which has been stamped and signed by a professional engineer. The applicant is supplying adequate parking for the square footage being proposed for the temporary structure. REQUIREMENTS: The applicant shall place signs at the entrance to the temporary facility to identify one way in and one way out. PERMANENT BANK FACILITY: LOTS 1 AND 2, BLOCK 1, WESTERN DAIRYMEN COOPERATIVE COMMENTS: Access will be gained from North Stagecoach Road with a two-way access to the main facility. Circulation through the drive-through section will allow traffic to exit one way. Additional traffic will utillize the off street parking area. REQUIREMENTS: Pickett Engineering needs to supply a drainage design for Lots 1 and 2, Block 1. The applicant needs to supply a typical cross section, or a note on the plat, describing depth of base and asphalt or full depth asphalt to be utilized for the drive through and off street parking lot. Section 10 of the Subdivision Ordinance Design Standards, Geometric Design should be utilized to cai Jatql*ty Planning Dept. cc: SPR-291 OCT 2 6 1998 S-291 planl5 IVED OCT-26-1998 15:49 • Ill • ,r P.01 0 ''m MEMORANDUM i 1 TO: Ben Patton, W.C. Planning DATE: October 23, 1998 , .. 'if e FROM: Sheble McConnellogu e, W.C. Health Department QOLOR'ADO CASE NO.: SPR-291 NAME: EATON BANK • The Environmental Protection Services has reviewed these proposals for both the temporary and main facility. The application materials indicate when the main facility is ready for occupancy, the temporary use will be removed. The following conditions are recommended to be part of any approval: 1) All liquid and wild wastes shag be stored and removed for final disposal in a manner that protects against surface and groundwater contamination_ 2) No permanent disposal of wastes shall be permitted at this site. 3) Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. 4) The maximum permissible noise level shall not exceed the commercial limit of 60 db(A) as measured according to 25-12-102, Colorado Revised Statutes. 5) The facility shall utilize the existing municipal sewage treatment system (St. Vrain Sanitation District). 6) Adequate toilet facilities shall be provided for the public and employees. 7) The facility shall utilize the existing public water supply (Left Hand Water District). SM/vh4773 TOTAL P.01 10/26/98 15:49 TX/RX NO.2996 P.001 II . 6 f & 4,.. ,:.: t i .. . Weld County Referral I v: October 13, 1998 • COLORADO • The Weld County Department of Planning Services has received the.following item for review: Applicant Eaton Bank i JW Miller and Case Number S-291 Associates 2 Please Reply By November 3, 1998 Planner Ben Patton i. Project Site Plan Review for Eaton Bank main facility as well as the temporary facility ii Legal Lots 1 &2, Block 1, Western Dairymen Cooperative, Weld County, Colorado. Location South of and adjacent to Hwy 119 and east of and adjacent to Weld County Road 4 ii 7-%and north of and adjacent to North Stagecoach Road. For a more preciseii location, see legal b g Parcel Number The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan U We have reviewed the request and find no conflicts with our interests. i6 See attached letter. Comments: Signature \3SI \ s'4 'it`--a \c\_Th.:\ .&k% Agency MOUN!TSIN VIEW FIRE PROTECTION DI^TRIc. Date 9119 County Line Road Long;:^t: CO C0501 {•Weld County Planning)• (g'rOttLAv@i lT8Gly.ei e_44fl70)353-6100 ext.3540 •3(970)352-6312 fax Fax (303) 651-77702 Oct-21-98 1O: 52A Mounlin View Fire Protec 303. 772 P_01 y01J++741/4 MOUNTAIN VIEW FIRE PROTECTION DISTRICT li ' Administrative Office: r r. ' 9119 County Line Road - Longmont, CO 80501 A^ (303)772-0710 Metro (303) 6666-4404 FAX(303) 651-7702 • En • 11 FAX TRANSMISSION 111 TO:_ 1 )crt-cn►. Fax Number: FROM : Chuck Boyes Mountain View Fire Protection District Fax Number: (303) 651 .7702 Nillinimmi • Date : \q ---.4„:\ -0\5 Number oP Pages : 3 plus th_s cover , v Oti.ejnjt wtl 1 =- L tc•, allIMINIEJOI reI3Q3) 7Q7TflZtd1ge: 91:: • i09n wen a 5.yy.a 5...�..3 *CaY kw au'-.CO O 9c.an ..wo ix.r xoso. 'brT•a. CO :^a a.... ::.. a�oo...wawa ioat oaaw,a.... .0 ea.Aea •c ao=ro 30504 :�,a.an- Cr; 50o a,w. .cc s.. ::...,s. ,.0 CO gent. .y;cxs v CO 9c3.6 Oacrr, ::WS•. 10/21/98 10: 11 TX/RX NO.2924 P.001 III Oct-21-98 10-b2A Mounten View Fire Protec 303Op1 7702 P-03 C"1 MOUNTAIN VIEW FIRE PROTECTION DISTRICT Administrative Office: I =i f+ 9119 County Line Road •Longmont, CO 80501 � i� + (303) 772-0710 Metro (303) 666-4404 FAX (303)651-7702 . el October 21, 1998 Mr. Ben Patton Weld County Planning Department 1400 N. 17th Avenue Greeley, CO 80631 RE: Case Number S-291 Centennial Bank of the West (Eaton Bank) 3551 Stagecoach Road North Weld County, CO Dear Mr. Patton: This is the site plan review for the permanent bank building to be located on Lots 1 and 2, of the Western Dairymen Cooperative Subdivision. 1 have reviewed the submitted materials for compliance with the adopted codes and standards of the Fire District. The project is within the boundaries of the Fire District and will be served by the District. The Fire District has no objections to the project, if the requirements of the District can be met. Based on my review, I have the following comments: I. The required fire flow for a building of 11,133 square feet of Type V-1 Hr construction, with credit given for the fire sprinkler system throughout the building is 1,500 gallons per minute at 20 pounds per square inch. Based on recent tcsts done in the subdivision, the Fire District will recognize that the required fire flow is available. (Fire Protection District Standards Section 5.02- 1) 2. A building with a required fire flow of 1,500 gallons per minute is required to have one fire hydrant available to serve the building. This hydrant must be located so that all parts of the building are within 450 feet of this hydrant by line of tire apparatus travel. Existing fire hydrants in the subdivision will serve the building. (Fire Protection District Standards Section 6.04-5) Centennial Bank of the West (Eaton Bank) - Site Plan Review. Permanent Building 1 of 2 Semen i Station 2 S41bn a Station 4 R1aMOn SlDobb5 O Docalken g o nn(:nint Una Rd. IonitwpNIl P.O.O�.NS P.O.,gv 11 ,pLatvetle Oita rA Scat P.O.Forest oreo Longmont co Lor�yinwn.CO Ma Parsee Ave. 6500 Nina RnM uvs04 Mead.CO 1%1541 Niwn_CO go644 �afarena,CO le CO0 os tac1no.CSO611. amzb qq waoslg e.c«w.COa ggS14 10/21/98 10:11 TX/RX NO.2924 P.003 II Oc -21-58 10: 53A Mean-tale View Fire Protec 303�1 7702 P_04 t 3. Submit construction plans for the building to the Fire District for review prior to obta'siing a building permit for the building. (Fire Protection ;;District Standards Section 1.01) If you have any questions, please contact me. Siincerrely,A Charles}. l.S t. Fire Prevention Specialist CC: LuAnn Penfold, Fire Marshal Jerry W. Miller Associates Centennial Bank of the West(Eaton Bank) - Site Plan Review, Permanent Building 2 of 2 10/21/98 10: 11 TX/RX NO.2924 P.004 • Oct-07-9a 10:41A Mount View Fire Protec 303 .1 7702 P.02 • RECEiVED • tocJr ce 1; t:› . Wefd County Referral October 2, 1998 COLORADO• • The Weld County Department of Planning Services has received the following item for review: Applicant The Eaton Bank Case Number SPR-291 Please Reply By October 26, 1998 Planner Ren Patton Projnrl Site Plan Review for Centennial Bank of the West Legal Lot 3, Block 1, Western bairymen Cooperative Subdivision. Weld County, Colorado. Location 3601 Stagecoach Road North. For a more precise location, see legal. Parcel Number The apphcatinn is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that We may give full consideration to your recommendation. Any response riot received before or on this dale may be deemed to be a positive response to the,Department of Planning Services. If you hove any further questions regarding the application, please call the Planner associated with the request. U We hove reviewed the request and find that it does i does not comply with our Comprehensive Plan U Wr; hove reviewed the request and find no conflicts with ow interests 17) See attached letter Comments • Signature r\N%s ��= -� \n-1 A� Agency Date 91^^1,, �t11 9 County Line p Roadt ',Wok]County Hannin Dept. 41i'961gAGtGR gO e0631 a(970) 353 6100 ext 3540 6(970)352-6312 fax (303) 772-0710 or Metro (303) 666-4404 fax (303) 651-7702 10/07/98 09:59 TX/RX NO.2703 P.002 - Oct,07-98 10:41A Meunal n View Fire Pretec 3034051 7702 P.03 MOUNTAIN VIEW FIRE PROTECTION DISTRICT Administrative Office; •_ �t 9119 County Line Road•Longmont,CO 80501 ,�' I 't eft (303) 772-0710 Metro (303) 666-4404 FAX (303)651.7702 • Y`: October 7, 1998 Mr. Ben Patton Weld County Planning Department 1400 N 17's Avenue Greeley, CO 80631 RE: SPR-291 Centennial Bank of the West Dear Mr. Patton: I have reviewed the material enclosed with the referral form. The project is within the boundaries of the Fire District and will receive service from the District. Based on my review, I have the following comments that apply to the site plan and review for the temporary building only: 1. The Fire District will not approve the issuance of any building permits in this subdivision until the emergency access to Highway 119 is completed and approved by the Fire District. At the last inspection of the subdivision, the access was not usable. The comment below assumes that the access is completed and approved. 2. The construction plans for the building need to be submitted to the Fire District for review prior to beginning construction. If the temporary building is a modular building, then the floor plans for the building need to be submitted to the Fire District for review. The Fire District will have specific requirements for the building. (Fire Protection District Standards Section 1.01) If you have any questions, please contact me. Sincerely, Cha�Bayer iC Fire Prevention Specialist CC: LuAnn Penfold, Fire Marshal J. W. Miller Associates 5te1b41 1 Stidon 2 yralbn 0 slaws 4 Station a Station 6 Station r altucnty Until'. 10071 well 13 P.O.Par 575 PO e4Y11 1410il Dinars Hit P.O.Hnregy PO.now 40 Lonpmnnt.CO Lor4Pment,CO SW Palmer Avis 8500 Niww Raid Lafayette,CO 600 Orlg t 100 So.Forest St. db01 005O4. Mead.CO90,14, N Sint C080544 H%YM Can. CO e051e Carona.CO 110514 10/07/98 09:59 TX/RX NO.2703 P.003 STATE OF COLORADO OFFICE OF THE STATE ENGINEER -occo� Division of Water Resources � � Department of Natural Resources ' a. Wtr $ 1313 Sherman Street, Room 818 Denver,Colorado 80203 ��revc!. Phone(303)866-3581 FAX(303)866-3589 Roy Romer Governor October 26, 1998 James S.Lochhcad Executive Director Weld County Planning De ..Simpson tate Engineer Mr. Ben Patton OCT 2 7 1998 Weld County Planning Dept. 1400 N. 17`h Ave. RECEIVE® Greeley, CO 80631 �/ RE: Western Dairymen Cooperative Subdivision, Lot 3, Block 1 , SPR-291 Dear Mr. Ben Patton: Pursuant to the State Engineer's August 7, 1995 memorandum to county planning directors, this office is no longer providing comments on land use actions that do not involve the subdivision of land as defined in Section 30-28-101 (10)(a), C.R.S. This referral is a site plan review for Centennial Bank of the West and does not appear to qualify as a "subdivision." Returned herewith are the materials submitted to this office in the above referenced matter. If you have any questions in this matter, please contact this office. Sincerely, Heidi Frey Water Resource Engineer Enclosures cc: Richard Stenzel, Division Engineer /subd-ltr.mrg • • WELD COUNTY ROAD ACCESS INFORMATION SHEET Weld County Public Works Department Date: OaDber Z, 199 933 North 11th Avenue,P.O.Box 758, Greeley,CO 80632 Phone: (970)356-4000,Ext.3750 Fax: (970)352-2868 1. Applicant Name The 1t.ai-on. Rank Phone<9I0' A-19-1- 3y% Address 100 oak R.44\1u4. City £atory State CO Zip 2.O(DIS 2. Address or location of access Section 10 Township 2 NORth Range jog West of}he- +k PM Subdivision wastem Dairy inn CooPcrftvc)Tn< • Block I Lot 1 Z Weld County Road # 7 '2 Side of Road Sew-1-4-1 Distance from nearest intersection ffiri' I-I w y I I oI 3. Is there an existing access to the property? Yes X No_ #of accesses 2. 4. Proposed Use: Permanent 0 Residential/Agricultural Industrial ❑ Temporary 0 Subdivision Commercial ❑ Other • 5. Site Sketch Legend for Access �► Description: , P 1 u � AGR= Agricultural RES = Residential t` ���E srr� „ O&G= Oil&Gas D.R. = Ditch Road 3 JT'b CO: Bsc9 I 7 ************************************************************************************************* OFFICE USE ONLY: Road ADT Date Accidents Date Road ADT Date Accidents Date Drainage Requirement Culvert Size Length Special Conditions ************************************************************************************************* ❑ Installation authorized ❑ Information Insufficient Reviewed By: Title: • 11 • Z0'd -Iw101�a ICII,��u�u nla}_Ilu�IID'r.nm'n �8 2MDl7/ 09/10 IN 11r 11814 County co I et 1 R COO 0 20.0E JR Buhl tS—sea 539 wanaazs f nano TRIP MQD, Keck this day of Marsh 30, 1991, between • 1fiSS2R l N AAIRlls •0 COOPOAATIVe1, INC. A COLORADO COIPQRAT'lON ' arperaties duly ergalad and aiotia0 inn sad by virtue at the !an of the tate of COIAAsaO, stater, mad TAR atwl un whose legal address is 100 OAK AVENUE, RATON, CO 00015 of the County of MID and State of COLORADO, grantees yttfiafita, that the pester, fa and in owideratiea el the in et Oisp,Its.ee season, thereceipt ad cy out!icltn el Aids is hereby .caoledged, has granted, bagafad, told sad carmed, sadby meet promote One great, bargain, all, any and nails ante the greaten, hie belts ad miter fkrsrsr, ell the roil. property, together with intaa.t., it say, ,Rote, lylq sad Miog la the County if fish as state of colored., dseeribed as Miens LOTS 1, 2, AND 3, BLOCK 1, (Alma t DAIRItm.'a COOeR*ATIVN, INC., A IVIPIVISION OF NRLD CONK?, COLORADO, ACCORDING TO TEN FLAT RICORDID JARVART 21, 19911 AR ROOEFTION KO. 2990003. 360.. • 11111111111111111111111IIII1101u 111111IIIINIIIIII11.•• • 2513240 00/10/1001 1a111M Meld County CO 1 t► t R IMO D 30.02 JA gold Tsukeaote • aloe known by strut and number as 3511 STATE MIONIDtT 119, LONGMONT, CO 00504 tOfiMMk win all sod elapula tilt hereditament,and spputenaaa entente Ielegly, or is arise mppattalaseg sot the merlin wed eaendne, rwidsr and rwlidste, tests, isms sad waits tins!, as all the estate, tight, title, !Kenn, clefs and dead et d t statsr of tbe prior, either la ler of"NUN .1, L sd to the abet bargained pral.e., vita the htnditssate and appet.wa na. t0 KW an IV SOU the said pralen sat largsissd sad taatbed, with tie eggaeteeua., ate the pane, Us heirs an assign Thrown. Pad the greeter, ter itself, sad its n ceisere, den overeat, gnat, haagain ad Mtn ts aced with the greaten, hit heirs ad nslga, that at the tie of the eaenlsag ad Silvery of these prenet., It is well seised el the pathos sere anyd, ee geed, sae, pertea, Oman ed SdefWible *step et itherhtahe, fa lee, is lee simple, sad la geed tight, yell pan dad la M nanny to gran, bargain, sell sad teeny the ma le.weer sad fee aforesaid, wed that the sae an Erse sod altar Ina all leaf and ether greets, busies, tale, lases, tan, ssssesant., ncnYrsaces eel ratrletine.f caterer Ud er attars sever, MO Ian to tMfis rat TIN COMM flu, I LIU fiT Ka 1St Ofi OR 9ATN12, eatossn, usnazCtiaa, COafisia Afi k1GRa-0y-1111T Or MOM, it MI, The greater shall sad.111 IBRRAlf An,mina OUSt the about-bargslad praises is yiet and iwaaable nemesia of the pasta, Us hairs ad assign, *last all and eery peen at pens / ly clabdig the nest it an put thereof. she Ung.lar saber sell Unlade the plural, the plerel the r and the no ey may der shall be applicable to alwan.n. - wider ge ! ErecutiqQ�Qing I aMM S nalma, TM grantee has oa.n its enrpsratt sat to he►eraets ahaaib.d CbaitneWEds SKr and its serpents seal to be hw.unt.effird, Otf/it$MM14/////4140.6104/Mf414fMV /044dHttlgb! atom: OrI.... Ck°L INltfsa AMU. $COgpq -'^I♦�_e;' ,ti.Cc • O71e0YRla t ;:.t � . o'• • �- '# -ritta4 ... (Una err mimeo 0 n i' 1st. . ce mmy c ADAMS The IersgelM iatnaset to acbaMgdgd Wen a es Rprnh1O; by Cretan G. !ands, is',r ' 11Cut1Vt Vice Chainan Ol 0$' //.''team saner c0 loon, IOC. , T'd} Uteri ay bed and official sal, �y;' Oy 4 Nf aalafa opine: yy Cn.an;..nBoaEtistniu then,\- :1 tO101 (Corporation Cestl fSa01a `' pg �,a Doc 0 3.01 POi]R'A l.Ct7 bCb w.F NSA NO1tf3 Spat 8661-2 -d3S LEFT HAND WATER DISTRICT September 21, 1998 William Farr, President The Eaton Bank 100 Oak Avenue Eaton, CO 80615 Re: Milky Way subdivision Lots 1 & Lot 2 TO WHOM IT MAY CONCERN: The properties located at the above legal descriptions are within the "Service Area" of Left Hand Water District . The referenced lots will be served in accordance to our standard subdivision agreement . Sincerely, ‘14/ C?- �S Kathryn A. Peterson General Manager P.O. Box 210 •Niwot CO. 80544.(303) 530-4200. Fax(303)530-5252 st. ` ta1n �anit at ion J�C1E LIC1110,V (cCainb cSan) 7e&eplionc JP.O.Box gob (303)776-9570 436 Coffman c$E.cSuite 200 (303)774-2349 gax August 25, 1998 _Conrman&,CO 8 05 02-0908 Mr. Jerry Miller J.W. Miller Associates 203 South Main Street Longmont, Colorado 80501 Re: Commitment to Serve Dear Jerry: This letter was requested in regard to Lots 1, 2 and 3, Block 1, Milky Way Business Park, Del Camino, Colorado, located within: Portion of NW/4 of the NE/4 and NE/4 of the NW/4 of Section 10, T2N,R68W of the 6th P.M., Weld County, Colorado The Property will be served by this District's municipal type collection system and aerated lagoon treatment plant constructed to Colorado Department of Health and Environment standards and operated subject to the Colorado Discharge Permit system. This project complies with the District's Master Plan. Sewer lines have been extended to serve these lots. Initially,there will be a temporary bank building, to be followed by a permanent bank building, each on separate lots with separate taps. The property is within the District. St. Vrain Sanitation District has 1,852 SFE (single family equivalent)taps of which 770.4 have been purchased, resulting in 1,079.6 available for purchase. These taps are available to referenced property and other eligible properties on a first-come, first-served basis. As the present supply of taps is consumed, the District plans to increase the size of its treatment plant to serve 5,555 SFE taps. These additional taps would also be made available on a first-come, first-served basis. The above-referenced property is eligible to utilize the available supply of taps on a first-come, first-served basis, subject to the following: • a. Purchase of the required number of taps, as needed; and b. Compliance with the District Rules and Regulations. • Mr. Jerry Miller • • August 25, 1998 Page 2 Should this property wish to obtain an absolute commitment to serve,taps may be prepurchased and held until needed. Monthly service charges will be assessed upon connection to the District or twelve months after purchase, whichever comes first. The Subdivision Service Agreement also provides for reservation of taps for thirty-six months at Applicant's discretion. Should you have any questions concerning this matter, do not hesitate to contact me. Very truly yours, ST. VRAIN SANITATION DISTRICT By ,CL. L. D. Lawson, P.E. Manager LDL:mej cc: Division of Planning Services, Weld CountyDia LARGE MAPS ARE LOCATED IN ORIGINAL FILE Hello