Loading...
HomeMy WebLinkAbout950646.tiff • USE BY SPECIAL REVIEW APPLICATION Department of Planning Services, 1400 N. 17th Avenue, Greeley, Colorado 80631 Phone- 353-6100- Ext. 3540, Fax #(303) 351-0978 TO BE COMPLETED BY APPLICANT: (please print or type, except for necessary signature) LEGAL DESCRIPTION OF SPECIAL REVIEW PERMIT AREA: Part NE4 Section 1 T 1 N, R 68 W TOTAL ACREAGE 3.0 + PRESENT ZONE A OVERLAY ZONE Geologic Hazard PROPOSED USE Motor grader and Household Hazardous waste collection facility owned and operated by Weld County Government SURFACE FEE (PROPERTY OWNERS) OF AREA PROPOSED FOR THE USE BY SPECIAL REVIEW PERMIT: Name: Weld County Government Address: P.O. Box 758 Greeley, C 356-4000 Ext 4224 UCity/State/Zip:Greet COL Telephone: Business Telephone: Name: Address: City/State/Zip: Home Telephone: Business Telephone: APPLICANT OR AUTHORIZED AGENT (if different than above): Name: Mr. Pat Persichino, Director of General Services, Weld County Government Address: 915 10th Street City/State/Zip: Greeley, CO 80631 Home Telephone: Business Telephone: 356-4000 Ext 4224 I hereby state that all statements and plans submitted with the application are true and correct to the best of my knowledge. 5 1I rJAN I� ii1�1�[ 177� r J � Signature: Owner or Authorized Agent 950646 USE BY SPECIAL REVIEW QUESTIONAIRE USR-1062 1. How is the proposal consistent with the Weld County Comprehensive Plan? The property is located within an Urban Growth Boundary area and is adjacent to the to the Town of Frederick, which has its municipal boundaries on the north side of State Highway 52. The Weld County Comprehensive Plan encourages this type of proposed use to locate in or adjacent to existing municipalities within an Urban Growth Boundary Area. The use is encouraged as long as it conforms to the desires of the municipality as expressed in its comprehensive plan. 2. How does this proposal meet the intent of the zone district it is located in: The propsed uses are permitted in the Agricultural zone district with the approval of a Special Review Permit. 3. How is this use compatible with future development as stated in the Weld County Comprehensive Plan? If yes, how? See answer number 1 4. What type of uses surround this site? Is this request compatible with surrounding uses? Agricultural uses predominately surround the proposed site. The Town of Frederick has annexed the property immediately across State Highway 52 from the site, but it remains in agricultural production. The request is compatible with existing surrounding uses. 5. Is this property located within a Flood Hazard zone, Geologic Hazard zone, or Airport Overlay zone and does it meet these special requirements? The property is not located in a Flood Hazard or Airport Overlay zone.The property is located in a Geologic Hazard Overlay zone. A Geologic Harzard Overlay District Development permit shall be obtained from Weld County prior to any development occurring on the property. 6. What efforts have been made to conserve productive agricultural land? This site was created through the recorded exemption process and removed a minimum amount of land for the proposed facility. 7. How will public health, safety and welfare be protected? The proposed motor grader and household hazardous waste collection facility will be designed in such a manner as to provide for the protection of the health, safety, and welfare of the immediate neighborhood and the county. All applicable rules, regulations, and codes will be followed to provide for the public health, safety, and welfare of the immediate neigh- borhood and the county. 950645 8. What will the site be used for? A Weld County household hazardous waste collection facility and a motor grader facility. 9. How close is this site to other residential structures? The closest residence is at least a half mile away in all directions. 10. How many people will be employed at this site and what hours will they work? One grader operator working four 10 hour days, Monday through Thursday, for the motor grader facility. One or two persons will operate the household hazardous waste collection facility, 40-80 hours a month. The majority of these hours will be between 8 am and 5 pm, Monday through Friday. Some receiving hours will be scheduled for Saturdays or Sundays during daylight hours. Health department personnel are also available for appointments outside normal working hours. 11. How many people will use this site? An average of 20 automobiles a week are expected to use the household hazardous waste facility. Some Weld County Public Works employees will use the site when there is a road or bridge construction project in the area, but only for storing equipment overnight for security purposes. Maintenance people will periodically visit the site for maintenance on equipment or oil changes for the motor grader. 12. What type and how many animals, if any, will be on this site? No animals are proposed to be located on this site? 13. What type and how much, if any, operating and processing equipment will be utilized on site? The motor grader may do some routine maintenance of the site to keep weeds down and to grade any ruts or surface problems. This will be done on a routine basis. 14. What type and how many structures will be erected (built) on this site? One 3200 square foot concrete block building. The household hazardous waste collection portion of the facility will be 1,200 square feet. The motor grader portion of the building will be 2,000 square feet. 15. What kind (type, size, weight) of vehicles will access this site and how often? An average of twenty automobiles or pickups a week will use the household hazardous waste collection facility. The site may be used by several different county vehicles, including motor graders, gasoline trucks, maintenance trucks, backhoes, and possibly gravel trucks or belly-dumps. Access to the site will be from an existing driveway access to Sate Highway 52 right-of-way. The County has purchased a permanent easement for access to the site on property immediately adjacent on the west side of the site. The access easement has an existing gravel road and may be improved with additional gravel or paved in the future. 950646 16. Will this site use a septic system or public sewer facilities? An individual septic disposal system approved by the Weld County Health Department. 17. Are you proposing storage or stockpile of wastes on this site? If so, what is the size and type proposed? The storage or stockpile of wastes will not be permitted nor occur on this site. 18. How often will debris, junk, or waste be disposed of? By what means? Household hazardous waste products like used motor oil, paints, and other household hazardous wastes will be received, sorted, and stored inside the facility until they are removed from the site. Motor oil will be sent off site for recycling. Other wastes that aren't recycleable or usuable in our community will be sent off site with a hazardous waste contractor for final disposal in an approved landfill or facilty. 19. How long will it take to construct this site and when will construction begin? Construction will begin in the spring of 1995 and take approximately 3 to 6 months to complete. 20. Explain the proposed landscaping plans and erosion control measures associated with this site. Landscaping will be located around the building which will include a combination of trees, scrubs, and grass. Erosion control measures will be practiced and an erosion control plan implemented if needed. 21. Explain any proposed reclamation procedures when termination of the Special Review use begins. Termination of the uses is not proposed at this time. 22. Explain the need for the proposed use (activity) in Weld County. Household hazardous waste can harm people and our groundwater if it is not separated from the waste stream. Most residents are either unwilling or unable to pay for hazardous waste services. Weld County was decided to provide proper disposal choices to its residents free of charge. Weld County has its motor grader stations set up geographically within the County to accommodate rural areas. Snow removal, routine grading and possible road construction are the principle duties of the grader operator and station. 23. Who will provide fire protection to this site? Mountain View Fire Protection District. 24. What or who will provide water to this site? Central Weld County Water District. 25. How will storm water drainage be handled on the site? Stormwater runoff is generally from the Northeast to the Southwest at an approximate slope of 1.5%. Storm water drainage will not be detained on site. 950646 WELD COUNTY ROAD ACCESS INFORMATION SHEET 1/11/95 Weld County Public Works Department USR-1062 933 North 11th Ave., P.O. Box 758, Greeley, CO 80632 (303)356-4000 Ext. 3750 1. Applicant Name weld County Government Phone 356-4000 Ext 4224 Address 915 10th Street City Greeley State Co Zip 80631 2. Address or location of access Pt NE4 Section 1 Township 1 Range 68 Subdivision Block Lot Weld County Road# state Hwy 52 Side of Road south N S E or W Distance from & number of intersecting road 1/2 mile east of WCR 11 3. Is there an existing access to the property? Yes x No # of accesses 1 *********5******************************************************** N en 4. Site Sketch H w E U S H State Highway 52 x fl mile» 3 E(X�(I�� G S;TGING A 5. Proposed use: Household x 'Permanent ' Residential/Agricultural - Industrial hazardous waste & Temporary Commercial _ Subdivision x Other motor grader facility OFFICE USE ONLY Road ADT Date Accidents Date Road ADT Date Accidents Date Drainage Requirement: Culvert Size Length Other Comments: Installation authorized - Information Insufficient Special Conditions Reviewed by: Title: :access.for 950646 i 67 K f d \: '; yP lT�.:.. I y. } A Y A lW�i % itrANI � & l � k t tl OI i ' 'i s 4 47 751) 47 _ $ x 5 ..•4 ,'q' - ,66 4, 4hw05 t' p 9 P 72 5 . " .. 4 -k \ de `*we }'` ys .7' fill ' ' x (I' 73 yy,•,_ , L ; . pi Y d - '� ".. Yysi a�sr� Y 4 6 ' ', ' c 72 + 2 1t1 I > 47 m�, ] p ' 0.� � � 1 73 • R q 32 p ,,. 40 apt A 1m'at"!at ` kx `t aoa J,"• r k' 1. p'� t-�; a Pve JQ � 4 r r k 'rrfpier, r t Y e; `C,t r A.-.'y r •' •4� ,,;p .. Y' ' , 51 f t Yr� `q ` 7 xt r I4 C #t ' s 4.,) SJ Y . 'Sty :t x r b2 a7 • .y ;, ! " r4 41 • • 47/ MMM • ' r . e;'.q' w' '�,K t 4r :,q t• P 3 •47 52C, r ` ' . FredeFlck .n ! r. r: ao f '� 40 ':, 44 4/ 32 ' 79 �'t X 32 + . 32 b a., �35 w " t� 36 '+4 „ Mkt ;";ri31 47 R ryy �V4•• ys , 47 )40 / 40 ltw .. a. AO 82 32 32IL ,.-mr2. zt ' ` 744.•C:1 USR 1.0;,• 4 Y .I,. A `b gr/,- 33 / y, ` '/: L '' . ?' nt^2E'- ��^ - !"' ., do Y -= 674, s_w �'a r A ris <, ir '. `- 4 4 rt.v XgS"l r 33 F y ! - 9 j1 5 40 y ?i'': + «`r )r C rsy i 92 1 f �• - 66 32 Y/ q . 1 t. + ' I k ," , 1 yv:? 40 t i a r;i "4. AO ,fig ': 4111, ytiu 7 t�. f 3z ;.. � r,i:: fit A •k7. ,• (`,,{{3� s ,. y, z`+ 9 -k4 w 1•"" : .L i .a.vl' i L 0p 6Jr } y .. _ q� 9 1 y ! q ?` � W� y S A {r �S Are 104 S IM f r 1J. Y 4T . .M1 (((( Fit, ` l 3 Y t� .rt 2��rr�. Gav _y I ; a 4 y 4 ,i �� .. q 4 j 1 E 1 «�a J 40 n :n.� Y � 4a5't\�N�y�x GF�r,��r ® „,,, .s'2 O ri F3 , tr '� rt aMt n /� Si ?'( t'i q � s ^y 42 ,� � y ' # a t�4 ' 4 }. 4 y},1 4 Y t q l f , f ; Ag31W, fy ,M. +h b w 67 • i At f t f yt:„:„� Fk ,P ',y ` 65 83:. A w . r o � ..# . P d 11, \:� H .. r = f ty,a- 40 ;A t+ 1i• • "66 Ft $1 k' kiC. !v, yA az' _ x ' ${ { p yyv[r y iyl_ mo . rt . tr+ `, 1 #1 4^v..A ' �11^^ 66 e� .l ta4, T-, +r NM" 'F.{Pt ' � 11 : u .,..�,. i y'•;'t`,k �. 4?7 :z y iq*{�t«,. 7' pt 'I':z x '."o" ) > „I..U' yi.. t '� ... "-. ''d3 -? et,'-`:" -. .. - '� Issunig aulhorly' �COLORADODEPARTMENTOF 'HWAYS application acceptance 'APPLICATION FOR :. .ATE HIGHWAY ACCESS PERMIT ale Instructions: - contact the Department of Highways or your local government to determine your issuing authority. - contact the issuing authority to detetmine what plans and other documents are required to be submitted with your application. e, - complete this form(some questions may not apply to you)&attach all necessary documents and submit it to the issuing authority. Submit an application for each access requested. Please print or type - if you have any questions contact the issuing authority. 1 Propertyowner Inermlued) 2) Applicant Pat Persichino, Director of General Services Weld County street address.city, street 1 city. B P.O. Box 758, Greeley, CO 60fi 32 915 10thStreet tzeet, Greeley, CO 80631 Phone II stale& Phon6 II slate&zip 356-4000 Ext 4224 Colorado 80632 356-4000 Het 4200 Colorado 80631 3) Address of properly to be served by permit(if known) unknown at present time 4) Legal description o1 property. lot section township range county I nbrlrvision block 1 1 I 68 Weld Js _ ' I ClIWhat side of the highway? �� 5) what stale hiyl nr:q are you requesting access Iron? ON NS OE OW 52 ! 7) How many teal is the proposed access from the neawe.l mile post or cross slreol9 — 2,640 feet I N SSE W Ifrom Weld County Road 11 a) Check here if you are requesting a use ❑ new access 0 temporary access 0 improvement to existing access IN change in access 9) What is the approximate dale you intend to begin construction? March 15, 1995 10) Do you have knowledge of any State Highway access permits serving this property.of for adjacent properties in which you have a property interest 0 yes El no If"yes" - what are the permit number(s)? and/or,permit date t I) Does the properly owner own or have any htleresls in any adjacent property? 0 yes R no If"yes" - please describe: 12) Are there existing or dedicated public streets,roads,highways or access easements bordering or within the property? ci yes ❑ no If"yes" - list them on your plans and indicate the proposed and existing access points. 13) It you are requesting commercial or industrial access please indicate the types and number of businesses and provide the floor area square footage of each? business square footage business square footage Veep Yost County Motor grader and Household I3,200 State aoft CDIDra-1u anzardnnn aeante on)lertino 'rani1;ty Colo. Dept. ot (ranspUt 1d MF . 1 p O. Bqx a5C _ 14) If you are requesting agricultural held access - how many acres will the access serve? Greeley, CO gp6.3 - 15) II you are requesting residential development access. - what Is the type(single family,apartment,townhouse)and number of units? type _ number of units type number of units I 16) Provide the!chewing vehicle count estimates le vehicles that will use the access.Leaving property then returning is two counts.Indicate it your counts are peak hour volumes O or average daily volumes O. a of other vehicles e o1 passengers cam and light trucks If I multi unit trucks of per week 20 per week ' Toler Count of All Vehicles II of single unlit vehicles rn excess o13011 II of farm vehicles(Bald equipment) 12 per week 17) Check with the issuing authority to determine w hitch of the following documents are required to complete the review of your application. (plans should be no larger then 24"x 36') Li CyCT «: Property map indicating other access,burdenng roads and streets. in Highway 1 1 ay planand profile t;O Proposed access design. tothe highway y right-of-way. Parcel and ownership maps including easements. CV Drainage U pit rigimpactt Map and lelh!s detailing 1'I'ty locations bol ore and alter Signing and stripingplans_ e) i) Traffic control plan _ development'm arid along the poem right-of-way. Proof of llabllily insurance (l Subdivision.zoning,or development plan. II -.t If an access permit is issued to you it will state the terms avid conditions for its use.Any changes in the use of the permitted access not consistent with the terms and conditions listed on the permit may be considered a violation of the permit. P AB APPLICANT DECLARES U FEDERAL PENALTY THAOF T ALLJ INFORMATION O MATIOY IN THE N PROVIDED ON THIS FORM AHER NDAPPLICABLE DSTATECE FE AERAL LAWS, SUB TTED ACHM ENTS ARE"f0 THE BEST OF THEIR KNOWLEDGE TRUE AND COMPLETE. '(� aplic De ichino 1/27/95 } If the applicant is not the owner of the property,we require this application also to be signed by the property owner or their legally authorized representative (or other acceptable written evidence). This signature shall constitute agreement with this application by all owners-of-interest unless stated in writing. If a permit is authorized, the property owner will be listed as the permittee. Data . 'frop ter si ra e Mr. Pat Persichino, Director of General 1 97/a5 1--�J+�_ ��� — ti r' e 1n F te C OH Form G�1 Priming em ces may be used until supplier are exhausted Ilie I 13 950646 Hello