HomeMy WebLinkAbout982260.tiff JULY 20, 1998
Weld County Planning Dept.
Department of Planning Services
1400 N. 17th Ave.
Greeley,CO 80631 JUL z 3 1998
RE: USR-1195
ECti vie ED
Dear Sirs:
I strongly resist the above mentioned development plan! When the wind
is in the North,we get a strong,raw odor. I understand that the Bella
dairy is a 700 cow dairy now and the odor and fly problems produced by
a 5000 cow dairy would be,at best,unbearable. This is far too many cows
for a parcel of their size.
I still depend on well water for my property. I have no way of proving
what it would do to the ground water, but that is a also a concern to
me.
As to the runoff from rain,they have ponds to collect this. But I vividly
remember in 1951,when we had a 9 inch downpour in this area,the run-
off from the east of town ran down across the English &Platteville Ditches,
flooding many basements. Ponds would not take care of that kind of run-
off.
Greeley has gone through moving Monfort Feedlots in the past few years
and,at the present, is reportedly in the process of buying Meyer Feed-
lot because of the odor. As the town of Platteville grows,which it has
every indication of doing,they will be faced with same actions to rid the
town of the odor. I understand there is a housing development planned
in the SW1/4 section west of my property. It also adjoins the Henrickson
property. It seems illogical to create a situation that has proven to be a
problem in other areas already.
I agree there is a need for feedlots and dairies, but it makes sense to me
they should be in sparsely populated areas- not- right next to a town
where existing and future homes would be adversely affected by odor
polution of this magnitude.
I respectfully request and strongly urge much consideration about this matter!
James S. &Winona R. Barclay,
SW1/4,SEC. 20,T3N, R66W
// s457/6,4
982260
CITIZEN INQUIRY FORM
WELD COUNTY DEPARTMENT OF PLANNING SERVICES/BUILDING INSPECTION
1400 N. 17th Avenue, Greeley, CO 80631
Phone: (970) 353-6100 Ext. 3540 Fax: (970) 352-6312
TELEPHONE FFICE FIRST INQUIRY? ❑ YES ki--EQO DATE: �7d'/ 9 X/
NAME: ,Q PHONE:
ADDRESS:TYPE OF INQUIRY: - ; �� CL
_ MHZP JJJ--��� _ SKETCH PLAN _ MINOR SUB SKETCH PLAN
_ ZPMH _ PRELIMINARY PLAN _ MINOR SUB FINAL PLAT
RE _ FINAL PLAT _ ZONING
AMENDED RE _ RESUBDIVISION _ ADDRESSING
SE _ FHDP - BUILDING PERMIT
_ AMENDED SE _ GHDP _ SETBACKS/OFFSETS
_ SITE PLAN REVIEW _ USR - HOME OCCUPATION
_ REZONING _ AMENDED USR _ VIOLATION
_ PUD SKETCH PLAN _ USR MINING - OTHER
_ PUD DISTRICT _ USR MAJOR FACILITY
_ PUD FINAL P T /���� 7LISR DISP SAL SITE
STAFF PERSON. y "^ (/C 1).4121
ITEMS DISQ S p: 7-le (ilk IQ Q,..Y.4J C� ia��,114 1/4a//
Q,lk � •
If `
koc lc! (.741N A-, .------ /AP CAIZZISMI
75 f2AI
ea ----
-/u-O et
:Cr&
CrO anng (4 O � .cp 2-e /l
p_A_6-t_- i 0
Time Spent: /() inciA,J Staff Member's Initih:
citizen.shl
01/17/1994 21:52 3034574609 COLO CATTLE FEEDERS PAGE 02
-JUL-2e-9e 03:39 PN ELLIS R LAPP 9T03929►79 P.
Ellis a Capp Equipment eo. CAr4.TON C SARMRT7, PalfaifXNr
90109 SU
301 LUST ran entry
aRCtUe.Cu UnAi el sus,
(CM,3e trial
July 28, 1908
TO Till.WIA.D COUNTY BOARD OF COMMISSIONERS!
RE: rive Thousand Raid Permit for Belk,Iwhitins.inv.
13278 Wald County Road 32
Platsevtlle,CO 80651
O nlets:Caryatid Roberta Henricksen
I tang known Clary and Robins Henricksen for over fifteen yams and em wry familiar with their
dairy operation in Platteville. I feel that their operation is one of the cleanest and bost•managcd
deities in Weld County. Having been in the farm equipment sales business fide almem twenty
years,l have had the opportunity to be around a lot of dairy and feedlot operations. Gary and
Roberts have an exceptional operation. Their pens,buildings,fecdyarde and lagoon arc always
clean and well kept.
I fc:l Bella Holsteins, Inc. is a true asset i0 our community. As purehefem ofali kinds of As
products and machinery,an enlargement of their operotirm would he a true enhancement to our
whole community. I would be very pleased to see them set the approval they are requesting far
their operation. I know that they will handle this enlargement very profbssionaty,
I would be glad to answer uny questions you may hew with reference to this miner. Please
contact me at 970.539-I A 15.
Sincerely,
ire Kindabhtr
Salts Manager
swam I
j3 i
08/03/98 19:48 TX/RX N0.1913 P.002
01/17/1994 21:52 3034574609 COLO CATTLE FEEDERS PAGE 03
_JVV-0Z9-7! 09:02 AM TOWN AHD COUNTRY %Ar 50% 705 2209 P.01
O �4
,
1r*\rte . �r4 ,
� ily
n
hay 29. tali
To.ryas it nay eognome ,
Thai iow Is In monk to the USA sppEatioolo Ada MOSES Paaahkrun). Oda a'Saar orMate.ipe ants
19115161.111O intpowint to continue to enraarr/e',Dear', minimsi impact apiwheS epsntios apsoi*OW
ow tot's Rdis Dairy ha doledntrswwus menFaa►to insure that it ha the ha,.uwriainhlo art.tower&ire
Was Ifni it wadi d a paw WNW=to Osatn.ps than Id's o►apisulptrtti opni.ms r Corona to
apwaionn rho do woe hsea the concerns aim rhithbore d haw
Mwwely.
itimpeets CNN
P.O. 8OX 450 PLATTEVILLE, COLORADO 80651 303.785-2284
per
08/03/98 19:48 TX/RX NO. 1913 P.003
01/17/1994 21:52 3034574609 COLO CATTLE FEELERS PAGE 04
I1�IG 15121 Weld Co. Road 32 Platteville. 6065 7.--- vie FRESH
(970) 78.5.2889 Denver(303)COO 8
(970) 785-6330 FAX
FARMS 0661
-6003
July 2$, 1998
915 e i Commissioners
t
Greeley.CO$0631
We understand that Della Holsteins, Inc. has applied for a permit to expand their dairy
operation. Based on the plowing factors, we encourage you to approve their request.
• This is one of the finest dairies in Colorado. They are excellent neighbors and have
proven themselves over the years to operate in a responsible, first class manner.
• Bella is well located to save the needs of the Front Range and our population growth
requires increased capacity.
• This expansion will provide additional benefits to our community through increased
employment and feed purchases_
I believe Sella Holsteins, Inc. is good for Weld County and should be allowed to expand.
Sincerely,dn.Joe P.aith
I #a
08/03/98 19:48 TX/RX NO.1913 P.004 U
July 30, 1998
Department of Planning Services
1400 N. 17th Ave.
Greeley, Co. 80631
RE: USR-1195
Dear Sirs:
As a resident of the town of Platteville, I strongly resist the
above mentioned development plan. Many evenings when the wind
is from the east we get a strong odor. The Bella dairy is a
700 cow dairy now and in the future the odor and fly problem
of proposed 5000 cow dairy would be unbearable. I also have
doubts that the property is large enough for the size of this
operation.
In 1951 , when we had a downpour I remember the run off that
came from the east across the English and Platteville ditches
caused flooding to many of the towns basements . I am concerned
that the proposed ponds would not be sufficient to handle such
a downpour with the already existing water and sediment in
them from normal operations.
With a proposed housing development just south of the dairy, I
foresee additional problems. Would you like to buy a lot by a
5000 head dairy or feedlot - I wouldn't. There is a need
for feedlots and dairys but not next to a town where existing
and future homes would be affected by the odor and flies .
I strongly urge that you deny this proposed plan.
Sinci erely,
L-LiAlr6
ohn A. Rupple
509 David Ct.
P. 0. Box 665
Platteville, Co. 80651-0665
Weld County Planning Dept.
AUG 3 1998
UMW
Et CEIV D
(itcj
July 28, 1998 Weld County Planning Dept.
Department of Planning Services JUL 2 9
1400 N. 17th Ave 1998
Greeley, Co. 80631 RECEIVED
RE: Usr-1195
To Whom it May Concern,
We are strict/yagainst such a large dairy operation so
close to city lim .Ls, and because of the extreme odor which
is ten times worse than a feedlot, ( think about the Meyer
Feedlot) .
Della Holsteins, do not have the facillities for such
a large dairy enlargement. Also the sewer ponds that they
put in were put in without any consent of the neighbors or
from the county. The sewer pond to the east of the dairy
when put in was not surveyed and is over on our land(according
to Acklam and Asso. of Brighton Co. ) the fence line is 10ft
out in middle of the pond. This pond runs over and is con-
tinually polluting my spring water pond and rumming down
into the English Ditch (which is every day) .
If we would happen to get a heavy rain there would be
nothing left of the ponds, because the ponds that are there
are so full they are not capable of holding any amount of
water from a heavy rain (it runs over without any rainfall ) .
I know that there is a need for daires ( I was a dairy
farmer myself for a numbers of years) , but when you get this
many head of cattle in one small location it is going to
effect the whole community.
I hope you take this letter to be truthfull and for
the good of the community.
Ray E. and Shirley A. Olin
13487 WCR. 32
Platteville Co. 80651
ina . 1)-PA;
P.S. Our land adjoining Bella Holsteins to the east and north.
Sec. 20 T3 Nr 66W
S 1 /2 Sec. 17 T3 NR 66W
Department of Planning Services Weld County Planning Dept.
1400 N. 17th. Ave.
Greeley, Co. 80631
AUG 31998
RE: USR-1195 RECEIVED
Dear Sirs,
I am writing this letter to inform you about the enlargement of the Bella Holstein Dairy. I am
strictly against this dairy being put in so close to city limits. Please take in consideration the smell
from the sewer ponds that were put in without any consent of any of the neighbors and when we
have any rainfall the sewer ponds over flow and the smell is unbearable. Also the flies and gnats
make it impossible to have any family time outside.
Gary and Roberta Hendrickson have been good neighbors and we have no problems with them
as being our neighbors, but as far as a larger dairy we are not for doing so.
Sincerely,
/3,4 4-2 cacrh.044O7,7
Burt A. Schoneman
QecaJ 0• -P kne411112fin-)
Debo h A. Schone an
71;471 v
Ryan R Schoneman
Christine E. Schoneman
Exton
Weld County Planning Dept rz,Q, a a, )7 ? y
AUU 31998
W R r>�LQ cYM?ti.(?ycJ ,LC g L Y
tia-a‘ a-)
/ , , - j C-JI &t >
v 4 Q r ,
Q-
4 -
it/L(2_ 7(4_4,,
ii) - � 't>j �
•
Mr. and Mrs. Poyner
13400 WCR 32
Platteville, CO. 80651
Weld County Planning Dept.
July 31, 1998 AUG 31998
Department of Planning Services RECEIVED
Weld County Administrative Offices
1400 N. 17th Ave.
Greeley, CO. 80631
To : Department of Planning Services,
We live on the east side of the Bella Holsteins dairy. The proposal of enlarging the dairy is disturbing. My
understanding is that there are 700 to 800 head of cattle now. We are constantly fighting flies and nats as it is.
There is a smell also. We are willing to live with what is here. The thought of raising the herd to 5,000 is unreal.
We also have a concern of our well water. Our well is only 10011 from Mr. Hendrickson's property. What is the
waste of 5,000 head going to do to the water that comes into our well? The flies and nats are going to triple as
well. This, to me, is going to be a health hazard. We have four children to think about also. Our property value
would drop drastically. Not too many people want to live next door to a large dairy.
As far as Gary Hendrickson being a good neighbor, he is ok. Although when we received a land survey and found
out that our fence line needs to be moved 45ft west Mr. Hendrickson has declined to move his electric fence so we
could correct our fence line. He is very reluctant to work with us. So how cooperative is he going to be if we have
a problem with the extra cattle.
The town of Platteville turned down this proposal. As I understand it the county thinks the enlargement of this
dairy will not effect the town. I tend to disagree. Bella Holsteins dairy is less than a mile from town. They would
definitely smell the dairy and have increased flies. If the town of Platteville turned this proposal down then Weld
County should honor their decision.
Sincerely,
?Et
ii
34i so, I9 q6
Weld County Planning Dept
EXHIBIT
1Oa(
'. Ir AUG 31998�►'l to RECEIVE
anti r¢fa tha fo cast s-
J
tts , s 15 drlla H o(t;,k s -g `
ppI icaha,
fir a sm .m • heat) rA41r(t' dl J
rchoh , 1ti( Y Cow.wnei art Alvingtottitil
WOh t be O& * atiLtkd at Muhl di
nkjtm& SCIta Jt1
S WOLU14 } b¢ era if- ici
must 't (oc&+ad. Sowuwknt two, grater
away ft"' +LP -kt. 6f )'kdwitk , ad
als6, n4y 1pochot until nof- be alai
0 DGC . T hs4ead, 'I4 +ko ac a/ pIys%ce
�1 + filivP0PVI � �; li -b
dith��, dui/Rasa s
opus tiny r<� CmJ fiaKs c'lc,, eutd 414
dwZasu rGi j 4 cor -b brtcck +k4
r La ri flaskn1¢ � -� ; packs, n'� �l
is 4L + skirt wit/ bL ray su skits us-
P.
/94 :jusil- Ms) i .4 2r3 j 40
31`11 e spulAit a bttfer ii
op uvlt
P �/
40 'puts( I-Fr 46(5645 y 4Itt
QpirQ. ioh 3ho U4 1ict3 M .h;s
pursed tics,S611 or /tof .
Ts aU fiftiriteSS, 4ke o a oh CassSS
Par
tattaiti as iv aUni a f eek Gk4 !
(fir i•1 •t h o art-kbh . Gyro, , z
01041 Liu o f b orf vki / r
ptsdy P� �
Qxtss -Iv close tif •t if 'muff f C4usa 15
Skown . (I firs+ Civics , t f r (Owed
havc 'J Loud be i+ tto+ o chill ate au.
-_ disti a Iira�� Could be Bead
Pp
ttirgi kis è341 b"ad* 4k, way tiex�s f s
• art a �6
nok► - tis alM n� — -Ile (ows b 9
rt tsoty i +k 4 avid's 4 r 6MQT�I
� Py ni �
citiCtrati - C
0 COLO CATTLE FEEDERS PAGE 01 1/17/1994 15: 27 3034574609
1ttvOa- 1. qgn-3s6 - 99GG
RAY E. OLIN
13187 W.C.R 32
Plea Colorado$0652
13O$) 7854352
July 29.1998
Department of Planning Services
1400 N. 17th Ave,
Greeley, Co. 80631
0
RE: USR-1195
Dear Sirs,
Sella Holsteins (Gary and Roberta Henrickson) asked
me to write a letter stating of how they are at being
a good neighbor.
Gary end Roberta and family have been a good neighbor.
We have had some business dealings with them and most
of these have worked out.
Sincerely,
Caielt."---
y E. Olin
Shirley A, Olin
lisue
dr
e.a. x.. .0.n..m.
COMPREHENSIVE PLAN
PLATTEVILLE, COLORADO
JANUARY, 1980
33
4t SR wets-
,
c
COMPREHENSIVE PLAN
PLATTEVILLE, COLORADO
JANUARY, 1980
This report was financed, in part,
through an urban planning grant
from the Department of Housing and Urban Development
under the provision of Section 701
of the Housing Act of 1954, as amended.
CERTIFICATE OF ADOPTION
This document is adopted by the Platteville Planning
Commission and is recommended to the Board of Trustees
for adoption as the official Comprehensive Plan for the
Town of Platteville, Colorado. The Plan is intended
to protect and guide the harmonious development of the
Town and its environs, which will, in accordance with
present and future needs, best promote health, safety,
morals, order, convenience, prosperity and general
welfare, as well as efficiency and economy in the pro-
cess of development, including adequate provision for
traffic, the promotion of safety from fire and other
dangers, adequate provision for light and air, the
promotion of good civic design and arrangement, wise
and efficient expenditure of public funds and the ade-
quate provision of public utilities and other public
requirements . All maps, charts or other descriptive
matter accompanying this document and all other matters
intended to form the whole or part hereof are hereby
made a part of this document and are adopted herewith.
Adopted this a9 dpi day of 2&.,,s,,.(-.1u/. , A.D. , 1980, by
the Planning Commission of the Towd of Platteville,
Colorado and recommended to the Board of Trustees for
Adoption. /—�`,
Signed: , t � 'P (. hrivi,
irman, lanning Commission
Plat ev lle, Colorado
Signed: 441.. a t_l A
Secretary, Planning Co ssion
Platteville, Colorado
Adopted this ‘ day of -27A-4,41-- , A.D. , 1980, by
the Board of Trustees of Platteville, - - ado.
Signe :
Mayor, P ttevill1e, ol• ado
Attest: �� /�/�- 'as
Town Clerk, Platteville, Colorado
PLANNING COMMISSION MEMBERS
Percy Hiatt, Mayor
Leonard Abbett, Chairman
George Breickler
Douglas Fey
Clifford Wright
CITIZENS COMMITTEE
Jan Cross
Susan Fey
Carol Grant
Joseph Grant
Sally Nishimoto
Lenore Sharp
Clifford Wright
STAFF
Paul Rochette, Larimer-Weld Regional Planner,
Council of Governments
Gayle Packard-Seeburger, Circuit Rider Planner
Gary West, Circuit Rider, Manager
Vi Baker, Draftsperson
Lucy Montoya, Assistant Town Clerk
Gayle Orr, Town Clerk
TABLE OF CONTENTS
page
I . INTRODUCTION 1
A. Nature of the plan 1
B. Plan Amendment 2
C. Geography 3
D. History 3
II . DATA BASE 5
A. SOCIO-ECONOMIC PROFILE 5
1. Population and Demographics 5
2. Business Activity and Employment 7
3 . Retail Sales 8
B. COMMUNITY SERVICES AND FACILITIES
PROFILE 8
1 . Water System 8
2. Sewer System 10
3. Stormwater Drainage System 11
4. Transportation System 11
5 . Government Services 12
C. LAND USE PROFILE 14
1. Land Use 14
2. Housing 16
D. ENVIRONMENTAL PROFILE 16
1. Topography, Climate and
Vegetation 16
2. Wildlife 17
3. Soil 17
4. Flood Prone Areas 17
5. Mineral Deposits 18
6. Environmental Limitations 18
7. Historic Sites 18
page
III . FUTURE LAND USE NEEDS 19
A. Residential Land 19
B. Commercial Land 20
C. Industrial Land 20
D. Park Land 21
E. Public Land 21
F. Roads 21
G. Summation of Future Needs 22
IV. HOUSING ELEMENT 23
A. Housing Stock 23
1. Housing Tenure 24
2. Vacancy Rates 24
3. Housing Costs 25
B. Households 25
1. Present Housing Needs 25
2 . Minorities 26
3 . Elderly 26
4 . Future Housing Needs 27
5 . Past Housing Assistance 28
6. Future Housing Assistance Needs 28
C. Housing Issues and Problems 28
D. Goals and Objectives 29
E. Policy and Implementation Strategy 30
V. FUTURE LAND USE 32
A. Introduction 32
B. Implementation 32
C. The Plan 33
D. Goals and Objectives 33
VI. FUTURE LAND USE: A MAP AND GUIDELINES 38
A. The Future Land Use Map 38
B. Development Guidelines 41
1 . Guideline Categories 41
a. Locational Guidelines 41
b. Social Guidelines 41
c. System Guidelines 42
2. Developmental Guidelines 42
a. Residential Development 42
b. Commercial Development 43
c. Industrial Development 45
3. Policies and Programs 46
a. Housing 46
b. Commercial and Industrial 47
c. Parks, Recreation, and
Open Space 48
VII . IMPLEMENTATION 50
A. Capital Improvements Programming 50
B. Development Regulations 52
C: Intergovernmental Regulations 52
D. Annexation _ 53
E. Staging 53
VIII. APPENDIX 54
MAPS
1. Existing and Proposed Utilities l0A
2. Stormwater Drainage 11A
3. Transportation System 12A
4 . Generalized Land Use Map
Existing Land Uses 15A
5. Existing Zoning Map 15B
6. Location Map 17A
7. Soil Map 17B
8. Environmental Limitations 18A
9 . Future Land Use 40A
I
INTRODUCTION
I . INTRODUCTION
The Platteville Comprehensive Plan was prepared April
1969 and last revised in June of 1973 . Since 1969 ,
the Town has nearly tripled in population. In order
to keep pace with the growing population and related
demand for services, the Town Officials felt a revised,
updated plan was necessary. As part of the Larimer-
Weld Regional Council of Governments work program for
fiscal year 1978-79, the Platteville Comprehensive Plan
was updated. The updating of the plan has entailed
incorporation of new data, citizens attitudes on growth,
and goals and objectives. The revised comprehensive
plan now contains eight sections, including a develop-
ment guideline section accompanied by policies and
programs. The Plan lxedicated much of its analysis
upon a projected population of 3600 by the year 2000 .
A more rapid growth would limit the useful life of this
plan to the date when the population figure reaches
3600 . Changing attitudes toward growth and changing
patterns of growth regionally will also affect the
useful life of this plan. Minor revisions should
occur annually to reflect all new circumstances .
A. NATURE OF THE PLAN
The Platteville Comprehensive Plan will serve as a guide
for development in and around the Town of Platteville.
Since the actions of local government influence community
development, the Town needs a general, long-range guide
in deciding day-to-day issues. The Plan proposes a
direction for growth and development that will protect
the assets of the Town and direct urban growth in a
manner that will lead to a coherent, viable community.
The Plan is to be used in conjunction with the zoning
ordinance, subdivision regulations, annexation procedures
and other growth management tools to guide the Town' s
future. Zoning and subdivision regulations deal pri-
marily with standards of land use and development appli-
cable to a specific parcel of land. These regulations,
however, cannot be administered without a general guide
or framework in which the long term effects of specific
land use decisions can be analyzed. In order to guide
these land use decisions, certain policy statements
should be made by Town officials to provide for consis-
tency in planning from a changing economy, population,
environment and elected officials. These policies are
stated in the Comprehensive Plan.
-1-
The fundamental principles behind the Platteville Com-
_ prehensive plan are :
1) That pressures of urbanization and growth will
continue to increase;
2) That the Town has the right of self-determin-
ation in participating in land use decisions
in order to minimize negative impact;
3) That the Town, through its regulations and
using the Comprehensive Plan as a guide, will
provide for an orderly pattern of growth and
development in the Town and vicinity.
The body of the plan contains more explicit policies
related to: land use, housing, public land, parks,
open space and flood plains, transportation, public
goods and services, community facilities, and capital
improvements. In adopting the Plan, Town officials
have accepted a logic of land use that they feel is in
the best interests of the citizens of Platteville.
Adoption of the Plan means that the policies as an
interrelated body of thought are being adopted. These
policies can be revised and updated by future town
officials to provide for a coherent decision-making
process. The Plan, then, should not be thought of as
a regulatory document, but as a document that gives
coherence and overall direction to the administration
of land use regulations.
B. AMENDMENT OF THE PLAN
The Platteville Comprehensive Plan is a growth manage-
ment tool; it is a flexible document which should re-
flect the Town' s attitude toward growth and development.
To ensure that this occurs, the Plan should be period-
ically reviewed and, when necessary, amended.
Amendments may be initiated by the Town of Platteville
or by other interested parties. If the latter is the
case, that party shall have the responsibility to show
that the proposed change is in the best interest of the
community by providing information necessary to assess
the impact of the proposed change. This information
shall include, but is not limited to:
1) Population data. How will the proposal affect
population growth.
2) Service data. How the proposal will affect
the Town' s capacity to provide adequate service
and utilities.
-2-
3) Financial data . How the proposal will affect
the Town ' s tax base and financial situation .
4) Environmental Considerations. What are the
environmental impacts associated with this
proposal?
In addition, the applicant shall provide any other
information the Town finds necessary to evaluate ade-
quately the proposed amendment.
C. GEOGRAPHY
Platteville is located in southwestern Weld County
(sections 18 and 19, T3N, R66W, and Sections 13 and 24,
T3N, R67W) . The Town is 18 miles south of Greeley on
U.S. Highway 85 and 35 miles north of Denver. Other
major cities in the region are: Boulder, Longmont and
Loveland. The other major north-south transportation
routes are Interstate 25 and Union Pacific Railroad.
Platteville lies in an area of level to gently rolling
terrain. Two major rivers, the South Platte and St.
Vrain, traverse the region. The climate is relatively
mild with warm summers and cool winters. Precipitation
is light, averaging 10-15 inches per year.
Platteville was developed as a service center for sur-
rounding agricultural activities. This predominantly
rural character has remained with the Town.
D. HISTORY
The first residents in the Platteville area were the
Cheyenne and Arapahoe Indians. They travelled through
the South Platte River Valley in search of its abundant
game. This game also attracted many fur trappers who
entered the area in the early 1800 ' s. Fort Vasquez,
located one mile south of the present town, was estab-
lished as a fur trading post in 1835.
The gold rush of 1859 brought many people to the mountains
west of Platteville. Many of the new people saw the
potential of the area and decided to settle in the
fertile Platte River Valley.
The present site of Platteville was surveyed and incorp-
orated in 1871 . One hundred years later, Public Service
Company of Colorado built the State ' s first nuclear
-3-
powered electric generating station. The Plant is
located approximately three miles northwest of Platte-
ville near the confluence of the South Platte and St .
Vrain Rivers. Thus, the area has progressed from
"arrows to atoms" . Over the course of 100 years,
Platteville has grown in the agriculturally rich Platte
;fiver Valley to a viaole agricultural service center.
i._
N
-4-
II
DATA BASE
II . DATA BASE
A thorough description of the Town of Platteville through
a data base and a series of maps is needed before the
policies guiding future growth can be developed.
The data base is presented in the broad categories of :
socioeconomic profile, community services and facilities
profile, land use profile, and environmental profile,
and follows a modified format of the manual for Colorado
Planners put out by the State Division of Planning.
A. SOCIO-ECONOMIC PROFILE
1 . POPULATION AND DEMOGRAPHICS
An examination of Platteville ' s population size and
general characteristics is an important element in the
development of the comprehensive plan. Population
estimates and projections serve as a basis for approx-
imating future needs for town facilities, services ,
housing and land uses.
The historical population growth of Platteville has
been relatively constant until 1970 . Before that date,
the largest 10 year increases occurred between 1910 -
1920 and 1920 - 1930 (11.3% each decade) . Between 1960
- 1970, the population increased 17.4% from 582 to 683.
Since 1970, the population has risen to an estimated
1600, an increase of 134. 3% in the past 8 years. The
population projections developed by the Larimer-Weld
COG estimate that 2100 persons will reside in Platteville
by the year 1980, 3200 by 1990, and 3600 by the year
2000. This represents a significant increase in the
size of Platteville and a rapid growth rate of 52. 4%
for the next decade.
Table 1 shows the historical population of Platteville
and estimates for future growth.
-5-
TABLE 1
HISTORICAL POPULATION GROWTH*
1910 430
1920 479
1930 533
1940 561
1950 570
1960 582
1970 683
1979 - Jan. 1 (Estimate) ** 1, 600
1985 2, 800
1990 3, 200
2000 3 , 600
* U. S. Bureau of the Census
** Larimer-Weld COG population projections
The future population projections confirm two factors
that indicate Platteville ' s potential for growth.
First, Platteville is expected to receive some of the
unprecedented growth that Colorado is receiving.
According to the 1970 U.S . Census, the population of
Colorado increased 25. 8% between 1960 and 1970. This
rate of increase was twice that of the nation. Many
cities, especially along the Front Range, have increased
more than 50% . Platteville could accommodate some of
the Colorado population increase. New residents are
attracted to a viable community with some commercial,
industrial, business and residential growth, and Town
officials would like to plan on a gradual increase in
population to about 3,000-5, 000 by the year 2000 .
Secondly, the Weld County Comprehensive Plan calls for
directing growth to the incorporated towns in the County.
This policy should mean a certain amount of industrial,
commercial and business development plus some accompany-
ing residential development will be directed to the Town
of Platteville. If this development comes on a pay-
as-you-go basis, it will mean an increase in population
and an increase in services that the Town will be able
to provide to these people.
The characteristics of population are also important in
planning for the Town ' s future. Table 2 lists some
basic population statistics from the 1970 census.
-6-
TABLE 2
CENSUS TRACT 18
COUNT OF PERSONS : 844
Male Female Total
Age Group Number Number Number Percent
0 - 5 25 48 73 8.64%
6 - 18 193 134 327 38.74%
19 - 24 18 21 39 4 .62%
25 - 34 17 70 87 10.03%
35 - 44 92 42 134 15.87%
45 - 54 39 29 68 8. 05%
55 - 64 20 27 47 5. 56%
64 - Over 41 28 69 8 .17%
445 399 844
*Additional population characteristics may be found in
the "Housing" element of the Plan.
The new population, after conversation with Town officials
and real estate people is thought to consist mainly of
young families in the 25-34 age bracket, with an average
of two children in the 0-5 and 6-18 age brackets.
Persons- above the age of 74, it is thought, represent
a smaller portion of the Town now than in 1970 .
Changes in population caused by births and deaths cannot
adequately be recorded as no hospitals are located in
Platteville. Additional demographic data is given in
the housing element.
2 . BUSINESS ACTIVITY AND EMPLOYMENT
A survey of business in Platteville in July of 1979
indicated that there were a total of 43 business estab-
lishments , employing 101 persons full-time and 107
part-time or seasonal. The largest single private sector
employer is the potato processing plant employing
60 persons on a seasonal basis. The government sector
employs an additional 70 full-time and 5 part-time.
The largest single public employer is the school district
with 56 full-time employees. Additionally, there are a
number of major employers in the surrounding area,
primarily the Fort St. Vrain Nuclear Power Plant and
poultry, cattle and agricultural producers.
-7-
3 . RETAIL SALES
The Town of Platteville collects a 2% sales tax on
retail items sold within its boundaries . This tax
was begun in the second half of 1976 and Table 3 indi-
cates the growth in retail sales tax collected.
TABLE 3
PLATTEVILLE SALES TAX RECEIPTS
Dates Tax in $1000 ' s
2nd half 1976 11 . 9
1st half 1977 15. 1
2nd half 1977 15. 8
1st half 1978 16 .9
2nd half 1978 18. 8
1st half 1979 21 . 8
The growth in sales indicates that the commercial sector
is growing with the population, and indicates the need
for a plan to accommodate the commercial sector
B. COMMUNITY SERVICES AND FACILITIES PROFILE
1. WATER SYSTEM
a. WATER SUPPLY
The Town of Platteville' s water supply is derived en-
tirely from subsurface sources through the media wells.
At the present time, the Town has three operating wells.
Additionally, a fourth well is owned by the Town which
has been used for irrigation purposes in the past.
This well is on the east side of the sewage lagoon and
will need to be relocated prior to any use for the
municipal water system. The Town also has rights to a
fifth well which is presently located just north of
Grand and west of Main. Town officials have discussed
the possibility of relocating this well to a small tract
of town-owned property just west of U.S. Highway 85
between Lincoln and Washington Avenues. Four of the
wells are listed with Groundwater Appropriators of the
South Platte (GASP) and their production is as follows:
-8-
WELL NO. 1 - Pumping rate : 450 Gallons per minute .
WELL No. 2 - Pumping rate : 515 Gallons per minute.
WELL NO. 3 - Pumping rate : 500 Gallons per minute.
WELL NO. 4 - Pumping rate : 600 Gallons per minute. *
*SOURCE: Norton Underwood & Lamb Engineering Associates
Water Study.
Chemical analysis of the water as records are available
from 1975 to the present, with testing done by the
Colorado Department of Health. This analysis indicates
that the quality of water is acceptable, but probably
marginal in overall quality. Tests to determine the
present concentrations of radioactivity are underway
and preliminary data suggests that there is no man
induced radioactivity in the water supply. However,
Platteville ' s location is in an area that contains a
higher than usual level of radioactivity and it is
anticipated that this will be reflected in the Health
Department ' s report. The presence of this element is
a natural occurance and is within acceptable limits .
The Platteville water system contains one main trans-
mission line. It is a six inch line and runs from the
main distribution system to the 90, 000 gallon ground
storage tank located on the east side of town in the
sw4 of the sw4 of section 18 T3N R west of the 6th P.M.
b. STORAGE
The Platteville water system contains one storage tank
(see above) . The existing unit contains numberous small
leaks that have resulted in the saturation of the ground
around the area. The tank has served its useful life
and Platteville anticipates relocating the water storage
facilities northward and obtaining a new tank which has
the capacity to accomodate 500, 000 gallons.
c. DISTRIBUTION
The existing distribution system consists of approxi-
mately eight thousand feet of four-inch line, thirty-
four thousand feet of six-inch line, and about two
hundred feet of eight-inch line, all of which is rela-
tively new or in good condition. There are also forty-
one fire hydrants in the system with good distribution
for fire protection.
-9-
The Town presently has 459 residential taps, including
eighty taps located in a trailer court . Also, there
are three taps for churches , three taps for schools,
and thirty business taps, making the total taps in use
495. Of the 495 total taps, 35 of the residential taps
are now metered.
d. SERVICE CAPABILITIES
The present capabilities of the Town water system is
fully discussed in the Water System report prepared
for the Town by Norton, Underwood and Lamb Engineering
Associates; however, in general, major improvements
will be required in the storage and transmission capa-
bilities to serve existing population and minor improve-
ments to the supply and distribution system.
The water system study indicates that a number of major
improvements will be required in order to meet the needs
of a design population of 3, 520 and three alternatives
were presented. Each alternative calls for addition
of storage, transmission-distribution system improve-
ments, improvements to existing wells and metering.
Twenty-year projected costs vary according to the alter-
native and financing, and are in the $600, 000 range
at 1979 prices,
Water supply is adequate to meet existing needs and can
be increased through the use of new wells or the purchase
of water from Central Weld County Water District/
Map 1 identifies the existing water system and proposed
additions or modifications.
2. SEWER SYSTEM
The Platteville sewage system is based upon a central
sewage lagoon system with three lagoons of 11 acres
of surface. The collection system serves all of the
developed area of Platteville and is generally in very
good condition. With only minor improvements and expan-
sitn of the collection system to the developing areas,
the present system has the capacity to accommodate a
population of 3, 600. If the system were to accommodate
a population larger than 3, 600, it will probably require
a major program of system improvements, including re-
location of the effluent treatment facilities. At this
time, no cost estimates have been made.
-10-
I MAP 1 ,
I
INFLOW '
3L1 PI akL •
• 7\. "I( '
ri
-1 , 1` f
---1-1— el
� . . . I _T.Ii; zr . 1 . 1 I
--
EaiS`CR
MG
.- 1 -------\ \ i TANK 1
I— I I PRo Elt.
WATc
STogaGE-IL
[11"a7 I1 VBole3=D BV ���Q 71
� J /' TaNKR
Ya }n rA.e . 1 ill
— --�—�'
EMDRO�/EDIG NTS ® I I }
Tn VIST,N4 WCII) j 99
•
A 6. 1
L Jo j
1-
%
'D f I
HI '
lill r
w
F'i
I
TOWN OF
EXISTING AND PROPOSED UTILITIES PLATTEVILLE
LEGEND
. Existing Water System PREPARED St
LARIMER-WELD REGIONAL
COUNCIL OF COVE RNME NIS
Proposed Water System ------ —
NOVEMBER 197E
Existing Sewer System I
Industrial capacity for the existing system is limited
to those without special retreatment needs and usage
requirements that will not utilize more than the re-
maining capacity.
3. STORMWATER DRAINAGE SYSTEM
In Platteville, the stormwater follows two basic drain-
age patterns . The first drainage pattern, located north
of Byers on Division St., channels storm runoff to U.S.
Highway 66, from which point it flows towards the river.
The remaining northern portion of the town channels its
runoff through a surface drainage system which flows
north to an underground pipe system which eventually
empties into the floodplain west of the town . To pre-
vent any additional stress to the existing system,
additional subdivisions should be reviewed to determine
their drainage impact on the system and to determine
if drainage can be feasibly handled. At present there
are certain undeveloped grounds in the north part of
town that can utilize the present storm drainage system.
This land will continue with some improvements to drain
into the State Highway barrow pit on north Main Street.
4. TRANSPORTATION SYSTEM
Platteville has one principle aterial (U.S. 85) running
north-south on the east side of town for 1.0 miles within
the town boundaries. U.S. 85 connects Platteville with
Greeley to the north, Fort Lupton and Denver to the
south. The average daily traffic count in 1977 was
7, 950. The 1997 projected count is 11, 925, which is
within the existing capacity of the highway. No major
improvements are planned.
One major collector street links Platteville to I-25 .
This is Highway 66, nine miles to I-25 . The highway
enters Platteville on the south side of town and connects
to U.S. 85. It has an average daily traffic count of
1, 750 and a projected count of 3, 500 in 1997 . No major
work is_ planned by the State Division of Highways for
the next 10 years.
Two minor collection streets are located in Platteville.
Main Street running north-south and Grand Avenue running
east-west with total length of 3.1 miles, are designated
-11-
-II MAP 2 I
— maul __.._ " 7
.1I
1 1 / / Lrj•
`1• ..- I (-r V J
I. I c� I-
•'1 � l ,^ II.,�'I^` r Grand r I c !
4 V V r I�,a �1 I
r 7 /`.
r ( Yti, �y��i '-r( ` < 1 1 •
24 31 I I- {
ii j_al • •:
En
.� _1
_ .J-1� I
It
. H
<c herry( < o •
I
TOWN OF v; a
PLATTEVILLE 1
.. .,.
STORMWATER DRAINAGE
nlra re `
LEGEND
r v
(----_ UNDERGROUND PIPE !
( ( SURFACE DRAINAGE I ...I...1J
o
m
• c
•
• _
0
N To River N.
Slate-Highway av 66 Ca. Avetia C
._C..er < .. ..�
1
6 ea lil .
«I
.._
11A
t
truck routes . Both streets would be utilized for any
expansion of the urban area . A major railroad and
highway crossing improvement would be needed for Grand
Avenue if the Town does grow to the east . There are
also 19 other streets, lanes and avenues in Platteville
with a running surface of 10 . 9 miles . The total surface
area of streets and highways consists of 100 . 5 acres of
the total 323 acres in Platteville.
The other major transportation factor of Platteville is
the Union Pacific Railroad located on the far east
edge of town. A majority of existing industries are
located within the railroad right of way, with a future
industrial expansion planned to the east of the rail-
road tracks . An average of 12 trains per day pass
through Platteville. The future number of trains is
hard to predict and depends greatly on state and federal
decisions regarding coal usage. No expansion or modi-
fications of the railroad is planned at this time by
the Union Pacific Railroad.
Noise created by the passing trains has been cited as
a problem by some of the residents living nearby.
Future residential development should consider this
and locate at an adequate distance from both the rail-
road and U.S. 85 .
The transportation system of Platteville is shown on
Map 3.
In the surrounding area to Platteville, a number`of
minor improvements are planned. County Road 32 East
will be rebuilt within the next five years and County
' Road 33, two miles east of Platteville, will be paved.
County Bridge• #3629 on County Road 36 will also be
replaced. These plans should not affect Platteville' s
future growth decisions in any major way.
5. GOVERNMENT SERVICES
a. FIRE PROTECTION
Platteville is authorized for a force of forty vol-
unteers and is in the Platteville Fire Protection
District. The main fire station is located at Main and
Washington and contains the following equipment:
-12-
AP 3 \
I II
NI
%® 3 I um .MI...-tt iiii.a.riiiiass ii asi!i 0
I . 6
i mil i_
1
• . I : S kil i_...' 32
iii r --`t1.
li! I F
I o <—
L�- 1ri V 1'
I1/4 :, }
•I:
tar
�• Ii
•
ll
•
al
•
IN
y
TOWN OF - •
PLATTEVILLE —
as
. TRANSPORTATION SYSTEM -
. 1 h
LEGEND •
- winim•NN Eriii_EXPRESSWAY .
=
in�..�.�.� ARTERIAL ' 0 •
ampp. ,-t . COLLECTOR , _
STATE HIGHWAY ; H
O • COUNTY ROAD ,I
•
•
12A
1 . One 300 gallon pumper carrying emergency
rescue equipment.
2 . Two 750 gallon pumpers .
3. One 3, 500 gallon tanker .
4 . One 100 fut aerial ladder.
5 . One ambulance manned by emergency medical
technicians .
The current Platteville force and equipment is adequate.
However, as the size and population of Platteville
increases, it will be necessary to increase the size
of the fire force as well as the amount of necessary
equipment. In addition, another fire station and equip-
ment should be considered if development occurs east
of town since this growth pattern will create a situa-
tion wherein one part of town could be isolated from
fire protection services by a stationary train at the
crossing. Before development is allowed east of the
railroad, this problem should be considered.
b. POLICE PROTECTION
Police protection is provided by the Town of Platteville.
The department employs three officers and requires two
additional officers to complete present requirements
for full-time police protection. As the town grows,
the department will need to increase in size and in
number of vehicles.
c. PARKS AND OPEN SPACES
Three parks located within Platteville offer recreational
opportunities to the Town residents; however, only two
of the parks have ,picnic or playground facilities.
The total acreage of the parks is 7 .4 acres. Design
criteria for park and recreation areas indicates that
for each 1000 population, tvo acres of neighborhood
parks and 1 .5 acres of play field is adequate.' Con-
sidering the use of school facilities, Platteville is
adequately served by parks land. In addition to the
parks within the Town, the area along the South Platte
River is used by many of the people as open space and a
(1) Source; Urban Planning and Design Criteria, DeChiara
and Koppelman.
•
-13-
nature area . Numerous birds, water fowl , deer and
ground animals inhabit the woods along the river, in-
cluding an endangered species, ibis . This area is
considered a valuable resource to the Town and should
be preserved in its natural state.
d. SCHOOLS
The school system was incorporated into the RE-1 School
District in 1960 . RE-1 includes the towns of LaSalle,
Gilcrest, and Platteville. The high school for the
district is located in Gilcrest and has excellent facil-
ities and resources. The middle school in Platteville
is also shared by students from Gilcrest. The elemen-
tary school and the middle school are at 79% and 86%
of their capacity, respectively. At present (projected)
growth rates, capacity should be sufficient for the next
five years. Capacity of the high school in Gilcrest
should be adequate for about ten years. The sites on
which the schools are located are sufficiently large
to allow for construction of additions. The School
Planning Commission is researching site needs dependent
upon the direction and amount of future growth.
The number of students in the schools for the 1978-79
school year are as follows :
Elementary School 287 students
High School 525 students
Staff for the elementary school and middle school numbers
47 teachers and four aids . Busing is provided for
students living further than one mile from the schools.
This involves 45% of the elementary and middle school
students and 100% of the high school students . Middle
school students from Gilcrest are bused to Platteville.
The district owns 20 buses, of which 17 are operated
daily.
C. LAND USE PROFILE
1 . LAND USE
A land use and zoning inventory conducted in March,
1979 by the planning staff mapped all existing land use
-14--
within the existing city boundaries by zone and cal-
culated the total acreage of each category. The results
of that study are shown in Table 4 . A summary of the
inventory indicates that the total land in the town is
323. 3 acres and that the largest percentage of land is
used for streets and highways (31 . 1%) . The next largest
usages are for low density residential development
(28 . 7%) and vacant undeveloped land (18. 2%) . The defini-
tions for the land use categories are given in the
Appendix. The allowable use for each zone is given in
the zoning ordinances .
Commercial land use is only 3.7% of the entire town.
For a town to support a community shopping center of
variety goods and a small department store, a base popu-
lation of 3, 500 , significantly greater than Platteville,
is needed. ' The land area required would then be 10 to
30 acres .
Vacant zoned commercial land added to existing commer-
cial land used in Platteville is 19.0 acres. Availabil-
ity of commercial land does not appear to be a constraint
to growth.
Industrial land availability appears to be adequate
with 8.2 acres of vacant industrially-zoned land.
However, the shape of the available land and the avail-
ability of land to purchase, is very limited. The
majority of industrial zoned land is located in the
railroad right-of-way and available for lease only.
Additional industrially zoned land is needed in order
to satisfy the potential demand of some industries
unable to use the existing industrially zoned vacant
land.
Residential land use consists of largely single family
homes on individual lots and one. mobile home park.
The R-1 zoned land allowing only single family dwellings
consists of 54% of all residentially zoned land.
The R-2 and R-2A zones allowing multi-family and mobile
home dwellings consists of 46% of the residential land.
Vacant residential land is readily available at the
present time with 27.7% of residentially zoned land
undeveloped. Availability of residential land for
development does not appear to be a constraint to future
growth at the present time.
Maps 4 and 5 show the existing land use and the existing
zoning of the Town.
(1) Source: Urban Planning and Design Criteria
-15-
I
MAP 4
/
• : • • I • • I
. • • f• • U
•- 1 • •: 1 •�• • It
• •.•...•.•
• • • • j`t
?• •" • • • • • ``r 4 r
JI._. . . . . • •� H
• • _i
-- -- 1 • •,•••
4• • • • 3• _ ■•
• • • • 1I
I. . i ..,. . i • • .. win•:
111---- • • • • .. �.`::; :
1 • • '• • • • • i i• • • • • • • I • • _ r
(T:
I• • • • : • 2 • •O • • e• el
M ■ tl 11 liji
1 • • II •
• -•• •
o' • •
iYi
• • • 3
c c
GENERALIZED LAND USE MAP f
EXISTING LAND USES a
, • • •• s
LEGEND • •• •
• ° • • •
Residential-Low Density • •• • • • • •
. • • • W• •'•^•' •
•••••31•1 • •
MO
Residential-High Density ••••••••
••••••••I
Commercial ■ ■ ■.i .� : t•0••••4M*
thm.ig1 • •_a D
Vacant ive13• l > V
•• • .I
Industrial •-• irl " .� •
Parks 4SS:°;::g >
g MY.v 66 A
•■•••■ •
• 1
• • • ■ ■ ■ ■ ■
-+rr ..p
wi-•■_p•.
•• • • • • •
NI
• .!• • •
J • .
- • • i t
TOWN OF • itflIOS•
y b •
PLATTEVILLE j f • •
•
•i Ic• ck
• • ,
• • •
1• •
PREPARED BY
_._ Lpfl IMER- WELD REGIONAL
COUNCIL OF COVE RNMENT.S '
15A
: mAP 5 i -
1 [:• Iy
,-, ••'Vt7 _
•• • `•••e•`e•• :•:1 1 Lle e o' er__
•o . 1 e • e • • i:.:.l .::.:� I•�• • J f ..-c
,� • •I e • • o e ti
• : ••1 .a ..• I • • • • • E'::.I . N�Y�YYY
- evv ++_::i: --.......---..:-:•:•:•:
tic:: ;f•if i• . • . . . . . .. F.—.1 f--- __-7  _W
:::::1; •••••••••••••••• : ' ""'ffc•--cf,ig:•:•:•:•:•:‘:•••:Lryte, VOi:._:1'..:2. ::::::::.::::::::: i
.•.•.•. . M - y w"�
EXISf_ING_ZO.NING_MAP • • • •e••••5
0
LEGEND I •:oue— c Wit.•• • _
en
RESIDENTIAL R1 • • • • o • • ._.
PI re,: .
v-nu-- ::
••••• +.....
RESIDENTIAL- R2 • • - ese • e •
-- • • o •• ▪ rat A
RESIDENTIAL- R3 • • • o,
t• • •w, 9
BUSINESS - B1 r///A _ Av " tl =�
• 8 =L.,
d_/a . s}
•
BUSINESS— 82 //� • • ,{�.'r 11 j/' M
S A tie a'
• • • o c
i-1\Z.)2 - • e e v D
PARKSit. � '�* • • • e
✓
Highw stin
• • • y 'j
INDUSTRIAL-,I4 .; :L� i C✓�• e •
• e e • o
6.`' _ __ •� '
-
AGRICULTURE l -•e••el w + i
•e ' }•N : I
• • • ' •
TOWN OF v2S•••• et
PLATTEVILLE r + • •_•
e • •
t.
PREPARED BY IV •W04 , `!
L(\RIMER-WELD REGIONAL " ` ! • w
COUNCIL OF COVE RNME NU
15B
2 . HOUSING
The housing sector of Platteville is fully described
in Section IV of this comprehensive plan . A synopsis
of relevant data is presented below. The housing
stock of Platteville is presented in the following
table:
TABLE 5
TOTAL STOCK
single multi- mobile
total family family home
Standard 427 330 10 87
Substandard, suitable
for Rehabilitation 29 26 3 0
Substandard, Dilapidated 11 7 4 0
TOTAL HOUSING STOCK 467 363 17 87
The vacancy rates are estimated to be between one and
two percent, which indicates that availability of housing
presents a constraint to future growth. Without adequate
vacant housing stock, new residents cannot move to Platte-
ville. The availability of vacant housing stock is also
a major factor considered in locational decisions of
many commercial and industrial companies. Future
growth is dependent upon additional housing provision.
D. ENVIRONMENTAL PROFILE
1. TOPOGRAPHY, CLIMATE, AND VEGETATION
Platteville is located in an area of gently rolling
terrain and has been developed in the level area along-
side the South Platte River. A narrow band of steep
sloped soil lies immediately east of the Town, followed
by rolling hills. To the south, the terrain is flat,
as it is also to the north. The western and northwestern
land surrounding Platteville consists of the South
Platte River and its associated area of flood potential.
The climate of Platteville is relatively mild with warm
summers and cool winters. Precipitation averages 10. 5
inches per year. The surrounding vegetation ranges
-16-
from lowland marsh and woods along the river to native
grasses and shrubs to the east.
Map Number 6 indicates the general vicinity of Platteville .
2. WILDLIFE
The potential for wildlife is great in the surrounding
areas to the Town. The river area provides a habitat
for deer, pheasant, water fowl and an endangered species
of ibis. The open grasslands provide habitat for phea-
sant, quail, and other wildlife.
3. SOIL
The major soil of the Platteville area is the altvan
loam. This is a deep, well-drained soil and was formed
in old alluvium from materials deposited by the South
Platte River. This soil has a fair to good potential
for urban and recreational development. The agricul-
tural subclass is a IIs irrigated, which indicates that
it has a good potential for irrigated agricultural use .'
Other soils found in and near Platteville are : Nunn loam
with fair to poor urban potential and class I irrigated
agricultural potential; Olney fine sandy loam with a
good potential for urban development and IIs irrigated
and IVs non-irrigated agricultural potential; Dacono
clay loam with fair urban development and IIs irrigated
agricultural potential; and Single Renohill complex
with a 3. 9% slope, poor urban potential and VIs agri-
cultural potential . Only the Nunn loam is considered
prime agricultural land and it is located immediately
east of the railroad tracks .
The soils of the Platteville area are shown on Map 7.
4. FLOOD PRONE AREAS
Map 8 indicates the areas along the South Platte River
that are classified as being flood prone. A flood
prone area is an area with a 1% chance of flooding in
any given year.
(1) Source: U.S. Dept. of Agriculture, Soil Conservation
Service.
-17-
MAP 6
WELD COUNTY .
m
*Platteville
0
_
R
EN IO
TOWN OF
o
•
PLATTEVILLE
Aga
P d
9' LOCATION MAP
6•
it
To Lon9moo
1I1 (t
11
o
•
17A
MAP 7
r Q r x
1:a to 1ere)
60 ---11 b w5A-:
Q} ��.coow
ti0-n i2-AB SI-D
•
gi 4 23-A r sl-o
r
29A'. 80 E- - 51-6
28 B-AB
a 5 I-lS
l
tl
SI-D
PLATTEVILLE <
v"r 29A•8 23-A Q
r
24 F- \ -
`tT, 2I 15-6
t- 288-A5 2.115-6
%vc4 — 8l z.c
29 A-6 m
m
< -
3
s
O; i_ - (/
28 ft)-AB v�
34
r 23-k
e
Nm < < 51-D _AI
34 r r q
mr 4
- e - 51 6-b
• •
liK PLATTEVILLE AREA
SOIL MAP
17B
5 . MINERAL DEPOSITS
Underlying most of the Platteville area are coal and
gravel deposits . At the present time, these deposits
have the potential to be commercially recoverable, but
any development of these resources must be balanced
against the impacts caused by the extraction. Gas and
oil are also present in the area around Platteville.
These resources are being utilized and indirectly, con-
tribute revenue to the Town through a franchise occupa-
tion tax.
6 . ENVIRONMENTAL LIMITATIONS
The environmental limitations of Platteville consist
of a combination of flood prone areas and soil character-
istics that have a poor or very poor potential for
urban development. Map 8 indicates areas that contain
environmental limitations. Any development in these
areas should not proceed unless appropriate mitigation
measures are undertaken.
7 . HISTORIC SITES
Only one site in Platteville has been identified in the
Larimer-Weld Historic Sites Inventory. The Platteville
River Land Company operated a brickyard south-east of
Platteville. This building is now completely gone.
Additionally, located one mile south of Platteville
is Fort Vasquez. This was a fur trading post used
during the period of 1835 to 1841. It is an adobe
post, operated now by the State Historical Society and
open to the public. During the 1930 's, the WPA admin-
istration restored the post to near original design.
•
-18-
I J
I'
1 v` MAP 8-
i ... ��
;
i
1 T /n
� e 7
�
r
•
v :� Oey .. y ` \ r.\ . 111y:ea.—I : ; . — .. I \
•h^'" c \<<1YteYII10 I . i �l i %/� .
@NJ ' I
• Q I
1 14iS yye: \
1
— (—sec_ i ,\1 '• •VI f
1
� �I. l4 � YI•
<p •
TOWN OF
1 I __ � PLATTEVILLE
25
I• PREPARED BY
1 LARIMER- WELD REGIONAL
• MP'I'•'i COUNCIL OF OOYERNME NISI
v,...•. __ ENVIRONMENTAL LIMITATIONS
\ LEGEND
i
Flood Prone Areas
Poor to Very PoorSoi I % �• ,,
Potential tor Urban ��. -,
Development
2
36 1 _.... '
. 3_
I I 18A
III
FUTURE LAND USE NEEDS
III . FUTURE LAND USE NEEDS
The objective of the future land use needs section is
to enable the Town to predict future growth and the
resulting land use needs , to insure that future devel-
opment proposals meet the needs of the Town, and to
insure a proper mix of uses to retain the rural small
town atmosphere of Platteville .
Population is expected to increase from the current
1600 to 3600 by the year 2000 . In order to project
the land uses that will occur, we need to examine the
uses for the present population and the need for a
proper land use mix.
A. RESIDENTIAL LAND
A population increase of 2000 can be anticipated to
require an additional 571 housing units . This figure
was derived by dividing the number of additional resi-
dents by the average household size of 3 . 5 . A proper
mix of housing types, as determined in the Housing Ele-
ment, would result in 380 additional single family homes .
Acreage required for single family home is . 24 acres;
for mobile homes .10 acres is needed. An additional
380 single family homes multiplied by . 24 acres will
require 91.2 acres of R-1 or R-2 zoned land. An addi-
tional 108 mobile homes will require 10.8 acres of
R-2A zoned land and 83 multi-family units will require
19 .9 acres of R-2 land.
Assume that 80% of the presently vacant land within the
Town will be developed and the remaining 20% will remain
vacant due to suitability, location and price. Presently
17.7 acres of R-1, 12 .9 acres of R-2, and 13.2 acres
of R-2A are vacant. New single family home construction
will require an additional 67 acres of R-1 zoned land
after utilizing 80% of the presently vacant land zoned
R-1. New multi-family construction will require an
additional 9.6 acres of R-2 zoned land and mobile home
construction will require . 3 additional acres of R-2A
zoned land. However, if the presently zoned R-2A
land is rezoned, there may be additional R-2A zoning
required in the future. Therefore, the projected resi-
dential land use needs are 67 acres of R-1 zoned land,
9.6 acres of R-2 zoned land, and .3 acres of R-2A
zoned land.
-19-
B. COAMERCIAL LAND
.As the population increases from the present 1600 to
3600, the commercial land use requirements will increase
rapidly due to a capturing of the presently "lost"
market and the needs of the new population . An estimate
of three times the existing use should suffice to meet
the commercial needs. This estimate was derived from
the fact that population is projected to increase by a
factor of 2. 25 and that the current "lost" market is
roughly one-third of potential business . If this lost
market is captured, then the needs will increase by
roughly one-third over the factor of 2 .25 .
At present, there are 12.1 acres utilized for commercial
use on all the zoned land of town. The needs of the
new future population then will be for an additional
24. 2 acres. At present, there are 24. 8 vacant acres
of commercially zoned land and at 80% usage, 19 . 8 acres
can be utilized. An additonal 4. 4 acres of B-1 and
B-2 zoned land will be required.
C. INDUSTRIAL LAND
A ratio of present use versus present population is not
a good indicator of the amount of industrial zoned land
needed for future growth, as industry is both more
"threshold" oriented and operates somewhat independently
from the population.
Provision of adequate industrial land must account for:
(1) maximum probable; (2) maximum appropriate land;
and (3) maximum desire on the part of citizens. Future
decisions for industrial land needs decisions should
reflect the amount of presently available vacant indus-
trial land and the three concerns listed above. As
indicated in the data base, available industrial land
is limited by the shape and ownership. As some job
producing industry is desired, additional land must be
provided. For a population of 3600, approximately
43. 2 acres of industrial land is needed. 1 The current
figure for all industrial land in Platteville is 19 . 7
acres, excluding the railroad use. An additional 23. 5
acres is required.
(1) Urban Planning and Design Criteria.
-20-
D. PARK LAND
A Town opinion survey indicated that the Town was divided
between feeling adequate park land was available if
properly equipped, and feeling that more park land was
needed. At present, there is a total of 7. 4 acres of
parks . A population of 3600 would require 12 . 6 acres
at a minimum, and an additional 5.2 acres of parks
should be provided.'
However, the flood plain area along the South Platte
is desired by the community to remain as open space
and open space between industrial land and residential
land is planned. Significantly more than 12 .6 acres
will be devoted to parks and open spaces .
E. PUBLIC LAND
At present, there are 11 .9 acres of land devoted to
public uses, such as schools, churches, and govern-
ment buildings . A population of 3600 would require an
additional 14 .9 acres that would be located in the R-1
R-2, B-1 and B-2 zones; the majority of which would be
located in R-1 and R-2 zones .
F. ROADS
Roads make up, on the average, one-third of the total
land use of Platteville. In order to provide adequate
space for roads in the separate land uses, additional
land is required for each category of land use.
(1) Urban Planning & Design Criteria
-21-
G. SUMMATION OF FUTURE NEEDS
The following table provides an estimation of the future
land use needs of Platteville.
TABLE 6
FUTURE LAND REQUIREMENTS
Land requirement (acres)
Use Zone Including Transportation
Single Family Homes R-1 100 . 5
Multi-family Homes R-2 14 . 4
Mobile Homes R-2A . 4
Commercial B-1 or B-2 6.6
Industrial In 35. 2
Parks All 5. 2
Public All ' 22 . 4
•
TOTAL 179 . 7
-22-
I.
IV
HOUSING ELEMENT
VI . HOUSING ELEMENT
This brief description of the housing situation in
Platteville relies primarily upon data gathered from a
recent housing survey and 1970 census data. As the
1980 census data becomes available, this section will
be revised.
A. HOUSING STOCK
As of March 1979, there were 467 housing units in the
Town of Platteville. The condition of these housing
units is relatively good. A large percentage of the
units in the town have been built in the last ten
years and the general growth of the area has caused
the older stock to be improved as well . A summary of
the housing conditions in Platteville is given in
Table 7. The housing condition data was developed through
windshield conditions survey done in March 1979.
TA3LE 7
TOTAL STOCK
Single Multi- Mobile
Total Family Family Home
Standard 427 330 10 87
Substandard, Suitable
for Rehabilitation 29 26 3 -
Substandard, Dilapidated 11 7 4
TOTAL HOUSING STOCK 467 363 17 87
These figures show that the single-family stock con-
sists of 77. 7% of the total stock; multi-family, 3.6%
and mobile home, 18.6%. Of the total stock, 91 . 4% is
standard, 6 .2% substandard suitable for rehabilitation
and 2. 3% dilapidated. The estimates of the housing
stock conditions was by a "windshield survey" using
housing evaluation survey form supplied by the Weld
County Planning Department. The survey evaluated eight
criteria that would indicate substandard housing condi-
tions and assigned varying points to each criteria.
The survey form is attached in the Appendix
Housing units receiving 0-1 points were considered
standard; 2-6 points--substandard, suitable for rehabil-
itation; 7 or more points--dilapidated. The housing
-23-
conditions survey was a measure of exterior conditions .
Such surveys can be misleading as to the need of assistance
since poor exterior conditions may not necessarily re-
flect a financial inability to correct the problem.
However, it is a good indicator of relative neighborhood
housing problems and is used by many communities to
estimate the need of rehabilitation funds . The low
substandard rate for Platteville in comparison with the
estimated number of households in need of assistance
indicates a positive attitude on the part of the town
citizens regarding their living environment.
1 . HOUSING TENURE
The tenure of existing units is not available except
for 1970 census data. At that time, 55% of all units
were owner occupied. If that figure is applied to the
total housing stock in 1979, there are 257 owner-occupied
units and 210 renter-occupied units .
A potential problem is indicated by the number of renter
households when the mix of housing types is compared with
the housing mix of the Region. Of all households in
the Larimer and Weld Region, 61% are owners and 39%
are renters. With 45% of all households in Platteville
as renters, and only 22% of all housing stock either
multi-family or mobile home, a shortage of affordable
housing could occur as single-family house prices rise.
There are no figures available to indicate whether this
is a problem in the Town of Platteville. However, the
regional housing survey indicates that renter house-
holds are more likely to pay more than 25% of their income
for housing than are owner households.
2. VACANCY RATES
The vacancy rates for single family units is estimated
to be 2% . The vacancy rate for mobile home units is
1% and the multi-family vacancy rate is less than 1%.
The vacancy rates indicate a serious shortage of housing
in Platteville. A figure of 3% is considered an accept-
able vacancy rate for single family units and 6% for
multi-family and mobile homes. An adequate vacancy
rate is desirable in order to provide for a good choice
of housing types and costs.
-24-
3 . HOUSING COSTS
Adequate data is not available as to the housing costs
for new homes , existing homes and rental units in
Platteville; however, the housing costs in the Region have
been rising rapidly and the median purchase price for
a home is now approximately $60 , 000 . The rate of
increase in the medium family income has been rising
much slower than the increase in housing costs . This
indicates a widening gap between the costs of housing
and the ability to afford that housing. The regional
housing survey shows that 19% of all households in
Weld County are forced to pay more than a quarter of
their income for housing. However, 53% of all low or
moderate income households must pay more than 25% of
their income for housing.
B. HOUSEHOLDS
The vacancy rates applied to the number of housing
units would indicate that there are 458 households in
Platteville. The average household size is estimated
to be 3. 5 based upon the trends that have occurred
regionwide since 1970 . The population of Platteville
is estimated to be 1800 .
1. PRESENT HOUSING NEED
A regionwide housing survey done in the spring of 1979
indicates that the average community in Weld County has
the following profile of households :
ALL HOUSEHOLDS
Owner: 78. 3%
Renter: 21.7%
Young: 78. 1%
Aged: 21. 9% •
High Income: 66 .3%
Low Income: 33.7%
Low Income in need of assistance, 19 .0%
White: 92.7%
Minority: 7. 3%
LOW INCOME HOUSEHOLDS
In need of assistance* : 53.2%
Not in need of assistance: 46.8%
-25-
F
*In need of assistance is any low income household
paying more than 25% of their income for housing or
living in overcrowded or substandard conditions . The
last household information reported specifically for
Platteville was the 1970 census . At that time, 22%
of all households were below, the poverty level , as
compared with the county poverty figure of 11 . 9% . If
this same ratio remains today, it indicates that Platte-
ville may have a low income in need of assistance
figure of 28 .5% (1 . 5 x county figure) of its total popula-
tion. The number of households in need of assistance
is estimated to be 131 (458 x 28 . 5%) . This is signi-
ficantly greater than the 30 houses in substandard
condition due tothe consideration of housing costs in
addition to housing condition.
The average household in need of assistance in tnis
area is most likely to consist of a head of household
working full-time for moderate wages . As the median
new house price in the region is $55, 000 and the median
prices of an existing house is $45, 000, an income of
$18, 000 to $22, 000 is necessary to buy a house using the
standard of not paying more than 21 times the annual
income for a house. As the median family income for
the region is less than the $18, 000 minimum, many
families are priced out of the market.
2. MINORITIES
Minorities, oftentimes, experience the housing problems
of a low income and discrimination. This restricts both
the availability of affordable housing and the choice
of housing. The special needs of minority households
are a further consideration in providing housing to
all residents.
Minorities are a significant segment of the Platteville
population. The 1970 census indicated that approximately
16% of the population was Spanish speaking or Spanish
surname persons . However, these minority households
reside in dispersed areas .of the community. There are
no major concentrations or separate neighborhoods of
minorities, nor any indications of housing discrimination
in Platteville.
3. ELDERLY
The elderly face a number of housing problems not
experienced by the rest of the population, the greatest
of which is usually living on a fixed income in an area
-26-
of rapidly rising housing costs . While many elderly
own their own homes and have only the expenses of taxes ,
insurance and maintenance, these costs have risen to
the point where they become a financial burden. The
regional housing survey indicated that in Weld County ' s
smaller communities, 55 . 5% of all elderly fall into the
category of in need of assistance.
Platteville ' s elderly population comprised 8% of the
total in 1970, or about 12 - 15% of the households due
to the smaller household size figure for elderly.
This indicates that there are 55-70 elderly households
presently in Platteville, of which 55 . 6% may be in need
of assistance.
In addition to financial burdens, many senior citizens
are physically limited to the type, design and location
of their housing. For example, they may be limited
to ground floors. They may face restrictions in location
such as needing to be near shopping facilities, health
services and public transportation. The elderly often
are not as mobile in choosing a place to live. Added
to the constraints listed above is the unavailability
of the smaller size of housing generally required by
the elderly and the special difficulties of the elderly
with maintenance and upkeep of their homes.
4. FUTURE HOUSING NEEDS
The number of units that need to be built is shown by
three components : the number needed to replace delapi-
dated units; the number needed to provide an acceptable
vacancy rate (3%. for single family and mobile homes,
and 6% for multi-family) ; and the number needed to provide
for future growth. The table below indicates the units
needed:
Single Multi- Mobile
Family Family Home Total
Replacement needs 7 4 0 11
Vacancy needs 3 1 2 6
Future growth,
1979-1984* 155* 34* 44* 233*
TOTAL 160 39 46 250
* Population increase of 815 is projected.
• -27-
The distribution of the type of future growth needs
is estimated based upon the present distribution, re-
gional trends and needs for an adequate housing mix
to provide for a choice of housing types and costs .
5 . PAST HOUSING ASSISTANCE
During 1973 and 1974, 66 houses were built in Platte-
ville using the Farmers Home Administration Section
502 subsidized loans. These loans reduced the interest
rate upon purchase to 71/2% for families with incomes
less than $8, 500 in 1974. Not all of the 66 units are
now participating in the Section 502 subsidized program
due to sales of homes to buyers unqualified for the
program.
6. FUTURE HOUSING ASSISTANCE NEEDS
From the analysis of the numbers of low income and
elderly households in need of assistance, it is estima-
ted that there are 131 low and moderate income house-
holds requiring some sort of assistance in Platteville
at present. An increase of population of 125% over the
next 20 years indicates that there may be an additional
164 families needing housing assistance of one type
or another. To meet these needs, policies and programs
are recommended in the policies section of this compre-
hensive plan.
C. HOUSING ISSUES AND PROBLEMS
An opinion survey made in December 1978 shows that the
most desired form of new housing in Platteville was
housing for the elderly with 75% of the respondents
favoring more such housing.
More single family housing was also desired by 60% of
the respondents. The least desired housing type was
multi-family with the response about evenly split
between more, less or the same amount of such housing
would bring about a change in the character of the
town.
The estimates of the number of low income households
in need of -assistance in Platteville, based on county-
wide projections indicate provision of low cost housing
may be needed.
-28-
Low cost housing can be provided in a number of ways .
The primary market response is the construction of
multi-family units, mobile home units and low cost
single family dwellings when conditions allow. Local
government can influence the conditions that the private
market must operate in through varying the amount of
zoned land, supply of services, degree of required
improvements and building codes .
Additionally, when the private market cannot adequately
meet the housing needs, the local government has the
option of becoming directly involved in housing assistance
through a Public Housing Authority or a community develop-
ment program.
The number of low income households in need of assistance
indicates that present market is not able to supply a
sufficient amount of low cost housing. Before a solution
to this problem can be found, it must be determined
if local government regulations in any way contribute
to the housing problems. An analysis follows :
Zoning - Platteville has adequate zoning for multi-
family and mobile home uses in the R-2 and R-2A Cate-
gories.. Together, they comprise 46% of all zoned resi-
dential land and have 59 . 7% of all vacant residentially
zoned land. Additionally, the R-1 land has a minimum
lot size of 8, 000 square feet, which is not a restric-
tive size.
Subdivision and Mobile Home Park Requirements -
No excessive improvements that would unduly raise housing
costs are required in the adoptied regulations. No
administrative barriers, such as delays, excessive fees,
or excessive requirements, have been noted in the con-
struction or development of low cost housing in Platteville.
Conclusions - The increase cost of housing to meet
the needs of low and moderate income households in
Platteville is caused by a combination of the general
inflation in housing costs nationwide, and particularly
in the Front Range of Colorado, as well as by a lack
of emplyment opportunities in the community. The goals
and objectives of the Housing Element recognizes these
conclusions and provides for direction in meeting the
needs of the households in Platteville.
D. GOALS AND OBJECTIVES
From the overall Goals and Objectives element of the
Comprehensive Plan, the following apply to housing:
-29-
I . To maintain and improve the existing small town
atmosphere of the Town of Platteville.
A. Preserve and enhance the peaceful, quiet
character of the Town of Platteville.
1 . Protect the character of residential
neighborhoods from intrusive and
disruptive development.
B. Retain the present feeling of spaciousness
by preserving and enhancing aesthetic features
and natural beauty of the Town of Platteville.
1. Utilize open spaces to buffer areas
with conflicting land uses, provide
relief from the effects of urban
intensities, and preserve the neigh-
borhood identity of residential areas .
C. Promote and protect the health, safety and
general welfare of the residents of the Town
of Platteville.
1 . Encourage alternatives in design and
materials so as to reduce construction
cost and energy expenditures, provided
such changes do not have a detrimental
effect on the health, safety and
general welfare of the residents of
Platteville.
D. Provide a choice of quality housing which is
affordable to a wide range of income levels
and available to all persons without discrimin-
ation and to lower the cost of conventional
housing.
1. Promote a community effort t0 encourage
the maintenance of standard units and
the rehabilitation of substandard units.
2 . Encourage the protection and preserva-
tion of historically significant or
unique buildings and homes in the Town.
3. Encourage the diversity and dispersion
of housing types and sizes which meet
a broad range of housing needs with a
greater choice of location.
4 . Provide incentives for low cost housing.
E. POLICY AND IMPLEMENTATION STRATEGY
The housing strategy for the Town of Platteville consists
primarily of encouraging the private sector provision of
housing for low and moderate income households through a
combination of non-restrictive regulations and provisions
-30-
5)
Question #7 : In this area, do you want growth to - -
Continue as it is - 24 Slow down - 12
Grow faster - 14 Not sure - 8
Question #8 : The present population is approximately 1800 , as
you see it, the ideal population for the town in
ten years (1988) should be -
Lower than 2000 - 5 2000 to 3000 - 35
3000 to 4000 - 21 4000 or more - 8
Question #13: How important is the environment to you as opposed
to economic and industrial growth?
Very - 36 Somewhat - 16 Very little - 5
Question #15
and 16 : Should the town allow development east of town across
the railroad tracks and Highway 85?
Limited - 4 If no utility problems 1
Yes - 38 No - 8 Maybe - 2
•
If yes, what kind? Residential - 20
Commercial - 24 Industrial .- 27
Parks - 18 Any r 2
54�
•
V. TOWN SURVEY
A survey of citizens attitudes towards growth, land use and the
environment was made in the Fall of 1978 . Approximately 13% of
the town' s households responded to the three page survey. The
survey contained 24 questions that related to the goals and
objectives of the town and examined the attitudes toward growth
and the environment, services, jobs and government. The survey
form is included in Appendix 3.
A summary of the most pertinent questions relating to future
development guidelines and land use policies is given below.
However, all of the questions in the survey relate to the devel-
opment of the Town and are given consideration in the formulation
of the development guidelines and policies.
The full response to the survey is also included in the supporting,
documents.
Question #4 : , Do you favor planned growth or should the unrestricted
market place determine the amount and rate that
Platteville grows?
Planned - 52 Market - 09
18. Which of the following is most appropriate for the flood plain area along the river:
Developed for residential?
Developed for commercial?
Developed for industrial?
Developed as a park?
Left as is?
Other (Specify)
19. If the Town of Platteville grows, what direction should it grow?
Why?
20. As new people move to Platteville, they will require housing.
MORE SAME LESS
a. How much single-family housing would you like to see?
b. How much multi-family housing would you like to see?
c. How much elderly housing would you like to see?
21. What problems exist with Platteville's environment now?
22. Do you wish to preserve Platteville's small town environment?
How?
23. Are the special needs of the elderly, handicapped, low-income, and minorities pro-
vided for? If not, what is lacking?
' 24. We are trying to discover the goals of Platteville. You as a citizen have a vital
role in this discovery. Your input is very important as it is the voice of all.
What did we forget to ask that we would need to know?
•
•
THANK YOU
(3)
d. What items do you now by mostly in Platteville? Food Hardware Auto
needs Specialty items Nothing at all
e. Why don't you buy more in Platteville?
f. If new stores or shopping centers are needed, where should they be located:
(check one or more)
In existing downtown South, near the new bank
Fast of the highway and railroad North of town
Elsewhere (specify)
g. What is the best thing that can be done to provide better shopping opportunities?
13. How important is the environment to you as opposed to economic and industrial growth?
Very important Somewhat important Of very little importance
Why?
14. What kinds cf industries should locate here?
What kinds should not?
15. Should the town allow development east of town across the railroad tracks and High-
way 85?
16. If yes, what kind? Residential
Commercial
Industrial
Parks
17. Do any problems exist in Platteville with the following transportation classes?
a. Local automobile traffic What?
b. Through traffic What?
c. Local truck traffic What?
d. Through truck. traffic What?
e. Public transportation What?
f. Railroad What?
g. Streets What?
h. Intersections What?
i. Other (specify) What?
(2)
APPENDIX C
TOWN SURVEY
1. How long have you lived in Platteville? less than 5 yrs. 5-15 15 T
2. What do you like best about living in Platteville?
3. What things do you think might make this area an even better place to live?
4. Do you favor planned growth or do you think an unrestricted marketplace should de-
termine the amount and rate that Platteville grows? Planned Market
5. What do you think is the prime advantage of growth?
6. The prime disadvantage?
7. In this area, do you want growth to: continue much as it has
slow down
grow faster
not sure
8. The present population of Platteville is approximately 1 ,800. As you see it, the
ideal population for the town in ten years (1988) should be :
less than 2,000 2,000-3,000 3,000-4,000 more than 4,003
9. To plan for growth and provide for consistency in making development decisions, the
Town is writing a future Land Use Comprehensive Plan.
YES NO
a. Do you feel it is important to have citizen input on this?
b. Would you attend a Community Planning Session?
c. Are you willing to accept guidelines to direct future growth?
d. Would you accept limitations on the use of land?
10. Does the town need better public facilities and services: such as police, fire,
government, health services, schools, library, parks, or utilities?
YES NO If so, what :
11. Is there need for more parks and recreation areas and activities?
What would be the best improvement on present facilities?
:7
12. The shopping facilities of Platteville are an important consideration. The next
-7- questions deal with this issue.
a. Is revitalization of downtown . important?
b. Are more stores needed in Platteville?
c. What stores are needed?
APENDIX E
SOIL AND CAPABILITY DEFINITIONS
t
CAPABILITY GROUPS OF SOILS
•
Capability classification is the grouping of soils to show, in a general way,
their suitability for most kinds of farming. It is a practical classification
based on limitations of the soils, the risk of damage when they are used, and
the way they respond to treatment. The soils are class _ 'ed according to
degree and kind of permanent limitation, but without cor. .ieration of major
and generally expensive landforming that would change the slope, depth, or
other characteristics of the soils; and without consideration of possible but
unlikely major reclamation projects.
Roman numerals are used to show the 3 broad Capability Classes and letters
follow the class numeral to indicate the principal problem or hazard. Classes
and sub-classes used are as follows:
Class I - Few or no limitations that restrict choice of crops or require
conservation measures.
Class II - Some limitations that reduce the choice of crops or require
moderate conservation measures.
Class III - Severe limitations that reduce choice of crops or require .
special conservation practices or both.
• Class IV - Very severe limitations that restrict the choice of crops , require
very careful management, or both. •
Class V - Not suited for cultivation but has few or no hazards when used for
pasture, range, woodland or wildlife.
Class VI - Not suited for cultivation. Severe limitations. Suited for range,
pasture, woodland or wildlife with careful management and needed conservation
practices. •
- Class VII - Not suited for cultivation. Very severe limitations. Suited for
range, woodland or wildlife uses if carefully managed. Usually cannot apply
physical practices such as pitting, furroving, seeding, etc.
Class VIII - Not suited for cultivation, range, pasture or woodland. Suited
only for recreation; wildlife, water supply or esthetic purposes.
e - Erosion by wind or water is the major problem.
v - Excessive water such as wetness, overflow, or high eater table. a:
a - Major problem is in the soil. It may be too shallow, too heavy, stony,
low in fertility, salty, alkaline or have low moisture capacity.
c - Climate is the major hazard. Growing season may be very short, there is •
'-� a shortage of rainfall or both.
Examples:
Ille —Class III land where erosion is the major hazard.
IVc — Class IV land vhe the climate is the m- - problem.
1
APPENDIX D
PI ATTEVtta, CONDITIONS
"ousing condition : (Items with * cannot be added. Items without * can)
0 = Generally sound condition
POINTS
o . Chimney and Eaves 0, 1 , or 2 points :
Cracks or missing materials on chimney and/or eaves .
Eaves rotten for chimney out of plumb . A.
. Roof 0 , 1 , 2, 3 , or 7 points :
1* Roofing is missing, rotted, or loose to a degree less
than or equal to 20% of roof.
2* Roofing is missing, rotten or loose to a degree more
than 20% of roof area.
3* Roof evidences minor structural sag by itself or in addi-
tion to any loose , rotted, or missing materials .
7* Roof evidences major structural sag or general deterior-
ation which warrants rebuilding the entire roof. B.
L. Walls . 0 , 1 , 2 , or 7 points :
1* Exterior wall materials are cracked, loose or missing.
—Tr Wall boards are rotted, warped, or missing.
7* Walls are out of plumb as viewed from any corner. C.
. Foundation 0 , 1 , 4, or 9 points : r .
1* Minor cracks or materials loose or missing from
visible part of foundation (skirt) .
4* Large open cracks and extensive deterioration of skirt .
—Ur— Foundation is visably sagging, sinking, or bulging,
oftentimes missing parts . • D.
E. Doors and Windows 0, 1 , 2, or 3 points :
Extensive breaks or cracks in panes or rips in screens .
1* Loose or rotting windows $ door frames up to 20% .
2r— Loose -or rotting windows F, door frames over 20% . E.
Porch and Stairs 0 , 1, or 2 points : •
Materials are rotten, broken, or missing from any
part of stairs or porch - including banisters . -
Detectable sag or lean in porch or stairs . • F.
3. Paint 0 or 1 point:
Paint neglected. G.
I. Additions 0, 3, or 6 points : •
3* Addition is structurally unsound comprising an area
equal to or less than 20% of the main house .
6* Addition is structurally unsound comprising an area •
more than 20% of the main house. H.
A Other:
4€,' •
primary use. This condition refers specifi-
cally to off-street parking facilities
(Example : a parking lot or structure adja-
cent to and primarily servicing a commercial
strip is classified commercial) . However,
unrelated land uses co-existing on the same
land area are considered as separate uses
and are classified accordingly.
1
-59-
facilities for a public or quasi-public
purpose. Included are government buildings .
Facilities for educational, cultural, medical,
correctional and religious purposes, military
installations, cemeteries, reservoirs,
passenger terminals . Note that undeveloped
school sites purchased at time of this study
are included while proposed sites not yet
publicly owned are not included.
Parks & Recreation: Public land such as parks, golf
courses, play fields, greenbelts, and pub-
lically owned recreational facilities such
as tennis courts, swimming pools, campgrounds .
Railroad Right of Way: Track lines and land area associ-
ated with railroad transport operation.
Spur lines providing access to individual
user and existing on land owned by other than
railroad company are excluded. Adjacent
land owned by the railroad but not in use
was called vacant. Where the rail line
crosses a street, the area of land will be
allocated to the street R.O.W. , where the
rail line crosses a creek, the land will be
measured as part of the railroad R.O.W.
Street Right of Way: The delineated right of way of
existing public roadways, paved or well
graded, including cul-de-sacs, access roads
on street parking and sidewalks if within
determined right of way. Does not include
private streets or driveways. Alley ways
are included in this category.
Vacant: All land not placed in another category.
Basically unimproved land areas which may
be considered developable without consider-
ation of possible terrain constraints .
Excludes land area where some activity is
suggested but currently non-existent (Example:
deserted house classified residential , vacated
shopping center classified commercial) .
Note : Dependent Land Use
Where a secondary land use exists as a result
of or related to a primary land use, the
secondary land use is classified with the
-58-
APPENDIX CAPS
LAND USE CLASSIFICATIONS
Residential : Land area used primarily for permanent
living quarters, either owned or rented, and accessory
uses normally associated with same. Excluding all
street and alley rights of way.
Low Density: RL -single family, detached dwelling
and duplex or two family dwelling.
Medium Density: RM -Multi-family dwellings and
mobile home parks . Does not include
group quarters or resident institu-
tions for non-family occupancy which
are considered public or quasi-public .
Commercial : C -all retail and service establishments .
Includes land area used for office type
activities such as business services (account-
ing, consulting, insurance, finance, real
estate) and professional services (legal ,
medical, dental, veterinarian) ; private
recreational facilities of primarily income
nature (movie theaters and race tracks) ; and
profit oriented public services (mortuaries,
employment services , auto dealers) ; and
residential structures of commercial nature
(hotels, motels, sample homes) .
Industrial : IN -establishments engaged in manufacturing,
processing or treatment of raw materials,
wholesale activities, warehousing and storage
facilities, contractors and rental services
to businesses.
in -uses of urban land that night be considered
temporary in nature due to minimal permanent
above ground improvements . All facilities
and activities associated with actual land
utilization such as surface and subsurface
mining or mineral extraction. Also includes,
greenhouses and nurseries .
Public and Quasi-Public: Land area associated with
establishments and facilities operated as a
governmental function or financed through
public funds or private institutions operating
-57-
PUD Planned unit development. A form
of development usually character-
ized by a unified site design
for a number of housing units,
clustering buildings and providing
common open space, density
increases, and a mix of building
types and land uses. It permits
the planning of a project and the •
calculation of densities over
the entire development, rather
than on an individual lot by lot
basis .
Socio-economic Profile A profile of households which
reveals important, family structure,
age, education and income informa-
tion about the area.
Subdivision The process (and the result) of
dividing a parcel of open or
raw land into smaller buildable
sites, blocks, streets, open
space, and public areas, and the
designation of the location of
utilities and other public improve-
ments .
Threshold A level of development at which
growth beyond allows activity to
occur that would not occur
otherwise.
Zoning A police power measure, enacted by
local government with special
permission from the State
Legislature, in which the community
is divided into districts or
zones within which permitted and
special uses are established as
are regulations governing lot
size, building bulk, placement
and other development standards.
Requirements vary from district
to district, but they must be
uniform within districts.
-56-
Goal The end toward which effort is
directed, it is something to be
sought, it is general and timeless.
Household A group of people, related or
not related, living in a dwelling
unit.
Housing Authority An agent of the local government
which is empowered to define
housing needs, prepare specific
plans to meet the needs and
implement the plan to meet the
housing needs. A Housing Author-
ity is able to administer a wide
variety of programs to receive
funds through numerous state and
federal programs. A housing
Authority may issue tax exempt
revenue bonds independent of the
local bonding capacity and is
tax exempt. However, the Housing
Authority may agree to make
payments in lieu of taxes .
Housing A place designed for residence;
may be either a single family
house, a mobile home, or a unit
in a multi-family complex.
- A dwelling unit must have a
kitchen, bath, and living
facilities.
Land Use How the land is used.
Local A roadway allowing access to
abutting land which serves local
or neighborhood traffic only.
Objective An end of action, a point to be
reached. It is capable of both
attainment and measurement.
Objectives are successive levels
of achievement in the movement
toward a goal.
Open Space Land which does not have buildings
or has not been developed and is
desirable for preservation in
its natural state of ecological,
historical or recreational
purposes, or in its cultivated
state to preserve agricultural,
forest or urban greenbelt areas.
-55-
APPENDIX DEFINITION OF TERMS
Arterial A street designed to carry large
amounts of traffic at speeds of
40 to 55 MPH. Land access is
discouraged to promote increased
mobility.
Capital improvements Major town facilities such as
parks, streets, water and sewer
lines and the Town Hall .
Collector A street designed to carry a
medium traffic volume at speeds
of 30 to 40 equally weighted.
A street whose function is to
channel traffic from local
street to arterial streets is a
collector.
Community Facilities Improvements owned by the Town
such as parks, streets, water
and sewer lines and the Town Hall.
Also referred to as capital
improvements.
Developer Person or organization engaged
in the process of changing the
use of land from agriculture or
open to a use which is more
intensive such as residential,
commercial or industrial.
Development The result of a land use change
from agriculture or open to
residential, commercial, or
industrial.
Flood prone area An area which stands at least
one chance in one hundred of
being flooded. This area extends
from the center line of a water
course to the outer limit of
water resulting from a "one
hundred year storm. "
Flood Plain The main channel of a river or
stream or the pathway of water
resulting from a flood.
Future Land Use Land use expected or proposed
to occur at some point in the
future.
-54-
VIII
APPENDIX
their interests and influence developrient within the
region. It should also be used as a resource to provide
the town with professional or technical assistance as
needed.
In addition to the above, the town should make a concerted
effort to coordinate its efforts with Weld County.
Weld County encourages growth to take place in incorpor-
ated communities. Weld County should be made aware of
Platteville' s growth policy and plans and all develop-
ment proposals should be submitted to the County for
review. A working relationship between Platteville
and Weld County should be developed.
D. ANNEXATION:
The Town, if it is to implement the Plan, will find it
necessary to annex additional land. Before this is
undertaken, Platteville should develop policies and
procedures regarding annexation. These policies should
adequately reflect town concerns as well as comply with
Colorado State Statutes.
E . STAGING
The rate and time growth will occur in a small town is
difficult to predict. Many factors such as the condi-
tion of the general economy, etc. are outside of the town ' s
sphere of control. However, they greatly impact the town ' s
ability to grow in accordance with its plans.
Platteville has promulgated its plans under the -assump-
tion that the Front Range will continue to grow and that
it will take part in that growth. To the extent that
it can control the timing of growth, it will do so
through Capital Improvements Programming. This means
that the town will budget for the facilities necessary
to accomodate a population of 3600 and generally attempt
to have them in place within the next ten years.
During the interim the population can experience some
moderate growth but it is anticipated that the largest
growth will occur during the latter- phase of the Plan.
-53-
coordinate its efforts with the school district so they
can maximize their efficiency.
Other public welfare concerns must also be included in
this budget. For example, a growth in population will
create greater demands for police and fire protection.
This will result in additional employees, high capital
investment in items like police cars, and higher costs
for town government. These costs should be offset by
the additional growth, but wise budgeting can reduce
some of these costs and provide Platteville the effective-
ness of implementing the Platteville Comprehensive Plan
though Capital Improvements Planning is great. Growth
is likely to occur where public improvements are planned.
Platteville is in a position to direct and plan those
improvements and can therefore exercise a great deal of
control over its future growth and development patterns.
B. DEVELOPMENT REGULATIONS
The most traditional way to implement a comprehensive
plan is through the promulgation and enforcement of
zoning ordinances and subdivision regulations. Platteville
has adopted both of these mechanisms and both are gen-
erally compatible with the goals and policies put forth
in the Plan. However, both the zoning and subdivision
regulations should be examined in more detail and re-
fined, if needed, to be more compatible with the Plan .
In particular, the category pertaining to mobile homes
should be revised and the development and use of a PUD
ordinance should be encouraged. Platteville should also
examine the development and dedication fees as well as
the specific development standards to determine if they
adequately protect the town and ensure that the town
can afford to assume the costs associated with any
new development.
C. INTERGOVERNMENTAL COOPERATION
Local land use decisions can affect planning at State and
regional levels. Platteville should attempt to coor-
dinate its planning with other levels of government
and work in conjunction with them when possible.
A method to facilitate this is the State Clearing House.
This agency reviews projects eligible for federal funds.
Platteville' s participation in this process will give
the town a voice in decisions affecting them, but outside
of their immediate jurisdiction.
Similarly, continued participation in the Larimer Weld
Council of Governments will provide a vehicle to express
-52-
the budget should address immediate concerns. The
present system needs chlorination in two wells, a modifi-
cation to its distribution system, and lacks adequate
storage (upgrading of transmission lines must accompany
additional storage) .
Platteville has begun to address these deficiencies and
the town has budgeted for an additional storage tank with
a capacity of 500 , 000 gallons. This will accomodate
the present population and permit a small amount of
growth. However, further capital improvements must
be planned and budgeted if Platteville expands to a
population of 3, 600 . At this population the town would
need a storage capacity of 1. 5 million gallons. It is the
recommendation of this plan that the town in its budgeting
process, while addressing short term needs, also be
cognizant of long term needs and attempt to meet both in
the most cost effective manner.
Along with capital improvements, budgeting for the town ' s
water system, Platteville should assign a priority to
the development of its stormwater drainage system, its
parks system, and other public welfare concerns .
In the case of stormwater drainage, the future land use
has been designed to minimize this problem and, other
than improving existing problems, the plan recommends
that any future development absorb the cost of modifying
the existing system and that this policy be implemented
through the subdivision regulations .
Parks and recreation is another area that can be appro-
priately addressed under capital improvements. It is
anticipated that as the town grows, Platteville will
be the recipient of lands donated for parks under the
subdivision regulations. Prior to accepting these lands,
the town should conduct a thorough needs assessment to
determine whether parks are needed in a given area or
whether there currently exists a sufficient amount of
open space. If the latter is the case, cash in lieu of
land may be considered as a viable option to land dona-
tion. While this plan advocates the development of parks
and open spaces, it is with the reservation that the
town will be financially able to maintain them. Main-
tainence is an important aspect of park development and,
in the long run, the most expensive. Therefore, the
town should make provisions for this aspect of parks
and open space in their budgeting process and assess
what they can realistically' support. Once this is
ascertained it is recommended that the town attempt to
-51-
IMPLEMENTATION
The land use plan ' s success is dependent upon its im-
plementation . The first step towards this is the
Plan ' s adoption, and a committment from the Town to
carry out the Plan. Since this document reflects the
work and is the result of many citizens ' efforts and time,
as well as that of Town officials, it is hoped that
Platteville is confident that the Plan reflects true
community needs and that the Town will want to implement
this Plan. There are several ways to implement the land
use plan and many can be used in conjunction with one
another.
A. CAPITAL IMPROVEMENTS PROGRAMMING
In Platteville, the most important factor in implementing
the Comprehensive Plan will be the Town ' s ability to
program for Capital Improvements . Using the budgetary
process to implement growth management, plans can be
particularly effective in Platteville since some public
improvements in the areas of water storage and storm
water drainage must be undertaken prior to the occurance
of substantial growth. In addition to this direct
impact or control, a capital improvements budget will
also permit. the Town to assign financial priorities to
various programs. This means that individual projects,
in competition for a limited amount of funds, can be
programatically evaluated on the basis of both their
individual effectiveness and their relationship to
broader goals and objectives. Specifically, Platteville
should use its capital improvements program to fund
public improvements in both its developed and yet-to-be
developed portions of the Town. These improvements
should include utilities, roads, parks, and other legiti-
mate areas wherein public funds are expended. This can
be accomplished through establishing a long range capital
improvements program (approximately five years) that is
reviewed, updated and revised on an annual basis. Within
this framework, each project should state its purpose
and estimated cost, so that it can be funded at a level in
accordance with the program budget and goals.
An element critical to the success of the plan is the
town' s ability to provide its present and projected
population with an adequate water system. Accordingly,
it is the Plan' s recommendation that this be a priority
within the budgeting process. In the immediate future,
-50-
VII
IMPLEMENTATION
2. Programs
a. Develop and maintain existing parks to
provide for the needs of the current
Platteville residents .
-49-
B. COMMERCIAL AND INDUSTRIAL
1 . Policies
a. Promote revitalization of downtown area.
b. Review commercial and industrial
development proposals with the develop-
ment guidelines .
c. Promote variety of goods and services .
d. Encourage activities of a Chamber of
Commerce which promotes desirable
economic development.
e. Attract industries and businesses
capable of providing jobs to local
residents.
2 . Programs
a. Actively promote the utilization of
Urban Development Action Grants for
commercial, industrial and community
development projects and to seek the
necessary business commitments.
b. Carry out a downtown revitalization
program utilizing private, and govern-
ment funds.
c. Participate in and support a study of
the economy of Platteville and the
region.
d. Include in the capital improvements
budgeting process a long range awareness
of capital improvement needs caused by
growth.
C. PARKS, RECREATION AND OPEN SPACE
1 . Policies
a. Provisions of adequate park, recrea-
tion and open space facilities will be
considered when any development proposal
is received.
b. A connected, open space area will be
encouraged in all development proposals
located wherever feasible upon land
least suited to urban development.
c. Maintain the South Platte River flood
prone area in its natural and undeveloped
state.
-48-
A. HOUSING
1 . Policies
a. Coordinate all residential development
proposals with school facility planners .
b. Support subsidized housing programs
such as FHA and VA which make it
possible for low income, elderly,
minorities and moderate income groups
to afford housing.
c. Encourage development proposals which
are attentive to the housing needs
of the elderly residents of the
community.
d. Review all residentially related
developments against the residential
guidelines .
e. Encourage the provisions of a wide
range of housing types and costs .
2 . Programs
a. Review all development standards,
review processing time, and other
associated additional costs of housing
that may be due to government action
so -as to identify and eliminate unneces-
sary costs and regulations .
b. Investigate the eligibility for and
use of Community Development Block
Grant funds for neighborhood revitali-
zation efforts and other federal and
state funds as they relate to the
provision of housing and community
development needs.
c. Adopt a fair housing ordinance that
makes it unlawful to discriminate
against any person on the basis of race,
sex, age, religion, or national origin,
in the provision of housing.
d. Implement a housing supply and house-
- hold needs monitoring system.
e. Establish a housing rehabilitation
program.
-47-
disruption of residential and commercial
areas -Locational Guideline .
8 . Proposed industrial development will be
analyzed to insure that it does not place
undue stress upon the existing services
capabilities, such as water, sewer, storm
drainage, police, fire, schools, and general
town government -Systems Guideline.
9. Industrial development shall not create
traffic safety hazards from the resulting
generated traffic. Mitigating actions will
be required of the developer -Systems
Guideline.
10. Industrial development that significantly
alters the rural small town environment of
Platteville shall be discouraged -Social
Guideline.
11. Industrial development that adversely
effects natural drainage patterns, wet-
lands, aquifer recharge areas, wildlife
habitat areas or historically significant
properties or locations shall be discouraged.
Additionally, valuable resources of prime
agricultural land and significant natural
resources shall be protected from development
whenever possible. -Systems Guideline.
3. POLICIES AND PROGRAMS
One of the most important functions of a comprehensive
plan is the identification of actions the planning body
and administration of a town will take to insure that
future development is in accordance with accepted de-
velopment guidelines.
The development guidelines are of no use if they are
not applied to the decision-making process. Problems
identified in the housing section, the data base and
the town survey will not be resolved without action.
The actions that the town commits itself to are iden-
tified through the policies and programs of this plan.
They govern how the town will react to future develop-
ment and how the town will respond to existing problems.
-46-
areas or historically significant pro-
jects or locations shall be discouraged.
Additionally, valuable natural resources
of prime agricultural land and significant
natural resources shall be protected from
development whenever possible -Systems
Guideline.
12. Commercial development shall not create
traffic flow patterns that disrupt resi-
dential areas -Systems Guideline.
c. INDUSTRIAL DEVELOPMENT
1 . Future industrial development shall provide
open space or physical separations such
as berms, trees and other barriers when
locating near existing non-compatable
development in order to minimize noise,
visual, odor or other intrusions -Systems
Guideline.
2. Future industrial development will be
evaluated as to energy conservation and
utilization considerations in design,
orientation and location of the development,
and will be encouraged to address such
considerations -Locational Guideline.
3. Future industrial development will be
required to locate contiguous to or at the
nearest suitable location to the existing
development in Platteville -Locational
Guideline.
4. Prohibit industrial development in flood
prone areas, unless satisfactory mitigation
procedures are instituted -Locational
Guideline.
5 . Industrial development proposed in areas
of :high shrink-swell soil characteristics
will require appropriate engineering re-
ports to determine the proper mitigation
procedures -Locational Guideline.
6. Industrial development through the PUD
regulations will be encouraged to provide
for an aesthetically pleasing development
- Social Guideline.
7. Future industrial development shall be
located in the nearest available and
appropriate location to existing major
highways and railroad, in order to minimize
-45-
intrusions -Locational Guideline .
2 . Commercial development shall provide suf-
ficient access, parking and landscaping -
Systems Guideline.
3 . Commercial development will be evaluated
as to energy conservation and utilization
considerations in design, orientation and
location and will be encouraged to address
such considerations -Locational Guideline.
4. Development requiring the demolition of
standard or suitable for rehabilitation
housing will be discouraged -Social Guideline.
5 . New commercial development will be required
to locate contiguous or at the nearest
suitable location to the existing compat-
able development in Platteville -Locational
Guideline.
6 . Prohibit commercial development in flood
prone areas, unless satisfactory mitigation
procedures are instituted -Locational
Guideline.
7. Commercial development proposed in areas
of high shrink-swell soil characteristics
will require appropriate engineering re-
ports to determine the proper mitigation
procedures -Locational Guideline.
8. Proposed commercial development will be
analyzed to insure that it does not place
undue stress upon the existing services
capabilities, such as water, sewer, ' storm
drainage, police, fire, schools and general
town government -Systems Guideline.
9. Commercial development shall not create
traffic safety hazards from the resulting
generated traffic. Mitigating action will
be required by the developer to avoid such
hazards -Social Guideline.
10. Commercial development that significantly
alters the rural small town environment of
Platteville shall be discouraged -Social
Guideline.
11. Commercial development that adversely
effects natural drainage patterns, wetlands,
aquifer recharge areas, wildlife habitat
-44-
will require appropriate engineering re-
ports to determine the proper irrigation
procedures -Locational Guideline.
8 . Residential development through the PLTD
regulations will be encouraged to provide
for affordable housing for lower and mod-
erate income residents -Social Guideline.
9 . Residential development will maintain a
reasonable ratio of housing types through-
out the town; proposed residential develop-
ment will be evaluated with respect to
this policy -Social Guideline.
10 . Proposed residential development will be
analyzed to insure that it does not place
undue stress upon the existing service
capabilities, such as water, sewer, storm
drainage, police, fire, schools and general
town government. The developer will pay
for the costs of services improvements
attributable to that development -Systems
Guideline.
11. Residential development will not create
traffic safety hazards from the resulting
generated traffic, including highway and
railroad crossing hazards. Mitigating
actions will be required by the developer
to avoid such hazards -Systems Guideline.
12. Residential development that significantly
alters the rural small town environment of
Platteville shall be discouraged -Social
Guideline.
13. Residential development that adversely
effects natural drainage patterns, wet-
lands, aquifer recharge areas, wildlife
_ habitat areas or historically significant
projects or locations shall be discouraged.
Additionally, valuable natural resources
of prime agricultural land and significant
natural resources shall be protected from
development whenever possible -System Guideline.
b. COMMERCIAL DEVELOPMENT
1. Protect existing commercial development
from industrial, or other non-compatable
-43-
c. SYSTEM GUIDELINES
The Systems Guidelines are intended to assess the
impact of any proposed development upon all the
systems existent in the Platteville area . This
includes both the man-made systems such as water,
sewer, storm drainage, police, fire, transportation
and government services; and natural ecosystems
such as natural drainage, aquifer recharge, open
space or wildlife patterns .
2. DEVELOPMENTAL GUIDELINES
The guidelines to be applied to any proposed develop-
ment activities are given below in the categories of
residential, commercial and industrial . The defini-
tions and standards needed to apply the guidelines are
included in Appendix.
a. RESIDENTIAL DEVELOPMENT
1 . Protect existing residential development
from industrial, commercial or other
non-compatable intrusions -Locational
Guideline.
2. Require future residential development to
provide adequate and usable open space and
recreational facilities -Systems Guideline.
3. Residential developments will be evalu-
ated as to energy conservation and utili-
zation considerations in design, orientation
and location of the development, and will
be encouraged to address such considerations
-Locational Guideline.
4. Development requiring the demolition of
housing which is standard or suitable for
rehabilitation housing will be discouraged
-Social Guideline.
5 . New residential development will be required
to locate contiguous to or at the nearest
suitable location to the existing compat-
able development in Platteville -Locational
Guideline.
- 6. Prohibit residential development in flood
prone areas, unless satisfactory mitigation
procedures are instituted -Locational
Guideline.
7. Residential development proposed in areas
of high shrink-swell soil' characteristics
-42-
B. DEVELOPMENT GUIDELINES
1 . GUIDELINES CATEGORIES
The Town of Platteville will guide decision making
with the development guidelines . The purpose of
the development guidelines is to list the concerns
of the Town when developing its regulatory documents,
such as the zoning ordinances and subdivision regu-
lations, or when assessing a requested change in
the future land use map, or when reviewing a devel-
opment proposal .
The guidelines have been developed through an analy-
sis of the Town ' s goals and objectives, the citi-
zens ' survey, town meetings and known data; and
they have been subject to an extensive review pro-
cess. There are three basic types of developments
guidelines. They are:
a. LOCATIONAL GUIDELINES
The locational guidelines are intended to assist
the Town ' s assessment as to the appropriateness
of a proposed location for any specific' proposal.
. Many locations surrounding Platteville are suitable
to more than one type -of development. Recognition
of this fact allows a degree of flexibility in
amending the future land use map.
It is intended that the location guidelines will
help to shape the future land use in Platteville,
basing future eveluations on all existing develop-
ment proceeding the proposed development. The
guidelines relate to residential, commercial, in-
dustrial and transportation development.
b. SOCIAL GUIDELINES
The Social Guidelines will assist the Town ' s assess-
ment as to the quality of a proposed development.
It will allow the Town to insure that the proposal
will be of an acceptable nature and will address
the human needs of the Town ' s population.
The health, safety and welfare of the community
shall be protected through the guidelines. The
desires of the community as expressed through
town meetings and the town survey are an important
part of the guidelines development.
-41-
Besides the development of designated areas outside
the town, Platteville has also designated land for var-
ious uses within its existing boundaries . These desig-
nations conform to existing development and land use
patterns . The majority of land in Platteville is de-
veloped with only a few parcels available for any ex-
tensive development. These parcels are adjacent to
residential land uses and have been designated for
residential use. The only major land use designation
other than residential within the town is commercial.
This designation reflects the commercial development
already present in Platteville, as well as its anti-
cipated growth and development.
It is Platteville' s determination that the Future Land
Use Map represents a realistic portrayal of how the town
can grow and develop. However, Platteville also realizes
that as new information becomes available that the plan
should be flexible enough to accomodate and reflect
necessary changes . To facilitate this process, a series
of development guidelines also accompany this map.
One of the purposes of these guidelines is to assist
Platteville in the review of any proposed development
activity. Therefore, when a proposal is reviewed
(particularly if it does not conform to the future
land use map) attention should be given to whether it
meets the criteria set forth in the guidelines, as well
as the designation given to it on the land use map.
This approach is an attempt to introduce an element of
flexibility into the plan itself, and to reduce the
need for continual amendments to the plan for relatively
insignificant changes. For example, since the plan
designates specific areas for multi-family development,
it is quite possible that requests to develop this use
in other locations will occur. Rather than making the
_ applicant go through a lengthy amendment procedure,
an analysis of the proposal's compatability with the
guidelines, as well as the map, will determine the
proposal ' s compatability with the Comprehensive Plan.
Divergence from the map itself will not necessarily
mean the proposal is incompatible, instead, the pro-
posal will be evaluated in conjunction with the Plan' s
goals, maps and guidelines.
-40-
• • • • • • • .• • . -. .
i:•:•:•:•::::•: ••• •• t • I• • • •J 6/ . r•-•--; -7-;--.• •• •r r lin
_° A • t!, .tf
*1 10 l fin, •eliemod . . . 0:.
r i I . .
__
• 4:;i: ..7;E.''' ...4):::::::.c.,......."..?..-...--....7.3...,.....7..r......„...1...........r.ii
•11lµ fi*'r :: •,I('1•:::::•_r•r 11;:. j• 'I S �•.4-•• '.--.:7_�::tch.a • • • • •)r::::-:•:•:•:•:•:t�,.•••••••••• .
r._•1■ ■ .•:•:': : I :..:r,_,1J�. . .. ,'7 • ° • . •
if '• • • • • • • • ,-isis�•::::d:iivi i. • • • • •
y.% k yr \° • • • • • ••
. • i 13vr:;vv.n: * rt ii•••••••••••
AtirtT$I �o°•°•°•°• icwY, • _ - - :•; In •V.�:v 3^',1 • • • • •
,� , r'• �• • • '• • • 1 • • •:;=?.vv ..::: v C .`1.T • • • • •�
iQtit?Pik.4' • • • • • • y • /t • • • • •
` C • • • • :.'^..:::::::. l,1 _• i.w..-IL.N.• � . \■• ••• • • • f +v `�3�' �1 i,
I,•• d .
• • • i • • .4
I - } I • •• � • • •
. LEGEND I �;r:, 4 `
,,,� • • ma 0
Y • J
Low Density Residential ° ° • • s `
.• .:i • • ■ ■ . . '
Medium to High Density t 1rt1
;••R ""'L'-• `I ::;:.• I
a • ■ ea
Commercial •\
; N •
°�„,i�f�s •,
tax ,-- i".° •" •
Parks and Open Space d �;��• °•° •
°. t :a j: •
Industrial • e? ' . _._._ .. ` • �
• i▪ s•i�•
• Agriculture. •
• • ■ • • •
■ ■ ■ ■ a • ■
- Town Boundary I (\ „::::■;'.▪ , TOWN OF
■ ■ ■ ■ . ■ ■ PLATTEVILLE
Proposed Boundary -- �':▪ ::::�
••••••••••••- PREPARED ■Y
• ■ ■ ■ ■ ■ • LARI MER-WELD REGIONAL
• • • • • •
LII-J-*j COUNCILOFGOVERNMENTS 1
L
development in this area . The map, however, does desig-
nate one small parcel of land in this area for commer-
cial development. The decision for this designation
was based on the fact that the land is now zoned commer-
cial and could be provided with utilities, if necessary.
Given the above, it became apparent that future expan-
sion should be encouraged to occur to the north and west
of Platteville. With this as a general guide, the Town
examined the areas reasonably available for development
and attempted to determine what would constitute the
best use of those lands . The results of this are re-
flected in the land use map.
The area to the east of town has been designated for
industrial and residential development, with the resi-
dential land placed east of English Ditch. The resi-
dential designation raises social, engineering, and
economic questions which must be resolved before this
area is developed. Some of these issues concern the
isolation of a small residential area by an industrial
area, the integration of this area with other residen-
tial areas, and the cost of providing adequate services
such as medical, fire, and road maintenance. The in-
dustrial designation however, appears appropriate from
several perspectives. The town believes that the
physical barrier isolating it from the town ' s residen-
tial areas is desirable and that its access to the
highway as well as rail services makes it a desirable,
developable location. In addition, the town can easily
provide water to the area from its existing plant:
Once having designated this land for industrial use, the
town still needed a substantial amount of land to ac-
comodate future residential growth. The triangular
area bounded by the Independent Ditch and the town
boundaries was one of the two areas selected. This
piece of land was designated as R (residential low
density) because it was adjacent to a low density resi-
dential development and because the town could service
the area at a reasonable cost.
The second residential area is located adjacent to the
town' s north boundary. Platteville, as in the case of
the first parcel, can accomodate residential expansion
in this area with only slight mo'ification and expan-
sion in its existing water, sewe and stormwater systems.
In addition, the area is compatible with the existing
land use. Its proximity to major transportation routes
will permit it to accomodate medium to high, multi-
family residential development with a minimum of noise
and traffic pollution.
-39-
V. FUTURE LAND USE : MAP AND GUIDELINES
A. THE MAP
The future Land Use Map is intended to be used as a guide
for future growth and development. It is based on present
available data and it is the Town ' s intent that, as condi-
tions warrant, it will evolve and adapt itself to meet
the needs of Platteville. To accomplish this, this map
is coupled with a series of development guidelines. To-
gether, the map and its accompanying guidelines shall be
considered by Platteville when it is in the process of
reviewing development proposals.
The Future Land Use Map, itself, is designed to reflect
what the Town considers to be a logical, rational and
desirable sequence of development. The amounts of land
reserved for different types of uses are based on the
Town ' s projected land use needs. In addition, the land
designated for residential use also reflects the needs
assessment contained in the Housing Element of this Plan.
Basically, the map is composed of all the land within
present jurisdictional boundaries and the immediately
adjacent lands that, from the town' s perspective, are
suited to urban development. These adjacent areas are
identified on the map and designated for specific land
uses. Land not identified for future urban development is
designated agricultural. It is the intent of Platteville,
relying on the cooperation of Weld County, that urban
development be prohibited in this area and that the land
be preserved for agricultural/open space/greenbelt uses .
The selection and designation of specific parcels of land
outside the Town for potential urban development was based
on a variety. of factors. First, the amount of land located
outside of Platteville and necessary to accomodate its
projected population was calculated. Second, the land
surrounding the Town was then analyzed to determine what
areas would be most condusive to urban development.
Natural barriers such as flood plains and man-made barriers
such as ditches eliminated large tracts of surrounding land
on the basis of environmental, economic and social consider-
ations. For example, the location of the South Platte
and a ditch to the west of the town seriously impedes
expansion in that direction. Expansion to the south is also
unlikely since the Town could not adequately adopt at a
reasonable cost its storm drainage system to accomodate
-38-
3 . Promote commercial and industrial development in
designated areas to provide Town residents with
a reasonable choice of goods, services and employ-
ment opportunities .
a. Promote a program to coordinate and
aggressively seek businesses to locate
in Platteville.
b. Strive to improve and unify the archi-
tectural and landscape design of the
business district.
c. Encourage diversified and non-polluting
employers to locate in Platteville .
d. * Require industries to be designed in an
aesthetic manner with buffers and
landscaping to minimize visual blight
and noise .
e. Encourage businesses to locate in
Platteville, that will demonstrate
benefits to the Town.
-37-
2 . Provide park and recreation programs which respond
to the needs and resources of the residents of
the Town of Platteville.
a. * Improve existing parks and encourage
the acquisition and development of
new park sites which are accessible to
all .
b. * Prevent urban encroachment upon areas
needed for recreational and open space.
c. Provide a broad spectrum of passive
and active recreational activities to
meet the recreational needs of all age
levels and interest types.
d. Provide community centers and recrea-
tional facilities as a place for groups
to meet and for general use .
C. To ensure the orderly, harmonious, and economical
development of the Town of Platteville.
1. Promote orderly growth for the Town of Platteville .
a. * Discourage urban sprawl .
b. Ensure consistent and equitable appli-
cation of land use regulations .
c. Encourage coordination between school
administration, planners and land
developers in order to locate residential
development where it can best be served
by educational facilities.
d. Promote energy conservation in all
land uses .
2. Promote the maximum harmony and compatibility
among land uses in the Town of Platteville.
a. * Require future development to be com-
patible with existing land uses and
the adopted land use plan of the Town
__. of Platteville.
b. * Encourage future development to util-
ize landscaping, screening, setbacks,
berms, and other techniques to provide
visual and noise barriers between
adjacent conflicting land uses.
c. * Maintain and preserve land for agri-
culture which is best suited for that
land use based on fertility, slope and
efficiency of operation.
d.* Ensure that future development will be
accomplished so as to create the least
degradation of the environment.
-36-
f . * Encourage alternatives in design and
materials so as to reduce construction
cost and energy expenditures, provided
such changes do not have a detrimental
effect on the health, safety and general
welfare of the residents of Platteville.
4. Provide a choice of quality housing which is
affordable to a wide range of income levels and
available to all persons without discrimination.
a. Promote a community effort to encourage
the maintenance of standard units and
the rehabilitation of substandard units.
b. * Encourage the protection and preservation
of historically significant or unique
buildings and homes in the Town of
Platteville.
c. * Encourage the diversity and dispersion
of housing types and sizes which meet
a broad range of housing needs with a
greater choice of location .
B. To maintain and improve public services provided to the
residents of the Town of Platteville. -
1. Provide safe, reliable, affordable and efficient
-public services and facilities to the existing
and future residents of Platteville.
a. * Ensure that proposed development will
not deplete the capabilities of the
Town of Platteville to provide services .
b. * Ensure, to the extent possible, that
new development pays its own way so
that it does not put an excessive
burden on the residing taxpayers. .
c. Promote progressive management techniques
in operating and maintaining utility
systems so as to provide good services
at reasonable rates.
d. * Encourage new development to locate
adjacent to existing development to
minimize extensions of services and
utilities.
e. Require new development to construct
storm drainage facilities which will
protect Town residents from drainage
problems or flood hazards.
-35-
d. Reduce public nuisances such as,
barking and roaming dogs, trash and
noxious weeds .
e. Protect town residents from crime
and promote an atmosphere in which
they can feel safe.
2 . Retain the present feeling of spaciousness by
preserving and enhancing aesthetic features
and natural beauty of the Town of Platteville.
a. * Utilize open spaces to buffer areas
with conflicting land uses, provide
relief from the effects of urban
intensities, and preserve the neigh-
borhood identity of residential
areas .
b. Develop and maintain, if possible, a
connected and linear open space system
which will be accessible to all
residents.
c. * Capitalize on the location and aesthe-
tic value of the South Platte River by
utilizing it as an open. space area .
d. * Encourage the use of canals and deten-
tion ponds for open space purposes .
e. Enhance the appearance of developed
and developing areas, public streets
and parking lots through the creative
use of landscape design.
3. Promote and protect the health, safety and
general welfare of the residents of the Town
of Platteville.
a. Provide safe drinking water to Platte-
ville residents.
b. Keep air, water and noise pollution at
a minimum.
c. Encourage the location in Platteville
of quality medical services which
conveniently and adequately meet the
health service needs of residents .
d. * Limit development in natural hazard
areas or require construction modifi-
cations which would mitigate -natural
hazards without degrading the environment.
e. Promote and support community service
organizations and facilitate the
establishment of other institutions
•
capable of offering a broad spectrum of
opportunities to meet the social,
cultural, recreational, and educational
needs of the Town residents.
-34-
THE PLAN
The Comprehensive Plan contains two major components .
This first states the goals and objectives the Town
finds necessary to support and implement if it is to
attain its underlying goal of encouraging moderate growth,
creating a strong econimic base and maintaining the
amenities associated with small towns . In addition,
Platteville has attempted to formulate growth projections
that are realistic, that can be attained.
The second section of this plan deals with the timing
and phasing, and implementation of the comprehensive
plan. It contains a future land use map which is accom-
panied by a discussion of its function and a number of
development guidelines. From this, the plan formulates
a strategy to implement both the growth and future land
use. The following parts of this plan present the
Towds goals and objectives and the strategy necessary
to implement the Plan.
GOALS AND OBJECTIVES
The following goals and objectives have been developed
in a cooperative effort between the Town ' s citizens,
administration and planners, and address the issues
that must be dealt with through the comprehensive plan.
They are a dynamic set of goals and objectives that
reflect the direction of Platteville and will be revised
and updated on an "as needed basis" . The objectives
with an asterisk (*) relate most directly to the formation
of the development guidelines to be found in Section
VII and the Future Land Use Plan, Section IX.
A. To maintain and improve the existing town atmosphere
of the Town of Platteville.
1. Preserve and enhance the peaceful and quiet
character of the Town of Platteville.
a. * Protect the character of residential
neighborhoods from intrusive and
disruptive development.
b. * Provide a transportation network
which will serve the residents travel
needs with maximum efficiency, safety
and comfort while minimizing the
disruption of neighborhoods.
c. * Encourage business and commercial
development which generates a high
volume of truck traffic to locate in
areas where the adverse impacts of
noise, street damage and congestion can
be minimized.
-33-
V. FUTURE LAND USE :
INTRODUCTION
The rate of growth, as well as the time frame in which
that growth occurs is , in a small town, often erratic and
difficult to predict. The intent of the Plan is to
determine the parameters wherein growth can occur, to
establish a time frame for that development, and to
establish the mechanics through which this plan can be
implemented.
This plan calls for the Town of Platteville to reach
a maximum population of 3600 by the year 2000 . This
figure was arrived at through an analysis of Platteville ' s
social, economic and environmental situation. This
analysis showed that the Town desired moderate growth,
a stronger economic base and the retention of the rural
amenities associated with small towns. Using this
information as a basis for initial planning, it was
possible to later quantify this goal by establishing
an optimal population figure for Platteville. The
primary basis for projecting and planning for a population
of 3600 is the Town' s present and future capacity to
provide services without imposing an unreasonable
financial burden on the present population. Platteville' s
water and sewer system, with adequate capital improvements
planning, can be expanded to accomodate a population of
3600.
Simultaneously, this population figure is compatible
with the Town' s other goals. First, it will encourage
a moderate growth that is large enough to support and
strengthen the existing commercial establishments and
can also provide inducements for industry to locate in
the Town. Second, this growth rate will permit Platte-
ville its rural atmosphere, create minimal environmental
disruption, and encourage the efficient utilization of
resources.
IMPLEMENTATION
It is the intent of this Plan to accomplish these
general goals by implementation stradegy. The scope
of the- implementation plan is fivefold and its success
is dependent upon the:
1. adequacy of the adopted Comprehensive Plan;
2. support of Town officials;
3. capital improvements programming;
4. development regulations;
S. intergovernmental cooperation.
-32-
of services at the lowest possible costs .
The active role that the Town of Platteville will take
is to meet the adopted goals and objectives through the
housing development guidelines as shown in the Develop-
ment Guidelines section and through the Housing Policies
adopted in the Policies section.
-31-
4 5C
Question #18 : Which of the following is the most appropriate use
for the flood plain area along the river?
Residential - 3 Commercial - 4 Industrial - 5
Parks - 26 Left as is - 34
Question #19 : If the Town of Platteville grows, what direction
should it grow?
North - 27 South - 14
East - 15 West - 3
Question #22 : Do you wish to preserve Platteville' s small town
atmosphere?
Yes - 39 No - 13
No conflicts seem apparent between the goals and objectives of the
Town and the citizens' attitudes and opinions. The overall concern
. is primarily to allow the Town to grow only enough to support some
new businesses and job producing industry, until that growth begins
to change the small town character of Platteville.
The direction of growth seems limited primarily by physical condi
• tions, with the flood plain to the west and the highway and railroad
to the east, as the greatest limiting factor.
EXHIBIT
1 39
ADDENDUM TO WATER SERVICE AGREEMENT
THIS ADDENDUM is made and entered into as of the 119thday of March
1998, between CENTRAL WELD COUNTY WATER DISTRICT, a quasi-municipal
corporation and political subdivision of the State of Colorado (the "District"), and the TOWN
OF PLATTEVILLE, a Colorado municipal corporation acting by and through the Platteville
Water Enterprise (the "Town"), the District and the Town being jointly referred to herein as
the "Parties":
RECITALS
A. The Parties entered into a Water Service Agreement dated April 14, 1994,
pursuant to which the District now supplies potable water to the municipal water system owned
and operated by the Town (the "Town System").
B. Under the Water Service Agreement as originally written, the sole Delivery
Point for District water to the Town System was located at the intersection of Weld County
Road 32'/2 and Weld County Road 25, which is located west of U.S. Highway 85 and the
right-of-way of the Union Pacific Railroad (the "Railroad").
C. The ability of the Town System as presently constituted to serve current and
future customers located east of Highway 85 and the Railroad is limited, and the Town will
need to construct a second feed to that portion of its service area in order to provide adequate
service there.
D. The Town's sole water storage tank is also located east of Highway 85 and the
Railroad, and it would be further advantageous for the Town to be able to fill its tank directly
from the District's conduits.
E. In order to serve a major new customer located several miles east of the Town,
the District is planning to extend a new conduit from a new connection ("New Connection") on
the District's main at Weld County Road 25 and Weld County Road 34 to the proposed new
customer's property along Weld County Road 34; the minimum diameter of a conduit
necessary to effect such service is six inches.
F. The District has offered the Town an opportunity to participate in the new
conduit by paying the additional costs necessary to increase its diameter to ten inches for that
portion located between the New Connection point and a point on the east side of Highway 85
and the Railroad along Weld County Road 34, at the north entrance to Colorado Park North
subdivision.
G. The Town has determined to accept the District's offer of participation, subject
to the terms and conditions set forth in this Addendum.
CAR\53378\267323.01
•
H. The Town presently serves a limited number of customers located outside of its
municipal limits, but it has done so since 1981 and such service is thus authorized pursuant to
Section 1.01 of the Water Service Agreement.
I. Since the date of the Water Service Agreement, it has become evident that the
Town's users outside of Town's boundary will require additional and expanded water service
from the Town, and the Parties desire by this Addendum to provide for such service.
COVENANTS AND AGREEMENTS
NOW, THEREFORE, for and in consideration of the mutual promises and
undertakings herein set forth, the Parties agree as follows:
1. District Construction of Participation Facilities.
1.1 The District shall obtain all necessary permits and easements for, and
shall design, construct, and install a conduit not less than ten inches in diameter from the New
Connection to a point, to be more specifically determined later by agreement of the Parties, on
Weld County Road 34 at the north entrance to the Colorado Park North annexation property,
together with all surface and subsurface appurtenances determined necessary or appropriate by
• the District not including a Master Meter Vault. Such facilities shall be referred to herein as
the "Participation Facilities." The Participation Facilities are part of a longer conduit
extension being designed and constructed concurrently by the District. This Addendum is
limited only to that portion of the longer project identified as the Participation Facilities.
1.2 Not less than 14 days before advertising for construction contract bids
for the Participation Facilities, the District shall submit the plans for same to the Town for its
engineering review and approval, which approval shall not be unreasonably withheld or
delayed. The Participation Facilities shall be constructed and installed substantially in
accordance with approved plans.
1.3 The District shall begin the performance of its obligation under 1.1
above within a reasonable time not to exceed 90 days after the mutual execution of this
Addendum, and shall place the Participation Facilities into service promptly upon the
completion of construction thereof. Completion and activation are anticipated to occur not
later than June 30, 1998.
1.4 Upon completion of the Participation Facilities, the District shall furnish
to the Town one additional Delivery Point within the meaning of Section 1.05 of the Water
Service Agreement, which shall be located and sized as follows:
Location Size
At the north entrance to the Colorado Eight (8) inches
Park North annexation property in diameter
on Weld County Road 34.
CAK 533781267323.01 -2-
Schedule B attached to the Water Service Agreement is hereby amended to
include the above-described Delivery Points.
1.5 A master meter shall be installed, operated, maintained and read at the
additional Delivery Point described above as provided by the Water Service Agreement. The
District shall furnish the Town with a copy of its monthly reading of the master meter within
two (2) business days after taking such readings.
1.6 The alignment of the Participation Facilities shall be as determined by
the District, except that such alignment shall provide for a point of connection to Town
facilities at the new Delivery Point.
2. Participation Facilities.
2.1 In consideration of the benefits to be derived from the Participation
Facilities, the Town agrees to pay the District the sum of Thirty Thousand Five Hundred
Twenty-Five Dollars ($30,525), being the difference in the estimated costs of the Participation
Facilities including a conduit with a diameter of six inches versus ten inches, per the cost
estimates attached hereto as Exhibit A. The Town's financial obligation to the District
hereunder shall be fixed at said amount, and the District shall have the sole risk of cost
overruns and the sole advantage of any savings realized during construction.
2.2 The Participation Payment described in 2.1 above shall be due and
payable as follows: $10,200 within five business days after the District issues its notice of
award of the construction contract for the Participation Facilities; and the balance of $20,325
when the Participation Facilities have been pressure tested and finally accepted by the District
and water is available for the Town to take same from the new Delivery Point.
3. Credit for Participation Payment. The District shall account for the Town's
Participation Payment as contributed capital paid by the Town, and the Town's demand charge
under the Water Service Agreement shall be reduced by $160 per month. Neither the Town's
Participation Payment nor any other provision of this Addendum shall be deemed or construed
to give the Town a proprietary or ownership interest in the Participation Facilities; said
Facilities shall be owned, operated, maintained, repaired and replaced solely and exclusively
by the District.
4. Property Interests. The Town shall grant to the District, at no cost to the
District, any and all easements across real property owned by the Town, and licenses to use
existing Town easements (subject to the District acquiring the necessary easement rights from
fee owners of the servient parcels), reasonably required by the District for the Participation
Facilities. The Town shall have no obligation to acquire property interests for the Participation
Facilities from third parties.
CAK\53378`267323.01 -3-
5. Town's Users Outside Town's Boundary.
5.1 Current Town service to real property outside of its municipal limits is
as follows:
a. Bella Holsteins: One one-inch Tap serving a dairy operation
located at 13278 Weld County Road 32, and one 5/8-inch Tap,
serving a residence located at 12784 Weld County Road 32, on
the following described property:
The West 550 feet of the North three-quarters of the Northeast
Quarter of the Northwest Quarter of Section 20, Township 3
North, Range 66 West of the 6th P.M., County of Weld, State of
Colorado.
b. Olin Property: One 5/8-inch Tap serving;
Lot A of Recorded Exemption No. 2004, being a part of the
North 30 acres of the Northeast Quarter of the Northwest Quarter
of Section 20, Township 3 North, Range 66 West of the 6th
P.M., except the West 550 feet thereof, also known as and
numbered 13542 Weld County Road 32; and
One one-inch Tap serving:
The South Half of Section 17, Township 3 North, Range 66 West
of the 6th P.M., all in the County of Weld, State of Colorado,
also known as and numbered 13487 Weld County Road 32.
5.2 Additional service to property outside the Town's boundaries which is
expected to be commenced in the near future is described as follows:
One 3/4-inch Tap serving:
Lot A of Recorded Exemption No. 2097, being a part of the North Half
of the Northeast Quarter, Section 20, Township 3 North, Range 66 West
of the 6th P.M., County of Weld, State of Colorado, expected to be
known as and numbered 13038 Weld County Road 32 (the "New Olin
Property").
5.3 The Town is expressly authorized to continue its current water service to
the property described in 5.1 above, and to extend the new service described in 5.2 above
when the customer requests same. The Town may further expand its water service to the dairy
operation on the Bella Holsteins property up to an additional one equivalent 34-inch Tap. The
Town's water service to such property shall be subject to the same provisions of the Water
Service Agreement as are applicable to Town service within its municipal limits. Any further
CA6v3378`.267323.01 4-
extensions or expansions of Town service outside its boundaries shall require express District
approval, in advance, in writing.
5.4 As between the Parties, the property described in 5.1 and 5.2 above shall
be deemed the exclusive service area of the Town, and the District shall not extend District
water service to any of such property except through the Town System, pursuant to the Water
Service Agreement and this Addendum.
5.5 Nothing in this Addendum shall be construed or interpreted as an offer
or willingness on the part of the Town, or consent by the District for the Town, to serve
outside of its municipal boundaries generally, it being the express intent of the Parties that the
Town shall not serve extraterritorially except as expressly authorized by the Parties on a case-
specific basis.
6. Scope and Purpose of Addendum. This Addendum shall be deemed an integral
part of the Water Service Agreement. Except as expressly or by necessary implication
modified or amended by this Addendum, all terms of the Water Service Agreement are hereby
reaffirmed in full and shall continue in full force and effect as originally written. This
Addendum shall supersede and control any conflicting provisions of the Water Service
Agreement.
IN WITNESS WHEREOF, the District and the Town have set their hands and seals
effective as of the day and year first above written.
CENTRAL WELD COUNTY WATER
DISTRICT
\--c----2 ,-
By r.97Atc, 7(7,//•" —
President
ATTEST:
. C 44t).a.. i .. , CL-721
Secr tary
Y
CAK\533 78\267323.01 -5-
TOWN OF PLATTEVILLE, acting by and
through the Platteville Water Enterprise
By:
Michael A. Cowper
ATTEST:
Margie Ortega, Town Clerk/See: retary
CAK,53378\267323.01 -6-
. i
WATER SERVICE AGREEMENT
This Water Service Agreement ("Agreement") is made and entered into as of the N day of
y between CENTRAL WELD COUNTY WATER DISTRICT, a Colorado
quasi-municipal corporation ("District"), and the TOWN OF PLAI IEVILLE, Colorado, a Colorado
municipal corporation acting by and through the Platteville Water Enterprise("Town"), the District and
the Town being jointly referred to as "parties;"
WITNESSETH
WHEREAS, Section 29-1-203, C.R.S. provides that the District and the Town may enter into
contracts and agreements with one another to provide intergovernmental services; and,
WHEREAS, the District owns, maintains and operates a system for the storage and
distribution of potable water within Weld County, Colorado; and,
WHEREAS, the Town owns, maintains and operates a system for the storage and distribution
of potable water to the inhabitants of the Town; and,
WHEREAS, the Town desires to secure from the District, and the District desires to provide
to the Town, a reliable supply of potable water, in terms of both quantity and quality, at a reasonable
rate, for use by the Town's inhabitants; and,
'WHEREAS, the parties desire that the District be the sole and exclusive potable water
provider to the Town, so long as the District is able to meet the needs of all current and future water
users within the Town;
NOW, THEREFORE, in consideration of the mutual covenants, agreements, and promises set
forth herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as
follows:
ARTICLE I
PROVISION OF POTABLE WATER
1.01 The District shall treat and deliver to the Town, and the Town shall purchase and receive
from the District, potable water for operation of the Town's municipal water system, in the annual
amount, peak demand and minimum and maximum pressures provided on Schedule A, attached
hereto. The Town shall not serve users outside the Town's boundaries as they currently exist or may
be changed from time to time, except for customers currently being served.
1
1.02 The Town shall not purchase or receive potable water for use by its inhabitants from any
water system other than the District throughout the term of the Agreement, so long as the District is
able to provide water at the rates and volumes specified in Schedule A, and any additional potable
water service as requested by the Town, as provided for in Article VIII. Notwithstanding the
foregoing, however, the Town may continue to use its own water system up to the extent of its
current capacity to provide potable water service within the Town.
1.03 Water furnished by the District to the Town shall meet all state and federal requirements
•
for domestic drinking water.
1.04 The range of pressures shown on Schedule A shall be provided at the Delivery Points;
thereafter, the Town is responsible for all minimum and maximum pressure rates within its system.
1.05 The point(s) of delivery of potable water by the District to the Town shall be as set forth
in Schedule B attached hereto, which may be amended from time-to-time as agreed upon by the parties
("Delivery Points").
1.06 The District shall use reasonable diligence to provide a constant and uninterrupted supply
of water except for interruptions or reductions due to: (1) Uncontrollable Forces; (2) operations of
devices installed for water system protection; and (3) maintenance, repair, replacement, installation of
equipment, or investigation and inspection of the water system, which interruption or reductions are
temporary, and in the opinion of the District, necessary. Excepting cases of emergency, the Town will
be given reasonable advance notice of such interruptions or reductions. The District shall remove the
cause thereof with diligence.
1.07 Neither party shall be considered in default under this Agreement if prevented from
fulfilling any obligations by reason of Uncontrollable Forces. The term "Uncontrollable Forces" shall
mean any cause beyond the control of the obligated party, including, but not limited to, failure of
facilities, flood, earthquake, storm, lightning, fire, epidemic, riot, civil disturbance, labor disturbance,
sabotage, breach of construction contract by a third party or restraint by court or public authority.
Uncontrollable forces do not include causes, which by due diligence and foresight, such party could
reasonably be expected to avoid. A party rendered unable to fulfill its obligation by reason of
Uncontrollable Forces shall exercise due diligence to remove such inability with all reasonable dispatch.
ARTICLE II
FACILITIES
2.01 The installation of the necessary interconnection and metering equipment, and the initial
delivery of water to the Town, shall be done only after giving the Town forty-eight (48) hours advance
notice of such work, and under the supervision of the Town.
2
2.02 The District shall install, own and operate a flow restricting valve at the point(s) of
connection. Said valve shall be equipped with a timer capable of providing one rate of flow between
6:00 AM and 12:00 midnight, and a second rate of flow from 12:00 midnight and 6:00 AM. The rates
of flow shall be set within the rates provided on Schedule A, as directed by the Town in writing. The
Town shall not be responsible for demand charges based on deliveries at flow rates greater than the
rates directed by the Town in writing.
2.03 The District shall provide the Town with design and construction plans for any facilities
or improvements to be constructed or work to be done at the points of connection with the Town's
system, including specifically any pressure or flow control facilities. The District shall not construct
any such interconnection facilities for which the Town has not approved the design and construction
plans, however, such approval shall not be unreasonably withheld. Approval of such construction shall
be deemed to have been given if written approval or denial has not been given within fourteen (14)
days after such plans have been received by the Town for review.
ARTICLE III
RAW WATER
3.01 The Town shall annually provide raw water for treatment and delivery by the District, in
the amount of 120% of the total measured potable water usage by the Town at the point(s) of delivery
for the previous year, plus any anticipated increases in the Town's use (the "Raw Water
Requirements"), as described in Section 8.04. Raw water provided to the District shall be provided on
an actual gallon basis .
3.02 The Raw Water Requirements shall be provided from the Colorado-Big Thompson
Project ("CBT"), the Windy Gap Project ("WG"), or from any other source reasonably acceptable to
the District which is at least as usable to the District as CBT or WG water.
3.03 The Town, commencing on the date of the interconnection with the District, shall, at its
sole expense, purchase over the raw water purchase period described in Section 3.04 below (and
temporarily transfer on an annual basis to the District) the Raw Water Requirement necessary for the
Town during the term of this Agreement. The Town shall retain ownership of the raw water rights
temporarily transferred to the District, and the rights to reuse such water, if any.
3_04 The first ten years under this Agreement shall be known as the "Raw Water Purchase
Period". During the Raw Water Purchase Period the Town shall purchase, own and make available to
the District for treatment and delivery no less than the minimum amounts of its Raw Water
Requirement as shown in the following table (the "Minimum Raw Water Ownership Obligation"):
3
YEAR TOWNS MINIMUM RAW WATER OWNERSHIP
OBLIGATION
1995 10%
1999 50%
2004 (and thereafter) 100%
The Town may, however, exceed its Minimum Raw Water Ownership Obligation in any year or years
without penalty or effect on any fees, charges or rates provided in this Agreement. During the Raw
Water Purchase Period, the Town may provide its Raw Water Requirements above its Minimum Raw
Water Ownership Obligation pursuant to a lease, lease-purchase, or other acquisition of less than a fee
interest. At the end of the Raw Water Purchase Period, the Town's Minimum Raw Water ownership
Obligation shall be 100% of its Raw Water Requirements.
3.05 The District shall not be required to acquire any additional raw water necessary to meet
the Town's Raw Water Requirements.
3.06 In the event the Town does not provide sufficient raw water to the District to meet its
Raw Water Requirements, the District shall give the Town notice of such insufficiency, as nearly as
possibly thirty (30) days prior to the time when such additional raw water will be necessary. If, after
such notice, the Town fails or refuses to provide sufficient raw water, the District may, in its sole
discretion provide such raw water. (See Section 7.04).
ARTICLE IV
OWNERSHIP AND MAINTENANCE OF FACILITIES
4.01 The Town will own and continue to be responsible for the construction, operation, and
maintenance of its distribution lines and other system facilities within the Town up to the Delivery
Points. The Town shall undertake all proper steps to prevent connections to the Town's water system
which would in any way permit water produced in or by the Town to enter the District's distribution
system by backflow, back-pressure or otherwise, so as to prevent the quality of water in the District's
transmission system from being affected by water produced in or by the Town. The Town, however,
shall not be liable to the District for contamination which may occur as a result of Uncontrollable
Forces in the absence of the Town's negligence or resulting from circumstances beyond the Town's
control. The District shall have no control or right of control over the design or operating standards,
specifications or practices of the Town system.
4.02 The District shall at its sole expense own, operate and maintain the District water system,
including any interconnection facilities, master meter and meter vault, flow and pressure control
facilities, water line, pump station and treatment plant facilities necessary to serve the Town as required
by this Agreement, up to the Delivery Points. For the purpose of determining operation and
maintenance responsibility, the District shall maintain to five (5) feet outside the master meter vault on
the Town's side.
4
•
ARTICLE V
MASTER METER(S)
5.01 The master meter(s) will be installed, owned, operated and maintained by the District at
its sole expense. Such meter(s) shall be read by the District at monthly intervals, under its own meter
reading schedule. If requested by the Town, the District shall give the Town notice of any master
meter reading and allow a Town representative to be present and observe.
5.02 Once every three (3) years the District shall test and calibrate the master meter(s), at the
District's cost. At any time, upon the Town's written request, the District shall make or cause to be
made a special meter test at the Town's cost. The District shall notify the Town in advance of any
master meter test and allow a Town representative to be present and observe.
5.03 The readings of any master meter which shall have been disclosed by tests, conducted
pursuant to American Water Works Association standards, to be inaccurate shall be corrected from the
beginning of the monthly billing period immediately preceding the billing period during which the tests
are made, in accordance with the percentage of inaccuracy found by such tests, provided that no
correction shall be made for a longer period than such inaccuracy may be conclusively determined by
the District to have existed.
5.04 If any meter shall fail to register for any period, the Town and the District shall agree as
to the amount of water furnished during such period and the District shall render a bill therfor. If no
agreement can be reached,the billing shall be based upon historical usage data.
ARTICLE VI
WATER RATES
6.01 The Town shall pay the District a fixed monthly demand charge based on the Town's
maximum hourly rate of usage for the previous year, and a commodity charge per one thousand
(1,000) gallons of potable water delivered to the Town. The maximum hourly rate of usage shall be •
the highest quantity of water delivered during any single hour occurring between the hours of 6:00 AM
and 12:00 midnight, or the average rate of usage determined by dividing the highest quantity of water
delivered to the Town in a single day by 24 hours, whichever is greater. Until revised pursuant to
Section 6.02, the demand charge and commodity charge shall be as specified on Schedule C.
6.02 The Board of Directors of the District may, once in each calendar year, review the rates
for potable water furnished hereunder, and, if necessary, revise such rates based on actual usage and
audit figures so as to produce sufficient revenues to maintain and operate that portion of its system
necessary to serve the Town and establish and maintain reasonable reserves for operation and
maintenance. My changes in rates charged to the Town shall be consistent with changes in rates
charged to all other District customers, and will be calculated based on the formula specified on
Schedule D and consistent with the District Rate Analysis attached as Schedule E. Such revised rates
5
shall be deemed to be substituted for the original rate herein provided, and the Town agrees to pay
such revised rates for potable water delivered after the effective date of such rate revisions.
6.03 In order to provide sufficient notice to the Town for budgeting, the District shall provide
preliminary notice to the Town by October 1 of any expected rate change for the ensuing year, or any
projected capital improvement that will affect the rates to be paid by the Town. The District shall
provide final notice of any rate changes to the Town by February 1, of every year. By March 1, when
each new rate becomes effective, the District shall also provide the actual adjustment for the previous
year based on actual audited figures. All rate changes for which the Town receives such notice shall
become effective March 1 of the year in which final notice was given.
6.04 Billing for each month shall be made on or about the last day of the month and payment
made on or before the 20th day of the following month. Any bill not paid by the twentieth (20th) day
of the month following billing shall be delinquent and the Town shall pay an additional $100 delinquent
fee. If the Town refuses or fails to pay any bill by the due date and thereafter fails to cure such default,
the District may discontinue delivery of potable water hereunder upon thirty (30) days written notice to
the Town of its intention to so do and an opportunity for a hearing on the matter.
6.05 If the Town is unable to take delivery or use potable water from the District by reason of
Uncontrollable Forces affecting the District's system, the Town shall not be responsible for payment of
a proportionate monthly demand,charge calculated by dividing the monthly demand charge by thirty
(30) days, and multiplying by the number of whole days of outage. If such inability is caused by
Uncontrollable Forces affecting the Town's system, the District may reduce or waive a similarly
calculated proportionate monthly demand charge.
ARTICLE VII
COSTS AND EXPENSES
7&1 The Town shall pay a system enhancement fee to the District in the amount of _
$412,500.00. Such system enhancement fee shall be considered contributed capital in calculating the
demand charge to the Town.
7.02 Said system enhancement fee is payable as follows: $10,000.00 upon execution of this
agreement; and the balance due upon availability of the remaining funds to the Town from the
Colorado Water Resources and Power Development Authority in May 1994.
7.03 In addition, the Town shall pay for all costs associated with acquisition of raw water by
the Town and temporary transfer of the same to the District, and any periodic charges or assessments
related to such raw water. The Town shall be responsible for all costs or expenses involved in
changing the District's operations to facilitate use of raw water from a provider other than the Northern
Colorado Water Conservancy District.
6
7.04 The Town shall pay an additional fee of fifty percent (50%) of the commodity charge for
any potable water furnished to the Town, for which the District provided raw water to meet the
Town's Minimum Raw Water Obligation. (See paragraph 3.06).
ARTICLE VIII
ANNEXATIONS AND INCREASES IN SERVICE
8.01 The parties recognize that the Town must have the ability to ensure an adequate potable
water supply at a reasonable price for its present and future inhabitants, including areas which may
currently be served by the District but which, in the future, are annexed by the Town.
8.02 District services and District local distribution lines and facilities, expressly excluding
conduits designed and operated to serve areas outside the Town, located within the legal boundaries of
the Town will be converted to Town responsibility and ownership as soon as it becomes reasonably
feasiblq f Iconomically and operationally for the Town to incorporate the said line and facility into its
system. Terms and conditions of the conversion of lines and facilities will be determined on a case by
case basis, without profit or unreasonable expense to either party, taking into account whether the
District or its customer paid for the same, the District's need to use the same, and any other relevant
factors. The Town will not annex any areas served by the District unless it reasonably and in good faith
expects to extend its system into such area and assume ownership of the District system in such area
within five(5)years after annexation.
8.03 The District shall be allowed to review and comment on proposals for any new
subdivision requiring more than twenty-five (25) new residential equivalent (5/8 inch) taps, any
annexation, and alterations or new construction requiring a service tap of greater than one inch. The
Town shall, in its sole discretion, make all final decisions regarding granting new or additional water
service within the Town.
8.04 The parties recognize that it is the partial intent of the demand charge imposed upon the
Town to pay for system enhancement needed by the District to supply expanded usage by the Town.
So long as the Town's demand stays within the peak demand specified on Schedule A, the District will
furnish the new service and no additional system enhancement fees or other capital contributions shall
be required of the Town for such new service. Also, the District will furnish the service and no
additional system enhancement fees or capital contribution shall be required of the Town for expanded
demand above the peak demand specified on Schedule A so long as such expanded usage is:
1. 115% or less of the highest prior year's actual usage while the Town serves less than
1,000 residential equivalent taps; or
2. 110% or less of the highest prior year's usage after the Town has begun serving 1,000
or more residential equivalent taps.
7
Should the Town expect additional demand above the peak demand specified on Schedule A and
greater than the percentage increases specified above, the Town shall make written request to the
District for such additional potable water service. Upon receipt of a written request, the District shall
have thirty (30) days within which to notify in writing the Town of its decision to supply such
additional potable water service. If the District determines to provide such additional potable water
service, the Town shall provide the additional raw water requirement necessitated thereby and advance
monies to the District equal to that portion of the District's tap fee attributable to system facilities and
not raw water for the number of equivalent taps represented by the requested additional service. After
being paid, such monies shall be considered contributed capital. For use in determining the revised rate
for water, the contributed funds shall be "Contributed Capital". The District, at its sole cost and
expense, shall within six (6) months of the Town's written request commence construction and within
one (1) year complete any necessary improvements to District facilities needed to provide the Town
with the additional potable water service. For the purposes of this agreement, an equivalent tap, (ET)
shall be determined as a 5/8 X 3/4 inch tap. All larger taps shall be allocated as equivalent taps
according to the relative maximum flow capacities specified in tables 5.6, 5.7, and 5.8 of American
Water Works Association(AWWA)Manual Number 22.
8.05 Notwithstanding any other provision contained in this Agreement, if the District is unable
or unwilling to provide potable water service to meet the reasonable and documented good faith
demands or anticipated demands within the Town, the Town may either: (1) secure the additional
potable water service from any other source or provider and this Agreement shall continue in effect for
that level of potable water service which the District can supply; or (2) the Town may terminate this
Agreement in total, to be effective three (3) years from written notice by the Town, and obtain potable
water service from any other source or combination of sources to satisfy its entire potable water needs.
For any Town request for increased service greater than twenty-five (25) residential equivalent (5/8
inch) taps, the Town shall provide written documentation of the calculation of the requested increase in
service; the Town shall not request additional service greater than the amount requested by and
necessary to serve the project#necessitating the increased service.
8.06 The District shall remain the sole and exclusive potable water provider to the Town to
the extent the District is able and willing to provide potable water service as requested by the Town.,
subject to existing capacity of the Town system as provided in Section 1.02 above.
8.07 So as to avoid disparate costs for potable water service within the Town, the District
shall cooperate with the Town to exclude from the District any property, now or in the future located
within the Town's boundaries not served by the District system. The Town agrees to pay the District's
reasonable costs of any uncontested exclusion of property located within the Town's boundaries.
8
ARTICLE IX
TERM
9.01 This Agreement shall remain in effect for an initial term of twenty (20) years from the
date of its execution.
9.02 After its initial term, this Agreement shall be automatically renewed for successive ten
(10)year terms, unless terminated as herein provided.
9.03 Either party may terminate this Agreement at the end of its initial term, or at the end of
any renewal term, upon giving three (3) years prior written notice to the other party of its intent to
terminate the Agreement ; no such notice shall be given prior to sixteen (16) years from the date of the
Agreement.
ARTICLE X
MISCELLANEOUS PROVISIONS
10.01 The Town agrees to adopt and enforce within the Town rules and regulations
reasonably compatible with those of the District related to the delivery and use of potable water.
10.02 No later than September 1, of each year, the Town will supply the District with
estimates of its projected maximum day and average day needs for the following year.
10.03 The parties shall assist each other in acquiring any easements and other permits or
approvals necessary to accomplish and place into effect this Agreement, and for the construction of any
necessary facilities.
10.04 The invalidity or unenforceability of any provision of this Agreement shall not affect or
impair any other provision unless material to the performance of either party.
10.05 The parties agree that, in addition to any other remedies allowed by law, the provisions
of this Agreement may be specifically enforced in a Court of competent jurisdiction and, in any judicial
action, the unsuccessful party agrees to pay all costs of such action as actually incurred by the
successful party, including attorney fees.
10.06 Except as otherwise provided herein, if either party shall be in default or breach in
performance of any term, covenant, or condition of this Agreement, the party not in default or breach
shall give the defaulting or breaching party prompt written notice of such default or breach. If the
default or breach is not cured within thirty(30) days following notice, the party that is not in default or
breach may seek remedies provided for herein.
9
10.07 The waiver by either party of any default or breach of any term, covenant or condition
of this Agreement shall not operate as a waiver of any default or breach of any other term, covenant or
condition, or subsequent default or breach of the same.
10.08 Neither party may assign or transfer all or any part of this Agreement without the prior
written consent of the nonassigning party, although such consent shall not be unreasonably withheld.
10.09 Any notice, demand, or request delivered by mail in accordance with this section shall be
deemed given seventy-two (72) hours after the same is deposited, certified mail, in any post office or
postal box regularly maintained by the United States Postal Service addressed to the District at 2235
2nd Avenue, Greeley, Colorado 80631 and to the Town at Town of Platteville, P. O. Box 70;
Platteville, Colorado 80651. The Addresses may be changed at any time by similar notice.
10.10 Neither party shall, by reason of any provision of this Agreement, or the use of water
thereunder, or otherwise, acquire vested or adverse right or future right, in law or equity, in the water
rights owned by the other party.
10.11 To the extent legally possible, each party shall indemnify and hold the other party
harmless from and against any and all liability, loss, damages, costs and expenses, including reasonable
attorney's fees, arising from the indemnifying party's negligence, including but not limited to negligent
delivery of water at rates or pressures which exceed the maximum pressure or do not meet the
minimum pressure established on Schedule A. By such agreement to indemnify and hold each other
harmless, neither party waives any defenses and immunities to third parties which it would otherwise be
entitled under The Colorado Governmental Immunity Act.
10
•
•
IN WITNESS WHEREOF, the District and the Town have hereunto executed this Agreement
the day and year first above written.
CENTRAL WELD COUNTY WATER DISTRICT
By: 6?-27G'�.G�/
President
ATTEST: •
cZA-- 04
Secretary
TOWN OF PLATTEVILLE, COLORADO
Acting by and through the Platteville Water Enterprise
ay /Chaum
ATTEST:
L riLem g• xXkh.
To Clerk/Secretary
11
SCHEDULE A
DELIVERY RATES
ANNUAL AMOUNT - 180 Million Gallons
PEAK DEMAND - 1 ,000 Gallons Per Minute
MINIMUM PRESSURE - 65 p.s.i .
MAXIMUM PRESSURE - 75 .s.
12
SCHEDULE B
POINTS' OF DELIVERY
Delivery Point I: Intersection of Weld County Roads 25 and 32'k
13
SCHEDULE C
RATES AND CHARGES
MONTHLY DEMAND CHARGE- $ 1,350.00
COMMODITY CHARGE - $ .66
14
SCHEDULE D
RATE FORMULA
A. Calculation of Commodity Charge for All Users:
$ 735,500 Total Estimated Operation and Maintenance(entire system)
1,114,393 (1,000 gal) Total Usage(entire system)
=$ 0.66 Commodity Charge
(Set by District @ minimum rate charged to all users)
x 180,000 Estimated Usage(Platteville only)
=$ 118,800 Expected Commodity Revenue from Platteville
B. Calculation of Platteville's Demand Charge Based on Estimated Costs& Usage
$ 166,445 Total Estimated Cost Responsibility for Platteville
(Capital and Operation and Maintenance)
$ (31,789) Credit for Contributed Capital (contributed capital x required rate
of return)
=$ 134,656 Adjusted Cost Responsibility
$ (118,800) Estimated Commodity Revenue /` l/ �
t
= $ 15,856 Estimated Demand Revenue Indicated (
12 (convert annual to monthly) U 1
=$ 1,321 Estimated Demand Charge
Town pays commodity charge and estimated demand charge throughout the year. At end of
year demand charge recalculated based on actual costs and usage. Credit or debit calculated for
adjustment of next year's rate.
15
CENTRAL WELD COUNTY WATER DISTRICT
NOTES TO RATE ANALYSIS
Note 1: Budget amount for minor improvements financed from revenues, but not less than required by
revenue bond covenants; may be greater as a policy matter determined by the Board.
Note 2: Annual allowance; determine from schedule of Operating Expense shown in the audit report for
the last year. Adjust for significant investments made since the latest audit report.
Note 3: Total cash required less Costs of Service(O&M &Depreciation).
Note 4: Total Fixed Assets (less Land and Water Rights) from latest audit report, adjusted to include
significant investments made since latest audit report.
Note 5: Actual water usage during prior water year(ending October 31).
Note 6: Actual maximum day usage by the Retail customers and the actual peak rate of usage by the
Towns during the period of 6:00 AM to 12 M or the average demand on the maximum day,
whichever is greater. Retail customers peak demands are equalized by the District's storage
which is not assessed to the Towns.
Note 7: Actual peak hourly rate of flow (MGD) occurring during the period of 6:00 AM to 12:00 M or
the average flow during the maximum day,whichever is greater.
Note 8: Percentage allocation is determined by dividing the usage of each facility for each town by the
total usage of all towns and the District in that facility.
Note 9: Amount shown for the Operation and Maintenance of the pipelines is a percentage of the
Pipelines Expense for the entire system from the most recent audited year. The percentage is
determined from the ratio of original investments in each line to the original investment in all the
pipelines shown in latest audit report and on the attached schedule.
Note 10: Water assessments are paid directly by the Towns and are not included in the analysis for the
wholesale customers.
Note 11: Total expense for Customer Accounting projected to the end of the current calendar year.
Customer Accounting Expense is allocated equally to all customers regardless of size. Consider
each Town as a single customer.
Note 12: Normal Administrative Expense generally is allocated to the Towns in accordance with the
percent of total water usage during the preceding water year. It may be appropriate to adjust
certain expenses such as unusual legal costs that may or may not apply to the Town.
Note 13: Each Town's responsibility for the operation and maintenance expense is determined from the
percentage as calculated under"Use of Facilities".
•
Note 14: Depreciated Investments and Annual Depreciation Allowances are allocated to each Town at the
percentages determined above under "Use of Facilities". Annual Depreciation and Depreciated
Investment in accordance with audited schedule.
Annual depreciation allowances are based upon original investments and do not change until
additional investments are made in the facilities. Annual depreciation allowances are in
accordance with the schedule used by the Districts auditor based on the economic life of each
facility as follows:
Facili Life
Office Building 40 Years
Pipelines 50 Years
Filter Plant 50 Years
Storage Tanks 30-40 Years
Mach. &Equipment 3-5 Years
Pump Stations 14 Years
Other 1-10 Years
Note 15: All costs and revenues based on most recent audit. Demand Charges applicable to next calendar
year are based upon continuation of the same Commodity Charges.
• •
• CENTRAL WELD COUNTY WATER D UCT
RATE ANALYSIS
DISTRICT CASH REQUIREMENTS
Actual Actual Actual Actual Actual Actual Budget
Expenditure Category 1988 1989 1990 1991 1992 1993 1994
Water Assessment $58,542 $59,449 $61,725 560.631 $70,422 $70,741 $75.000
Filter Plant $79,429 $81.469 $82,609 585,378 $94,767 $129,075 $175,000
Pipelines $178,412 $176,173 $200,571 $173.948 $173,927 $132,202 5230.850
Pump Stations 512,499 $19,306 $25,987 524,046 $26,700 $23,206 $25,500
Customer Accotmting $49,775 $54,415 $56,882 559.393 $65,679 $65,818 568.750
Administration 5121.737 $125.256 $132,106 $125,876 $150,839 S182,271 $160,400
Total 0&M $500.394 5516.069 $559,881 $529,272 5582.334 5603,313 $735,500/-
Debt Service(Schedule) $2,424.773 .5844.543 $847,107 . $334,252 $793,688 $499,481 $619,278
Capital Inc.&Resents(Note I) (SI,552,410) $1,049,008 ($68,685) $208.314 $383,521 $686,83I $615.000
Total Cash Required 51372,757 $2,409,619 $1.338,303 $1,571.838 $1,759,543 $1.789,625 $1,969.778
Income With Exiting Rates 51,652,871 $2,856,756 $1.613,933 51,765.804 $1,759,543 $1,789,625 $1,495.000
Required Rate Increase 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 31.76%
Avg O&M Cost(SJI,000 gal) $0.37 $0.39 $0.42 $0.40 $0.44 $0.45 $0.55
COST OF SERVICE
Depreciation(Nett 2) $199,890 $210.421 5228,190 5227,335 $345,126 5345,126 $345,126
Required Return(Note 3) $672,473 $1,683,129 $550,232 $815.231 $832,023 $841,186 $889.152
Depreciated Investment(Note 4) 36,524.853 57,092.550 $7,848,618 $7,620,428 $11.882,971 $11,537,846 $11,537,846
Required Rate of Return 10.31% 23.73% 7.01% 10.70% 7.00% 7.29% 7.71%
Contrnodity Charge/1000 gal. $0.60 $0.66 $0.66
kid.Cottoned.Chg./1000 gal. $0.44 $0.45 50.55
NON-OPERATING INCOME
1993 1994
Water Rental SO SO
Plant Investment Fee $204,510 $100,000
Interest $201,555 $80,000
Taxes $604 SO
Other $96,536 $1,205,000
Total $503,205 51,385.000
2128/94 Page 1
•
•
:ENTRAL WELD COUNTY WATER D' .ICT
RATE ANALYSIS
WATER USAGE&ALLOCATION OF FACILITIES
RETAIL METERED USAGE
Meter Size> 5/8" 3/4" 1" 1 1/2" 2" 3" 4" Retail
Cap.Rano to 5/8" 1.0 1.5 2.5 5.0 8.0 15.0 25.0
Total Usage(1000 gal) 207.546 43,681 92,240 159.154 29.833 107,970 640.424
Max.Mo.Usage(1,000 gal) 30,283 5.306 9.433 13,582 5,620 19,486 83,710
Number Of Meters 1.299 58 41 7 I 3 1.409
.AWWA Equiv.5/8'Maus 1,299 87 103 0 56 15 75 1,635
Avg.UseMder(1000gal) 160 753 2,250 22.736 29,833 35,990 455
Usage Ratio I 4.71 14.08 142 187 225 2.84
No.Equiv.5/8'Meters 1.299 273 577 996 187 676 4.008
%Of Total 32.41% 6.82% 14.40% 24.85% 4.66°° 16.86% 100.00%
3vTIOLESALE METERED USAGE
Town > Dacono Firestone Frederick Kersey Milliken LaSalle Gilcrest Platteville
Annual(1,000 gal)(Note 5) 104,546 67,555 82,148 42,732 62,211 127.798 28,507 180,000
Max.Mo.Usage(1,000 gal) 14.497 11,402 13,604 5,850 8,688 19,671 7,981
Number Of Maecs 1 1 I I I I I 1
Avg.UsdMdrs(1.000gal) 104,546 67,555 82,148 42,732 62,211 127,798 28.507 180,000
Usage Ratio 65434 422.82 514.15 267.45 389.37 799.87 178.42 1126.59
No.Equiv.5/8"Maas 654 423 514 267 389 800 178 1,127
Ma Day(MGD)(Note 6) 0.527 0.482 0.602 0.247 0.367 0.820 0.220 0.721
Peak Demand(gam)(Note 7) 366 502 418 172 382 569 153 500
USE OF FACILITIES (Usage In MCD)
Facility Dacono Firestone Frederick Kersey Milliken LaSalle Gilcrrst Platteville
Filter Plant(Note 5) 104.546 67.555 82.148 42.732 62.211 127.798 28.507 180.000
20'Line To WCR 15(Note 6) 0.290 0398 0.331 0.136 0303 0.451 0.121 0396
24"Line to WCR 15(Note 6) 0.237 0.325 0.271 0.111 : 0.248 0.369 0.099 0.324
20"To WCR 21(Note 7) 0.247 0.551 0.820 0.220 0.721
20"To WCR 25(Note 7) 0.247 0.820 0.220 0.721
14"To WCR 31(Note 7) 0.247 0.820 0.220 0.721
14"To WCR 35(Note 7) 0.247 0.820
14"To WCR 39(Note 7) 0.247 0.820
12"To WCR 43(Note 7) 0.247 0.820
10"To WCR 46(Note 7) 0.247
10"To WCR 49(Note 7) 0.247
8"To WCR 54(Note 7) 0.247
8"To Kersey(Note 7) 0.247
10"To Platteville(Note 7) 0.721
12'To LaSalle(Note 7) 0.820
Line to Gilaest 0.220
Pump Station#5(Note 7) 0.820 0.220 0.721
So.Line To WCR 30(Note 7) 0.527 0.723 0.602
So.Line To PS#4(Note 7) 0.527 0.723 0.602
So.Line To WCR IS(Note 7) 0.527 0.723 0.602
So Line To Tank#3(Note 7) 0.527 0.602
Pump Sta.No.4(Note 7) 0.602
Math.&Equipment(Note 6) 0.527 0.482 0.602 0.247 0.367 0.820 0.220 0.721
Office i3uilding(Note 6) 0.527 0.482 0.602 0.247 0.367 0.820 0.220 0.721
Administration(Note 5) 104.546 67.555 82.148 42.732 62.211 127.798 28.507 180.000
Other(Note6) 0.527 0.482 0.602 0.247 0.367 0.820 0.220 0.721
2/28/94 Page 2
•
:ENTRAL WELD COUNTY WATER DI .ICT
RATE ANALYSIS
ALLOCATION OF FACILITIES(Note 8)
Percent of Usage
Facility Dacono Firestone Frederick Kersey KGGW7:en LaSalle Cllcrest Platteville
Filter Plant 7.83% 5.06% 6.15% 3.20% 4.66% 9.57% 2.13% 13.47%
20"Line To WCR 15 6.63% 9.09% 7.57% 3.11% 6.93% 10.32% 2.77% 9.07%
24'Line to WCR 15 6.63% 9.09% 7.57% 3.11% 6.93% 10.32% 2.77% 907%
20'To WCR 21 0.00% 0.00% 0.00% 6.22% 13.87% 20.65% 5.54% 18.14%
20"To WCR 25 0.00% 0.00% 0.00% 7.23% 0.00% 23.97% 6.43% 21.06%
14"To WCR 31 0.00% 0.00% 0.00% 7.13% 0.00% 23.97% 6.43% 21.06%
14"To WCR 35 0.00% 0.00% 0.00% 10.92% 0.00% 36.21% 0.00% 0.00%
14"To WCR 39 0.00% 0.00% 0.00% 16.75% 0.00% 55.57°. • 0.00% 0.00%
12"To WCR 43 0.00% 0.00% 0.00% 15.09% 0.00% 50.06% 0.00% 0.00%
10"To WCR 46 0.00% 0.00% 0.00% 34.11% 0.00% 0.00% 0.00% 0.00%
10'To WCR 49 0.00% 0.00% 0.00% 47.17°%. 0.00% 0.00% 0.00% 0.00%
r To WCR 54 0.00% 0.00% 0.00% 40.11% 0.00% 0.009%. 0.00% 0.00%
8"To Kersey 0.00% 0.00% 0.00% 53.01% 0.00% 0.00% 0.00% 0.00%
10"To Platteville 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 45.60%
12°To LaSalle 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.00%
Line To Gilaed 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 0.00%
Pump Sta.No.5 0.00% 0.00% 0.00% 0.00°4 0.00% 46.58% 12.50% 40.93%
So.Line To WCR 30 21.26% 29.15% 24.28% 0.00% 0.00% 0.00% 0.00% 0.00%
So.Line To PS M4 21.26% 29.15% 24.28% 0.00% 0.00% 0.00% 0.009%. 0.00%
So.Line To WCR 18 21.26% 29.15% 24.28% 0.00% 0.00% 0.00% 0.00% 0.00%
So.Line To Tank#3 30.00% 0.00% 34.27% 0.00% 0.00% 0.00% 0.00% 0.00%
Pump Stn.No.4 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Distribution Lines
Malt.&Equipment 8.37% 7.66% 9.57% 3.93% 5.83% 13.03% 3.50% 11.45%
Office Building 8.37% 7.66% 9.57% 3.93% 5.83% 13.03% 3.50% 11.4596
Customer Accounting 0.07% 0.07% 0.07% 0.07%. 0.07% 0.079%. 0.07% 0.07%
Administration 7.83% 5.06% 6.15% 3.20% 4.66% 9.57% 2.13% 13.47%
Other 8.37% 7.66% 9.57% 3.93% 5.83% 13.03% 3.50% 11.45%
2/2894 Page 3
CENTRAL WELD COUNTY WATER DI 1CT
RATE ANALYSIS
ALLOCATION OF COSTS
COSTS TO BE ALLOCATED
Original Total Depreciated Annual
Facility Cost O&M Investment Depreciation
Water Assessment(Note 10) 570.741
Filter Plant $4,929,606 $129,075 54,291.328 $98,267
20'Line To WCR 15(Note 9) 5730.247 $9.816 $327,484 $14,605
24"Line to WCR 15(Note 9) $2,148,559 $28,881 $1,955.189 $42,971
20"To WCR 21(Note 9) $132.098 $1.776 559,240 32,642
20'To WCR 25(Note 9) 588,065 $1,184 539.494 S 1,761
14'To WCR 31(Note 9) $65.472 5880 $29,362 $1,309
14'To WCR 35(Note 9) S98,208 $1320 S44.042 51,964
14"To WCR 39(Note 9) • 567.704 $910 $30,363 $1,354
12"To WCR 43(Note 9) $72,230 5971 $32392 51,445
10'To WCR 46(Note 9) 519.536 $263 $8,761 $391
10"To WCR 49(Note 9) $100,987 $1,357 $82.807 $2,020
8"To WCR 54(Note 9) $41.500 $558 $18,611 $830
8"To Kersey(Note 9) $34,584 5465 $15.509 5692
l0"To Platteville(Note 9) $75.794 $1.019 $33,990 31,516
12'To LaSalle(Note 9) $306,505 $4,120 $291.180 $6,130
Line to Oilcrest $35.000 $470 532,550 $700
Pump Station F5 $199,854 $23,206 $144.894 $9,993
So.Line To WCR 30(Note 9) $346.817 54.662 $208,090 $6,936
So.Line To PS#4(Note 9) $163,208 $2,194 597.925 $3,264
So.Late To WCR 18(Note 9) $326.416 $4.388 $195,850 $6,528
So.Line To Tank#3(Note 9) $214,210 $2,879 5128.526 54,284
Pump Sta.No.4
Distribution lines $4,568,034 $61,403 53,288.800 $95,061
Math.&Equgan..c_t 5266.308 $56,469 $21,846
Office Building $236,406 S113.132 $11,545
Customer Accounting(Note 11) 565.818
Administration(Nate 12) $182,271
Other
Totals 515,267348 $600.627 $11,525,987 $338,054
2/28/94 Page 4
- • ' :ENTRAL WELD COUNTY WATER DI ICT
RATE ANALYSIS
ALLOCATION OF O&M EXPENSES(Note 13)
Facility Dacono Firestone Frederick Keno Milliken LaSalle (-Merest Platteville
Water Assesanem
Fiker Plant $10,101 56.527 S7.937 $4,129 $6,011 $12.348 52.754 517,391
20"Line To WCR 15 $651 $893 $744 $305 5680 $1,013 $272 5890
2E Line to WCR 15 $1,915 52.626 $2.188 $898 $2,OO1 $2,980 $799 $2,618
20"To WCR 21 SO SO SO Sill $246 $367 $98 5322
20"To WCR 25 SO SO SO S86 SO 5284 576 5249
14"To WCR 31 SO SO SO 564 SO S211 557 5185
14"To WCR 35 SO SO SO $144 SO $478 SO SO
l4"To WCR 39 SO SO $0 $152 SO 5506 SO SO
12"To WCR 43 SO SO S0 $147 SO $486 SO SO
10"To W'CR 46 $O SO SO $90 SO SO $0 SO
10"To WCR 49 SO SO S0 $640 SO SO SO SO s
8"To WCR 54 SO 50 SO $224 SO SO SO SO
8"To Kersey SO SO SO S246 SO SO $0 SO
10"To Platteville SO SO SO SO SO 50 SO $465
12"To LaSalle SO SO SO S0 S0 $4,120 SO SO
Line to Crib:rest SO SO SO SO SO SO 5470 SO
Pump Station#5 SO 50 SO SO SO 510,809 52,900 59,497
So.Line To WCR 30 $991 SI,359 $1,132 SO SO S0 SO SO
So.Line To PS k4 $466 $640 $533 SO SO SO 50 SO
So.Line To WCR 18 $933 SI,279 $1,065 SO 50 SO SO SO
So.Line To Tank k3 S864 SO $987 SO SO 50 SO SO
Pump Sta.No.4 SO S0 SO SO SO SO SO SO
Distribution Lines SO SO SO SO SO SO SO SO
Mara.&Equipment SO SO SO SO SO SO $0 SO
Office Building SO SO SO $0 SO SO SO SO
Customer Accounting $46 $46 $46 $46 346 $46 546 546
Administration SI4,264 S9,2I7 $11,208 $5,830 58,488 $17,437 53,889 524,559
Other SO SO $O SO SO SO SO SO
530,231 $22,587 $25,840 $13,112 517.473 $51,083 $11,363 $56223
2128/94 Page 5
' ;ENTRAL WELD COUNTY WATER D1 ICT
RATE ANALYSIS
ALLOCATION OF ANNUAL DEPRECIATION(Note 14)
Facility Dacono Firestone Frederick Kersey Mi11(ken LaSalle Cilcrest Platteville
Filter Plant $7.690 $4.969 $6.047 $3,143 54,576 $9,401 $2,097 $13,240
20'Line To WCR IS S968 51,328 51,106 S454 SI.012 SI,507 $404 $1324
24"Line to WCR 15 $2,849 $3,908 $3.255 $1,337 $2,978 54,434 51,190 53,896
20"To WCR 21 SO SO SO $164 $366 $545 $146 $479
20"To WCR 25 SO SO SO $127 SO 5427 $113 S37I
14"To WCR 31 SO $0 SO $95 SO $314 S84 5276
14"To WCR 35 SO $0 SO $'214 SO S71 I $0 SO
14"To WCR 39 SO SO SO $227 SO $752 SO SO
I2"To WCR 43 SO SO SO $218 SO 5723 SO S0
10"To WCR 46 $0 SO SO $133 SO SO 50 S0
10"To WCR 49 SO SO SO $953 SO SO SO SO
8"To WCR 54 SO SO $0 $333 SO SO SO SO
8"To Kersey $0 SO SO $367 SO SO SO SO
10"To Plmeville SO $0 SO SO SO $0 SO $691
12"To LaSalle SO SO SO $0 SO $6,130 SO SO
Lime to Glenna SO $0 SO SO SO SO $700 SO
Pump Station#5 SO SO SO $0 SO $4,654 $1,249 $4,090
So.Line To WCR 30 $1.474 $2,022 $1,684 SO SO SO SO SO
So.Lure To PS M4 $694 S952 $793 SO SO SO SO SO
So.Lane To WCR 18 51.388 $1,903 $1,585 $0 SO SO SO SO
So.Lure To Tank II3 $1,285 SO $1,468 SO SO SO SO $0
Pump Sta.No.4 SO SO SO SO SO SO SO SO
Distribution Lanes SO SO SO SO SO SO SO SO
Mach.&Equipment $1.830 $1,673 $2,090 $858 $1.275 52,847 $764 $2.501
Office Building 5967 $884 51.104 $454 5674 $1,504 $404 51,322
Customer Accounting SO SO SO SO SO SO SO SO
Administration. $0 SO SO SO SO SO SO SO
Other SO SO SO SO SO SO SO SO
' $19,146 $17,638 $19,128 $9,077 $10.880 $33,945 $7,151 $28.190
2/28/94 Page 6
• • :ENTRAL WELD COUNTY WATER D' ICT
RATE ANALYSIS
ALLOCATION OF PLANT INVESTMENT(Note 14)
Facility Dacono Firestone Frederick Kersey Milliken LaSalle Cllcrest Platteville
Filter Plant $335,829 $217.004 $263.881 $137,266 $199,838 $410,521 $91,572 $578,207
20"Line To WCR 15 $21,715 $29,781 $24,806 $10,186 $22.692 $33,783 $9,065 $29689
2C Line to WCR 15 $129,648 $177,802 $143.098 $60,816 $135,480 $201,729 $54,122 $177,251
20'To WCR 21 SO SO SO $3,687 $8.214 $12,231 53,281 510.747
20"To WCR 25 SO SO SO $2,854 SO 59,467 52,540 $8,318
l4"To WCR 31 SO SO SO 52,122 SO $7,033 51,888 56.184
14"To WCR 35 SO SO SO $4,808 SO $15,948 SO SO
14"To WCR 39 SO SO SO $5,087 SO $6 SO SO
I2"To WCit 43 SO SO SO $4,888 SO $16,214 $0 SO
l0"To WCR 46 SO SO SO $2,988 SO SO SO SO
10"To WCR 49 SO SO SO $39,063 SO SO SO SO
8"To WCR 54 SO SO SO $7,465 SO SO SO SO
8"To Kersey SO SO SO $8,221 SO SO $0 SO
10"To Platteville SO SO SO $0 SO SO SO S15.499
I2"To LaSalle SO SO SO SO SO $291,180 SO SO
Late to Oilaest SO SO SO SO SO SO S32,550 SO
Pump Sta.#5 SO SO SO SO SO $67,488 518,107 559,299
So.Line To WCR 30 544,233 $60,662 $50,528 SO SO SO SO SO
So.Line To PS#4 $20,815 528.547 523.778 SO SO SO $0 SO
So.Line To WCR 18 541.631 $57,093 $47,555 SO SO SO SO SO
So.Line To Tank#3 $38,561 SO 544.049 SO SO SO $0 SO
Punta Sta.No.4 S0 SO SO SO SO SO SO SO
Distribution Lines SO SO SO SO SO SO SO SO
Mad,.&Equipment $4,729 $4,324 $5,402 $2,218 $3.295 $7,359 $1,974 $6.466
Office Building $9,475 $8.662 510.823 $4,444 $6,601 $14,742 53,955 512,953
Customer Accounting SO SO SO SO SO SO SO SO
Administration SO SO SO SO SO SO SO SO
Other SO SO SO SO SO SO SO 1 SO
Total $646,636 $583,875 5618,920 5296,114 $376.119 $1,087,709 $219,055 $904.612
Return This Year $47.144 542,568 $45,123 $21,589 527,422 $79,301 $15,971 565952
Return Ned Year $49,832 $44.996 $47,696 $22,820 $28,985 $83,823 $16,881 569,713
2/28/94 Page 7
.ENTRAL WELD COUNTY WATER D ICT
RATE ANALYSIS
DETERMINATION OF CILAROES
WHOLESALE CUSTOMERS(Note 15)
Actual 1993
Town> Dacono Firestone Frederick Kersey Milliken LaSalle Oilcrest Platterilk
O&MExpenses $30,231 $22.587 525.840 $13,112 $17,473 $51,083 $11,363 S56,223
Annual Depreciation 519.146 $17,638 $19,128 59,077 510.830 $33,945 $7,151 $28.190
Return on Investment $47,144 542.563 545.123 $21,589 $27,422 $79,301 $15,971 565,952
Carry Over Front Prior 1'r. SO SO SO SO
Total Cost Responsibility $96.521 $82,794 590,092 $43,778 555.775 $164,329 $34,484 5150.366
Contributed Capital $313100 $142,700 $1,029,000 $44,200 $33.150 $1,133,000 $137,500 5412.500
Less Credit For Coot Cap. $22,834 510.404 575.021 $3,222 52,417 $82,603 SI0,025 $30,074
r
Adj.Cost Responsibility $73,687 $72,390 515.071 $40,555 $53,358 $81,726 $24,459 $120,292
Leas Commodity Revenue $69,000 $44,586 $54,218 $28,203 $41,059 $84,347 518,815 $118,800
Required Denund Revenue $4,687 527.804 (539.147) $12,352 $12298 (52,621) 55,645 $1,492
Monthly Demand Charge $391 $2,317 ($3,262) $1,029 $1,025 ($218) $470 $124
Operating Income
Pups-Ay Taxes •
Total Revenue S0 SO SO SO SO SO SO $0
Carty Over To Nat Year
Budget 1994
O&MExpenses 536.855 $27,536 $31,501 515,985 521.301 So2,270 S13152 Slih.542
Annual Depreciation ' $19,146 517.638 519.123 $9,077 $10,380 $33,945 $7,151 $23,190
Return on Investrnant 549.832 $44,996 $47,696 $22,820 528.985 $83,823 $16,881 $69,713
Carry Over From Prior Yr. SO SO SO SO SO SO SO SO
Total Cost Responsibility $105,833 $90.170 $98.326 $47,882 561,166 $180,044 $37,884 5166,445
Less Credit For Cont Cap. $24,136 SI0.997 $79.299 $3,406 $2,555 587,313 $10,596 531,789
Adj.Cost Responsibility $81,697 579.173 519.027 544,475 $58,612 $92,730 527,288 $134,656
Las Commodity Revenue $69,000 $44.586 $54.218 $28,203 541,059 $84,347 $18,815 $118,800
Demand Rev.Indicated $12,696 $34,587 (535.190) 516,272 $17,553 58,383 $8,473 $15,856
Monthly Demand Charge $1.058 $2,882 ($2,933) $1,356 $1,463 $699 $706 $1.3211
2128/94 Page 8
Hello