Loading...
HomeMy WebLinkAbout951777.tiffCOLORADO LAND USE SUMMARY Case Number: Z-495 Applicant's Name: Quinlan Construction Inc. Request: Change of Zone from C-3(Commercial) to PUD (Planned Unit Development) for C-3 Uses Legal Description of Property: Lot 2 of RE -1201 in part of W2 SW4 of Section 11, T2N, R68W of the 6th P.M., Weld County, CO Location: East of and adjacent to 1-25 Frontage Road and north of Weld County Road 22 in the 1-25 MUD(Mixed Use Development) Area Total Number of Acres: 6 acres, more or less Proposed Water Supply: Central Weld County Water District Proposed Sewer: St. Vrain Sanitation District Access: Existing from 1-25 Frontage Road Overlay District(s): none Referrals: Department of Transportation - comments Army Corps of Engineers - comments Town of Mead - comments City of Longmont - no conflict Weld County Health Department - no conflict Longmont Soil Conservation District - no conflict Tri-Area Planning Commission - no conflict Mountain View Fire Protection District - no conflict Weld County Public Works Department - no conflict Comments: The Department of Planning Services has not received any objections from surrounding property owners. 951777 DATE: June 6, 1995 CASE NUMBER: Z-495 NAME: Quinlan Construction Inc. ADDRESS: 5540 Central Ave., Boulder, CO 80301 l REQUEST: Change of Zone from C-3(Commercial) to PUD (Planned Unit Development) for C-3 (Commercial) Uses ZEGAL DESCRIPTION: Lot 2 of RE -1201 in part of the W2 SW4 of Section 11, T2N, R68W of the 6th P.M., Weld County, CO LOCATION: East of and adjacent to Interstate 25 Frontage Road and north of Weld County Road 22 THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. She submitted materials are in compliance with the application requirements of Section 28.5 of the Weld County Zoning Ordinance. 2. It is the opinion of the Department oI Planning Services' staff that the applicant has shown compliance with Section 28.8 of the Weld County Zoning Ordinance as follows: The proposed Planned Unit Development (PUD) District is located within the I-25 Mixed Use pevelopment Area (I-25 M.U.D.). The uses associated with the proposed PUD District are consistent with the uses identified in the I-25 M.U.D. Conceptual Land Use Plan of the Weld County Comprehensive Plan. The uses allowed in the proposed PUD District will conform to the Performance Standards set forth in Section 35.3 of the Weld County Zoning Ordinance. The uses permitted ahall to compatible with the existing or future development of the surrounding area as permitted -by the existing zoning, and with the future development as projected by the Comprehensive Plan. Surrounding land uses include outside storage and a contracting business, vacant commercial ground, manufactured home sales and Interstate 25 right-of-way. 951777 Change of Zone to PUD - Quinlan Construction -Inc. Page two Adequate water and sewer service will be made available to the property to serve the proposed uses. Central Weld County Water District and St. Vrain Sanitation District will provide water and sewer service to the site. Highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the proposed commercial uses. 1-25 Frontage Road will provide access to the PUD, in accordance with the letter from Teresa Jones, Colorado -Department of Transportation, dated May 16, 1995. - No overlay districts, restrictive soil conditions, or zommeriai-al mineral deposits are known to be located on the -subject site. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services' staff recommendation for approval is conditional upon the following: 1. The Change of Zone plat shall to delivered to the Department of Planning Services and be ready for recording in the Weld County Clerk and Recorder's Office within 15 days of the date of approval by the -Board of County Commissioners. 2. The following notes shall be placed on the-PUD District plat: a. Uses_allowed within the PUD District shall comply with uses identified in the C-3 (Commercial) District as set forth in -Section 33.4 of the Weld County Zoning Ordinance. b. A site plan review shall be required for all uses within the POD, in accordance with Section 33.4.5 of the Weld County Zoning Ordinance. c. All streets within the POD District are private and shall be built to County standards. All streets within the POD District shall be maintained by the lot owners of the "POD -District. 951777 Change of Zone to PhD - Quinlan Construction Inc. Page -three d. Central Weld County Water District shall provide the PUD District water supply. e. St. Vrain Sanitation District shall provide sewer service to the PUD District. f. Installation of utilities shall comply with Section 10 of the Weld County Subdivision Regulations. g. Each lot within the -POD shall be developed with no less than 15 per cent open space. h. Landscaping within the I-25 Frontage road right-of-way on Lots 1 -or 2 shall be maintained in -such a way that it -does not impair site distance at any access, does not present -a safety hazard to the travelling public on the 2-25 _Frontage Road, and shall be maintained by the respective lot owners. No trees shall be all -owed within the I- 25 Frontage road right-of-way. 3. The PUD Plan application submittal shall _contain the following information: a. Identify a location on the PUD plan plat where potential oil and gas uses will occur within the PUD District. Document the applicant's willingness to satisfy concerns expressed by Teresa Jones, Colorado Department of Transportation, regarding future additi-on of auxiliary lanes to the I-25 Frontage Road, drainage, utility _permit and temporary state highway access permit, in her letter dated May 15, 1995. c. Evidence that all permits required by the Department of the Army -Corps of Engineers have been obtained for this PUD development. 9b1.777 ADDITIONAL COMMENTS Z-495 Quinlan Construction Inc. Staff has not yet received a referral response from Colorado Geological Survey regarding on -site soil conditions and the presence of commercial mineral deposits underlaying thesix acres. Comments are expected prior to the Board of County Commissioners consideration of this change of zone request. Approved access to the property is by way of a shared access easement with property owner to the north. The easement is thirty (30) feet in width, lying fifteen (15) feet on each side of the property line. The easement is recorded in Book 1364 as Reception number 02116562. The applicant is requesting that -a twenty (20) foot utility easement located in a north -south direction near the center -of the parcel be vacated, as a part of the PUD process. The property owner has documented that Flatiron Structures owns the easement, that there are no users of the easement nor does any other party have an interest in the easement. 951777 FIELD CHECK FILING NUMBER: Z-495 DATE OF INSPECTION: APPLICANT'S NAME: QuinlanConstruction, Inc. CURRENT PLANNER: Gloria Dunn REQUEST: Change of Zone from C-3 (Commercial) to PUD (Planned Unit Development)%r C-3 (Commercial) uses LEGAL DESCRIPTION: Lott of RE -1201 in part of the W2, SW4 of Section 11, T2N, R68W of the 6th -P.M., Weld County, Colorado. LOCATION: North of Weld County Road 22 and east of and adjacent to I-25 Frontage Road. WELD COUNTY PLA \-11 MAY 81995 MPHC J LAND USE: ZONING: CONTS/ N 414:6 �&virucLI N A (Agricultural) E A (Agricultural) S A (Agricultural) W A (Agricultural) v aPe, °( a- Q5C6L h fO62, o/oF`4 oicia s-046 951:777 FIELD CHECK FILING NUMBER: Z-495 DATE OF INSPECTION: February 15, 1995 APPLICANTS NAME: Quinlan Construction Inc. REQUEST: Change of Zone from C-3(Commercial) to PUD(Planned Unit Development) LEGAL DESCRIPTION: Part_of the SW4 SW4 of Section 11, T2N, R68W LOCATION: North of Weld County Road 22 and east of and adjacent to 1-25 Frontage Road LAND USE: N Vacant commercial ground, off -site directional signs (billboards), mobile home sales E Outside storage of -miscellaneous S Flatiron Structures Company W 1-25 Frontage Road and highway ZONING: N C-3 (Commercial, PUD (Planned Unit Development) E PUD (Planned Unit Development), A (Agricultural) S PUD (Planned Unit Development) W PUD (Planned Unit Development) COMMENTS: Proposedaccess is from 1-25 Frontage Road. The access is located along the north boundary of the parcel and is a shared access with property located to the north, which is presently vacant. The 6 acres is fairly level. The southwest lot (Lot 1) is already developed, having previously completed a Site Plan Review for C-3 (Commercial) uses. Dunn, Current Planner 951777 u COLORADO April 25, 1995 Quinlan Construction, Inc. 5540 Central Avenue Boulder, CO 80301 DEPARTMENT OF PLANNING SERVICES PHONE (970) 333-6100, EXT 3540 FAX (970) 352-6312 WELD COUNTY ADMINISTRATIVE OFFICES 1400 N. 17T -H AVENUE GREELEY,LOLORADO _80631 Subject: Z -495- Request for a Change of Zone from C-3 (Commercial) to PUD (Planned Unit Development) for C-3 (Commercial) uses, on a parcel of land described as Lot 2 of RE -1201 in part of the W2, SW4 of Section 11, T2N, R68W of the 6th P.M., Weld County, Colorado. Dear Applicant: Your application and related materials for the request described above are being processed at the present time. I have scheduled a meeting with the Weld County Planning Commission for June 6, 1995, at 1:30 p.m. This meeting will take place in the County Commissioners' Hearing Room, First Floor, Weld County Centennial Center, 915 10th Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It isihe policy of Weld County to refer an application to any town or municipality lying within three miles of the property or if the property islocated within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the Longmont and Mead Planning Commissions for their review and comments. Please call Brad Schol, City of Longmont at 651-8330, and Judy Hegwood at Town of Mead at 535-4477, for further details regarding the date, time, and place of these meetings. It is recommended that you and/or a representative be in attendance at the Planning Commission meeting to answer any questions the Commission members may have with respect to your application. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. This -recommendation will be available twenty-four (24) hours before the scheduled hearing. It is the responsibility of the applicant to_call the Department of Planning Services' office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully, 951777 Hello