HomeMy WebLinkAbout952192.tiffor'zig
To
COLORADO
From
mEmoRAnDum WELD COUNTY
1995 OCT -4 R9 3: 03
Clerk to the Board October 2, 1995
Dete
Drew Scheltinga, County Engineer..
Subject:
Road Closures - 3 Days or Less
CLERK
TO THE BOARD
The following road was closed for three days or less during September, 1995:
Closure of WCR 7 between WCR 6 and WCR 8 on 9/5/95 and 9/19/95 for culvert
replacement.
Appropriate documentation is attached.
DS/mw:fmclos.mrw
Attachments
cc: Commissioner Webster
WCR's 6,7,8
952192
o Tyi-T 4vvv cie
qiiiIyA t
pG d QfaseJ
G4> C -Q / .J e% 7T -c t '.
C )- re IT Div
IA -1050 (/&sGrr
12.06,1
6,) e tour 7S0
•
3 L
F -t
r
S
Wc1?
r oac: 0635rcl Co( cc:/u
rox1'dlto IP (y 3 4,et,G Yea
TITLE ef2lccr C' -7 t we -X? 4VC
reap c fl (4^ Y i
SURVEY BY DATE
DRAWN BY /7"6'6 DATE
CHECKED BY DATE
APPROVED BY COUNTY ENGINEER
cfS—
COUNTY ROAD NO.
WELD COUNTY DEPARTMENT OF ENC;JNFFRIN1v
wcF g
O l € La' kpv; caofC
�7N/ 914t n���S� Pry
3G d Pose'
f>e IcuV Avvo"�
cc) co :,-
c
`t/tae .'J- CO/v; C efol
cc r C.16.J
C k- ,o (Wise" A cc/
CL) Of f o - 7S0
1jocc' C Io5 - I/81 Is CO C , LP'
a pr o Y 1.47t,0ply 3 7, 1g '/ 5
(GCptnnYr/T7
Car-
_
,.
TITLE a✓e R 1 a1 turR 6 1 C[
"� ��
SURVEY BY DATE I I
�(� ; e
) DRAWN 8Y �4 `*RUC DATE 7
- ,r.
CHECKED BY DATE
COUNTY ROAD NO.
> ;y
APPROVED BY COUNTY ENGINEER
WFI n not INTV fwonmyth Act\ir rvr cnintntr-y— �ft I..
Hello