Loading...
HomeMy WebLinkAbout660247.tiffRESOLUTION WHEREAS, the Board of County Commissioners of Weld County, Colorado have been asked many times to adopt uniform and minimum specifications for the construction of roads and streets in the County, and, WHEREAS, after considerable study and research, the Board of County Commissioners of Weld County have found a book which outlines the minimum specifications of roads and streets to be used by Weld County, Colorado, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County that they do hereby adopt the "Recommended Minimum Specifications" booklet as prepared by County Area Engineers Council of Colorado (1964 Edition) as the official guide for road and street construction in the County of Weld, Colorado. Dated this 15th day of June, 1966. THE BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY BY: ; motet 1J`%,f1 LL ->t G -a--4-,/ Attest: Clerk `'b the Board BY: 71,,,,;k Deputy County Clerk APPROVED: County Attorney -1- c 2, ,,d" , /L/�� v ✓/-sue'/. %%�i 660247 RECOMMENDED MINIMUM SPECIFIC,? PREPARED BY FIVE COUNTY AREA ENGINEERS COUNCIL COLORADO 1966 MEMBER COUNTIES ADAMS ARAPAHOE BOULDER DENVER JEFFERSON MEMBER CITIES ARVADA AURORA BOULDER BRIGHTON BROOMFIELD DENVER EDGEWATER ENGLEWOOD GOLDEN LITTLETON LONGMONT SHERIDAN THORNTON WESTMINSTER DISTRIBUTED BY E -Z BLUE PRINTS 6415 W 44TH AVE. WHEATRIDGE, COLORADO.,80033 424-6431 FIVE COUNTY AREA ENGINEERS COUNCIL COLORADO PRESIDENTS Benton, Kelly Bingman, Roy Brandt, Warren H. Cassell, David Cellars, Robert Cox, Howard Dieffenderfer, enderf er, Ted Haase, Edward Hardin, Ira HerchQnroeder, E. G. Baird, Dale F. Blank., Robert A. Boekenkamp, Robert Bridwell, H. G. Broyles, Cecil D. Bruns, Kenneth Burno, Edward S. Cutler, Harland K. Davies, William O. Gilkey, Charles R. Gorsline, Bob Hamilton, Dale Dale F. Baird Robert L. Sandquist . Eugene L. Padon .... Charles R. Gilkey ) Kells Waggoner ) • Milton McFatter • • .. MEMBERS 1961-62 • 1962-63 • 1963-64 • 1964-65 • 1965-66 -.Hob'b ., Noel Howat, Walt Hulse, Don Kinsall, Robert E. Lewis, Charles J. Lewis, S. R. Lind, Edward Lorenson, Burman M arkam, W. S. McPherson, Tom PAST MEMBERS Hayner, Eugene Haynes, Ben F. K. Reiter, Sam Hodges, Mark D. Johnson, Daniel Korbitz, William E. Leigh, Robert Lindstrom, Bob Maguire, Jack H. Mercer, Tom Merten, Fred K. Miller, "Red" H. Newman, Edward Olsen, Leo Padon, Eugene L. Patton, Art Sagrillo, Gene Seaman, Paul Sellers, David A. Smith, James E. Troxell, Larry Waggoner, Kells V anderhoofven, David Nelson, Tom O'Conner, M. A. Phillips, William Postlethwaite, R. C. Rozelle, :Lewis C. Ryan, Robert Sandersfeld, R. E. Seiferth, Victor G. Sleeper, Ben Slinn, Dennis Stradley, T. V. Ward, Sam B. Wurl, Leon Revision Date Dec. 1965 INDEX PAR T I A. Definition of Terms B. Bonds C. Authority of the Engineer D. Authority and Duties of Inspectors E. Closing of Streets and Roads F. Testing G. Lines and Grades H. Recommended Permit Fees PART II A. R.O.W. Widths - - Fig. 1 thru 5 B. Foundation Material C. Sub Base Material Fig. 6 D. Surfacing Material E. Asphalt Paving F. Concrete Paving G. Curb, Gutter, Sidewalk, Driveways & Parking Areas Fig. 7A, 7B, 7C, 7D H. Soil Cment and Design Thickness Fig. 8A, 8B I. Construction, Installation and Repair of Right-of-iay Openings for Sub -Surface Utilities S. Bituminous Treated Base Course K. Water Main. L. Sanitary Sewer Construction Detail Dwgs. 1 thru 4 M. Sanitary Sewer Design Criteria Trenching & Bedding Standards, 1 thru 6 PAGE NUMBERS I -A-1 & 2 zB-3&4 I -C-5 I -D-6 I E-7 I -F-8 & 9 I -G-1 I -H-1 II -A-10 - 13 II -B-14 & 15 II -C-16 II -D-17 II -E-18 & 19 II -F-20 - 29 II -G-30 - 34 II -H-35 - 38 11-1-39 - 42 II -J-43 - 53 II -K -S4 - 63 II - 72 II -M-73 - 83 aKEINr&Tioii 1 Design Grade 2. Excavation 3. Embankment 4. Grading 5. Subgrade 6. Sub -base 7. ,_ase 8. Granular I,,aterial 9. Prime Coat 10. Surfacing 11. Tack Coat 12. Seal Coat 13. Finished Grade 14. Stabilometer 15. Construction Joint 16. Contraction Joint The elevation established for final grade. The removing of material from its existing position. A mound constructed of specified materials and in accordance with specified procedures. The operation of moving soil or other natural sub- stances from one position to another to obtain a required elevation for the construction of roadway, sidewalk or other improvement. That level of the road structure upon which the sub -base (if required), the base (if required) or the surface is to be placed. That material in pavement construction which lies between the subgrade and the base. That material in pavement construction which lies immediately below the surfacing. A material which consists of particles larger than 200 mesh. An application of a low viscosity liquid asphaltic material to an absorbent surface preparatory to any superimposed treatment or construction. Upper portion of road upon which traffic moves. The application of asphaltic material to an exist- ing pavement to ensure thorough bond between superimposed construction and the old pavement surf ace . A thin asphaltic surface treatment applied to an existing surface. The final designed level to which finished surfac- ing is to be constructed. A device for measuring resistance co plastic de- formations of asphaltic paving materials. Any joint formed to facilitate construction. A dummy groove in the transverse direction formed in the plastic concrete or sawed in hardened con- crete to control random cracking. I -A-1 BEEINITIONa 17. Dummy Joint Any joint that does not extend the entire depth of the slab. 13. Expansion Joint 19. Integral Curb 20. Mule 21. Pavement 22. Soil Cement Pavement 23. Road A full depth joint containing inert compressible material to allow for expansion of the concrete slab without damage to the abutting structure. Curb constructed at the same time or shortly after the placing of the pavement slab becoming an in- tegral part of the pavement section. A metal hand tool shaped to specified dimensions for shaping plastic concrete to the desired contour. That part of the street structure that is designed to carry the traffic load on the existing subgrade. A pavement consisting of a cement stabilized base and an asphaltic wearing surface. Any traveled way. 24. Frontage Road That roadway which lies between controlled access or street or highway and abutting property, and which provides access to the street or highway. 25. Expressway The type of highway which is characterized by di- vided roadway, controlled access, and crossings at intersections at grade and separations. 26. Freeway An expressway with fully controlled access and grade separation for crossings. 27. Traffic -Control Devices The signs, signals, markings and other devices placed on or adjacent to a road by authority of a public body or official having jurisdiction for the purpose or regulating, warning or guiding traffic. 28. Abbreviations: a. AASHO b. ACC c. ARBA d. ASA e.ASME 1. ASTvi g. AWWA h. }CA i. SAE American Association of State Highway Officials. The Associated General Contractors of America, Inc. American Road Builders Association. American Svandards Association, Inc. American Society of Mechanical Engineers. The American Society for Testing Materials. American Water Works Association. Portland Cement Association. Society of Automotive Engineers, Inc. BOI 3 REQUIRfl EI'ITS Note: The term bond shall be any surety acceptable to the regulating authority, such as, surety bond A 1, A raLed company, cash, real estate, etc. 1. Municipalities, counties, or governing agencies shall require a bond for work in public rights of way where it is the duty and responsibility of the municipality, county, or regulating agency to maintain said public rights of way after completion of the work. 2. A noncancellablo bond in an amount as specified below, payable to the municipality, county, or regulating agency, shall be required in the name of the contractor prior to the commencement of any work. Said bond shall assure recovery by the regulating agency of any expense incurred, within a period of 365 days following the acceptance of tho construction. Said recovery to be the amounts necessary to repair or replace said construction. Said bond shall not be cancelled without 30 days notice to said municipality, County, or regulating authority. 3. Amount of Bonds a. Work in Public Rights of Way (New Subdivisions) In new subdivisions, the subdivider of the property shall post with the regulating agency a bond in an amount of 100 per cent of the total cost of the improvements of said subdivision. Said cost of improvements shall be that required to bring the area within the public rights of way up to the standard of the regulating authority as determined by the regulating authority. In new subdivisions whore the subdivider is bonded, the contractor performing the work need not be bonded. The subdivider may bond for only those rights of way that he intends to develop immediately. Under this condition, building permits and construction shall be allowod only on those properties on which the abutting rights of way are bonded. Work in any other contiguous area may commence upon posting the required bond for that area. There will be no partial release on bonds -- work must be completed prior to the release of a bond. b. Work in Public Rights of Way (Other than new Subdivisions) To be accomplished by a private contractor for a private individual whore said work in the engineerrs opinion is minor, the contractor shall posL a bond of 02,000.00 to assure compliance with the regulating specifications. In the case of major construction projects, the bond shall be in the amount of 25 per cent of the project cost. AUTHORITY OF THE ENGINEER A. The Engineer or his authorized representative shall give all orders and directions contemplated under the Contract Documents, Specifications or Resolutions relative to the execution of the work. The Engineer shall determine the amount, quality, acceptability, and fitness of the several kinds of work and materials which are to be paid for or installed under the contract or permit and shall decide all questions which may arise in relation to said work and the construction thereof. The Engineerts estimates and or decisions shall be final and conclusive except as herein otherwise expressly provided. In case any question shall arise between the parties hereto, relative to the Contract Documents, Specifications or Resolutions, the determination or decision of the Engineer shall be a condition precedent to the right of the Contractor to receive finA1 approval of the work under his contract. B. Prior to commencement of the work the Contractor shall prepare and submit to the Engineer for approval, a written schedule covering the general sequence of the whole work to be performed. The work schedule, when approved, shall not be subject to change by the Contractor without the written consent of the Engineer. Orderly procedure of all work to be performed under this contract shall be the full responsibility of the Contractor. I -C-5 THE AUTHDRITY AND DUTIES OF ±NSPm1DRS The inspectors shall observe assigned construction and installation processes, insuring that they are carrier3 out in compliance with the appropriate plans and.speca.— ficatihns-as well as the regulations of the City and/br County. 'He shal,..be Arectiy responsible to the',Engi;neer, shall submit required reports to the Engineer, and have such authority as the Engineer may delegate. I -D-6 CLOSING OF STREETS AND BADS Should operating conditions require the Contractor to close a street or road, the Contractor must accomplish the following requirements: 1. Submit a written notice to the Engineer 48 hours prior to closing of street. 2. Notify the appropriate fire protection district and police of the exact location of street and dates traffic will be impeded, 24 hours prior to closing of street. 3. Streets can only be closed between the hours of 8:30 a.m. to 3:30 p.m. or an approved alternate route provided with detour signs. 4. Contractor shall furnish, erect and maintain, at his own expense, necessary barricades, suitable and sufficient flashers, construction signs, provide a sufficient number of flagmen, and take necessary precautions for the protection of the work and safety of the public around his construction operations. I -E-7 $UBGRADE 1. - Classification (a) Gradation (b) Atterberg Limits — AASHO-T89 & AASHO-T90 (c) K value (Concrete Pavement Only) - ASTM D1196 2. - Compaction (a) Density curves - AASHO-T99 (b) Field density - AASHO-T147-54 or any other approved method acceptable to the Engineers. .PUB -BASE Gradation Atterberg limits - AASHO-T89 & AASHO-T90 California Bearing Method or Hveem Stabilometer Density curve - AASIIO-299 Field Density - T147-54 or any other approved method acceptable to Engineers BASE COURSE Gradation Atterberg limits - AASHO T89 & AASHO-T90 California Bearing or Hveem Stabilometer Loss on abrasion - AASHO-T96 Fractured faces (by separation and weighing) Density curves - AASHO T99 Field Density - AASHO T147-54 or any other approved method acceptable to Engineers 1. - Aggregate (a) Gradation (b) Atterberg limits (c Fractured faces (d Loss on abrasion (e Specific gravity g$PHALT PAVING - AASHO T89 & AASIIO-T90 - AASHO-T96 - AASHO-T84 & AASHO-T85 2. - Asphaltic Cement (a) Penetration - AASHO-T49 (b) Ductility - AASIiO-T51 (c) Specific gravity - AASHO-T43 (d) Viscosity - ASTM-D88-56 & AASHO-T72-57 (e) Distillation - ASTK-D402-55 & AASHO-T78-60 3. - Bituminous Mixture (a) (b) (c) (d) (e) (f) (g) Sampling - AASHO-T168 Extraction of asphalt - AASHO-T184 or Rotorex Gradation of aggregate Stability - ARIE D1560 & ASTIR -01559 Density of Laboratory specimens - AASHO-T166 Field density - Rings, cores, nuclear methods, cut out method. Wet -dry ratio Item 31.2.2 Colorado Highway Specifications (centrifuge) piece or any other approved I -F -S G0ICRETE 1. - Aggregates (a) Gradation (b) Loss on abrasion T96 (c) Soundness AASHO-T104 2. - Cement Appropriate method of test as designated in ASThi-C 150 3. - Concrete Mixture (a) Slump AASHO-T119 ASTM-0143 (b) Air content AASHO-T152 ASTM C231 (c) Compressive strength AASHO-T22 ASai-C39 (d) Flexural strength AASHO-T97 ASTM-C78 Compressive strength of specimen taken from (0) SOIL CEAIEI' 1. - Soil (a) Gradation (b) Atterberg limits AASHO-T89 & T90 hardened concrete AASHO-T24 & ASTM-C42 2. - Soil Cement Mixture (a) Moisture density relation AASHO T134 (b) Wetting & drying test LASHO-T135 (c) Freezing & thawing AASHO T136 (d) Unconfined compressive strength - Soil Cement Lab. Handbook (e) Field density - AASHO-T147-54 or any other approved method acceptable to the Engineers I -F-9 LINES , I� GRADES SURVEYS All lines and grades will be furnished by a Registered Professional Engineer to the Municipality or County for checking and approval. If necessary, the Contractor's operations may be suspended to permit checking. The Contractor shall have all lines and grades set by a registered Engineer or Land Surveyor, bench marks and control survey points shall be preserved by the Contractor. F C AEC RECOMMENDED PEWIT FIRS STREETS: NEW CONSTRUCTION Permit Fee - - - - $ 5.00 Inspection Charge- $25.00 per day $15.00 per half -day CUTS IN EXISTING SURFACE Permit Fee - - $10.00 Asphalt Pavement With Rigid Base $12.00 for a 2t x 4' cut, plus $ 1.10 for each additional sq. ft. from 8 to 50 $ 1.02 for each additional sq. ft. from.50 to 100 $ 0.96 for each additional sq. ft. — Over 100 Replacement of Surfacing Included in Fee. Asphalt Pavement With Flexible Base $ 4.00 for a 2' x 4' cut, plus $ 0:70 for each additional sq. ft. $ 0.65 for each additional sq. ft. $ 0.60 for each additional sq. ft. Replacement of Surfacing Included $ 7.00 for a 2' x 4' cut, plus $ 1.10 for each additional sq. ft. $ 1.02 for each additional sq. ft. $ 0.96 for each additional sq. ft. Replacement of Surfacing Included $ 2.00 for a 2' x 4' cart, plus $ 0.25 for each additional sq. ft. STREET CUTS BY ITPILITY COMPANIES Public Service Company Mountain States Telephone & Telegraph Co. $ 3.00 for each Street Cut Permit Concrete Pavement Gravel Surface SF SF SF from 8 to 50 SF from 50 to 100 SF — Over 100 SF in Fee. from 8 to 50 SF from 50 to 100 SF — Over 100 SF in Fee. pURB & GUTTER: Permit Fee - - - $ 5.00 Inspection Fee- Plu44 0.015 per L. F. Design, Layout & Staking in Field $50.00 for the first 100 LF, plus $ 0.24 for each additional i00 ft. $50.00 for repeats for each block Curb Cuts - $5.00 Permit Fee; $5.00 Inspection Fee) SIDEWALKS: (Fees do not apply if C & G is constructed at the same time as Sidewalk) Permit Fee - - - $ 5.00 Inspection Fee — $ 0.015 per L. F. Staking $50.00 for the first 100 LF, plus $ 0.24 for each additional 1XNI ft. $50.00 for repeats for each block 1—H-1 1.0 -Street Classifications. Right-ofryav and Design Standards. 1.1 -Foreword. The has adopted the following street classification system together with respective standards for right -of -sway and street design. The standards are to be used in the design and construction of new streets and as guides in the improvement of the existing street system. The classification system was applied to existing streets. It was recognized in classifying streets that existing streets do not always comply with the standards, and in these instances the function being performed by existing streets was used as the primary basis for classification. The design of new streets and highways and the improvement of existing streets and highways can now be directly related to a classified system. 1.2 -Standards for Local Streets. 1.2.1 -The following minimum factors apply to single-family residential areas as well as multiple -family residential areas as shorn in Figure 1: 1.2.2 -Function a. Local streets provide direct access to adjacent property. b. Traffic carried by local streets should have an origin or a destination within the neighborhood. 1.2.3 -Right -of -Way Width 1.2.Q Number of Moving Lanes 1.2.5 -Access Conditions 1.2.6 -Traffic Characteristics 1.2.7 Planning Characteristics a. b. 1.3 -Standards for Collector Streets. 1.3.1 -The following minimum design factors apply 2: 1.3.2 -Function a. In single-family residential areas: 60 feet. In multiple -family residential areas: 60 feet. Two Intersections at grade with direct access to abutting property permitted. Traffic requirements in other than .resi- dential areas may require special design consideration by the Engineer and Traffic Engineer. Local streets should be designed to dis- courage through traffic from moving through the neighborhood. Local streets should not intersect major arterial streets. to collector streets as shorn in Figure Collector streets collect and distribute traffic between arterial and local streets. b. Collector streets serve as main connectors within communities, linking one neighbor- hood with another. II -A-10 c. Trait carried by collector streets should have an origin or a destination within the community. 1.3.3 -Right -of -Was Width 1.3.4 -Number of Moving Lanes x -.3.5 -Access Conditions 1.3.6 Traffic Characteristics 1.3.7 -Planning Characteristics 1.4 -Standards for Artorial Streets.. 1.4.1 -The following design factors apply 1.4.2 -Function 1.4.1 -Right -of -Way Width a. b. a. b. c. 74 feet. Two or four. Intersections at grade with direct access to abutting property permitted. Regulation of traffic accomplished through the use of stop signs and channelization. Traffic signals normally used only at in- tersections with arterial . street. Collector streets should have continuity throughout a neighborhood but need not extend beyond the neighborhood. Intersections with arterial streets should be at least one —quarter mile apart. Sidewalks should be set back from the street. to arterial streets as shown in Figure 3: 1.4.4 Number of Moving Lanes 1.4.5 -Access Conditioryg - - - - -• 1.4.6 Traffic Characteristics a. b. c. d. Arterial routes permit relatively unimpeded traffic movement and are intended for use on those routes where four moving lanes and one left —turn lane are required but where a major arterial cross section would not be warranted. 100 feet. Two or four. intersection at grade. Intersection with other streets will not be: restricted. Access from street of lower classification will be permitted but in all cases will be controlled by traffic —control devices. Normally, all abutting property will be allowed access to the streets and will face the street but perhaps with increased setback requirements. a. Regulation of traffic accomplished by signs and channelization. b. Traffic signals will norm,lly be located only at intersections with streets of higher classification. c. Parking should be prohibited. II -A-11 a. b. c. d. Arterials should 1 mile apart and be continuous. Arterials should tween neighborhood areas. Arterial cross—section should be employed where traffic demands are high and right of way acquisition costs are • prohibitive. Sidewalks should be set back from streets. be spaced from 2 to should, where possible, act as boundaries be - )..5 -Standards for idaior Arterial Streets - - 1.51.The following mini= design factors apply to major arterial streets Figure 4: 1.5.2 -Function 1.5.3 -Right -of -Way Widt4 1.5.4 -Number of Moving Dies 1.5.5 -Access Condition.. 1.5.6 -Traffic Characteristics 1.5.7-P4nning Characteristics a. b. c. d. as shown in Major arterial streets permit rapid and relatively unimpeded traffic movement throughout the city, connecting major land use elements as well as communities with one another. Two-way operation: 140 foot minimum. Six or eight. Intersections will general]ybe at grade Intersections will normally be located at one -quarter mile intervals. Access from collector and arterial streets shall be controlled by traffic control devices. Normally, abutting properties and local streets will not be allowed direct access to the street. Abutting properties should not face on the roadway unless separated from it by a frontage road. a. Movement of traffic will be controlled by signals and channelization. b. Parking shall be prohibited. c. Roadways should have a median strip between them. a. Major arterial streets should be spaced approximately one mile apart and should traverse the entire city and/or county. b. Major arterial streets should not bisect neighborhoods but should act as boundaries between them. c. Sidewalks should be set back from the street. II -A-12 1.6 -Standards for Fredways. 1.6.1 -The following minimum design factors apply to freeways as shown in Figure 5: 1.6.2 -Function 1.6.3 jtight-of44av Width 1.6.4 -Number of Moving Lanes 1.6.5-Accesa Conditions - 1.6.G Traffic Characteristics Freeways permit rapid and unimpeded move- ment of traffic through and around the city. 250 feet. Four to eight. a. Access will be completely controlled. b. No intersections at grade will be per- mitted. a. Freeways should connect with main highways approaching and leaving the city from all directions. b. Freeways should be so aligned as to serve the major traffic generators within the city. (Central business district, major industrial areas, regional shopping centers, etc.) c. Freeways should not bisect neighborhoods or communities but should act as bounda- ries between them. II -A-13 LOCAL STREET Single-family Residential Area 1.7.44-4.5}-1' PARKING ' p, MOVING LANES 101 "I PARKING.54.73.41 R.O•W. ..__0.02./FT, SLOPE MIN. I � SLOPE MIN ' 36' PAVEMENT - 60'R.0.W. Multiple -family Residential Area 1 3.3-+-- 4.F Tv. 10� PARKING I- 10, 0.027FT.SLOPE MIN iimommwmp 10' .4. MOVING 0.021/FT. ounimmi 1d — 10' LANES PARKING 4d PAVEMENT ea R.O.W. _ 0.02%FT. SLOPE MIN. L-1 Raw F 10� FIGURE -I- SHEET-2- r W W ec U) CO LLE CTO R b b O 0 4, C 0 -J P C co 0.02'/FT, SLOPE MIN.--+ r 0.01/FT. SLOPE MIN. 1 W io N t FIGURE -2 - SHEET- 4- I W W ct i- U) ARTERIAL I- 404 i 66' PAVEMENT g FIGURE-3- SHEET- 5- H W W N ARTERIAL it 0 7 4 2 Y • • 0 a FIGURE-4- ro n a • • e - - e it I Ii K ii ii a I • • • . . • • • • " • if i I s • • • SHEET-T- FREEWAY SHEET-9- g.0-Gradinc and Suberede Preparation. 2.1 -Scope -The work covered by this section of the specifications consists in furnishing all labor, equipment, supplies and materials in connection with the excavations, construction of embankments, including borrow and grading pertaining thereto for roads, and the preparation of subgrade, as required, complete, in strict accordance with this section of the specifications and the applicable drawings. 2.2 Excavati,pn-Excavation of every description and of whatever substances encountered within the limits of the project shall be performed to the lines and grades indicated on the drawings. Except as otherwise permitted by the engineer, all excavated areas shall be excavated in such a manner as will afford adequate drainage. All suitable material removed from the excavations shall be used,insofor as practicable, in the formation of embankments, backfilling, and for such other purposes as directed by the engineer. Where material encountered within the limits of the work is considered unsuitable by the engineer, such material shall be excavated below the grade shown on the drawings or as directed by the engineer, and replaced with suitable material. All excavated materials which are considered unsuitable and any surplus of excavated material which is not required for embanlonents shall be disposed of by the contractor. 2.3 -Embankment -This work shall consist of the construction of embankments by depositing, placing and compacting materials of acceptable quality above the natural ground or other surface in accordance with the lines, grades and cross -sections shown on the plans and as required by the engineer. Before any embankment is placed, clearing, tree removal, sod and topsoil removal over the entire area shall be performed as directed by the engineer. Clearing shall consist of the removal and disposal of obstructions such as foundations, walls, fences, buildings, rubbish, etc., to a depth of at least 12 inches below subgrade elevation. Sod within the area shall be removed to a depth of 6 inches. Trees, except those designated to be saved, and all stumps shall be removed to at least 18 inches below the subgrade elevation. Trees designated to be saved shall be protected carefully during clearing and subsequent construction operations. Topsoil shall be excavated and stockpiled as directed by the engineer. Each layer of the embankment material shall not exceed 8 inches in loose depth and shall be discod sufficiently to break down oversized clods. The contractor shall thoroughly mix the different materials to secure a uniform moisture content and insure uniform density and proper compaction. Each layer shall be thoroughly compacted by roller or vibratory equipment suitable for the type of embankment material. 2.4. -Borrow or Excess Excavation -In the event sufficient suitable filling material is not obtained within the limits of this contract to provide all the embankment required, the contractor shall furnish such additional filling material (borrow) to complete the designated embankment. Borrow shall be an acceptable type of soil as the embankment material and shall be approved by the engineer before being placed. 2.5-Subsrade-The bottom of the excavation for the pavement or top of the fill shall be known as the pavement subgrade and shall conform to the lines, grades and cross sections shown on the plans. II -B-14 Soft and yielding material and other portions of the subgrade which will not compact readily when rolled or tamped shall be removed as directed and replaced with suitable granular material, placed and compacted as specified herein. Work done under this item will be in accordance with Standard Specifications for Item No. 17, State Highway Department Specifications, and the following standards will be in effect: Soils meeting the Highway Research Board Classification of A-1, A-2-4, and A-3 shall be compacted to a minimum of 100% of °Standard Density" as determined by Laboratory Test A.A.S.H.O. Method T-99. Other soils shall be compacted to a minimum of 95% of "Standard", and the minimum moisture content shall not be less than 2% below the "Standard Optimum". Additional wetting will be required when in the judgment of the engineer the minimum water requirement is not sufficient to produce a stable condition in the subgrade soil. Trenches and structure excavations shall be backfilled to natural or finished grade as soon as conditions permit. Backfill shall be compacted with mechanical tampers in layers of not over 6 -inch loose material. Vibratory compactors that are small enough to operate within the limited area may be used. The subgrade shall be finished in an acceptable condition for at least one day's progress in advance of the pavement construction at all times. No paving, sub base or base material shall be placed upon a soft, spongy or frozen subgrade or other subgrade, the stability of which is, in the opinion of the engineer, unsuitable for the placement thereof. 2_.6 Protection of Finished Grade -The finished grade shall be maintained in a smooth and compacted condition until the paving has been placed. The mixer or ready -mix trucks shall not be permitted to operate from previously paved lanes until the pavement is at least 7 days old or a flexural strength of 550 p.s.i. is attained with A.A.S.H.O. Standard Method T-23 and T-97. If it is necessary to operate trucks between the forms and the trucks cause rutting or displacement of the subgrade material, the contractor shall re -roll or hand -tamp the subgrade to correct any ruts or other objectionable irregularities which may have been caused by the trucking of materials. Excess concrete and debris shall be removed from the excavation behind the curb lino before backfilling. 2.7 -Protection of Utility Lines The contractor shall at all times take proper precautions for the protection of utility lines, the presence of which are known or can be determined by the examination of appropriate maps of the utility companies. The contractor shall be responsible for the repair of any damaged service lines. 2.S -Protection of Miscellaneous Public and Erivate Installations -The contractor shall at all times take proper precautions for the protection of and replacement or restoration of driveway culverts, street intersection culverts or aprons, irrigation crossings, moil boxes, driveway approaches, and all other public and private installations that may be encountered during construction. II -B-15 3.0 -,Sub -Base Material. 3.1 -Description -This item shall consist of a foundation course composed of granular material, constructed on the prepared base in accordance with these specifications and established by the engineer. 3.2 -Gradation -This material need not be crushed but can be of the pit run variety providing it is graded within the following limits: Otandar5l SizQ of Sieve 2-1/2 inch 2 inch No. 4 No. 200 Liquid Limit Plasticity Index Percentage by Weight Passing Sieve 100% 95 100% 30 - '664 5 - 15% 35 Max. 6 Max. Bearing value and/or stebilometer tests may be required to properly evaluate the quality of the material. The material supplied shall be a well graded mixture, consisting of sound aggregate particles and sufficient filler or other proper gnp01ty binding material, which when placed and compacted will result in a firm, dense, unyielding foundation. ;elect Borrow Material. In the event that suitable material is not available in the district for backfilliag excavations from which unsuitable material has been removed, the contractor shall procure select subgrade material conforming to the following requirements. 1.3 -Placement -Select sub -base material shall be placed to the minimum depth as determined by the engineer from Figure 6. The thickness of any one layer shall in no case exceed six (6) inches. Wetting or aerating and rolling of the material will be required as ordered by the engineer. The surface of the select sub -base material after compaction shall coincide with the finished grade elevation. II -C-16 I a cn • N f• 2 W W 5 O W 1- 2 2 W a c ■■ ■ ■■■se �ii■■,i ■lug ■ w�fI ■� ,- * 4 I N I s, f t ir S 6 ' I Y I I I 1 J IS : I u 1 S r Minima Thicknesses ,. lisk34t:•_1" etcd Arterial - 1" Aaahaltie C i ti A p �i Y. s..1 l UIA I j L 4 W > 1 • N� i, t, 1 1* r l i 41 U 0 iI I - 41 al S3440N1 11101 B 4 S .o T off I j • a Z In W Cr o� N• •; p 4! • elm Sheet 13 4.0 -Base Course Material. 4.1 -Description -This item shall consist of a foundation course composed of crushed gravel or crushed stone and filler, constructed on the prepared base in accordance with these specifications and established by the engineer. k.244aterials-Crushed gravel or crushed stone base course material shall consist of hard, durable particles or fragments of stone or gravel crushed to required size and a filler of sand or other finely divided mineral matter. The portion of the material retained on a No. 4 sieve shall be known as coarse aggregate, and that portion passing a No. 4 sieve shall be known as filler. When produced from gravel, not less than 50 % by weight of the coarse aggregate particles shall be particles having at least one fractured face, and if necessary to meet this requirement or to eliminate an excess of filler, the gravel shall be screened. The composite base course material shall be free from vegetable matter and lumps or balls of clay and shall meet one of the following grade requirements: ,Standard Size of illeve percentage by Weight Passing Sieve Type I Type II 1-1/2" 100% 1" 90 - 100% 3/4" 60 - 90% 100% 3/8" 45 - 75% No. 4 30 - 60% 30 - 60% No. 10 20 - 50% 25 - 50% No. 40 10 - 30% No. 200 5 - 15% 5 - 12% Liquid Limit 25 Max.* 25 Max* Plasticity Index 6 Max. 6 Max *30 max. if non -plastic Bearing value and/or stabilometer tests may be required to properly evaluate the quality of the material. 4.3)Abras_ion. Course aggregate shall show a loss of not more than fifty per cent (50;) when tested in accordance with A.A.S.N.O. Standard Method of Test for Abrasion of Coarse Aggregate by use of the Los Angeles Machine, Designation: T-96 (A.S.T.M. C131) 4,14 -Placing and Spreading -Base course material shall be placed to a depth as determined by the engineer from Figure 6 on the prepared subgrade as described in Paragraph 2.5 and compacted in layers to required thickness. The material shall be deposited and spread in a uniform layer and without segregation of size to such loose depth that when compacted, the layer shall have a thickness not to exceed 4 inches. The material shall be compacted to a minimum density of 100% as determined by Laboratory Test Method A.A.S.II.O. T-99. II -D-17 5.0 -Asphalt Paving 5.1 -Paving Asnhalt-This item shall conform to the Standard Specifications of the Colorado Department of Highways for Item No. 29, Grade 85-100 Penetration, unless otherwise specified by the engineer. 5.2 -Prime Coat -This item shall conform to the Standard Specifications of the Colorado Department of Highways for Item 30 and shall be a medium curing asphalt of a grade specified by the engineer and shall be applied at a rate specified by the engineer. The use of other asphaltic materials will be permitted as directed by the engineer. 5.3 -Seal Coat -This item shall conform to the Standard Specifications of the Colorado Department of Highways for Item 30 and shall be a rapid curing Asphalt of a grade specified by the engineer. The use of other asphaltic materials will be permitted as directed by the engineer. The quantities of the liquid asphalt and the cover aggregate that are to be used shall be determined by the engineer. 544 -Cover Aggregates -Stripping resistance of the corer aggregate shall conform to Colorado State Highway Specification Item 31.2.3.3. Construction methods shall conform to State Highway Specification Item 31.3.21. Gradation gieve Sim 5/8" 1/2" 3/8" No. 3 No. 4 No. 8 No. 200 Fractured Face (% by weight) 44 Ter Cent Passing Uvne I 100% 95-100% 50-70% 10-30% 0-10% 0-3% 0-2% 60% Min. ape Jal 100% 100% 90-100% 45-70% 0-20% 0-4% 0-2% No Req. * When specified, Type II cover aggregate may be used. 4brasion-Course aggregate shall show a loss of not more than forty—five per cent (45%) when tested in accordance with A.A.S.H.O. Standard Method of Test for Abrasion of Course Aggregate by use of the Los Angeles Machine, Designation: T-96 (A.S.T.M. 0131) 5.5 -Plant -Mixed. Asphalt Surfacing. This item shall conform and all work shall be done in accordance with the Standard Specifications of the Colorado Department of Highways for Item 32, and the mineral aggregate shall meet the following requirements: GRADATION gieve Sing, 3/4" No. 4 No. 10 No. 40 No. 200 Liquid T,i mi t Plasticity Index Wet/Dry Ratio Fractured Face (% by weight) $er Cent Passing 100% 30 - 60% 25 - 50% 18 - 30% 5 - 12% 25 Max. 6 Max. 75 Min. *4 50% Min. II -E-18 AbrA anion -Course aggregate shall show a loss of not more than forty-five per cent (45%) when tested in accordance with A.A.S.H.0. Standard Method Test for Abrasion of Course Aggregate by use of the Los Angeles Machine, Designation: T-96 (A.S.T.M. C131) 5.5.1, -The asphalts, cements and liquid asphalt shall conform with Items 29 and 30 respectively of the Colorado Highway Department Standard Specifications. 5.5.2 -Rolling shall conform to Colorado State Highway Specifications Item 32.3.5 except that two rollers, one steel and one rubber —tired, self propelled non —wobbly wheel, a' 1 be required at all times. Additional rollers will be required when placing over 75 tons per hour at the rate of one additional roller per 50 tons per hour. The contractor will be required to obtain a minimum of 95% of laboratory density determined from specimens made in accordance with the Hveem or Marshall Method of Test. Surface smoothness shall conform to Item 32.3.5.2. of State Highway Standard Specifications. II -E-19 6.0 -Concrete Pavement 6.1 -Scope -The work covered by this section of the specifications consists of furnishing all labor, equipment and materials and in performing all operations in connection with the construction of air -entrained portland cement concrete pavement for streets and alleys in strict accordance with this section of the specifications and the applicable drawings. 6.24faterials-Concrete shall be composed of portland cement, air entraining agent aggregates and water. These materials shall be furnished only from sources of supply approved by the engineer before shipments are started. The basis of approval of such sources shall be the ability to produce materials of the quality and in the quantity required. 6.2.1 -Portland Cement -Cement of the type specified shall conform to requirements of the current A.S.T.M. Specifications for Portland Cement Type I, Type II, or Type III (Designation 0-150) or for air -entraining Portland Cement Type 1A, (Designation C-175). Cement which for any reason has become partially set or which contains lumps of caked cement shall be rejected. Either packaged or bulk cement may be used. 6.2.2 -Air -Entraining Agent -Air -entraining agents shall conform to the requirements of the current A.S.T.M. Specifications for air -entraining agents for concrete(Designation 0-260). 6.2.3 -Aggregates -All aggregates for concrete shall meet the Standard Requirements for Concrete Pavements of the Colorado Department of Highways or the current A.S.T. Specification for Concrete Aggregates (Designation C-33) Aggregates shall be so handled that moisture content and gradation are reasonably uniform and do not change appreciably from batch to batch or hour to hour. No aggregates shall be used which have become contaminated or intermixed. Frozen aggregates or aggregates containing frozen lumps shall be thawed before use. 6.2.4 -Water -Water used in mixing or curing concrete shall be clean and free from injurious amounts of oil, acids, salt, alkali or organic materials or other substances harmful to concrete. Water from public supplies or which is suitable for drinking is always satisfactory. 6.2.5 -Reinforcing Steel Reinforcing steel, if specified, shall conform to the latest A.S.T.M. Specifications as follows: Tvne Bars and rods Steel wire fabric A.S.T.M. Designation A-432, A 15 or A-16 A-185 Tie bars which are to be bent after one end is encased in concrete shall be structural grade. 6.2.6 -Joints 6.2.6.1 -Expansion Joints -Expansion joints shall be non -extruding preformed joint fillers of one of the following types: Redwood, cypress or cedar boards or premolded fiber and shall conform to A.S.T.M. Designation D-544 and A.A.S.H. Designations M-33, M-58 and M-59 Standard Specifications. 6.2.6.2 -Joint Sealing Compound -Sealing material for filling all types of pavement joints shall comply with A.A.3.H.0. Standard Specifications (Designation M-89 or M-18) II -F-20 6.2.6.3- emolded Joint Material-Premolded parting strips, when called for on the plans, shall be 3/16 inch thick or more and of the width shown on the plans. They shall consist of strips which have been formed from layers of felt or shredded felt, cane, wood or other suitable fibers, securely bound tcepthor and uniformly impregnated with a suitable binder. They shall be of such character that they will not be permanently deformed by ordinary handling during hot weather or become hard and brittle in cold weather. 6.2.7 -Curing -Burlap shall at time of using be in good condition, free from holes, dirt, clay or any other substance which would have a deleterious effect upon concrete. Burlap shall be of such quality that it will absorb water readily when dipped or sprayed and shall weigh not less than 7 ounces per square ;yard when clean and dry. Waterproof paper for curing concrete shall conform to the current A.S.T.M. or A.A.S.H.0. Specifications for waterproof paper for curing concrete (C-171 and M-139 respectively). Membrane curing compounds shall be the white -pigmented type and conform to the require- ments for the current A.A.S.H.0. Standard Specifications for Liquid Membrane Fbrming Compounds for Curing Concrete (Designation M-148) or ASTM Designation C-309. Polyethylene sheeting shall consist of a single sheet having a thickness of not less than 4 mills (.004"). Moisture retention shall conform to the requirements of A.S.T.M. Specifications, Designation C-156. Tho material shall be tested for tensile strength and elongation as prescribed in the current A.S.T.M. Specification Designation D -882 -Method A. Q)-Bgtching7Measurement and batching of cement, fine and coarse aggregates shall be by weight on scales accurate to within 1/2 of one per cent. One sack of cement shall be considered to weigh 94 pounds net. Bulk cement and cement from fractional sacks shall be weighed. 6.3.1 Proportioning Concri e -The concrete shall have a minimum compressive strength of 3750 p.s.i. in 28 days. Proportions of cement, water and aggregate shall be determined in accordance with ACI Standard 613, "Recommended Practice for'Selecting Proportions for Concrete". Mixes shall comply with the following table: Maximum Water Nominal Size Minimum Content Total Air Content Of Coarse Cement Content (U.S. Gal Per Sack (Per Cent By Aggregate (Inches) fSack Per Cu Yd) Of Cement) Volume) 1-1/2 6.00 3/4 6.25 5.50 5`% t1 5.75 6% ± 1 The entrained air shall be obtained either by using air -entraining cement or an air - entraining agent: For a method of measuring air content, see Section 6.4 - The maximum size aggregate shall not exceed 1/4 of the slab thickness. The maximum water content shall include the surface water on the aggregate. 6.3.2 -Consistency -The slump of the concrete shall be from 1 to 3 inches. The consistency shall be measured as described in the current ASTM Standard Method of Slump Test for Consistency of Portland Cement Concrete (Designation C-143) or the Method for Ball Penetration for Portland Cement Concrete, A.S.T.M. Designation C-360. II -F-21 R/5/26/64 6.3.3 -Workability -Concrete shall at all times be of such consistency that it can be worked into corners and angles of the forms and around joints, dowels and tiebars by the construction methods used without excessive spading, segregation or tunic accwnlation of water or laitance on the surface. 6.3.4 -Ready -Mixed Concrete -Ready -mixed concrete shall be proportioned, mixed and transported in accordance with the current A.S.T.M. Specification for Ready -Mixed Concrete (Designation C-94). Any concrete which is not plastic and workable when it reaches the subgrade shall be rejected. When construction conditions are such that it is absolutely necessary for trucks hauling concrete to operate on the grade between forms, they shall not back over previously deposited fresh concrete. 6.3.5 -Job -Mixed Concrete -Job -mixed concrete shall be mixed in a drum mixer which shall conform to the concrete paving mixer standards of the Mixer Manufacturers Bureau of the Associated General Contractors of America. The mixer shall be capable of combining the aggregates; cement and water into a thoroughly mixed and uniform mass within the specified time and of discharging the material without segregation. The entire contents of the drum shall be discharged before recharging.. The volume of the mixed materials per batch shall not exceed the manufacturer's guaranteed capacity (110 per cent of rated capacity) cf the mixer. 6,3.6 -Time of Mixing -The mixing of each batch shall continue for not less than one minute after all materials, excepting water, are in the mixer. All mixing water shall be introduced in the drum before one-fourth of the mixing time has elapsed. The mixer shall rotate at the rate recommended by its manufacturer. The mixer shall be provided with a batch timing device which shall be subject to inspection and adjustment by the engineer at any time. 6.44 easurin _r Content The air content of freshly mixed air -entrained concrete shall be checked by the engineer. Concrete with air contents above or below the amount specified in Section 6.3.1 shall be corrected by adjustments in the mix design or quantities of air -entraining admixture being used. The air content shall be measured in accordance with A.S.T.M. Tentative Method of Test for Air Content of Freshly Mixed Concrete by the Pressure Method (Designation C-231) or A.S.T.M. Method of Test for Air Content of Freshly Mixed Concrete by the Volumetric Method (Designation C-173). 6.5 -Forms -Forms may be made of wood or metal and shall have a depth equal to or greater than the prescribed edge thickness of the pavement. Each section of form shall be straight, free from bends or wraps. The maximum deviation of the top surface shall not exceed 1/8 inch in 10 feet or the inside face not more than 1/4 inch in 10 feet. The method of connections between sections shall be such that the joint thus formed iS tight and free from movement in any direction. Forms shall be of such cross-section and strength and so secured as to resist the pressure of the concrete when placed and the impact and vibration o•f any equipment which they support without springing or settlement. Approved flexible forms shall be used for construction where the radius is 150 feet or less. II -F-22 R/5/26/64 6.5.1 -Setting Forms -The subgrade under the forms shall be compacted and shaped so that the form when set will be uniformly supported for its entire length at the specified elevation. The supply of forms shall be sufficient to permit their remaining in place for at least 12 hours after the concrete has been placed. All forms shall be cleaned and oiled each time they are used. 6.5.2 -Grade and Alignment The alignment and grade elevations of the forms shall be checked by the contractor immediately ahead of concrete placement and necessary corrections will be made. Any forms that have been disturbed or subgrade that has become unstable shall be corrected and forms reset and rechecked. Any variations in grade and alignment shall be subject to approval by the engineer prior to placing the concrete. 6.6 -Placing Concrete -The concrete shall be mixed in quantities required for immediate use and shall be deposited on the subgrade to the required depth and width of the construction lane in successive batches and in a continuous operation without the use of intermediate forms or bulkheads. The concrete shall be placed as uniformly as possible in order to minimize the amount of additional spreading necessary. While being placed, the concrete shall be spaded or vibrated and compacted with suitable tools so that the formation of voids or honeycomb pockets is prevented. The concrete shall be especially well spaded or vibrated and tamped against the forms and along all joints. Care shall be taken in the distribution of the concrete to deposit a sufficient volume along the outside form lines so that the curb section can be consolidated and finished simultaneously with the slab. No concrete shall be placed around manholes or other structures until they have been brought to the required grade and alignment. 6,6.1-Cold_Weather Concreting -Except by specific written authorization, concreting shall cease when descending air temperature in the shade and away from artificial heat fall below 40° F. It shall not be resumed until the ascending air temperature in the shade and away from artificial heat rises to 35° F. When concrete is permitted during cold weather, the temperature of the mix shall be not less than 60° F.,not more than 80° F. at the time of placing. Aggregates of water or both may be heated, but the water shall not be hotter than 1750 F. and aggregates shall not be used which are hotter than 150° F. Before concreting is started, remove ice, snow and frost. When concrete is being placed in cold weather and temperature may be expected to drop below 35° F., a supply of straw, insulated curing blankets or other suitable material shall be provided along the line of work. At any time when the air temperature may be expected to reach the freezing point during the day or night, the material so provided shill be spread over the concrete to a sufficient depth to prevent freezing of the concrete. Concrete shall be protected from freezing temperatures until it is at least 5 days old. Concrete injured by frost action shall be removed and replaced at the contractor's expense. 6.64_2 -Hot -Weather Concreting- Except by written authorization, concrete placing shall cease if the temperature of the plastic concrete cannot be mnaintaipe_d at 90° F. or lower. To facilitate the placement of concrete in hot weather, the aggregates or water or both may be cooled. 6.7 -Consolidating and Finishing 6.7.1 -General- The pavement shall be struck off and consolidated with a mechanical finishing machine or by hand -finishing methods. When a mechanical finishing machine is II -F-23 used, the concrete shall be struck off at such a height that after consolidation and final finishing, it shall be at the elevation as shown on the plans, with not more than 1/8 inch variation when measured with a 10 foot straightedge. The finishing machine shall be provided with a screed which will consolidate the concrete by pressure, vibration or both. The concrete shall be brought to a true and even surface, free from rock pockets. The edge of the screeds along the curb line may be notched out to allow for sufficient concrete to form the integral curb. Hand —finishing tools shall be kept available for use in case the finishing machine breaks down. When hand finishing is used, the pavement shall be struck off and consolidated by a vibrating screed to the elevation as shown on the plans, with not more than 1/8 inch variation when measured with a 10 foot straightedge. When the forward motion of the vibrating screed is stopped, the vibrator shall be shut off; it shall not be allowed to idle on the concrete. 6.7.2 -Scraping and StraightedginR--The pavement shall be scraped with a straightedge 10 feet long, equipped with a handle to permit it to be operated from the edge of the pavement. The straightedge shall be operated so that any excess water and laitance are removed from the surface of the pavement. When irregularities are discovered, they shall be corrected by adding or removing concrete. All disturbed places shill be floated with a wooden or metal float not less than 3 feet long and not less than 6 inches wide and again straightedged. The pavement surface shill have no depression in which water will stand. The use of the long -handled float shall be confined to a minimum. It may be used with the straightedge to correct surface texture but shall not be used to float the entire surface of the pavement. 6.7. -Edging -Before final finishing is completed and before the concrete has taken its initial set, the edges of the slab and curb shall be carefully finished with an edger, having a 3/8 inch radius. 6.7.4 -Final Surface Finish -A burlap drag shall be used as the final finishing method for concrete pavement. The drag shall be at least 3 feet in width and long enough to cover the entire pavement width. It shall be laid on the surface of the pavement and dragged forward in the direction in which the pavement is being laid. The curb shall have the same final finish as the pavement. The final surface of the concrete pavement and curb shall have a uniform gritty texture free from excessive harshness and true to the grades and cross-section shown on the plans. The engineer may require changes in the final finishing procedure as required to produce the desired final surface texture. 6.8 -Integral Curb -When integral curbs are required along the edges of all street pavement, depressed curbs shall be provided at all driveway entrances and at such other locations as designated by the engineer. The integral curb shill be constructed with or immediately following the finished operation. Special care shall be taken so that the curb construction does not lag the pavement construction and form a "cold joint". In placing curb concrete, sufficient spiding shall be done to secure adequate bond with paving slab and eliminate all voids in the curb. II -F-24 Curbs shall be formed to the cross-section as shown on the drawings with a mule or templates supported on the side forms and a wood float not less than 4 feet in length. The finished surface of the curb and gutter shall be checked by the use of 10 foot straightedge and corrected if necessary. 6.9-C uri.ng-Concrete shall be cured by protecting it against loss of moisture, rapid temperature change, from rain, flowing water, and mechanical injury for a period of not less than 5 days from the beginning of the curing operation. Moist curing, waterproof paper, polyethylene sheeting, white pigmented liquid membrane compound or a combination thereof may be used for curing. After finishing operations have been completed, the entire surface of the newly laid concrete shall be covered by the curing medium which is applicable to local conditions and approved by the engineer. The edge of concrete slabs exposed by the removal of forms shall be protected immediately to provide these surfaces with continuous curing treatment equal to the method selected for curing a slab surface and to prevent injury to concrete edges. The use of a covering material which contains or becomes contaminated with sugar in any form, annic acid or any other substances considered detrimental to portland cement will not be permitted. The initial curing medium shall be effective and shall be applied so as to prevent checking, cracking and the appearance of dry spots in the surface of the concrete. The contractor shall have the equipment needed for adequate curing at hand and ready to install before actual concrete placement begins. In all cases in which the curing medium requires the use of water, the curing shall have prior right to all water supply. Failure to provide sufficient cover material of the type selected, failure to maintain saturation for the entire curing period in the moist -curing methods, lack of water to adequately care for both curing and other requirements or other failures to comply with curing requirements shall be cause for immediate suspension of concreting operations. 6.9.1 -Moist curing -Moist curing shall be accomplished by covering of burlap, cotton mats or other approved fabric mat used singly or in combination. Curing mats shall be thoroughly wet when applied and kept continuously wet and in intimate contact with the pavement surface for the duration of the moist curing period. Other fabric mats shall conform in design and shall provide a curing medium at least equal to cotton mats. Cotton mats, other fabric mats and burlap strips shall be furnished in the widths or lengths, after shrinkage, required to cover the entire width and edges of the pavement lane. Mats or burlap shall be lapped at joints between adjacent sheets to prevent drying of this location. Moist curing, when used as initial curing, shall be continued for not less than 24 hours. 6.9.2 Waterproof Paper _and_ Polyethylene Sheeting Curies The surface of the concrete shall be wetted with a fine spray of water and then covered with the waterproof paper or sheeting. The paper or sheeting shall be in pieces large enough to cover the entire width and edges of the slab and shall be lapped not less than twelve (12) inches. Paper or sheeting shall be adequately weighted to prevent displacement or billowing due to wind. Paper or sheeting folded down over the side of the pavement edges shall be secured by a continuous bank of earth. Tears or holes appearing in the paper or sheeting during the curing period shall be immediately repaired. 6.9.-Liguid Membrane Curing Compound Pigmented liquid membrane curing compound shall meet the specifications under Section 6.5. The curing compound must be applied to cover the surface completely and uniformly at a rate which will achieve the performance II -F-25 requirement specified in A.A.S.H.0. Specifications M-148, or A.S.T.M. Designation C-309. This method of curing shall be applied behind the final finishing operation or after the initial curing when a combination of methods are used. Failure to provide complete and uniform coverage at the .required rate will be cause for discontinuance of this method of curing and the substitution of one of the other approved methods. The compound shall be kept agitated to prevent the pigment from settling. Special care shall be taken to apply the curing compound to the pavement edges immediately after the forms have been removed. 6.10 -Joints -Longitudinal and transverse joints shall be constructed as shown on the plans. Longitudinal joints are those joints parallel to the lane of construction. They may be either intermediate center joints or the construction joints between construction lanes. Transverse joints shnll be contraction joints or construction joints. Construction joints are put in transversely wherever construction operations require them. Expansion joints may be either longitudinal or transverse. They are used only where specifically shown on the plans. The edges of the pavement and those joints where such edging is shown on the plans shall be rounded with an edger having a radius of not larger than 3/8 inch. Transverse joints except keyed and tied construction joints, shall be continuous across the entire pave area including the curb. 6.10,1 -Transverse Joints -Transverse joints shall be contraction, expansion or construction joints. Contraction and expansion joints shall be placed as indicated on the plans and construction joints wherever construction may require them. 6,10.2 -Transverse Expansion Joints -Expansion joints, where shown on the plans, shall coniom to the specification in Section 6.2.6.1.They shall extend the entire width of the pavement and from the subgrade to one (1) inch below the surface of the pavement. They shall be of the dimensions and spacing as shown on the plans. The filler shall be held accurately in place during the placing and finishing of the concrete by a bulkhead, a natal channel cap or other approved method. Under no circumstances shall any concrete be left above the expansion material or across the joint at any point. Any concrete spanning the ends of the joint next to the forms shall be carefully cut away after the forms are removed. Before the pavement is opened to traffic, the groove above the filler shall be cleaned and sealed with specified joint sealing material covered under Section 6.4.2. 6.10 --Transverse Contraction Joints -Transverse contraction joints shall be of the sawed, formed dummy groove or premolded strip type. 6,10 -!.-Transverse Sawed Contraction Joints -When transverse contraction joints are to be formed by sawing, care must be taken to saw the grooves soon after placing to prevent the formation of cracks due to contraction of the slab. All transverse joints shall be sawed at least 1/4 of the slab depth. Any procedure for sawing joints that results in premature and uncontrolled cracking or raveling shall be revised immediately by adjusting the time interval between the placing of the concrete and the cutting of the joints. 6.10.Transverse Formed Dummy Groove -Transverse dummy groove joints shall be formed by a groove or cleft in the top of the slab of the dimensions shown on the plans. The groove II -F-26 R/5/26/64 made in the plastic concrete by a suitable tooling device shall extend vertically downward 1/4 of the slab depth from the surface and shall be true to line. 6.10.6 Transverse Premolded Strip Joints -Transverse premolded strip joints shall be of the proper dimensions as shown on the plans. The premolded filler is placed in a vertical groove formed to receive it. The top of the filler should be flush with the pavement surface. 6.102.7 -Transverse Construction Joints -Transverse construction joints of the type shown on the plans shall be placed wherever the placing of concrete is suspended for more than 30 minutes. A keyed type joint without tie bars shall be used if the joint occurs at the location of a contraction joint. Keyed joints with do bars are used if the joint occurs at any other location. 6.10.8 -Longitudinal Joints -Longitudinal joints shall be placed as shown on the plans. They shall be of the sawed, dummy groove, premolded strip or the keyed construction type. Joints between construction lanes shall be the keyed construction type. 6.10.9 -Sawed Longitudinal Center Joints -Sawed longitudinal center joints shall be sawed after the concrete has hardened. The saw cut shall be The joint may be sawed at any time prior to the time These joints are otherwise formed in the same manner Section 6.1:0.4. grooves made with a concrete saw at least 1/4 of the slab depth. the pavement is open to traffic. as the transverse sawed joints - 6.10.10 -Longitudinal Formed Dummy Groove Joints -Longitudinal dummy groove joints are formed in the same manner described for transverse formed dumpy groove joints - Section 6.12.5. 6.10.11 -Longitudinal Premolded Strip Joint -Longitudinal premolded strip joints are formed in the same manner described for transverse premolded strip joints, Section 6.10.6. 6.10.12 -Longitudinal Construction joints -Longitudinal construction joints (i.e., joints between construction lanes) shall be of the dimensions shown on the plans. The key shall be constructed when the first lane adjacent to the joint is placed. 6.10.1, -Integral Curb Joints -In the construction of transverse joints of concrete integral curb pavement, special care must be taken to see that all transverse joints extend continuously through the pavement and curb. 6.11 Tiebars Tiebars, when shown on the plans shall be of deformed steel and of the dimensions and at the spacing specified. 6.12 -Joint Sealer -After the curing period, all sawed and dummy groove joints in the pavement shall be cleaned and sealed with material meeting the requirements of Section 6.2.6.2. All foreign material, joint sawing residue, dirt and curing membranes shall be removed. Joints shall be slightly underfilled (about 1/4 inch) to prevent extrusion of sealer. Any excess material should be removed from the pavement surface as soon after sealing as possible. 6.11 -Structures -All manholes, catch basins or structures of a permanent nature encountered in the areas to be paved shall be raised or lowered as the case may be to the surface of the new pavement, and the necessary expansion material as specified in Section 6.4.1 placed around each structure for the full depth of the slab and of the thickness shown on the plans. II -F-27 R/5/26/64 6.14 -Co Weather Protection -When concrete is being placed in cold weather and temperature may' be letpecte27o drop below 359 F., a supply of straw, insulated curing blankets or other suitable material shall be provided along the line of the work. At any time when the air temperature may be expected to reach the freezing point during the day or night, the material so provided shall be spread over the concrete to a sufficient depth to prevent freezing of the concrete. Concrete shall be protected from freezing temperatures until it is at least 5 days old. Concrete injured by frost action shall be removed and replaced at the contractor's expense. 6.15 -Protection and 9poning to Traffic -The contractor shall protect the pavement against all damage prior to final acceptance of the work by the owner. Traffic shall be excluded from the pavement by erecting and maintaining barricades and signs until the concrete is at least 7 days old or attained a flexural strength of 550 p.s.i. when tested in accordance with A.A.S.l.O. Standard Methods T-23 and T-97. The pavement shall not be used at any time within this period for transporting or operating equipment. As a construction expedient the subgrade planer, concrete finishing machine and similar equipment may be permitted to ride upon the edges of previously construct' d. slabs provided the concrete is more than 72 hours old and the equipment has rubber -tired wheels to run on the finished slab. 6.16 -Optional Construction Equipment 6.16.1 -Slip -Form Paver -In lieu of the construction methods described in the preceding section of the specifications, the contractor may use a slip -form paver. When the slip - form paver is used, all reference in the preceding sections of this specification referring to forms shall be deleted. Slip -form pavers shall be equipped with vibratory and tamping bar assemblies which are effective over the full width of the pavement. The paver shall also have a metal float with a bullnozed front end for the full width of the pavement, excluding curbs, which will extrude the concrete under pressure. Behind the float shall be a rubber belt, mechanically operated and with a lateral movement of 4 to 8 inches. The curb shall be formed by extrusion plates or mules mounted at the rear of the machine. 6.16.2-Subgrade--The subgrade shall be brought to the proper grade and cross-section by means of a properly designed and operated machine. The subgrade shall comply with applicable sections of this specification. If any traffic is allowed to use the prepared subgrade, some device, satisfactory to the engineer, shall be provided for checking and correcting the subgrade immediately ahead of placing the concrete. The subgrade work, especially the path on which the tracks of the paver ride, must be done carefully and accurately. 6.16.3 -Placing -Concrete shall be of uniform slump and adequately supplied in front of the paver. The rate of progress shall be controlled so that the forward movement of the paver will be as nearly continuous as practicable. If it is necessary to stop the forward movement of the paver, the vibrator and tamping elements shall also be stopped immediately. Care must be taken to see that a sufficient supply of concrete passes around the float and the belt along the form line to form the integral curb where shown on plans. 6.16.4 —Final Finishing —Final finishing operation shall conform to the applicable sections of this specification. 6.17—Subgrade Preparation —The subgrade shall be in a moist condition at the time the concrete is placed. It shall be thoroughly wetted a sufficient time in advance of the II -F-28 placing of the concrete to insure that there will be no puddles or pockets of nnid when the concrete is placed but shall not be allowed to dry out before the concrete is placed. Immediately prior to placing the concrete, the subgrade shall be tested for conformity with the cross-section shown on the plans by means of an approved template riding on the side forms. If necessary, material shall be removed or added, as required, to bring all portions of the subgrade to the correct elevation. It shall then be thoroughly compacted and again tested with the template. Concrete shall not be placed on any portion of the subgrade which has not been tested for correct elevation. The subgrade should also be cleared of any loose material which may have fallen upon it. All soft and yielding material and other portions of the subgrade which will not compact readily when rolled or tamped shall be removed as directed and replaced with suitable granular material, placed and compacted as specified herein. II -F-29 7.0 -Curb, Gutter. Side elk, Driveways, and Parking Argos 7.1 -Scone -The work covered by this section of the specifications consists of furnishing all labor, equipment, supplies and materials, and performing all operations in connection with the excavation, embankment, and preparation of subgrade, form setting, placing, finishing, curing and jointing of concrete curb, gutters, sidewalk, driveways and parking areas as required and in accordance with these specifications and applicable drawings, and in accordance with the line and grade established by the engineer. 7.2 -Excavation -Excavation shall be performed to the lines, grades and cross sections indicated on the drawings and/or staked out on the ground. Suitable material removed from the excavations shall be used as far as practicable for embankments and backfilling. Unsuitable material shall be excavated below the grade shown on the drawings or indicated by grade stakes as directed by the engineer and replaced with suitable material. Excavated materials which are considered unsuitable and any surplus of excavated material not required for embankments or backfill shall be disposed of by the contractor. 7.3 -Embankment -Embankments shall be constructed by depositing, placing and compacting materials of acceptable quality above the natural ground in accordance with lines, grades and cross sections shown on the plans and/or staked out on the ground. Before any embankment is placed, clearing, tree removal, sod and topsoil removal shall be performed as directed by the engineer. Clearing shall include removal and disposal of obstructions and rubbish to a depth of 12 -inch minimum below subgrade elevation; sod will be removed to a depth of 6 -inch minimum; trees and stumps 18 -inch minimum below subgrade elevation. Each lift of embankment material, not to exceed 8 inches of loose depth, shall be thoroughly mixed and moistened to full depth and compacted to uniform minimum density of 95% of standard laboratory method, and optimum moisture content 4-2c; as directed by the engineer. (A.S.TJ4. D-69. 7.L. -Protection -The finished grade shall be maintained in a smooth and compacted condition until concrete has been placed. The finished grade ahnll be moist but not wet prior to the placing of concrete. 7.5 -Materials -Concrete shall be composed of portland cement, air entraining agent aggregates and water. These materials shall be furnished only from sources of supply approved by the engineer before shipments are started. The basis of approval of such sources shall be the ability to produce materials of the quality and in the quantity required. 7.5.1 -Portland. Cement -Cement of the type specified shall conform to requirements of the current A.S.T.M. Specifications for Portland Cement Type I, Type II, or Type III (Designation C-150) or for air -entraining portland cement Type IA, (Designation C-175). Cement which for any reason has become partially set or which contains lumps of caked cement shall be rejected. Either packaged or bulk cement may be used. 7.5.2-Air-Enntraining Agent -Air -entraining agents shall conform to the requirements of the current A.S.T.M. Specifications for Air -Entraining Agents for Concrete (Designation C-260). 7.5.3 -Aggregates -All aggregates for concrete shall meet the Standard Requirements for for Aggregates for Concrete Pavements of the Colorado Department of Highways or the current A.S.T.D4. Specification for Concrete Aggregates (Designation C-33). Aggregates shall be so handled that moisture content and gradation are reasonably uniform and do not change appreciably from batch to batch or hour to hour. II -G-30 No aggregates shall be used which have become contaminated or intermixed. Frozen aggregates or aggregates containing frozen lumps shall be thawed before use. 7.5.4 -Water -Water used in miring or curing concrete shall be clean and free from injurious amounts of oil, acids, salt, alkali or organic materials or other substances harmful to concrete. Water from public supplies or which is suitable for drinking is always satisfactory. 2 5.5-Joipta- 7.5.5.1-Expansion Joints -Expansion joints shall be non -extruding preformed joint filler and shall conform to standard specifications for preformed joint filler for concrete, A.S.T.M. D-1751, "Non -extruding and aesilient Non -bituminous types", or A.S.T.M. D-1752, "Non -extruding and Resilient Non -bituminous Types". 7i....2 -Joint Sealing Compound -Sealing material for filling all types of pavement joints shall comply with A.A.S.H.O. Standard Specifications (Designation M-89 or M-18). 7.5.6 -Curing - 7.5.6.1 -Waterproof Paper Waterproof paper for curing concrete shall conform to the current A.S.T.M. or A.A.S.H.O. Specifications for Waterproof Paper for Curing Concrete (C-171 and M-139 respectively). 7x,6,2 -Liquid Membrane Cgxina Qompound-Membrane curing compounds shall be the white - pigmented type and conform to the requirements for the current A.A.S.H.O. Standard Specifications for Liquid Membrane Forming Compounds for Curing Concrete (Designation 14-148) or ASTM Designation C-309. 7.5:6.3 -Polyethylene Sheeting Polyethylene sheeting shall consist of single sheet having a thickness of not less than 4 mills (.004"). Moisture retention shall conform to the requirements of A.S.T.M. Specifications, Designation C-156. The material shall be tested for tensile strength and elongation as prescribed in the current A.S.T.M. Specification Designation D -882 -Method A. 77.6-Batching-Measurement and batching of cement, fine and coarse aggregate shall be by weight on scales accurate to within 1/2 of one per cent. 7,6,1 -Proportioning Concrete The concrete shall have a minimum compressive strength of 3500 p.s.i. in 28 days. Proportions of cement, water and aggregate shall be determined in accordance with A.S.I. Standard 613, "Recommended Practice for Selecting Proportions for Concrete". Mixes shall comply with the following table: Nominal Size of Minimum Maximum Total Air Content Coarse Aggregate Cement Content Water Content (U.S. (Per Cent (Inches) (Sack Per Cubic Yard) Gallons Per Sack of By Volume) Cement) TABLE 11 1 1/2 3/4 3/8 5.75 6.0 6.50 6.0 6.25 6.75 5 ± 1% 6 t 1 % 7.5 t 1 The entrained air shall be obtained either by using air -entraining cement or an air - entraining agent. For a method of measuring air content, see Section 7.7. II -G-31 R/5/26/64 The max1Tmim size aggregate shall not exceed 1/4 of the slab thickness. The maximum water content shall include the surface water on the aggregate. 7.6.2 -consistency —The slump of the concrete shall be 3" t 1" as determined by the Standard Method of Test for Slump of Portland Cement Concrete, A.S.T.M. C-143. 7.6.3—Re_adr-Mixed Concrete —Ready —mixed concrete shall be proportioned, mixed and transported in accordance with the current A.S.T.M. Specifications for Ready -Mixed Concrete (Designation 0-94). 7.6.4 -Job -Mixed Concrete -If ready -mixed concrete is not available, then job -mixed concrete shall be in a drum -type mixer and shall conform to the standards of the Mixer Manufacturers Bureau of the Associated General Contractors of America. The mixer shall be capable of combining the aggregates, cement and water into a thoroughly mixed and uniform mass within the specified time and discharge the material without segregation. The entire contents of the drum shall be discharged before recharging. The volume of the mixed materials per batch shall not exceed the manufacturer's rated capacity of the mixer. 7.6.5 -Time of Mixing -The mixing of each batch shall continue for not less than one minute after all materials, excepting water, are in the mixer. All mixing water shall be introduced in the drum before one-fourth of the mixing time has elapsed. The mixer shall rotate at the rate recommended by its manufacturer. The mixer shall be provided with a batch timing device which shall be subject to inspection and adjustment by the engineer at any time. 7.7 -Measuring Air Content The air content of freshly mixed air -entrained concrete shall be checked by the engineer. Concrete with air contents above or below the amount specified in Section ('7.6.1 shall be corrected by adjustments in the mix design or quantities of air —entraining admixture being used. The air content shall be measured in accordance with A.S.T.M. Tentative Method of Test for Air Content of Freshly Mixed Concrete by the Pressure Method (Designation C-231) or A.S.T.M. Method of Test for Air Content of Freshly Mixed Concrete by the Volumetric Method (Designation 0-173). 7.8.1 -Forms -Forms shall be of wood or metal and shall have a depth equal to or greater than the section being placed. Each section of form shall be straight, free from warps and bends. Maximum deviation of the top surface shall not exceed 1/8 inch in 10 feet or the inside face not more than 1/4 inch in 10 feet. The method of connections between sections shall be such that the joint thus formed is tight and free from movement in any direction. Approved flexible forms shall be used for construction where the radius is 150 feet or less. 7.8.2 -Setting Forms -The subgrade under the forms shall be compacted and shaped so that the form when set will be uniformly supported for its entire length at the specified elevation. The supply of forms shall be sufficient to permit their remaining in place for at least 12 hours after concrete has been placed. All forms shall be cleaned and oiled each time they are used. 7.8.3 -Grade and Alignment -The alignment and grade elevations of the forms shall be checked by the contractor immediately ahead of concrete placement and necessary corrections will be made. Any forms that have been disturbed or subgrade that has become unstable shall be corrected and forms reset and rechecked. Any variations in grade and alignment shall be subject to approval by the engineer prior to placing the concrete. II -G-32 R/5/26/64 7.9.1 -Placing Concrete -After the inspector has approved the forms and subgrade, then concrete shall be deposited on the subgrade to the required depth and width in successive batches and in a continuous operation. The concrete shall be placed as uniformly as possible to minimize the amount of spreading necessary. While being placed, the concrete shall be spaded and/or vibrated with suitable tools to prevent the formation of voids or honeycomb. 7.9.2 -Cold Weather Concreting -Except by specific written authorization, concreting shall cease when descending air temperature in the shade and away from artificial heat falls below 40° F. It shall not be resumed until the ascending air temperature in the shade and away from artificial heat rises to 35° F. When concrete is permitted during cold weather, the temperature of the mix shall be not less than 600 F. nor more than 80° F. at the time of placing. Aggregates or water or both may be heated, but the water shall not be hotter than 175° F. and aggregates shall not be used which are hotter than 1500 F. Before concreting is started, remove ice, snow and frost. When concrete is being placed in cold weather and temperature may be expected to drop below 350 F., a supply of straw, insulated curing blankets or other suitable material shall be provided along the line of work. At any time when the air temperature may be expected to reach the freezing point during the day or night, the material so provided shall be spread over the concrete to a sufficient depth to prevent freezing of the concrete. Concrete shall be protected from freezing temperatures until it is at least 5 days old. Concrete injured by frost action shall be removed and replaced at'the contractor's expense. 7.9.3 -Hot -leather Concreting-ExcePt by written authorization, concrete placing shall cease if the temperature of the plastic concrete cannot be maintained at 90° or lower. To facilitate the placement of concrete in hot weather, the aggregates or water or both may be cooled. 7.10 -Finishing -After the concrete has been placed and consolidated in the forms, it shall be finished. Wood float shall be used. Excessive working of the surface will not be permitted. Final texture of the surface shall be obtained by lightly brooming the surface to produce slightly roughened surface with not more than 1/8 inch variation when measured with a 10 foot straightedge. 7.10.1 -Edging -Before final finishing is completed and before the concrete has taken its initial set, all edges in contact with the forms shall be tooled with an edger having 3/8 inch radius. 7.11.1 -Jointing -'Transverse joints will be located at maximum intervals of 10 feet. To control random cracking, the joints shall be formed, sawed or tooled to a minimum depth of 1/4 of the total thickness. If divider plates are used, the maximum thickness of plates shall be 1/2 of the total thickness. 7.11.2 -Expansion Joints -Expansion joints shall be placed as shown on the plans or as designated by the engineer and shall extend to the full depth of the concrete. Expansion joints shall be edged with a suitable edging tool. 7.12.1 -Curing -Concrete shall be cured by protecting it against moisture loss, rapid temperature change, from rain, flowing water and mechanical injury for a period of not less than five days after placement. It shall be the contractor's responsibility to protect the concrete from the elements and traffic, and if neglected the engineer shall direct that the necessary protective measures be taken at the expense of the contractor, and no further pouring will be permitted II -G-33 7.12.2 -Moist Curing -Moist curing shall be accomplished after initial set by covering with wet burlap, cotton mats or other approved fabric used singly or in combination. Curing mats shall be kept continuously wet and in intimate contact with the concrete for the duration of the moist cure. 7.12.3 -Waterproof Paper and Polyethylene Sheets The surface of the concrete shall be thoroughly moistened with a fine spray of water and then covered after initial set with the waterproof paper or sheeting. Paper or sheeting shall cover the entire width and edges shall be lapped at least 12 inches to insure complete coverage. Paper or sheeting sham be adequately weighted to prevent displacement or billowing due to wind. ("Waterproof Paper For Curing Concrete", A.S.T.M. C-171) 7.12.4 -Liquid Membrane Curing Compound -Only white pigmented membrane curing compound shall be used and shall be applied immediately after the water sheen has left the finished concrete. The compound shall be applied at a rate to completely cover the surface uniformly and at a rate that will achieve the performance requirement specified in A.S.T.M. C-309. The compound shall be kept agitated to prevent the pigment from settling. After the forms have been removed, the exposed edges shall be covered immediately with the compound. 7.13 -Cold -Weather Protection -When concrete is being placed in cold weather and temperature may be expected to drop below 350 F., a supply of straw, insulated curing blankets or other suitable material shall be provided along the line of the work. At any time when the air temperature may be expected to reach the freezing point during the day or night, the material so provided shall be spread over the concrete to a sufficient depth to prevent freezing of the concrete. Concrete shall be protected from freezing temperatures until it is at least 5 days old. Concrete injured by frost action shall be removed and replaced at the contractor's expense. 7.14 -Marking -Sidewalks shall have the 'Isms of the contractor and the year of construction impressed therein, using block letters not less than one inch high and three -eights (3/8) inch deep. Impressions shall be made in sidewalks at each end of each day's construction. 7.15-Testing- 7.15.19zality of Concrete -Compliance with the requirements of these specifications shall be determined by routine field tests performed by a recognized testing agency designated by the engineer in strict accordance with current A.S.T.M. procedures and will be conducted without expense to the contractor. 7.15.2 -Measuring Air Content -The air content of freshly mixed air -entrained concrete shall be checked by the engineer. Concrete with air contents above or below the amount specified in Section 7.8 shall be corrected by adjustments in the mix design or quantities of air -entraining ruimiYture being used. The air content shall be measured in accordance with A.S.T.M. Tentative Method of Test for Air Content of Freshly Mixed Concrete by the Pressure Method (Designation C-231) or A.S.T.M. Method of Test for Air Content of Freshly Mixed Concrete by the Volumetric Method (Designation C-173). II -G-34 SECTION C SCALts re I' • SECTION X NORMAL. I SLA GAMM ESPANINON JOINT / PIOT MONOLITHIC) CURS TRANSITION SECTION SGAL,E • 'Ins I* —a- x I1 Is SA Or 9 IC WOE Of MSfl-,. NORIiL. sot sow l I l l i( l !rum ' i l CONTRACTION JOINTS _ IO n MAX SPACING j.` TIM, 11QTt_. _,2f.. —reitios use a" __ „�, e. �"_ IDOL ,D1 ►AN C. DRIVE itmmmak. r. C X SONS: I«. S' FIGURE-7A— Aor. tea ALTERNATE 14TASE CONSTRUCTION a' • 1I" - I" SECTION A SCALE: r u is 4.• e. S'- 0" ttr. _. DETAIL OF ALLEY GUTTER FOR COMB. CURB -GUTTER SIDEWALK SCALE% I"■ I' PLAN OF ABOVE SECTION SCALE: las10° I FIGURE-7B- r FOR STANDARD LOCAL STREETS Mitt -0" Tie FOR COLLECTOR STREETS Nis Sr -O" Tat CROSS PAN sc*L1: s�M%I• tici."WyttnuptillThi PLAN OF INTERSECTION SGALts st FIGURE-7C— l C LOMtn IOU Of TSYKATs rf _ fs Vl' • k 6 INCH CURB -GUTTER snALEtr•f• A NOTE: AT DINVIVVIS TIIt I LAN *MU. BE a TM !Gil SLOf't • 1W KQ ROOT TOWARD CUM 4 INCH SIDE WALK SLAB saALE:a•t M.alti :" 1 Ni R..Z. i'� s" DETAIL OF ALLEY GUTTER FOR 6 INCH CURB — GUTTER c I r SIDATIALK OF ABOVE SECTION saALE:I"• 10' PLAN SG ALE : I"• I ALLEY worn' 4.-6" ►MO►EhT1 tins T FIGURE-7D- 8.0 -Specifications for Soil -Cement Base Course - 8.1 -General - 8.1.1 -Description -Soil -cement base course shall consist of soil and portland cement uniformly mixed, moistened, compacted, finished and cured in accordance with these specifications, and it shall conform to the lines, grades, thicknesses and typical cross section shown on the plans. 8.2 -Materials - 8.2.1 -Portland Cement -Portland cement shall comply with the latest specifications for portland cement, A.S.T.M. C-150 for the Type I. One cubic foot of portland cement shall be considered to weigh 94 pounds and 1 barrel of cement shall be considered to weigh 376 pounds. 8.2.2 -Water -Water shall be free from substances deleterious to the hardening of the soil -cement. 8.2.3 -Soil -Soil shall consist of the material existing in the area to be paved, of approved select soil, or of a combination of these materials proportioned as directed. The soil shall not contain gravel or stone retained on a 3 -inch sieve or more than 45 per cent retained on a No. 4 sieve. The minus No. 4 fraction shall not contain less than 15 per cent nor more than 35 per cent passing the No. 200 sieve. The percentage of minus 0.05 milimeter shall not be more than 25 per cent. 8.2.4 -Cement Qontent-Cement content shall not be less than 3 per cent by weight of the material as determined by the Moisture -Density Test (A.S.T.M. Designation D-558-57) and shall not be less than the amount required to produce a compressive strength of 300 p.s.i. in 7 days. Materials existing in the area and borrow materials not meeting the requirements set forth in 8.2.3 shall be tested in accordance with the ' Wot-Dry and Rreez-Thaw Test (A.S.T.M. Designation D-559-57 and D-560-57) to determine the required cement content. 8.3 -Equipment - 8.3.1 -Description -Soil -cement may be constructed with any machine, combination of machines or equipment that will produce the results meeting the requirements for soil pulverization, cement application, mixing, water application, incorporation of materials, compaction, finishing and curing as controlled by these specifications, 8.4.2 to 8.4.9 inclusive. 8.4 -Construction Methods- 8.4.l-Prenaration-Before other construction operations are begun, the area to be paved shall be graded and shaped as required to construct the soil -cement in conformance with the grades, lines, thicknesses and typical cross section shown on the plans. Any additional soil needed shall be placed as directed. Unsuitable soil or material shall be removed and replaced with acceptable soil. The subgrade shall be firm and able to support without displacement the construction equipment and the compaction hereinafter specified. Soft or yielding subgrade shall be corrected and made stable before construction proceeds. 8.4.2 -Pulverization -The soil shall be so pulverized that at the completion of moist - mixing, 100 per cent by dry weight passes a 1 -inch sieve and a minimum of 80 per cent passes a No. 4 sieve, exclusive of gravel or stone retained on these sieves. 8.4.3 -Cement Application. Mixing and Spreading -Mixing of the soil, cement and water shall be accomplished either by the mixed -in -place or the central -plant -mixed method. II -H-35 No cement or soil -cement mixture shall be spread when the soil or subgrade is frozen nor unless the air temperature is 400 F. in the shade and rising. The percentage of moisture in the soil at the time of cement application shall not exceed the quantity that will permit a uniform and intimate mixture of soil and cement during mixing operations; and it shall not exceed the specified optimum moisture content for the soil -cement mixture. The operations specified in 8.4.3 to 8.4.5 in daylight within 6 hours. Any soil -and -cement mixture that has not been compacted shall not remain undisturbed for more than 30 minutes. Method A. Mixed -in -Place. The specified quantity of cement shall be spread uniformly on the soil. ' Spread -cement that has been displaced shall be replaced before mixing is started. After the cement has been applied, it shall be mixed with the soil. Mixing shall continue until the cement has been sufficiently blended with the soil to present a uniform colored mixture. Immediately after the soil and cement have been mixed, water shall be incorporated into the mixture. Excessive concentrations of water on or near the surface shall be avoided. A water supply and pressure distributing equipment shall be provided that will assure the application within 3 hours of all mixing water required on the section being processed. After all mixing water has been applied, mixing shall continue until a uniform and intimate mixture of soil, cement and water has been obtained. inclusive shall be continuous and completed Method B. Central Plant Mixed.. The soil, cement and water shall be mixed in a pugmill either of the batch or continuous -flow type. The plant sh.+» be equipped with feeding and metering devices which will add the soil, cement and water into the mixer in the specified quantities. Mixing shall continue until a uniform and intimate mixture of soil, cement and water is obtained. The mixture shall be placed on the moistened subgrade in a uniform layer by an approved spreader or spreaders. Not more than 30 minutes shall elapse between the placement of soil -cement in adjacent lanes at any location except at longitudinal construction joints. The layer of soil -cement shall be uniform in thickness and surface contour and in such quantity that the completed base will conform to the required grade and cross section. Dumping of the mixture in piles or windrows upon the subgrade will not be permitted. Not more than 60 minutes shall elapse between the start of moist mixing and the start of compaction of soil -cement. 8.4.4 -Compaction At the start of compaction the percentage of moisture in the mixture shall not be below or more than two percentage points above the specified optimum moisture content. The specified optimum moisture content and density shall be determined by a moisture — density test, A.S.T.M. D-558-57, on representative samples of soil —cement mixture. II -H-36 Prior to the beginning of compaction, the mixture shall be in a loose condition for its full depth. The loose mixture then shall be uniformly compacted to the specified density within 2 hours. During compaction operations, shaping may be required to obtain uniform compaction and required grade and cross section. 8.4.5 -Finishing -After compaction the surface of the soil -cement shall be shaped to the required lines, grades and cross section. If necessary during shaping operations, the surface of the base shall be lightly scarified to remove any tire imprints or smooth surfaces left by equipment. The resulting surface shall then be compacted to the specified density. Rolling shall be supplemented by broom -dragging if required. The moisture content of the surface material must be maintained at not less than its specified optimum moisture content during finishing operations. Surface compaction and finishing shall be done in such a manner as to produce, in not longer than 2 hours, a smooth, dense surface free of compaction planes, cracks, ridges or loose material. Any portion of the soil -cement that has a density of 5 pounds or more below that specified shall be corrected or replaced to meet these specifications. 8.4.6 -Curing -After the soil -cement has been finished as specified herein, it shall be protected against drying for 7 days by the application of bituminous material. The curing material shall be applied as soon as possible after the completion of finishing operations. The finished soil -cement shall be kept continuously moist until the curing material is placed. The bituminous material specified shall be uniformly applied to the surface of the completed soil -cement at the rate of approximately 0.2 gallon per square yard with approved heating and distributing equipment. The exact rate and temperature of appli- cation for complete coverage without excessive runoff will be specified by the engineer. At the time the bituminous material is applied, the soil -cement surface shall be dense, shall be free of nil loose and extraneous material, and shall contain sufficient moisture to prevent penetration of the bituminous materials. Water shall be applied in sufficient quantity to fill the surface voids of the soil -cement immediately before the bituminous curing material is applied. Should it be necessary for construction equipment or other traffic to use the bituminous -covered surface before the bituminous material has dried sufficiently to prevent pickup, sufficient granular cover shall be applied before such use. The curing material shall be maintained by the contractor during the 7 -day protection period so that all of the soil -cement will be covered effectively during this period. Finished portions of soil -cement that are traveled on by equipment used in constructing an adjoining section shall be protected in such a manner as to prevent equipment from marring or dnmnging completed work., Sufficient protection from freezing shall be given the soil -cement for 7 days after its construction and until it has hardened. 8.4.7 -Construction Joints -At the end of each day's construction a straight transverse construction joint shall be formed by cutting back into the completed work to form a true vertical face. II -H-37 Soil -cement for large, wide areas shall be built in a series of parallel lanes of convenient length and width meeting the approval of the engineer. Straight longitudinal joints shall be formed at the edge of each day's construction by cutting back into the completed work to form a true vertical face free of loose or shattered material. 8.4.5 processing and Compaction Along Concrete Gutter -All material along the gutter shall be moved away from the edge into the mixing area for the full depth of processing and sufficient distance to insure complete mixing with cement and water. The mixed material shall then be replaced and compacted in such a manner to insure full depth and required density adjacent to the existing gutter. Moving, mixing, replacement and compaction shall be done without damage to the gutter edge. 8.4.94Manholes and Service Boxes -Prior to construction of the base, all manholes and service boxes shall be lowered to sufficient depth below the surface and protected by an adequate cover so that processing and compaction of the base may proceed without obstructing the full width of the street. After completion of the soil -cement base course and before complete hardening of the base, these areas shall be excavated, the material wasted, and the manholes and services raised to finished grade. The area excavated shall be of such extent as to provide sufficient working space to perform the operations necessary in raising the manhole or service box and to insure the soil - cement base along the perifery is clear of the covered area. Soil -cement base that is fractured or broken adjacent to the excavation shall be removed and wasted. The space between the cut section and the manhole or service box shall be backfilled with portland cement concrete. 8.4.9.1 -Traffic -Completed portions of soil -cement may be opened immediately to local traffic and to construction equipment and to all traffic after the 7 -day curing period provided the soil -cement has hardened sufficiently to prevent marring or distorting of the surface by equipment or traffic and provided the curing, as specified in 8.4.6, is not impaired. 8.4.9.2 -Maintenance -The contractor shall be required, within the limits of his contract, to maintain the soil -cement in good condition until all work has been completed and accepted. Maintenance shall include immediate repairs of and defects that may occur. This work shall be done by the contractor at his own expense and repeated as often as may be necessary to keep the area continuously intact. Faulty work shall be replaced for the full depth of treatment. Any lower areas shall be remedied by replacing the material for the full depth of treatment. Any low areas shall be remedied by replacing the material for the full depth of treatment rather than by adding a thin layer of soil cement to the completed work. 8.5 -Design Thickness of Soil -Cement Base- 8.5.1-Miniwum Thickness The minimum thickness of soil -cement base shall be 4 inches when approved selected borrow soils are used and 5 inches when existing soils are used. 8.5.2 -Minimum Total Thickness -Soil cement base material shall be placed to a depth as determined by the engineer from Figures 8-A and/or.8-B. II -H-38 W to O W N J a) W O • 0 a s cn CO —• w CC W Y 0 ti z J C O 1- f Z W N W I- 2 W a W V -J a) i _ S. i V • As lttt Concr•t• . " avi r+ a S. . •i S its 1 r fi1lr1 of 111") •7NJNI • 1 J • 0 N • • D ITEM 9 CONSTRUCTION, INSTALLATION AND REPAIR OF RIGHT -0F -WAY OPENINGS FOR SUB -SURFACE UTILITIES 9.1 DESCRIPTION: 9.1.1 This item shall apply to any persons, corporation, municipality, or quasi - municipality who for any reason cuts, disturbs or otherwise defaces any property being a public thoroughfare for the purpose of installing or repairing, or for any reason pertaining to the presence of, an underground utility or structure. 9.2 PERMITS 9.2.1 Prior to commencing any work covered by this item, the contractor who will actually perform the work, or his duly authorized representative, shall obtain written permission to undertake said work in accordance with the provisions of this item. The work of adjusting manhole rings and service boxes, or any work undertaken solely for the convenience of and at the order of the governing authority shall be exempt from the provisions of section 9.2, PERMITS, of this specification. 9.2.2 Permits shall apply to emergency repairs; however, a delay of 48 hours is granted excluding weekends and holidays, following the beginning of such repair before the permit for same shall become a penalty permit. 9.2.3 Permits shall be obtained at the office of the Engineer, or from his duly authorized representative at other designated locations. No permit shall be issued to any person or corporation not bonded to the governing authority in accordance with Part 1, Section B. 9.2.4 Fees shall be assessed for permits and inspection at the time of issuance of the permit. The amount of said fees shill be established to cover the actual cost of the governing authority incurred in the enforcement of these regulations, as approved by the governing authority. 9.2.5 Any permit issued shall pertain only to making an opening within the public owned right-of-way and is in no way to be considered a permit to enter onto any private property adjacent to such .right-of-way nor to alter or disturb any facilities or installations existing within the right-of-way and which may have been installed, and are owned, by others. 9.3 PENALTY PERMIT: 9.3.1 Any person or corporation commencing any work under this item prior to obtaining a valid permit, except as provided under paragraph 9.2.1, shall be required to obtain a Penalty Permit, in lieu of the normal permit, and pay the additional fee pertaining thereto. 9.4 SPECIFICATIONS, GENERAL: 9.4.1 Any work done under this item shall result in a repair being made to the street or other public property involved, said repair causing the street or other property to be returned to a condition equal to or better than original, within the limits of careful, diligent workmanship, good planning, and quality materials, said repair being accomplished in the least possible time and with the least • II -1-39 R-5/26/64 disturbance to the normal functioning of the street or other property. All cuts shall be made with straight line boundaries and all cut faces shall be within 50 of vertical. In cases where caving or slump of a cut face occurs from under any roadway surfacing, slab, or bound type base the dimensions of the cut shall be extended to beyond the occurance of caving or slump. 9.4.2 All backfill material, compaction, and resurfacing of ally excavation made in the county property will be done in accordance with the -provisions of following paragraphs 9.5, 9.6, and 9.7, after having first properly bedded and compacted, to a depth of not more than one (1) foot, over the top of the structure or utility line being installed or repaired, in accordance with the specifications of the person or corporation responsible for the maintenance of the structure or utility line being installed or repaired. 9.5 BICKFILL MATERI&L: 9.5.1 Materials acceptable for backfill purposes are divided into two (2) categories, as defined below: NATIVE BICKFILL---That material which was originally removed from the excavation, after having had all organic material, frozen material, material larger than that which will pass a 3" square opening, or any other elements other than natural soils removed and discarded. SEIECT.BICKFILL---Granular material meeting the requirements of Colorado Department of Highways Specifications. Item 16 -Class 1 backfill, Item 26 -Grading B, or fq»;ng within LASED Classifications A -1-a or L -1-b, except that materials of predominately 1 grain size, such as chips, pea gravel, squeegie or single sized waste from screening plants that are within the A -1-a and A -1-b classifi- cations may not be used, and that such A -1-a or A -1-b materials shall contain no particles larger than which will pass a 3" square opening. 9.5.2 Backfill materials as defined in paragraph .9.5.1 shn» be used as provided below: NATIVE BiCKFILL--May be used in any case consistent with the requirements of Item 9..6 - Compaction. SDT,W T BACKFILL---The contractor may at his option remove any native backfill materials from the project and substitute therefore any of the materials listed under paragraph 9.5.1 - Select Backfill. 9.6 COMPACTION: 9.6.1 Either Native Backfill or Select Backfill shall be consolidated or compacted according to the following: 1. Materials of AASHC Classification A -1-a or A-3 shb» be consolidated by jetting, and rolling or vibrating. 2. Materials of LASHO Classification A -1-b shall be compacted to 95% of Modified Proctor Density. 3. Materials of AASI-D Classification A-2 and A-4 through A-7 shall be compacted to 95% of Standard Proctor Density. II -I-40 R/5/26/64 9.7 RESURFACING OF BACKFILL: 9.7.1 Following proper backfill procedures in accordance with paragraph 9.6, the backfill shall, within a period of 15 calendar days, be surfaced in a manner so ab to duplicate the original surface as nearly as careful workmanship and availability of materials permit, except that the following minimum standards shall apply to the resurfacing of any backfill within the surfaced area of any surfaced street. 9.7.2 GRAVEL SURFACED---Backfill shall be placed to within 8" of the surface and the 8" vacant depth shall be filled. with thoroughly tamped granular material meeting the Colorado Department of Highways Specification for gravel surfacing Item 26. 9.7.3 SOIL CE}IENT SURFACED---Backfill shall be placed to within 8" of the surface and the 8" vacant depth shall be filled with 54 sack/cu.yd. portland cement concrete, which shall be struck and floated to match the adjacent undisturbed surface. 9.7.4 PORTLAND GE}IENT CONCRETE---Backfill shall be placed to within 8" of the surface, or to the bottom of the existing slab, whichever is the deepest, and the remaining vacant depth shall be filled with 6i sack/cu.yd. portland cement concrete, which shall be struck and floated to match the adjacent undisturbed surface. 9.7.5 ASPHALTIC CONCRETE SURFACED- Backfill shall be placed to the depth below the surface stated herein, the vacant depth shall then be filled to within not less than 2" of the undisturbed surface with compacted granular material meeting the Colorado Department of Highways specification for gravel or crushed rock surfacing, Item 26. The depth of excavation for replacement by Grading C material shall be as follows: 1. Over A -1-a, A -1-b, A-2 or A-3 materials --8". 2. Over A-4 and A-5 materials --10". 3. Over A-6, A-7-5, or A-7-6 materials --the group index of the materials in inches but not less than 14". 4. In the event that backfill consists of a properly compacted material of AASHO Classifications A-1, A-3, A-2-4, or A-2-5 and of minimum thicknesses as listed in 1, 2, and 3 above; the governing authority may at the request of the contractor waive the requirements for Grading C as stated herein. Such waiver shall be only by written notice from the Engineer, and the Engineer shall be the sole judge as to application of this provision. The surface of the gravel base material and the sides of the cut shall be thoroughly coated with prime oil RC -2 or approved equivalent. Not less than 0.3 gall/sq.yd. prime oil shall be acceptable. Following the prime oil application, hot plant mixed asphalt shall be thoroughly compacted into the cut by means of a metal drum roller. Sufficient asphaltic concrete shall be used to result in a patch which matches the adjacent undisturbed surface within the tolerances established in paragraph 9.7.7. II —I-41 R/5/26/64 AU asphaltic concrete used for final patching shall conform to Colorado Department of Highways specification for asphaltic concrete pavement, Item 34 —Type B. 9.7.6 It shall be the responsibility of the person or corporation which undertakes the work of installing a permanent asphalt patch to re -cut, if necessary, the sides of any asphalt cut so as to produce a perimeter that is in compliance with the requirements of paragraph 9.4.1 of those specifications. 9.7.7 Patches in any asphaltic concrete surface shall match the plane of the adjacent undisturbed surface, when measured by means of a 6 foot straight edge rule or beam, within the following tolerance: 95% of Patch Area 1.1/89 100% of Patch Area - 1/4n 9.7.8 A temporary patch shall be placed immediately upon completion of backfill operations in any asphalt or concrete surfaced street. This patch may be cold plant -mixed asphaltic concrete, an adequate treatment of prime oil, or other similar material of such a nature as to "yield a smooth driving surface of sufficient durability to endure the period of its intended use. 9.7.9 During certain times of the year when hot plant -mixed asphalt is unavailable, cold plant -mixed asphalt shall be placed in compliance with the provisions of paragraph 9.7.5 and 9.7.7; this, however, shall not be considered a permanent patch, and the required permanent patch shall be placed within 15 days following the availability of proper material. 9.7 10At the conclusion of work on any street cut or opening within public owned right-of-way, the entire area shall be left in its original condition. All waste construction or excavated materials shall be removed from the site. Any ditches, gutters, culverts, storm sewer works, or drain pipes shall be left open, unblocked, and in operating condition. 9.8 INSPECTIONS, TFn,AI, REQUIREMENTS: 9.8.1 An inspection by the Engineering Department must be requested 24 hours in advance of the backfill operation on any work covered by this item, and subsequent inspections requested in accordance with instructions received at the time of initial inspection. 9.8.2 No work covered by this item, except that of an emergency nature, shall be done on Saturdays, Sundays or legal holidays. 9.8.3 All work done under this item shall be dono in accordance with Section 7, LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC, of the Standard Specifications for Road and Bridge Construction accepted by the Colorado Department of Highways on January 1, 1958 II -I-42 R/5/26/64 10.0 Specifications for Bituminous Treated Base Course (B.T.B.C.) 10.1 General a. The bituminous treated base course shall be hot -mixed at a central plant. It shall consist of mineral aggregates uniformly mixed with asphalt cement and laid upon the prepared subbase to thefinished thickness shown on the typical cross sections on the plans or as directed by the Engineer. In general, the bituminous treated base is to be con- structed in one or twolayers as shown on the plans and as di- rected by the Engineer. The bituminous treated base course - aggregate shall be crushed gravel. b. All materials, methods of preparation, and construc- tion shall conform to the requirements of these specifications. c. B.T.B.C. may be substituted for granular base course at the ratio of one (1) to two and one-half (2.5). 10.2 Materials a. Crushed Gravel. The crushed gravel for the bituminous treated base course shall consist of clean, hard; durable stone particles whichhave been screened and crushed to the following gradation prior to compaction. Standard Size of Sieve The than six - The fract determine T 90-56 a 1-1/2" 1" 3/4" 3/8" No. 4 No. 10 No. 4O No. 200 Percentage by,. Weight. Passing Sieve Type I Type II 100%. 70 - 100% 60 - 90% 45 - 75% 30 - 60% 20 - 50% 10 - 30% 5 - 10% 5 - 10% fraction passing the No. 200 tenths (0;6) of the fraction ion passing.the No. 40 sieve d in accordance with A.A.S.H nd T 91-54. 100% 30 - 60% 25 - 50% sieve shall not be greater passing the No, 40 sieve. shall be non -plastic as .0. Methods.T 89-60; II -J-43 The crushed gravel shall have a more than 50 per cent when tested in Method T 96-56: (Los Angeles Abrasion Of the crushed gravel particles at least 50 per cent by weightshall faces. percentage of wear.of not accordance with A,A.S.H.O. Test). retained on the No. 4 sieve have One or more fractured The crushed gravel shall be free of- lumps or balls of clay and contain a maximum of 5% of soft particles that can be dis- integrated between the fingers after soaking in water for 24 hours. .b. Mineral Filler,- In the event that the crushed gravel is lacking in minus. No. 200 material, the contractor will be per- mitted to use mineral_ filler. The mineral filler shall consist of limestone dust, Port- land Cement, or other,approved suitable mineral matter. It shall be thoroughly dry and free of lumps consisting of aggrega- tions of fine particles. The mineral filler shall conform to the following gradation: % Passing by Weight -Sieve Size Min. Max. No. 40 No.. 200 95 100 80 100 c. ,Effect of Water on Cohesion of Compacted Bituminous. Mixtures. The combinedmineral aggregates and asphalt cement, when tested in.accordance with A.S-.T.M. B 1075-54 shall have an index of retained stability of ❑ot less than 75%. Mixes showing an index of retained stability between 50% and.75% shall be re- jected, or an approved method -of processing -the aggregate or of treating the asphalt shall be_required to increase the index of retained strength to a minimum of 75%. Any aggregates showing an index of retained stability of less than 50% when combined with untreated -asphalt cement shall be rejected. ,Admixtures.,and treating.method.s'shall be at the expense of the contractorand be subject to the special approval of the Engineer. Special attention will be given to the thermal sta- bility of admixtures. d. Asphalt.Gement. The asphalt cement shall be uniform in character free -from -water.; and shall not foam when heated to - 347° F. It shall meet thefollowing requirements for penetra- tion: Penetration at 77° F,, 100G., 5 sec. The asphalt cement shall conform to all of the following.'. requirements and to-the-A:A.S.H.O. Specification for Asphalt Cement M 20-60. Penetration Min. Max. 85 100 Property, Proportion of bitumen soluble in carbon tetrachloride. not less than Ductility at 77° F., 5 cm, per min., not less than Flash point (Cleveland open cup), not less, than Loss on heating, 325° F., 5 hr., not more than Penetration of residue from loss, on heating test at 77° F., 100 g., 5 sec., compared to pene- tration before heating Spot Test: Naptha xylene solvent, 10% xylene 99.0% 100 cm. 450° F. 1.0% 75% min. Negative Certified refinery tests of the above properties for each ship- ment of asphalt cement shall be furnished in duplicate by the contractor to the Engineer at the time of delivery of such shipments. A certified weight ticket indicating the net weight of the load shall also accompany each shipment of asphalt cement. e. Sampling and Testing of Materials.. All sampling and testing of materials shall be done in accordance with the latest methods of the American Association of State Highway Officials unless otherwise specified. 103 Preparation of Materials. a. Preparation of Asphalt Cement. The asphalt cement shall be heated at the paving plant to a temperature not exceeding 325°F. The penetration of the asphalt cement shall be maintained within the limits of penetration specified throughout the period of use. b. Preparation of Mineral Aggregate. The mineral aggre- gates shall be dried and heated at the paving plant so that when delivered to the mixer, they shall be at as low a tempera- ture as is consistent with proper mixing and placing, and in no case shall the temperature exceed 350° F. They may be fed simultaneously into the same drier, but in all cases, immedi- ately after drying and heating, they shall be screened into three bins. c. Preparation and Composition of the Mixture. Each size of hot aggregate and asphalt cement shall be measured separately and accurately to the proportions in which they are to be mixed,. After the hot aggregate has been charged into the mixer and thoroughly mixed for the length of time as directed by the Engineer the asphalt cement shall be added and the mixing of all materials continued for a period of at least 30 seconds, or longer if necessary, to produce a homogenous mixture in which all particles of the mineral aggregate are coated uniformly. II -J-45 The'gradation the mineral aggregates shall be within the' following limits Standard Size of Sieve; Percentage by Weight Passing Sieve Type II 1-1/2" 1" 3/4" 3/8" No. 4 No. 10 No. 40 No. 200 Asphalt Cement Type I 100% 70 - 100% 60 - 90% 100% 45 - 75% 30 - 60% 30 - 60% 20 - 50% - 25 - 50% 10 - 39% 5 - 10% 5 - 10% 4.0 - 7.0% by weight of mixture The combined mineral aggregate shall conform to the above gradation and shall, not vary from the low limit on one sieve to the high limit on the adjacent or vice versa, but shall be uni- formly graded from coarse to fine. The bituminous treated base course mixture shall fulfill the following requirements when tested in accordance with A.S.T.M. Method D 1559-58 T Property Air Voids* -% Voids filled with bitumen Stability.- pounds Flow - 9.01 inches Min. Max. 4 60 500 7 70 14 or when tested in accordance with A.S.T.M..0 1560-63 T Property" Min. Max. - Air Voids* -% 4 7 Stability -value 35 Cohesiometer value 50 * Based on apparent specific gravity of the mineral aggregate; No bituminous treated base course mixture shall .be produced until a job -mix formula has been provided the Contractor by the Engineer. The formula will indicate the definite percentage of each sieve fraction, the percentage of asphalt, and the tempera- ture of the completed mixture as it is discharged from the mixer; The job -mix formula_will be allowed the following tolerances Aggregate passing 1", 3/4", and No. 4 sieve --5% above and below.- Aggregate` passing No. 10 and No. 40 sieve --4% above and below. Aggregate 'passing .No. 200 sieve --2% above and below. Bitumen— 0.3% above and below, Temperature of Mixing 20° F., plus or minus. The percentages of each fraction given in the job -mix for, mula will be restricted to values such that application of the above tolerances will not cause the limits in the gradationtables to be exceeded. Adjustments of the bitumen content and aggregate gg g gradation within the limits of the gradation iteas tablesspecified herein may be made to improve the paving mixtures, by the Engineer, without adjustments in the contract prices. The mixture, when thoroughly compressed, shall have a den- sity of not less than 90% of laboratory density determined from specimens made in accordance with the Hveem or Marshall Method of Test. 10.4 Construction. a. General Conditions. The mixture shall be laid only when the base is dry and only when weather conditions are suitable. The mixture shall be laid only, when atmospheric temperatures are above 40°F. and rising and when no frost exists in the subgrade. b. Transportation of Mixture. The mixture shall be trans- ported from the paving plant to the work in vehicles equipped with tight metal compartments previously cleaned of all foreign materials. When directed by the Engineer, the compartments shall be suitably insulated, and each load shall be covered with canvas or other suitable materials of sufficient size to protect it from weather conditions. The inside surface of all vehicle compartments used for hauling mixture shall be lightly lubricated with a thin oil just before loading, if the mixture adheres to the compartment, but excessive lubricant will not be permitted. No loads shall be -sent out so late i.n the day that the mixture cannot be spread and compacted during daylight. c. Placing Asphalt Mixtures The mixture shall be delivered on the work at a temperature of not less than 250° F. The desired temperature shall be set by the Engineer and shall be maintained within + 20° F. II -J-47 Unless otherwise permitted by the Engineer, the mixture shall be spread by means of a mechanical self -powered paver capable of spreading the mixture true to the line, grade, and crown set by the Engineer. The paver shall be capable of spreadingand finishing.the material to the required thickness by strike -off and screed action without segregation of the mix- ture. Hand -placing and spreading will be permitted in irregular areas (or when strips less than 8 feet in width are to be paved ) Pavers shall be equipped with hoppers and distributing screws of the reversing type to place the mixture evenly throughout the width of the course in front of adjustable screeds. The mixture shall be dumped in the center of the hoppers, and care shall be exercised to avoid overloading and spilling the mixture upon the base. The forward rate of travel of the paver during the progress of the operations of laying the asphaltic concrete shall be capable of being regulated to a speed of between 10 and 30 feet per minute. The actual speed that will be permitted for any particular operation will be dependent upon the capacity of the plant to furnish adequately heated and mixed material and as di rected by the Engineer. The paver crawler tracks or wheels shall be kept clean at all times. The spreading of loose mixture to provide traction for the paver -will not be per- mitted. Pavers shall be equipped with a quick and efficient steering device and shall have forward and reverse traveling speeds of not less than one hundred (100) feet per minute. Unless operating on fixed side forms, pavers shall employ mechanical devices such as equalizing runners, straight -edge runners, evener arms, or other compensating devices to adjust the grade and confine the edges of the mixtures to true lines without the use of stationary side forms. The paver shall be equipped with tamping bars or other approved devices to insure continuous and uniform consolidation of the mixtures without segregation and/or tearing. Pavers shall also be capable of placing courses in thickness of from iy" to at least 3" and to a normal of 8' to a maximum width of 13'. They shall be equipped with blending or joint leveling devices for smoothing and ad- justing all longitudinal joints between adjacent strips of courses of the same thickness. 11-J-48 /1 The term .creed" includes a "strike -off" device operated by cutting, crowding, or other practical action which is effec- tive on the mixture at a workable temperature without tearing, shoving, or gouging and which produces a finished surface of an even and uniform texture, free from hollows and bumps, and of uniform density. The screed itself shall be capable of being heated throughout the entire length and equipped with proper controls to prevent overheating the mixture. The screed of the paver shall be adjustable to crown and to level. Immediately after any course is screeded and before roller compaction is started, the surface shall be checked, and in- equalities shall be corrected. Any fat sandy accumulations from the screed shall be removed by a rake or hoe and shall be replaced with satisfactory material. Irregularities in align- ment and grade along the outside edge shall also be corrected by the addition or removal of mixture before the edge is rolled. The Contractor shall provide competent workmen who are capable of performing the work incidental to the correction of all pavement irregularities. Special attention shall be given to the straight -edging of each course immediately following the initial rolling. In narrow, deep, or irregular sections, intersections, turnouts, or driveways where it is impractical to spread and finish the mixtures by machine methods, the Contractor may use approved spreading equipment or acceptable hand methods as directed by the Engineer. When the mixture is to be spread by hand, upon arrival on the work, it shall be dumped upon a steel board outside the area on which it is to be spread, or shoveled directly from the truck to the area on which it is to be spread. Im- mediately thereafter, it shall be distributed into place by means of hot shovels and spread with hot rakes in a loose layer of uniform density and correct depth. Tines of the rakes shall be not less than i" longer than the loose depth of mixture, and spaces between tines shall be not less than the maximum diameter of aggregate particles; except that in no case should the spaces be less than 1 inch. Loads shall not be dumped any faster than they can be properly handled by the shovelers. The shovelers shall not distribute the dumped load faster than it can be properly handled by the rakers. The rakers will not be permitted to stand in the hot mix- ture while raking it, except where necessary to correct errors in the first raking. The raking must be carefully and skill- fully done in such a manner that after the first passage of the roller over the raked mixture, a minimum amount of back patching will be required. - II -J-49 :Placing t r mixture shall be as cont_ aous.as possible, and the roller shall _pass over the unprotected edge of the freshly laid mixture -only when the laying of this course is to be discontinued for such intervals of time -as to permit the - mixture to becomechilled. d. Joints: Transverse construction joints shall be made in a careful manner. The edge of the previously. laid course shall be cut back as far as is necessary toeliminateirregula- rities incidental to finishing and rolling. After laying the finished mixture adjacent to a transverse construction joint, a skilled laborer shall follow up each rolling with a straight- edge and corrective measures to insure a smooth riding surface. He shall be equipped with hot smoothing irons, tampers, and other devices for use in truing up the pavement surface adjacent to the joint. Longitudinal joints against both hot and cold material shall be made with equal care. Mixtures spread and compacted (or partially compacted) by the machine shall not be dis- turbed by. a rake in dressing the joint unless one side is too high; nor shall surplus mixture be spread or scattered back of the machine when not needed to build up low spots. When spread- ing next to the warm or cold edge of a previously laid section of surfacing, the machine shall be adjusted to leave a "bead" of material, roughly one inch by one inch, which is to be. rolled in to compensate for uneven density at the joint. If one side of the joint is cold, the "bead" shall be moved with the back of the rake to the warm side of the joint, but other- wise the machine -laid mixture shall not be disturbed. In making the joint along any adjoining edge such as curb, gutter, or an adjoining pavement, and after the hot mix- ture is placed by the finishing machine, just enough of the hot material shall be carried back to fill any space left open and provide a small "bead" of extra material. This joint shall be properly "set-up" with the back of rake at proper height and level to receive the maximum compression under rolling. The work of "setting -up" this joint shall always be performed by competent workmen who are capable of making a correct, clean, and neat joint. Before the mixture is placed -against unprimed contact surfaces of curbs, gutters, headers, manholes, etc., this sur- face shall be painted with a thin uniform coating of hot as- phalt cement or asphalt cement dissolved in naptha or gasoline. e. Compaction of the Mixture. After spreading, the mix- ture shall be thoroughly and uniformly compressed by, a power - driven roller. Rolling equipment shall consist of steel wheel rollers and pneumatic -tired rollers as specified herein. II -J-50 1. Steel Wheel Rollers may consist of two types: 3 -wheel macadam - type rollers; 2 -wheel tandem rollers. Steel -wheeled power rollers shall be equipped with a power unit of not less than 4 cylinders. Tandem -type rollers shall weigh not less than 8 tons and shall weigh not less than 200 pounds per inch of roller. width; 3 -wheel power rollers shall weigh not less than 12 tons and shall provide a compression on the rear wheels of not less than 325 pounds per inch of roller width. 2. Pneumatic -tired rollers shall be self-propelled and of the double -axle type and have a shuttle speed transmission with rear wheel drive. They shall have a width of not less than 4 feet and be equipped with pneumatic tires of equal size and diameter. Treads on pneumatic -tired rollers shall be sufficiently smooth so that they do not leave perceptible tread marks at any time during rolling operations. The tires shall be so spaced as to give complete coverage. The wheels shall not wobble, and the roller shall be so constructed that the contact pressure shall be uniform for all wheels. The air pressure in the several tires shall not vary more than 5 pounds per square inch and shall be not less than 45 pounds per square inch. Pneumatic -tired rollers shall be so constructed that the total weight per tire of between 1,000 and 2,000 pounds, and during the operation, the total operation weight of the roller shall be varied as directed by the Engineer. Rolling of the mixture shall consist of 3 separate opera- tions; break -down rolling, pneumatic rolling, and final rolling. The minimum number of rollers required for each laydown machine shall be according to the following schedule: Hourly production from 50 to 120 tons - two steel wheel rollers and one pneumatic -tired roller. Hourly production over 120 tons - two steel wheel rollers and two pneumatic -tired rollers. The breakdown rolling shall be done with a three -wheel roller weighing not less than 12 tons or with a tandem roller weighing not less than 8 tons, as soon after spreading the mix- ture as possible without undue displacement. Delays in rolling of fresh mixtures shall not be tolerated. Rolling shall start longitudinally at the sides and proceed toward the center of the roadway, overlapping on successive trips by at least one-half the width of the rear wheel. At unsupported edges, the roller shall cover the edge but shall not overhand the edge by more than two inches. Except for hot joints, narrow bands of unrolled surface shall not be left to be rolled with an adjoining section. Points of reversing the roller shall be staggered at both ends of each trip. The break -down rolling operation shall consist of a minimum of two complete coverages by the roller. II -J-51 The speea of the roller shall not ex.,ed three (3) miles per hour and shall at all times be slow enough to avoid dig - placement of the hot mixture; and any displacements occurring as a result of reversing the.direction of -the roller, or from. any other cause, shall at once be corrected. To prevent ad- hesion of the mixture to the steel rollers; the wheels shall. be kept properly moistened with water or water and a detergent but excessive use of water:will not be permitted. -Oil will not be permitted for this purpose. The pneumatic rolling shall be done by the pneumatic -tired roller and shall begin at a -time when themix is still hot, slightly plastic, and shows slight roller marks. This rolling shall continue until a minimum of four (4) complete -coverages" have been made and the surface is thoroughly compacted, after .which the surface shall be.given a final rolling with a 2 -wheel tandem -roller. The rolling shall be continued until the speci- fied density is attained and the desired surface smoothness is obtained. The rollers shall be ingood mechanical condition,. capable of reversing without backlash.. They shall -be -operated by compe- tent and experienced rollermen and must be kept in continuous. operation as nearly as practicable in such manner that all -parts of the pavement shall receive substantially equal compression. Along curbs, headers, manholes, similar structures, and. at all places not accessible to the roller, thorough compaction must be obtained by means of hot tampers, and at all contacts of this character, the joints between these structures and the surface of the mixture must be effectively sealed. The bituminous treated base course, after final compression shall conform to the following requirements: The surface shall be smooth and true to the established crown and grade as shown on the plans. The final surface shall be finished to within a surface tolerance of one-fourth (1) inch, measured as the vertical ordinate from the face of a ten (10) foot straight edge. Further, the bituminous treated base course shall not deviate by more than plus and minus two hundredths (0.02) feet from the surface profile grade as called for on the plans. The bituminous treated base course shall have the average thickness specified and shall at no point vary more than i4 inch from the thickness shown on the typical cross sections on the plans. Any high, low, or defective places shall immediately be remedied by cutting out the course at such spots and re- placing it with fresh,, hot mixture which shall be immediately compacted to conform with the surroundingareaand shall be thoroughly bonded to it. II -J-52 The finished, compacted' bituminous treated base course shall have a density at all locations of not less than 90 per cent of the laboratory density of a mixture composed of the same materials in like proportions as specified in para- graph 10.3. Density will be determined on specimens furnished by the Contractor. The contractor, under the supervision and at the direction of the Engineer, shall cut samples of the com- pleted bituminous treated base course for determination of density. In general, these samples will be taken in the morn- ing on the .day following the placement of the material. Not more than four samples per day's placement per plant for each lift placed will be required, unless retests are needed to insure compliance with specification requirements. The samples shall be taken at points designated by the Engineer by sawing the asphaltic concrete with a power driven masonry saw. The sawed samples shall not be less than twenty-five one -hundredths (0.25) square feet in area. The surface from which the samples have been taken shall be restored by the Contractor no later than the succeeding day of plant operation. The cost of ob- taining the samples and restoring the surface, as described herein, shall be borne by the Contractor. II -J-53 FIVE COUNTY AREA ENGINEERS COUNCIL REQUIREMENTS AND SPECIFICATIONS FOR THE EXTENSION OF WATER MAINS The facilities for distributing water shall be designed so as to ensure the development of an integrated system, the adequacy of which will be judged by the current applicable standards of the City or County within which they are located. It should be noted that these standards include a basic minimum distribution main size of six inches internal diameter. The extension and/or the addition to any facilities must be approved in writing by the Governing Authority prior to the commencement of construction. Before final approval shall be given, the following provisions for applica- tions and maps must be met: 1. A certified map of the subdivision, signed by the proper City or County Officials, showing the streets and street widths, blocks, lots, and lot measurements must accompany each application. The outer perimeter of the subdivisions must be tied into the section lines. 2. Recorded copies of deeds are required for those installations in streets not dedicated by subdivision. 3. New mains will not be located in alleys. 4. Mains will not be installed in rights -of -sway or easements except where the approval of the Governing Authority has been obtained. Desirable minimum width requirements for the maintenance of pipelines in easements and rights -of -way are as follows: 12" pipe or smaller 10' each side of centerline 12" thru 24" pipe 15' each side of centerline From'24" thru 42" pipe 20' each side of centerline From 42" thru 60" pipe 30' each side of centerline Larger than 60" 40' each side of centerline 5. The original and four copies of the proper main extension form must be filled out by the applicant. This application must contain a description of the location of the water mains in the street, state the size, type and total footage of the pipe to be installed, and the number of the premises to be served along with the block and lot numbers of these premises. 6. Five copies of the plans and specifications and one reproducible drawing for facilities to be installed shall be furnished to the Governing Authority, two copies of which will be returned to the applicant when approved, and will bear the evidence of such approval by the signature of a representative of the Governing Authority. One Esia of these returned maps is for the use of the contractor and must be in his II -K-54 possession at all times during construction. No work shall be started until the approved mates have been returned to the applicant. The underlined sentences in the above. paragraph must be contained in and made a part of the specifications. 7. All deviations from the approved maps, or changes occurring due to field conditions must be discussed with the inspector at the jobsite, and approved by the Governing Authority's representative whose signature appears on the maps, prior to any relocation being made. No taps will be given on installations varying from the approved maps, where changes have not been authorized by the Governing Authority. 8. Plans and specifications shall: (a) Be made from actual field surveys, referred into land corners or other official survey control points, such as property lines, and be of sufficient accuracy so that the facilities when installed can be readily found for tapping, control, and repair. Fences shall not be used as the basis of surveys. When stationing is used, the starting point shall be referenced into the closest land corner and/or property corner. Where the line crosses streets or avenues, the property lines extended of said streets and avenues shall be referenced to the centerline stationing of the pipeline. (b) Be of suitable scale to show all necessary information, preferably one -inch equals 100 feet, or one -inch equals 50 feet. Standard size drawings shall be 36" x 24". (c) Show sufficient adjacent area to give the relation of new facilities to existing facilities. (d) Indicate the widths of streets and the length of blocks in the vicinity of the new facilities. (e) Show the location of the new mains in the street with reference to stakes set, and to property lines. .• Standard position for locating mains, unless some major interference prevents, is along a center- line five feet north or five feet east of the centerline of the street. Control stakes should not be set on the proposed centerline of a pipe. It is the responsibility of the Engineer or other party submitting maps for approval to survey the proposed installation and set the control stakes in accordance with the approved maps. Inspection of lines will not continue and installations will not be approved where, in the opinion of the Governing Authority's Inspector, proper control has not been furnished. Give the dimension and location of the main or mains to which new facilities will be connected. Show the locations of valves, fire hydrants and fittings. Valves shall be located on property lines extended, not in the middle of II -K-55 intersections. Preferred location of hydrant tees shall be a minimum of five feet away from the property line of the inter- secting streets and preferably on the northeast earner as shown on the following drawing. If such installations are not possible because of some physical obstruction, the valves or fire hydrants may be relocated, subject to the approval of the Governing Authority. (h) State the minimum cover over the top of the pipe. (The minimum permissible cover is four and one-half feet (4-1/22) below the official grade of the street or road. If official grade has not been established, the cover shall be at least four and one-half feet (4-1/2') when laid, and maintained at this depth.,) (i) State that the trench will not be backfilled until the pipe shall have been inspected by the Governing Authority for leakage, depth and alignment, and by the State Board of Health for sterilization and flushing. The Governing Authority will not release any main for tapping until this requirement is met. 9. Approval of plans and specifications will be dated and valid for only six months after their approval. Therefore plans and specifications should not be submitted for work that cannot be installed in tha immediate future, as the Governing Authority may require entirely new plans before approval will be given for the resumption of interrupted work. In any event, the approval of the Engineering Division of the Governing Authority is re- quired before work may be restarted on maps six months old. 10. It is the responsibility of the contractor to notify effected customers prior to times of outage, and to schedule audit times of outage so as to afford a minimum amount of inconvenience tv evicting customers. II -K-56 FIVE COUNTY AREA ENGINEERS COUNCIL REQUIREMENTS AND SPECIFICATIONS FOR THE EXTENSION OF WATER MAINS II -K-57 FIVE COUNTY AREA ENGINEERS COUNCIL SPECIFICATIONS COVERING THE MATERIALS WHICH ARE ACCEPTABLE FOR THE EXTENSION OF WATER MAINS The following materials are acceptable to the Governing Authority under normal working pressures of 150 p.s.i. and less. Materials for use in water mains designed for working pressures higher than 150 p.s.i. must be approved individually by the Governing Authority. Cast Iron Pike in all sizes through 24" shall be Class 150, and conform to Federal Specification WW -P -421b with cement mortar lining or the equivalent ASA Standard. Larger mains shall conform to individual specifications issued therefore by the Governing Authority. Joints for cast iron pipe may be push - type joints utilizing a rubber ring gasket of a design approved by the Govern- ing Authority, provided each such joint is bonded to provide a continuous electrical circuit, or bell and spigot poured joint using unbraided jute or hemp and lead. Joints between systems of different ownerships shall be insulated so as to prevent the flow of electrical current between the two systems. Corrosion protection must be provided for all ferrous pipelines, as indicated by a soils resistivity survey acceptable to the Governing Authority; however, at the option of the Governing Authority the soils resistivity survey may be waived. Cast iron pipe and joints not conforming to the above enumerated standards are prohibited. Cement -Asbestos Pipe in sizes 12" and smaller shall be at least Class 150, Type 22 and conform to AWWA Specification C-400-53 T and the following additional requirements: Joints shall be formed by couplings of a sleeve -type which employ two (2) rubber ring gaskets, one at either end of the coupling to form a water tight seal. The pipe ends shall be machined so there is a gap of at least 3/16" within the couplings between pipe ends when the pipe is assembled and coupled. The gap is to be obtained without the use of a spacer. The rubber gaskets employed for affecting a seal within the coupling shall be of a uniformly solid cross-section. The design of the coupling, gaskets and ends of the pipe shall be subject to the approval of the Governing Authority's Engineer. Foreign manufactured pipe shall be certified pressure tested according, to A.W.W.A. Standard C-400-53 T, prior to the last handling in transit in the United States. Under special soil conditions it may appear that non-ferrous pipe in sizes larger than 12 -inches may be more advantageous to use in the distribution system. In such cases a written request to deviate from these standards must be authorized in writing by the Governing Authority. II -K-58 Steel Elm may be used in transmission mains of internal diameter fourteen inches and larger. Steel pipe and fittings, sizes 14 -inch through 24 -inch shall be fabricated in accordance with A.W.W.A. Specification 0-201-60 T or designation C-202-60 T where mill -type steel water pipe is used, and the additional requirements contained herein. Corrosion protection must be provided for all ferrous pipelines as indicated by a soils resistivity survey acceptable to the Governing Authority; however, at the option of the Governing Authority, the soils resistivity survey may be waived. The minimum wall thickness for steel pipe shill be 1/4 -inch or the Design Criteria, whichever is greater. Design Data shall be submitted for the approval of the Governing Authority. The steel pipe shall be coal -tar enamel coated in accordance with A.W.W.A. Specification designation C-203-62 with the addition of a fibrous glass mat and coal -tar enamel protection as required by Section A-1.4 of the above specification. The inside surface of the pipe shall be cement mortar lined in conformance with A.W.W.A. Specification C-205-62 T (Tentative). Joints for steel pipe shall be of the compression coupling type, approved by the Governing Authority, and each such joint shill be bonded to provide a continuous electrical circuit. Joints between systems of different ownership shall be insulated so as to prevent the flow of electrical current between the two systems. Concrete Pine may be used in transmission mains of internal diameter fourteen inches and larger; however, concrete pipe in sizes 14 -inch through 24 -inch shill be manufactured in accordance with A.W.W.A. Specifications C-300-57 or 0-301-64 with the following additional requirements: Joints shill be rubber and steel, and meet the approval of the Governing Authority. Pipe shall be designed for a minimum working pressure of 150 p.s.i. Pipe shill be protected against sulfate attack. These standards are for pipe to be laid in the ground and are not neces- sarily those for use in vaults, pump stations, etc. VALVES Valves 4 -inch to 12 -inch in diameter must be provided with valve boxes and shall be upright valves for use in horizontal lines, cast iron body, fully bronze mounted, designed for a minimum working pressure of 150 p.s.i., and shall be manufactured and tested in accordance with A.W.W.A. Specification C -500-59T. Valves shall be double disc with solid bronze discs and parallel seats with non -rising stem. Valves shall have bell, flanged, mechanical or push on joint ends. Valve stems on valves from 3 -inches to 12 -inches shall be threaded so that the number of turns to open shall be three (3) times the nominal diameter in ches with a tolerance of plus three (3) turns. Valves shell have stuffing boxes and shall be furnished packed with Rains -Flo No. R.F.-II packing or equal, or as approved by the Governing Authority. II -K-59 The direction valves open shall be in accordance with the existing standards of the Governing Authority. Manufacturers catalogues and one set of certified drawings shall be furnished for each size valve (where necessary). Valves larger than 12 -inch in diameter shall be housed in valve vaults of a design approved by the Governing Authority and shall be horizontal valves for use in horizontal lines, cast iron body, fully bronze mounted, designed for a minimum working pressure of 150 p.s.i. and shall be manu- factured and tested in conformance with A.W.W.A. Specification C -500-59T. Valves shall be nonrising stem with bevel gears, extended gear case, bypass and position indicator. Valves shall be double disc gate valves with parallel seats. Valves shall have bell, flanged, mechanical or push on joint ends. Valves shall have stuffing boxes and shall be furnished packed with Rains -Flo No. R.F.-II packing or equal, or as approved by the Governing Authority. Valve stems on horizontal valves with bevel gears shall be threaded so that the number of turns to open shall fall within the limitations set forth in the following table: Valve Size 14" 16" 20" 24" Minimum Turns Maximum Turns 84 94 95 105 125 135 145 The direction valves open shall be in accordance with the existing standards of the Governing Authority. Manufacturers catalogues and one set of certified drawings shall be furnishedfor each size valve where necessary. Butterfly Valves aro acceptable only as approved by the Governing Authority. Specifications for such Butterfly Valves may be obtained upon request. PLUG TYPE VALVES Plug type valves shall be designed for 150 p.s.i. unless otherwise" specifically designated by the Governing Authority, and shall have fully unobstructed circular openings, equal to the valve size, through the body and the plug when the valve is in the open p'..sition. The valve shall bo designed to operate in closed, partially open, or fully open positions and to operate satisfactorily when operated either frequently or infrequently. Design and manufacture shall be in accordance with the manufacturer's specifications, subject to the approval of the Governing Authority. The Manufacturer shall submit for the approval of the Governing Authority's Engineer three sets of catalogue data and certified drawings, II -K-60 showing principal dimensions, general construction and material used for all parts of the valve. FITTINGS Fittings shall be made of cement mortar lined cast iron. Fittings 3 —inch to 12 —inch inclusive shall be Class D, and fittings larger than 12 inches shall be Class B, all manufactured in accordance with A.W.W.A. Specification C-100-55. Fittings for use under pressures higher than normal working pressures (150 p.s.i.) shall be designed for the pressures to which they may be subjected, and shall be subject to the approval of the Governing Authority. FIRE HYDRANTS Fire hydrants shall be cast iron, with full bronze mountings. Bells shall be for 6 -inch hydrant branch pipe and the valve opening in the hydrant shall not be less than 5 -inches in diameter. Hydrants shall have one, four and one-half (4-1/2) inch pumper connection and two, two and one-half (2-1/2) inch hose connections. Hydrants shall be designed to operate under 150 p.s.i. working pressure and shall be tested under 300 p.s.i. pressure hydro- statically. Fire hydrants shall open in accordance with the existing standards of the Governing Authority. Threads on pumper and hose connections shall con- form to the requirements of the fire department equipment of the area which they are to serve. II -K-61 FIVE COUNTY AREA ENGINEERS COUNCIL WATER MAIN INSTALLATION STANDARDS 1. It will be the responsibility of the contractor to maintain adequate safety precautions for the protection of the public, his employees, and existing facilities at all times. This shall include adequate shoring of trenches, warning devices and/or barricades, and correlation of construction with local law enforcement agencies and fire districts or departments. No valve or other control on the existing system shall be operated for any purpose by the contractor except as explicitly authorized by the Governing Authority. It is the responsibility of the contractor to obtain any necessary permits prior to construction. The contractor will be responsible for the maintenance costs arising due to faulty materials or workmanship for a period of one year after acceptance by the Governing Authority. Acceptance of the water mains for use by the Governing Authority does not constitute a waiver of the one year guarantee. 2. Materials shall be handled in accordance with the manufacturerIs recommendations and in such a manner that the pipe, fittings, valves, and appurtenances shall be protected at all times prior to and during construction. Materials damaged by the contractor, whether discovered prior to, during, or after installation, shall be replaced by the contractor at no cost to the Governing Authority. 3. Water mains shall be located a minimum distance of 10 feet horizontally from existing or proposed sewer lines. Where sewer lines cross water mains, the sewer pipe shall be a minimum of 24 inches clear distance vertically below the water main. If this clear distance is not feasible, ar the sewer is located above the water main, the crossing mast be designed and constructed so as to protect the water main. Minimum protection shall consist of the installation of an impervious and structural sewer (e.g., cast iron water pipe, reinforced concrete pipe or vitrified clay pipe with reinforced concrete encasement) for a distance of 10 feet each side of the centerline of the water main. In all cases, suitable backfill or other structural protection shall be provided to preclude settling and/or failure of the higher pipe. Where a ferrous water main crosses another ferrous pipeline, a minimum of 6 inches clear distance vertically shall be maintained between the two pipe— lines. If this clear distance is not possible, then a suitable insulating material shall be installed to prevent the flow of electrical current between the two lines. 4. Pipe shall be laid to the alignment and grade shown on the appruved drawings and as staked by the Engineer. Minimum cover for water mains shall be four and one—half feet (4-1/2') below the official grade of the street or road. The contractor shall be responsible for contacting pertinent utility °companies for the location of underground obstructions and protecting same, and shall be responsible for the repair and/or replacement of such nbstructions when broken or damaged because of carelessness on his part.. The contractor shall exercise due diligence in preserving survey monuments and control pointa. 5. The width of the trench shall be ample to permit the pipe to be laid and jointed properly and the backfill to be placed and compacted as specified. II -K-62 6. The pipe shall be uniformly supported for its entire length in the trench and the joints not allowed to settle down to, or rest upon the original trench bottom. 7. The pipe shall be assembled, laid and bedded in accordance with the manu- facturer's recommendations, and such additional requirements as may be specified by the Governing Authority. 8. Concrete thrust blocks shall be provided as indicated by the Engineer of the Governing Authority. 9. The joints shall not be backfilled until after the pipe has been inspected by the Governing Authority for leakage, depth and alignment. No material shall be used for backfilling that contains stones greater than six inches (6") in diameter, frozen earth, broken concrete slabs, or earth with exceptionally high void content. The original soil may be returned to the excavation if it can be placed so that moistures and densities, substantially like those of the adjacent soils, can be achieved. Mechanical compaction equipment shall be used, except as authorized by the Governing Authority. If the original soil cannot be used to success— fully complete the backfill, it shall be removed, hauled away, and replaced with new material of quality which will permit completion of the backfill to substantially the moisture and density conditions of the adjacent soil. The contractor shall be responsible for leaving the jobsite in a condition acceptable to the Governing Authority. Backfill material shall not include rock greater than 1 —inch in diameter within one foot of the pipe. 10. Temporary plugs shall be installed at any unattended openings in the pipe— line to prevent the entrance of foreign matter into the pipeline. 11. Flushing and sterilization of water mains sh,ll be performed in accordance with A.W.W.A. Specification C-601-54. Chlorine dosage shall be at least 25 p.p.m. and shall be retained in the line at least twenty-four (24) hours, at which time the chlorine residual shall be at least 10 p.p.m. If less, the entire disinfection procedure shall be repeated until a 10 p.p.m. residual is obtained upon testing. No water line shall be accepted or placed in service and tapped, until it has been disinfected, flushed and written acceptance from the State Board of Health's authorized representative has been received by the Governing Authority. The contractor shall take all necessary pre— cautions to prevent the flow of the strong chlorine solution into existing water facilities. The contractor will assume any and all responsibility for damage done by heavily chlorined water entering existing facilities due to negligence on his part. II -K-63 SANITARY SEWER SPECIFICATIONS 1965 LOCATION When the sewers are placed under city streets they shall be placed as follows; 1. On streets running north and south. the sewer line shrill be placed 5' (five feet) west of the center line of the street. 2. On streets running east and west:the sewer line shall be placed 5' (five feet) south of the center line of the street. 3. On streets shaped as a "U" or on streets having unusually sharp turns the sewer line will conform to the above speci- fication as near as practical, but the final location shall be as determined by the City Engineer or his representatives. 4. In cities where sewer lines are placed in an easement at the back of tho bts all sewer lines shall be placed as shown on the contract drawings. CLAY SEWER PIPE No P'+hlic sewer main line shall be less than eight inches in diameter. All standard strength vitrified clay sewer pipe 15 inches inside diameter or under shall conform to A. S. T. M. Designation C 13-57T or latest revision thereof. Under special loading condition or for sewer pipe-of-dimsnd nns larger -than 15 inches inside diameter, extra strength sewer pipe shall be used which shall conform to.A.S.T.M. Designation 0276 -60T -or latest revision -thereof. Thempleilmrm tnlerance for out --of round -on -ell _.sewer•pipe shall be three percent (3%) of the diameter of the pipe. The maximum ordinate -for straightness on sewer pipe shall.be-f inch per joint of pipe. After the spigot of one pipe has been centered in the bell of the other pipe, the anmriRV space between the two shah not vast' more .than. 3% (three. percent) of the outside diameter of the spigot end of the sewer pipe and 3$ -(three percent) of the innirip diameter ofthe bell and of the,pipe. CAST IRON PIPE In cases where the Engineer deems it necessary to use cast iron sewer pipe,.. only centr.ifugell.y cast pipe shall be-used.conforming to W. W. P. - 421 or W. W. P. 421-a. The class of pipe to be used ghnll be shown on the Engineer's drawings or specified in a special Olegcification a000xding to the follrwing.Table: II -L-64. Size Class ASA Class 3" to 12" 50 to 200 22 14" to 20" 100 to 150 22 14" to 20" 200 23 24" 100 22 24" 150 23 24" 200 CEMENT ASBESTOS PIPE 24 Cement asbestos Sanitary Sewer Pipe may be also used as specified by the City or County Engineers. This pipe may be obtained from class 1500 to class 5000, depending on the depth of fill over the sewer pipe. Epoxy lined cement asbestos pipe shall be used in lines having a high hydrogen sulphide content. CONCRETE SEWER PIPE Concrete sewer pipe shall conform to the standard specifica- tions for concrete sewer pipe A. S. T. M. Designation C-14-59 or latest revision thereof. Reinforced concrete sewer pipe shall conform to the tentative specifications for reinforced concrete culvert storm drain, and sewer pipe A. S. T. M. Designation C76 -59T or latest revision thereof. All pipe of whatever kind shall be inspected by the Inspector who is a representative of the Engineer and any pipe having flaws or those not meeting these specifications in regard to roundness or ordinate for straightness or specification regard— ing nnnilar clearance shall be rejected by the inspector. JOINTS Vitrified clay sewer pipe shall be jointed according to the tentative specifications for vitrified clay pipe joints using materials having resilient properties as specified in A. S. T. M. Designation 0425-60T or latest revision thereof. 1. Hot Poured Bituminous Compounds shall be equal to Federal Specifications No. SS -S-169 Type No. 1. Sealer, Joint, Sewer Mineral Filled Hot Pour. 2. Special Cold T 2e Bituminous Compounds shall be sewer —tight, caulk —tight or approved equal, and shall be used only with the approval of the City or County Engineer. 3. Factory Fabricated Joints such as Perma Joint manufactured by Denver Brick and Pipe Company, Speed Seal a poly -urethane II -L-65 joint manufactured by International Pipe and Ceramic Corporation, or joints consisting of a gasket or compression ring of a resilient material having a controlled and calculated shape which will be compressed within the winner space to form a fluid tight seal may all be used or may be specified by City or County Engineer under special conditions. 4. Mortar Joints shall be composed of 1 part Portland cement and three parts clean sharp mortar sand with only enough water for workability. In no case shall mortar be used that has partly set up and water shall not be added to a batch of mortar to restoro.its plasticity. In all cases mortar joints shall be used only with the approval of the City or County Engineer. 5. Jointing of Concrete Sewer Pipe shall conform to the recommenda- tions of "American Concrete Pipe Association's Concrete Pipe Handbook." 6. Jointing of Cast Iron Sewer Pills shrill be according to the method recommended by the pipe manufacturer. TRENCHING SI PREPARATION OF TRENCH BOTTOM Sewer pipe trenches shall be dug one-half (i-) the inside diameter of the pipebeing placed deeper than that shown on the Engineer's drawing as the finished grade of the invert of the sewer pipe. Where an 8" pipe is to be placed in the trench, the trench pha11 be dug 4" deeper thAn that. shown on the Engineer's drawings as the depth for the invert. In the case a sixteen (16) inch sewer line is to be placed in the trench, the trench µhnild be dug eight (8) inches deeper than the depth shown for the sewer invert.in the Engineer's drawing. This additional trench depth is to make roam for a gravel bedding which owl be placed under the sewer pipe. Said gravel to be washed gravel having a maximum size of site and"wne half (lj)..inches. Trenches sbnl1 be dug true to 1inP and grade and be free from high and low places in the bottom of the trench. Where the soil is wet or subject to caving and the trench is too deepfor safety of the workers in the trench, shoring =hA11 be required; however, said shoring or the time of shoring is not the. responsibility of the City or Af any of the City employees and nothing contained herein shall be so construed. The City Inspector. ahn11, however, have the power'to shut down any job which he and the City Engineer shrill consider unsafe for the workers. CONCRETE INCASEMENT OF SEWER LINES Sewer lines which are at a depth too shallow be sustain the traffic load or any other load to which they are subjected, qhnll encased in reinforced concrete. Sewer line which must cross under irrigation ditches, through .bogs or swamps where the soil is unstable and water infiltration will `probably be high must at the discretion of the City or County Engineer be encased in reinforced concrete. be II —L-66 PLACING OF gaga PIPE IN THE DITCH 1. When placing sanitary sewer pipe in the ditch the recommended practice for installing clay sewer pipe A. S. T. M. Designation C12-54 or latest revision thereof shall be used. Pipe chap be laid true to line and grade as shown on plans approved by the City or County Engin- eer. To assure a true line and grade, batter boards shall be in- stalled on each side of the sewer ditch. Stakes supporting the batter boards shall be placed the same distance apart as the grade stakes set by the designing engineer. Three batter boards shall be in use at all times. The cross members or straight edges crossing the sewer ditch shall be set according to the grade showing on the grade stakes of the designing engineer. A center line grade string and plumb -bob shall be used to keep the sewer pipe in line. A grade rod shall be used to assure accurate grade on the invert of the sewer pipe. All pipe shall be protected during handling against impact shocks and free fall nndi no pipe shall be placed in the sewer line that has been damaged while lowering into the ditch. Bell holes shall be dug under the bells of all pipe, regardless of the type of bedding used in the ditch and the barrel of all sewer pipe shall rest firmly on the bedding material used in the ditch and the weight of the sewer pipe in no case shall be supported by the bells of the pipe. After lowering into the ditch both the bell and spigot shall be thoroughly cleaned and free from any foreign material. When using hot mix jointing material meeting Federal Specification No. SS -S-169 Type No. 1, sealer, joint, sewer, Mineral Filled, Hot Pour shall be used. Both the spigot and the inside of the bell shall have been primed with the same material at least 24 hours prior to the time of laying. When hot poured bituminous compounds are used in jointing sewer pipe, the compound shall be prepared and heated in accordance with the manufacturerIs recommendations. The necessary temperature shall be maintained to keep the compound liquid enough to pour easily but not heated above the point where it begins to bubble, or so hot as to cause more than a slight amount of smoke. The spigot of one pipe shall be placed tight against the shoulder of the inside of the bell of the adjoining pipe. The annular space between the spigot and the bell shall be carefully caulked with jute or braided hemp in such a manner as to perfectly center the qpigot of one pipe into the bell of the joining pipe. Only an amount of jute or braided hemp shall be tamped into the annulus to assure a plug so the hot mix will not leak to the inside of the sewer pipe and to exert sufficient pressure so as to center the spigot in the bell of the adjoining pipe. A space 2i inches deep shall be left in the entire circumference between the bell and the spigot which shall be complete- ly filled with hot mix bituminous compound. II -L-67 In pouring hot bituminous compounds into the previously caulked rnrn,lar spacesan asbestos runner or sand filler canvas tube runner shall be wet with thin mud and tightly clamped around the pipe spigots and placed tightly against the bell of the joining pipe. A pouring gate or opening shall be left on top of the pipe and slightly to one side of the center of the pipe, so that the molten compound will flow into and around the inside of the bell in one direction only, forcing the air out ahead of it and thus eliminating any possibility of air bubbles. All openings between the pipes and the runner shall be carefully plugged with wet clay so there will be no loss of hot bituminous material during the pouring operation and so the joint will have a smooth appearance on the outside. The annular space between the bell and the spigot shall be completely and solidly filled with bituminous compound. After the bituminous material has cooled enough to set up firmly (this usually will occur within 15 minutes) the pouring runner may be removed but the position of the two joined pipes may not be changed for at least one hour; after which time gravel (1" max. size) shall be placed around and up to the spring line of the pipe (center of the barrel) where the cover or backfill over the pipe is 14 feet or less. If the cover over the pipe is 15 feet or greater this gravel shall be increased to cover the entire pipe to c. depth of six (6) inches. 2. When manufacturer's prefabricated joints are used in the laying of sanitary sewer lines, such lines shall be joined using lubricants, primers, adhesives, solvents, etc. recommended by the manufacturers of said manufactured joints. All factory fabricated joints shall be placed, fitted, joined and adjusted in such a work- manlike manner as to obtain the degree of water tightness required and in compliance with recommended methods of the manufacturer. 3. Where cast iron sewer pipe is used in a sanitary sewer line it shall be as designated under sewer pipe in these specifi- cations. The method of placing cast iron sanitary sewer pipe in the trench shall be in accordance with specifications of the pipe manufacturer on this operation. 4. Whore cement asbestos sanitary sewer pipe is used in a sani- tary sewer line, the trenching, bedding and laying of all size cement asbestos pipe shall be as outlined in the manufacturer's Installation Specifications. 5. The placing of all concrete sewer pipe both reinforced and not reinforced shall be according to specifications of the concrete pipe manufacturer. 6. Ground Water If the engineer deems it advisable to install a french drain or a french drain and an under drain under the sanitary sewer line, to lower the level of ground water in the area, he shall do so by including such installations in his contract drawings. During the process of installing any and all types of sanitary sewer pipe the trench in which the sewer pipe is being placed shall be kept free from water at all times while work is in progress. II -L-68 Water shall be pumped from the sewer trench and under no circumstances shall ground water be allowed to drain down the previously constructed sewer line. At the end of the work day a water tight plug shall be placed in the open end of the sewer line under construction so no water can enter the sewer line. Next morning all water which has accumulated in the ditch over night must be pumped out until the water level in the trench is below the invert of the sanitary sewer pipe; after this has been accomplished the laying of sewer pipe may proceed.. 7. Manholes. — Regular and Drop Manholes may be of either brick construction or of precast con— crete. All manholes shall have an inside diameter two (2) feet greater than the outside diameter of the sewer pipe or pipes entering and leaving the manhole but in no case shall any manhole have an inside diameter less than four (4) feet. Where a second sanitary sewer line enters a manhole the invert on the second sewer line shall enter the manhole at least 3 inches higher than the invert of the main sewer line and shall enter the line of flow of the main sewer line with as near a full sweep 90° bend as possible. The base on all manholes shall be eight inches (8") thick, and the overall outside dimensions shall be one (1) foot greater than the outside dimension of the manhole constructed thereon. The base shall be constructed of premixed concrete composed of a mix of well graded, well washed aggregate ranging from sand to gravel (li") one and ono —half inches in maximum diameter. The mix shall contain six (6) sacks of cement to the cubic yard and only enough water shall be used in the mix to give it a slump test of'two (2") inches. Air entrained in the mix when placed shall be between 4 and 6%. Cylinders taken from the mix shall in 28 days have not less than 3,000 pounds crushing strength per square inch. BRICK MANHOLES Brick Manholes are constructed of brick and shall be of eccentric construction. Brick sidewalls for manholes shall be eight (8) inches thick and constructed with bricks conforming to A. S. T. M. Designation C62-59. Brick used in brick manholes shall be laid up in a mortar composed of one (1) part Portland cement and two (2) parts clean sand. All brick manholes shall be plastered on the outside with a mortar coat one—half (2) inch thick with mortar as that above described. II -L-69 CONCRETE MANHOLES Concrete manholes shall be constructed of precast concrete rings composed of concrete consisting of aggregate meeting A. S. T. M. Specifications C -33-54T. Cement used shall meet A. S. T. M. specifi— cations C-150. The concrete mix shall be made with type 2 cement with a cement factor of six (6) sacks per cubic yard. The course aggregate shall be no less than 40% of the combined mix. The minimum core strength in 28 days shall be 4500 P. S. I. Concrete manholes shall consist of one or more concentric rings according to the depth of the manhole. The top ring shall be eccentric and shall be one (1) foot below the finished grade on the street. So the manhole level can be brought to the finished grade with brick by the contractor when final grade on the street is established. Cast iron steps shall be firmly embedded in the walls of all manholes; they shall be placed in a straight line 15 inches apart on the straight side of the manhole. (See drawing.) Manhole covers shall be of close grained gray iron semi —steel in a solid cover of a design conforming to the standard of the City and conforming to the approval of the City Engineer. Manhole frames and covers shall be dipped into a coal tar varnish. They shall be equal to the City of Denver Standard Traffic Pattern and weigh approximately 400 pounds. Covers shall be solid, and shall be machined so that they will not rock under traffic. All manholes shall be water —tight and the floor shall slope two (2) inches per foot toward the sewer line in the manhole. DROP MANHOLES Drop manholes shall be constructed exactly the same as a regular man— hole except the manhole base shall be extended upstream far enough to form a base for the concrete encasing the sewer pipe drop entering the bottom of the manhole. The drop entering the manhole shall be completely encased in concrete up to the spring line of the pipe of the main sewer line. (See schematic drawing on drop manhole.) In all manholes where either a french drain or an under drain must be used, the french drain or the under drain must be carried under the foundation of the manhole. LAMPHOLES Lampholes shall not be used in city streets unless absolutely necessary and then only when specified by the engineer. Lampholes shall be constructed as shown by engineers drawing on lampholes. SPACING OF MANHOLES Manholes shall be installed at the end of each sewer line; at all changes in grade, size or alignment, at all intersections; and at distances not greater than four hundred (400) feet for sewers 15 inches inside diameter or less, and five hundred (500) feet for sewers eighteen (18) inches to thirty (30) inches inside diameter. Longer spacing may be permitted in sewer lines of larger diameter or in these carrying a settled effluent. II -L-70 WIPING When lamping a sewer line a bright light is shone down the sewer line in one manhole and the full unobstructed circumference of the sewer pipe should be visible from the next manhole. INFILTRATION Infiltration is the ground water that leaks through the walls of the sewer line and drains down from manhole to manhole. The maximum amount of infiltration that shall be allowed in any newly constructed sewer line is 500 gallons per inch of inside diameter of the pipe per mile of pipe in 24 hours. BACKFILLING TRENCHES All trenches and excavations shall be backfilled immediately after pipe is laid therein and inspected, unless other protection of the pipe line is provided. Under no circumstances, however, shall water be permitted to rise in an unbackfilled trench after the pipe has been placed. No material shall be used for backfilling that contains stones greater than six (6) inches in diameter, frozen earth, debris, broken concrete slabs, or earth with exceptionally high void content. For backfill up to a level of two (2) feet over the top of the sewer pipe, only fine selected material shell be used, and the backfilling shall be placed in a manner not to disturb or injure the pipe line. COMPACTION OF TRENCHES After select material salvaged from that material excavated from the sewer trench has been placed and compacted around and over the sewer pipe to a depth of two (2) feet, the balance of the sewer trench may be filled and compacted in one of the following ways: 1. The trench may be backfilled in six (6) inch lifts and compacted to 95% of the density of the two walls of the ditch. (This way is preferred). 2. The sewer ditch may be completely filled above the 2' (two feet) of protective fill over the sewer pipe. The fill is then lightly jetted with water and allowed to stand for 3 weeks and then hydro —tamped until the fill in the ditch is compacted to 95% of the density of the walls of the ditch. 3. All of the material excavated from the trench may be removed and the entire trench above the 2 feet protective covering of select material, shall be filled with No. 2 road base having a maximum diameter of gravel of one (1) inch. This material should not be dry but the moisture content should be as near optimum as possible. A hydrotemper should then be moved in and the material tamped until the density of the trench is 95% of that of the walls. II -L-71 4, If the subdivider so desires, he may fill the trenches above the two feet of compacted select material with the balance of the material excavated from the trenches, com— pacting it as well as possible with the bucket of the back — hoe and with wheels of trucks. The street shall then be cut to the depth of the finished sub —grade and either temporary gravel, or the entire amount of gravel required for the fin— ished street shall be placed in the street and the street shall be allowed to stand for twelve (12) months In no case shall material be used that contains stones greater than six (6) inches in diameter, frozen earth, debris, or earth with exceptionally high void content. Ditches after standing for twelve (12) months shall be checked for compact— ion by the City Engineer or his legal representative before the street may be paved. INSPECTION All sewer lines, manholes or parts thereof shall be inspected by the City or County inspectors, who may at any time halt construc— tion that does not conform to the specification of the City or County in which the work is being performed. When a sewer line is completed or when any part of a sewer line is completed, the inspector who is the authorized representative of the City or County Engineer has the delegated authority to both lamp and check such completed pipe line for water infiltration. Should the inspector find that the completed line or part thereof fails either on the lamping test or the infiltration test, he may halt construction on new sewer line until such a time as previously placed sewer line meets the specifications. If the sewer line is completed he may require that the contractor repair the line until it meets specifications before the line is released by the City or County. In case there is still some question as to the condition of the sewer line, the City or County Engineer may require that pictures be taken of the interior of that part of the sewer line under question. After the pictures have been interpreted by the contractor and the City or County Engineer, should the sewer line be interpreted to be defective the cost of taking the pictures shall be borne by the con— tractor. Should the sewer line be interpreted as being a good sewer line, the cost of taking the pictures shall be borne by the City or County represented by the engineer. After the pictures have been interpreted they shall become the property of the owner of the sewer line. II -L-72 B When possible, pipe shall be laid through to form invert Cast iron M.H. ring and cover, Denver heavy (4001b) Each ring to be set in full bed of mortar 5" I i I 1 I I I I i l I Concrete. base to be poured to at least top of pipe 2-0" o* • 4'-0" Set rungs at 15" no stagger Max. two courses brick Finish M.H. bottom with sand, cement mortar, see drop M.H. sheet for detail B 4"concrete under drain H _ s ��. 12 • II 6‘--0r (min) STANDARD CONSTRUCTION ,4 washed rock JAN. I, 1965 0 O O O aw a► O. A•a O r O a a a O a °i w o v 0 c a O v a 0 N a) C O Cr ... r= Cost iron M.H. ring and cover Denver heavy (400 lb) Cut hole having ot least I" clearence around pipe and completly witb morta r l5;'no staggar Varies Max. two courses brick Each ring shall be set in full bed of mortar 5" DROP MANHOLE ndisturbed soil Encase drop .section in concrete to spring— line Reversed Y 12" „f I i Washed rock z.",. --Undisturbed soil /--When underdrain required use closed joints when buried in concrete STANDARD CONSTRUCTION JAN. I, 1965 (2 ) 90° BASE PLAN Lomphole cover UNDERDRAIN SECTION Backfill around vertical tile with select mtl. — see spec. STANDARD LAMPHOLE 12 I_12 Side invert should be approx. 3" above main line invert Lay tile throgh to form invert whenever possible Flow Form bottom with sand —cement mortar — see plate 2 for section detail Hand place bpckfill to at least 6 over pipe Water tight plug Gravel underdrain STANDARD CONSTRUCTION CONCRETE ENCASEMENT JAN. I, 1965 SADDLE SHALL NO1 S- PLACED UN"iiLL TAP HOLE HAS BEEN INSPECTED CONCRETE COLLAR SHALL BE PLACED AROUND SADDLE IMMEDIATELY AFTER INSPECTION Center of top hole to be placed in upper third of main cSv CONCRETE COLLAR SADDLE S TAP THIS BELL SHOULD NOT TOUCH SIDES OR BOTTOM OF BELL HOLE NOT THIS SERVICE BEDDING COMPACTED BACKFILL CONCRETE SUPPORTS SIZE TO BE SET BY ENGINEER Concrete encasement shall extend at least 6" around pipe CAST DITCH CROSSING TILE DITCH CROSSING SANITARY SEWER DESIGN CRITERIA 1. GENERAL CONSIDERATIONS: 1. Trunk Line Sewers A. Master Plan for location of trunk line sewers. B. Calculations of the total area that will drain by gravity into the trunk line sewers as master planned. C. Calculate gallons of flow based on total area served under master plan of sewer. 1. Based on 4 houses per acre and 3.5 people per house at 100 G.P.D. per person. D.' Size trunk line sewer based on flowing (i) half full. 1. Minimum velocity of 2 ft. P.S. 2. Maximum velocity of 8 ft. P.S. 2. nIFIC I .SIGN PROCEDURE:1 1. Obtain prints of the design area (tributary to the proposed sewer) 'using recorded plats, grade maps, resurvey maps or other plena available. 2. Check and conform survey reference data with the official plat or other recorded information available from legal descriptions, deeds, etc. Revise the print accordingly. 3. Locate utility lines, existing and proposed, from files and from infor— mation supplied by Utility Companies. Dimension accurately the distance between the survey and plat reference lines. If information is incom- -plate, request a survey by the survey crew. A. Determine the boundary of the tributary area and establish the general route of the proposed sewer. Check connecting sanitary sewer lines, appurtenances, street grades, and all other reference data pertinent to the location of the proposed sewer. Prepare preliminary layout and grades in pencil. 5. Compute estimated ultimate population of the tributary area based upon estimated ultimate population density obtained from the City Planning Office or Inter -County Regional Planning Commission. 6. Determine the peak flow from the Peak Flow Chart (see supplemental sheets), using a minimum average flow of 80 gallons per capita per day, plus 500 G. P. D. per inch diameter per mile of sewer line. From tentative grades, determine the pipe size by Manningns formula. 7. Verify the preliminary design by a field check of critical connections, crossings, slopes, etc. before proceeding on the final draft. 1144-73 3. DESIGN STAND. S: 1. Location, Crossings, ERj Ali&met: 1.1 Sanitary Sewers shall be located within the area between the center- line and five feet south or west of the centerline of the street, as applicable. Where sewer lines cross water mains, the sewer pipe shall be a minimum of 2 feet below the water main; where this is not feasible, cast iron pipe shall be used for a distance of 10 feet each side of the water main crossing. 1.2 Crossings over other underground lines, except at intersections shall be avoided. If it is necessary, the crossings should be at angles greater than 45 degrees. 1.3 A cover of 3.5 feet shall be maintained for sewers crossing under ditches and gulches. If there is less than 3.5 ft. of cover, a cast iron pipe or a concrete cradle around the pipe shall be used. Con— crete cradles should be designed when the sewer is near large size pipelines where stability of the fill is questionable. 1.4 Indicate deflection angles, size of pipe, and distance between man— holes, which shall not be greater than 400 ft. for sewers 15 inches or less; 500 ft. for sewers 18 inches to 30 inches. Greater spacing may be permitted in larger sewers. Spacing should never be at inter— vals in excess of the distance that can be efficiently serviced by the available rodding equipment. 1.5 Sewers 21 inches and under shall be laid with straight alignment be— tween manholes. 2. Curves: 2.1 In sewer lines 24 inches or greater, the change in direction of flow in the manhole shall not exceed 45 degrees. The pipe line shall be curved according to the table of radii before entering the manhole to achieve turns greater than 45 degree. 2.2 Sewers 24 inches and .over shall be curved on the basis of the follow- ing table of radii of the center -line unless otherwise approved by the Sanitary Engineer: Diameter 24" to 54" R - 28.50 ft. 57" to 72" R = 32.00 ft. 78" to108" R - 38.00 ft. 3. Slope: 3.1 All sanitary sewers shall be so designed and constructed to give mean velocities, when flowing full, of not less than 2.0 ft. per second. The following are the minimum slopes which should be provided; however, slopes greater than these are permissible: Sewer Size 8" 10" 12" 14" 15" 16" 18" 21" 24" Minimum Slope ft/100 ft. 0.40 0.28 0.22 0.17 0.15 0.14 0.12 0.10 0.08 II -M-74 Maximum calculated velocities shall not exceed those recommended by the manufacturer of the pipe used. Where velocities greater than 12 ft. per second are attained, special provisions shall be made to protect against displacement by erosion and shock. 3.2 Sewers shall be laid with uniform slope between manholes. 4. Depth an Connections: 4.1 A milliremm depth of 9 feet shall govern except in cases where this will not drain basements, in which cases the sewer shall be 3 feet deeper than the basement floor level. 4.2 All sewer lines shall be designed according to standards covering soil type, loads, class of pipe, beddings, etc. See supplemental sheets. 4.3 Plans and specifications shall state minimum cover over the top of pipe indicating means to be employed for the protection of pipe to be subjected to any unusual or extreme conditions. 4.4 In connecting house lines, "Y0 connections shall be used unless otherwise authorized by the Sanitary Engineer. 4.5 Risers to "Y" connections shell be used on deep sewers (over 10 ft. of cover) and their location indicated on the drawings. 5.. Manholes: 5.1 The location. of all manholes, "YKs, 2191s, branches, stubs, and slants shall be shown on the plans. 5.2 Manholes shall be installed at the end of each line, at all changes in grade, size, or alit, and at all pipe intersections. and alignment shall be according to Section 3, 1. 3�8_ 5.3 Indicate existing manholes and pipes coming into manholes with invert elevations. Design a minimum drop of .10 ft. through aynhwles at bends and angles of more than 45 degrees. 5.4 If the new pipeline is omneoted to a larger diameter pipe or the Ripe size' oranges on entrance and exit to the manhole; this change shall be indicated in drawings. (a) Set the arch elevations equal and show the difference in the invert elevations as a drop, or if this drop is excessive - (b) Set the 75 per cent full flow line of the two pipes equal. 5.5 If the new pipeline is 24 inches or larger, it shall enter the man— hole at an angle not greater than 45 degrees with the larger diameter pipe. (See Section 3, 2.1.) 5.6 9n outside drop pipe shall be provided for a sewer entering a man- hole at an elevation of 18 inches or more above the manhole invert. Where difference in elevation between the incoming sewer and the manhole invert is less than 18 inches, set the sewer grade such that the incoming line will enter the manhole at the manhole invert elevation. 5.7 Special manholes or junction boxes may be designed in crowded inter- sections. Show structural details in large scale. II -M-75 6. Deviations: 6.1 Any deviation from these standards must be given prior approval by the Sanitary Engineer. 4. DESIGN DETAILS: 1. Plan: 1.1 Plans chair indicate the widths of all -streets and alleys* including the rights -of -way and roadways. Sewer easements and the dimensions of lots and blocks in the vicinity of the new facilities -Flail also be shown. 1.2 Plans shall be of suitable scale to show all necessary information. Except for plans of unusual conditigns requiring enlarged scales, the scale will be as follows: Plan Scale, one inch equals one hundred feet. Profile Scale, vertical, one inch equals ten feet. 1.3 Indicate lots or blocks to be served, with dimensions by a heavy solid line. Plans shall show the location of the sanitary sewers in the streets, alleys, or easements with reference to property lines. Plane shall give dimensions, gradient, and invert elevations at man— holes of the sanitary sewer or sewers to be constructed. Show and label surrounding streets and area by broken lines. 1.4 On curved streets, show deflection angles of turns and clearance and crossing angles of other utility lines. 1.5. Show details of easements, where required, on a large scale ( 1 in. equals 20 ft. or greater ). Indicate easements by a broken line and label "easement" and given width (10 ft. minimum). A legal des- cription and drawing of the location of easements and rights -of -way should be made on vellum sheets (8.5" x 11"). 1.6 Plans ahoy' show sufficient adjacent area to indicate the relation of new facilities to existing facilities. In large areas a key or index map, sometimes called a master plan shall be used. Give man hole numbers, distance between manholes, and pipe sizes on the master plan. 2. Profile: 2.1 Locate all streets, railroad tracks, utility lines, manholes, pipes, ditches, etc. in profile. Show cross -sections, ties, and elevations of all utility lines and pipes crossed. Show existing parallel utility lines by a dash line and describe fully: type, top and bottom elevations, junctions, etc. 2.2 Proposed finished grades (solid line) and existing grades (dashed line) of grades of streets, alleys, and easements shall both be shown where such grades are not th same. Elevations shall be given at street intersections and/or tops of manholes. 2.3 If the sewer line is located in an alley, an easement, or a right-of- way in the interior of a block, etc., show the ground line of the alley, etc., plus grade lines of the nearest parallel streets. II4S-76 2.4 Show test holes where required, at least one at each street inter— section. Show location, time, and the numbers of the test holes. Soil types and conditions shall be indicated in the specifications or on the plans for purposes of evaluating the classification and kind of pipe to be used. 2.5 Indicate the kind of pipe to be ]aid. Pipe must conform to standard specifications for the kind used. Standard specifications include those of American Society for Testing Materials (A. S. T. M.), American Association of State Highway Officials (A. A. S. H. 0.), American Water Works Association (A. W. W. A.), and various Federal specifications. 3. Details: 3.1 Plot crowded intersections, special manholes, junction boxes, concrete cradles, and other than standard structures in large scale and show elevations or sections. Show steel reinforcing details and schedule where required. 5. REVIEW AND APPROVAL: 5.1 All plans will be reviewed by the Sanitary Engineer and approved by the City Engineer prior to release. II -M-77 MAXIMUM DEPTH OF FILL 1. Formula used - 0/24:/4 4Z Aly Maximum'allowable'load 4, as 4. aConstant Unit Weight of backfill sw Width -of trench at top of pipe 2. Unit weight of backfill is 130 lbs. per cu. ft. 3. For standard and extra strength concrete and clay was added to the ASTI. 3 -edge bearing strength as Pipe, 200 required lbs. per L.F. by City Specs. 4. A safety factor of 1.25 was used on C-14 standard and extra strength and on C-261 and on C-278. 5. Backfill material used: A. Granular materials without cohesion B. Sand and Gravel O. Saturated top soil D.- Ordinary Clay E. Saturated Clay 6. References: Concrete Pipe Handbook - 1959 Edition Clay Pipe Engineering Manual - 1962 Edition Pips Ate 10 12 15 18 21 24 Pipe Size 8 10 12 15 18 21 24 - A A B C MAXIMUM IEPTH OF FILL (in Ft.) 0-14 STANDARD Bedding ---- D E - No 0 It n n -A Bedding - A B C D.E No Limit n a n If n n If n n v N.L. N.L. N.L. N.L. N.L. 29.71 25.4 25.1! 18.8 ------ B Bedding - A B C D E N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. 24.5 27.9 19.0 21.3 16.9 17.2 14.9 15.1 13.3 C-14 EXTRA -B Bedding - A,B C D E N.L. N.L. N.L. N.L. N.L. N.L. 23.0 0 L I M I T N.L. 20.8 17.0 15.3 14.5 13.2 12.2 18.5 15.5 13.8 13.1 12.9 12.2 11.4 A N.L. N.L. 21.5 15.6 13.9 12.2 11.1 C B Bedding C V E N.L. 17.0 12.8 10,.9 17.8 13.2 11.3 9.9 13.5 11.5 10,3 9.3 12.3 10.9 948 9.2 11.7 10.1 9.5 8.9 10.8 9.5 8.8 8.5 10.0 9.2 8.5 8.1 C Bedding A B C D E N N.L. N.L. N.L. N.L. N.L. N.L. 29.1 18.4 N.L. N.L. 22.3 16.6 N.L. N.L. 22.2 17.1 N.L. N.L. 22.4 18.0 N.L. 28.0 21.4 17.9 23.7 19.5 16.9 15.3 II -M-78 MAXIMUM DEPTH OF FILL (in Ft.) C-76 CLASS 2 Pipe ------ A BEDDING --- Size A B C D E 12 N.L. N.L. N.L. 20.0 15.7 15 N.L. N.L. N.L. 22.2 17.5 18 N.L. N.L. N.L. 24.4 19.2 21 N.L. N.L. N.L. 24.8 19.5 24 N.L. N.L. N.L. 24.1 19.9 27 N.L. N.L. N.L. 26.0 21.4 30 N.L. N.L. N.L. 26.0 22.1 33 N.L. N.L. N.L. 25.9 22.1 36 27.8 22.7 19.8 18.1 17.6 42 26.9 23.1 20.6 18.8 18.1 48 26.6 23.2 20.5 19.1 18.4 54 26.0 23.0 20.8 19.3.18.6 60. 25.6 22.4 20.8 19.2 18.4. 66. 24.0 21.5.20.6 19.7 18.0 72. 22.9 21.1 20.2.19.3 18.3 78 24.3 22.4 21.5 20.5 19.5 84 23.8 21.7 20.7 19.6 18.6 90 25.1 22.9 21.8 20.7 19.7 96 . 23.0 21.8.20.7 19.6 19.6 102 21.7 20.5 20.5 19.3 18.1 108 22.8 21.5 21.5.20.3 19.0 - --- B Bedding BCDE- - AC D E 11.4 9.8 8.8 8.0 7.7 12.7 10.9 9.8 8.9 8.6 14.0 12.0 10.7 9.8 9.4. 13.8 12.0 10.6 9.9 9.6 14.0 13.0 11.5 10.7 10.3 14.4 12.8 11.5 10.7 10.3 15.4 13.7 12.3 11.5 11.0 15.1 13.2 12.2 11.3 10.8 11.3 10.8 10.2 9.6 9.6 11.3 10.6 10.6 10.0 9.4 12.3 11.6 11.6 10.9 10.2 11.9 11.9..11.1 10.4 10.4 12.0 11.2 10.4 10.4 9.6 12.9 12.0 11.2_11.2 10.3 11.9 11.0 11.0 11.0 10.1 12.7 11.7 11.7 11.7 10.7 13.4 12.4 12.4 12.4 11.4 12.0 12.0 10.9 10.9 10.7 12.7 12.7 11.5 11.5 11.3 13.3 13.3 12.1 12.1 11.8 12.4 12.0.11.5 11.3 10.8 II -M-79 ---C BEDDING - A B C D. E 6.6 6.1 5.9 5.6 5.3 7.4 6.8 6.5 6.2 5.9 8.1 7.5 7.2 6.8 6.5 8.9 8.1 7.8 7.4 7.1 8.8 8.0 7.7 7.3 6.9 9.5 8.7 8.2 7.8 7.4 10.1 9.3 8.8 8.4 7.9 9.4 8.9 8.5 8.0 8.0 8.5 7.9 7.4 7.4 6.8 8.1 7.5 7.5 7.5 6.9 8.9 8.2 8.2 8.2 7.5 8.2 8.2 7.4.7.4 7.3 8.8 8.8 8.0 8.0 7.8 8.4 8.2 7..8 7.6 7.3 9.0 8.7 8.3 8.2.7.8 9,6.9.3 8.9 8.7 8.3 8.6 8.3 8.1.7.97.6 9.1 8.7 8.5-8.3 8.1 9.5 9.2 9.0 8.7 8.5 8.3 8.1 8.0 7.7 7.6 8.7 8.5 8.4 8.1 8.0 MAXIMUM DEPTH OF FILL ( IN FT.) C-76 CLASS 3 Pipe --- A BEDDING ---- Size A B C DE 12 N.L. N.L. 15 N.L. N.L. 18 N.L. N.L. 21 N.L. N.L. 24 N.L. N.L. 27 N.L. N.L. 30 N.L. N.L. 33 N.L. N.L. 36 N.L. 26.6 42 H H H N.L. 27.5 H H H 48 z z. z N.L. 28.7 H H H 54 a a a N.L. 28.9 60 0 0 0 29.6 27.2 66 z z z 29.6 28.3 72 29.3 28.4 78 29.3 28.3 84 28.9 27.9 90 30.0 29.5 96 30.0 28.8 102 29.0 27.8 108 29.1 26.6 B BEDDING - C BEDDING ABCDEABCD E. N.L. 21.3 16.9 13.3 11.7 13.0 10.6 9.3 8.5 8.2 N.L. 23.7 17.8 14.8 13.0 14.5 11.8 10.4 9.5 9.2 N.L. 26.0 19.5 16.3 14.3 15.9 13.0 11.4 10.4 10.1 N.L. 28.3 21.2 17.7 15.6 17.3 14.2 12.4 11.3 11.0 N.L. 26.0 20.7 18.0 16.1 16.5 14.2 12.6 11.5 11.1 N.L. 24.7 20.6 17.7 16.1 16.1 14.0 12.4 11.5 11.1 N.L. 22.6 19.1 16.9 15.5 16.4 14.212.0 11.6 11.1 N.L. 22.6 19.8 17.4 16.0 16.5 14.6 13.2 12:2 11.8 18.1 15.9 14.7 13.6 13.0 11.9 10.8 10.2 10.2 9.6 20.0 17.5 16.3 15.0 14.4 13.1 11.9 11.3 11.3 10.6 19.1 17.1 16.4 15.7 14.3 13.0 12.3 11.6 10.9 10.2 19.3 17.1 16.3 15.6 14.8 14.1 13.4 12.6 11.9 11.1 18.4 16.8 16,0 15.2 14.4 13.6 12.8 12.0 12.0 11.2 19.7 18.0 17.2 16.3 15.4 12.9 12.0 12.0 11.2 10.3 19.3 17.4 16.5 16.5 15.6 13.8 12.8 12.8 31.9 11.0 18.5 17.6 16.6 15.6 14.6 12.7 11.7 11.7 10.7 10.7 19.6 18.6 17.6 16.5 15.5 13.4 12.4 12.4 11.4 11.4 18.6 17.5 16.4 16.4 15.3 14.2 13.1 13.1 12.0 22.0 19.6 18.4 17.3 17.3 16.1 13.8 13.8 12.7 12.7 11.5 18.1 16.9 16.9 15.7 14.5 13.3 13.3 12.1 12.1 11.8 19.0 17.7 17.7 16.5 15.2 12.7 12.7 12.4 12.0 11.5 r-� MA fl1UM DEPTH OF FILL (in ft.) C-76 CLASS 4 Pipe Size -- A A BEDDING B' C D --- E ----- B BEDDING Ai B I C ------- A C B BEDDING C --------- D E ----- D E 12 NO LIMIT NO LIMIT N.L. N.L. N.L. 27.9 N.L. N.L. N.L. 20.0 15.7 15 IN.L. N.L. N.L. N.L. N.L. N.L. N.L. 22.2 17.5 18 N.L. N.L. N.L. N.L. N.L. N.L. N.L. 24.4 19.2 21 N.L.- N.L. N.L. N.L. N.L. N.L. N.L. 26.6 20.9 24 N.L. N.L. N.L. N.L. N N.L. N.L. N.L. 24.1 19.9 27 N.L.; N.L. N.L.. N.L. N.L. N.L. N.L. 24.3 20.2 H E-' 30 H H H.N.L. N.L. N.L. N.L. N.L. N.L. 29.5 23.8 20.7 33 ;-' z N.L. N.L. N.L. N.L. N.L. N.L. 29.5 25.4 22.1 36 H H H N.L. N.L. 26.6 .23.2 .24.4 21.0 18.7 17.0 15.9 42 a a .-a,N.L. N.L. 26.9 24.4 26.9 23.1 20.6 18.8 17.5 48 N.L. N.L. 27.4 25.3 26.7 23.3 20.5 19.1 18. 54 0 0 o N.L. 27.5 26.0 : 26.0 23.0 20.8 19.3 18.6 60 z,N.L. .N.L. N.L. 28.0 26.4 24.8 22.4 20.8 19.2 18.4 66 N.L. N.L. 27.5 26.6 26.6 24.0 22.3 20.6 21.5 72 N.L. N.L. 27.5 25.7 25.7 22.9 21.1 20.2 19.3 78 N.L. 27.7 25.7 24.7 25.7 22.7 21.7 20.7 19.8 84 29.3 27.2 25.1 24.1 ; 24.1 22.0 20.9 19.8 18.8 C-76 CLASS 5 12 15 18 21 24 27 30 33 36 42 48 54 60 66 72 H H a H H a 0 0 zz 0 z Ei E1 H H H , H a� a 0 z 0 z H H H 0 E-+ H X H E1 H H 0 0 z z Ea H H 0 z El H H a E-+ H 0 E-� H H El H H 0 0 z z El H H 0 z Ei H H 0 z II -81 MAXEAUM DEPTH OF FILL (in ft.) C - 213 Pipe --- A BEDDING ----- Size A B C D E ----- B BEDDING A B C DE C BEDDING ---- ABCD C D E 8 N.L. N.L. N.L. 10 N.L. N.L. N.L. 12 N.L. N.L. N.L. 15 18 21 24 27 30 33 36 H H H HI H H a a 0 0 Z z N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. 25.3 25.7 27.6 N.L. N.L. 27.3 26.2 23.2 21.0 N.L. N.L. N.L. N.L. 19.3 N.L. N.L. N.L. 20.8 15.5 N.L. N.L. 23.8 16.8 13.5 N.L. N.L. 25.2 19.4 19.2 20.6 20.1 14.4 27.9 19.5 21.6 16.9 17.2 14.8 15.6 13.7 15.8 14.1 17.0 15.1 16.8 15.1 13.1 12.1 C - 278 15.5 13.3 14.5 12.9 13.1 12.1 12.4 11.7 12.9 12.2 13.8 13.1 N.L. N.L. 17.8 13.1 N.L. 17.6 13.4 11.4 21.8 13.4 11.4 10.1 15.8 12.4 10.9 9.9 13.9 11.7 10.4 9.5 12.5 10.8 9.8 9.1 11.4 10.1 9.3 8.8 11.7 10.5 9.7 9.1 12.5 11.3 10.4 9.8 10.9 9.9 9.3 9.2 9.1 8.7 8.4 8.7 9.4 13.8 13.1 12.5 11.1 10.4 9.8 9.5 11.6 11.1 9.8 9.3 8.7 8.5 8.1 Pipe --- A BEDDING --- Size. A B C D E B BEDDING ----- A B C D E ---- C BEDDING ---- A B C D E 8 10 12 15 18 21 24 27 30 33 36 H H H El El H HI H H H H H H H H a a a a a 0 0 0 0 0 z H H H 0 z N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. ILL. N.L. N.L. 27.5 N.L. N.L. N.L. 24.7 N.L. N.L. N.L. 24.5 25.1 21.8 19.8 17.9 II41-82 N.L. N.L. N.L. N.L. N.L. N.L. N.L. N.L. 29.1 18.4 N.L. N.L. N.L. 23.8 17.3 N.L. N.L. N.L. 23.2 17.8 N.L. N.L. N.L. 22.9 18.2 N.L. N.L. N.L. 22.5 18.3 N.L. N.L. 29.2 22.3 18.8 N.L. N.L. 23.4 19.8 17.4 ILL. 24.7 20.8 18.4 16.7 N.L. 23.8 20.6 18.2 16.7 18.4 16.2 14.7 13.8 13.1 SEWAGE FIOW FACTORS Pop. x 1000 Pop. Pop. Pop. x x x Peak Min. 1000 Peak Min. 1000 Peak Min. .. 1000 Peak Min. 1.0 5.0 .20 .8 .7 4 16.0 3.1 .-6 4.0 .5 .-0 .1 4.9 .20 .9 .7 .T4 17.0 .1 .27 5.0 .5 .-0 .2 4.8 .20 6.0 .7 4 18.0 .1 .-7 6.0 .5 .-0 .3 .8 .20 .1 .7 .-4 19.0 3.0 .-7 7.0 .5 .-0 .4 4.7 .21 .2 .7 . 4 20.0 3.0 .-7 8.0 .5 .-O .5 .7 .-1 .3 .7 .-4 1.0 3.0 .-7 9.0 .5 .-0 . 6 4.6 .-1 .4 3.6 4 2.0 2.9 .-7 70.0 .5 .31 . 7 .6 .-1 .5 .6 .-4 3.0 .9 .-7 1.0 .5 .-1 .8 4.5 .-1 .6 .6 .-4 4.0 .9 .-7 2.0 2.4 .-1 .9 .5 .-1 .7 .6 .-4 5.0 2.8 .28 3.0 .4 .-1 2.0 4.4 .-1 .8 .6 .-4 6.0 .8 .-8 4.0 .4 .-1 .1 .4 .-1 .9 .6 .-4 7.0 .8 .-8 5.0 .4 .-1 .2 .4 .22 7.0 .6 .-4 8.0 .8 -8 6.0 .4 .-1 .3 4.3 .-2 .1 .6 .-4 9.0 .8 .-8 7.0 .4 .-1 .4 .3 .-2 .2 .6 .-4 30.0 .8 .-8 8.0 .4 .-1 .5 .3 .-2 .3 .6 .-4 1.0 .8 .-8 9.0 .4 .-1 .6 4.2 .-2 .4 .6 .-4 2.0 .8 .-8 80.0 .4 .-1 .7 .2 .-2 .5 3.5 -4 3.0 .8 .-8 1.0 .4 .-1 .8 .2 .-2 .6 .5 .-4 4.0 .8 .-8 2.0 .4 .-1 .9 .2 .-2 .7 .5 .-4 5.0 .8 .29 3.0 .4 .-1 3.0 4.1 .-2 .8 .5 .-4 6.0 2.7 .-9 4.0 .4 .-1 .1 .1 .-2 .9 .5 .-4 7.0 .7 .-9 5.0 .4 ,-1 . 2 .1 .23 8.0 .5 .25 8.0 .7 .-9 6.0 .4 -1 .3 .1 .-3 .1 .5 .-5 9.0 .7 .-9 7.0 .4 .-1 .4 .1 .-3 .2 .5 .-5 40.0 .7 .-9 8.0 .4 -1 .5 4.0 .-3 .3 .5 .-5 1.0 .7 .-9 9.0 .4 .-1 .6 4.0 .-3 .4 .5 .-5 2.0 .7 .-9 90.0 .4 .-1 . 7 4.0 .-3 .5 .5 .-5 3.0 .7 .-9 1.0 2.3 .-1 ..8 4.0 .-3 .6 .5 .-5 4.0 .7 .-9 2.0 .3 .-1 .9 4.0 .-3 .7 .5 .-5 5.0 2.6 ,-9 3.0 .3 .-1 4.0 3.9 .-3 .8 .5 .-5 6.0 .6 ,-9 4.0 .3 .-1 .1 .9 .-3 .9 3.4 .-5 7.0 .6 .-9 5.0 .3 ,-1 .2 . .9 .-3 9.0 .4 .-5 8.0 .6 .-9 6.0 .3 .-1 .3 , .9 .-3 .1 .4 .-5 9.0 .6 .-9 7.0 .3 .-1 .4 . .9 .-3 .2 .4 .-5 50.0 .6 .30 8.0 .3 .-1 .5 .9 .-3 .3 .4 .-5 1.0 .6 .-0 9.0 .3 .-1 . 6 3.8 .-3 .4 .4 .-5 2.0 .6 .-0 100.0 .3 .7 .8 .-3 .5 .4 .-5 3.0 .6 .-0 .8 .8 .-3 .6 .4 .-5 4.0 .6 .-o .9 .8 .-3 .7 .4 .-5 5.0 .6 .-0 5.0 .8 .24 .8 .4 .-5 6.0 .6 .-0 .1 .8 .-4 .9 .4 .-5 7.0 .6 .-0 .2 .8 .-4 10.0 .4 .-5 8.0 2.5 .-0 .3 .8 .-4 11.0 3.3 .26 9.0 .5 .-0 .4 3.7 .-4 12.0 .3 .-6 60.0 .5 .-0 .5 .7 -4 13.0 3.2 .-6 1.0 .5 .-0 .6 .7 r-4 14.0 .2 .-6 2.0 .5 .-0 .7 .7 .-4 15.0 .2 .-6 3.0 .5 .-0 BY d A......--.. DATCGa/1-.i3 r[CT--tRF.N f/N6. _..1.BED.Q/N67 SHEET NO. /_ ...OF. 6 CHKD. ov.t.f._C:. DATE (.7..L °I S .SIM Y 0 _ ..QLTA/tJ JOB NO N CONCRETE CRADLE SEE 2.3. 3.5 FOR SAC/fF/L L 1 WET OMPACTED R SAND BEDDING MIN/MUM TRENCHING I BEDDING REQUIREMENTS CLASS A TRENCH WIDTH: MIN.= 0 D. t /2" MAX: PIPE D/AM. 33" AND LESS= 0.0 t/6" LARGER = O. D t 24" TRENCH WIDTH MUST BE MAINTAINED TO AT LEAST 1-O" OVER Top OF PIPE. NOTE, See Standard Spec/ fica lions for Street, Alley, Sewer and Bridge cons/rue/ion, Issued by the City Engineers Office and Doted Dec. /s/ /959 ITEMS 23 and 34 App /y here. BY ✓.A..,9. DATE .kfassi 4.6S B}&BJECT T„Rt1_. Ql/Aid' �`. /ACCL'... ...._ SHEET Na . _.. --OF 6 CHKD. wits .. DATE I• i %JJ-SD_ .DETAILS '" JOB NO... O e Ih W jX WO —mine 4 to SEE 23 3.5 FOR BACKF/L L -EARTH SUBGRADE I 60• 0 Q I CAREFULLY SHAPED MINIMUM TRENCHING 0' BEDDING REQUIREMENTS CLASS B TRENC/4r iv/OTH! M/N = Oka *12" MAX: Pipe D/AM 33" AND LESS= OD' *16" LARGER= OD t 24". TRENCHW/DTH MUST BE MA/N TA/NED TO ATLEAST /'-O" OVER TOP OF Pipe. NOTE' See Standard Specifications for Street, A//ey, Sewer and Br/dye construction, Issued by the City Engineers Office and Dated ITEMS 23 and 34 Apply here. Dec /ri /9S9 BY t/_.,r9. B tumid:z..a.¢3 "utc-r TR_P.N.C /NC2._.. _Lew/ 6' .... SHEET NO. _.._.OF6• CHKD. BY_.4titem .DATE__,F..T.A.NLYISQ.._.Pt A/L ' .. _ JOB NO. v QC W i° CC eZh SEE 23.3. 5 FOR BACKFILL I EARTH FOUNDATION I I 1050 O.D. I ff----0I SHAPED BY HAND. MINIMUM TRENCH/NO BEDD/NS RECD U/REMENTS CLASS C TRENCH WIDTH: M/N = Q D. */2 MAX. PIPE O/AM. 33" AND LESS= O. O t/6" LARGER 0 D 7'24" TRENCH WIDTH MUST BE MAINTAINED TO AT LEAST /'-O" OVER TOP OF PIPE. NOTE: See Standard Spec/fica/ions for Street, Alley, Sewer and Bridge Constrvchen, Issued by the till Engineers Office and Doted Dec. /s/ /9S9 ITEMS 23 and 34 Apply here CHKD. By.L.S:C.__oATE..L.- LQ.-43 SEANPAR_o JOE TA/L,5' BY.. <IA.B owrtdr,1$3►^,JEcr._TRENCH INS ... e._BE0thNG,�. SHEET NO.._..4._.-OP .._6_ JOB NO. SEE !3.3•S FOR BACKFI LL BROKEN CONCRETE, EXCAVATED RACK OR OTHER APPROVED / RICKY MATERIALS IRON GRAVEL 4 -MAX. SIZE _t_ MAX/5%.L74TOTAL NSTAELE SUBORAOE. BEDDING REQUIREMENTS WHEN TRENCH CANNOT BE MAINTAINED IN NOR MA L SOIL CONDITIONS CLASS B NOTE: See Standard Spec/fica/ions for Street, Ailey, .Sewer and Brio/99 constrvc/ion, Issued .by /he Ci/yEnrneers Ottke and Dated Dec. /s /959 /TEM3' 23 and 34 Apply here. Br. </A S DATEamins w,ac RENCN/NO t .BEDDING CHKD. BY_t.L. DATE I•Lt.:k! _. __,SrANDMRO DETA/LS SHEET NO. S OF._6 JOB NO.. See 23.3.5 FOR BACKF/L L fat --ROCK SUB GRADE BEDDING REQUIREMENTS WHEN TRENCH /S IN ROCK, SHALE OR ...SIMILAR HARD MATER/AL CLASSB NOTE: See Standard Spec/ ficofions for Street, Alley, Sewer and Bridge construct/on, /sweat by the CityEn9ineers Office and Doted Dec ist /959 ITEMS 23 and 34 A,op /y here. Or ct19:.a_. DATI!c. tit 63 ' "si acT__778. NCRMIA IIEDDIAO SHEET NO. .._ _..... ..OF....tr.... CHKD. Sr._t ._.one ..i-.t_ !J .__........_._f_TANe9R2._Q rALLS.._._......._.... _. JOS NO. NONPEPMISS/BLE BEDDING IN TRENCHES EARTH SUBGRADE LINE CONTACT EARTH .SUBGRADE NOT SHAPED TO FIT PIPE 11`\ >/iRxK .SUBGRADE SHALLOW EARTH CUSH/ON THESE THREE TYPES SHALL NOT BE USED Hello