HomeMy WebLinkAbout620128.tiffTHE HARTFORD STEAM BOILER
INSPECTION AND INSURANCE COMPANY
HARTFORD CONNECTICUT
JOHN R. CLINE
MANAG ER
G. F. WARD
CHIEF INSPECTOR
DENVER OFFICE
916 GAB AND ELECTRIC BUILDING
DENVER 2. COLORADO
November 27 1962
REPORT OF INSPECTION
11-20-62 INSPECTOR R.S. Swanson
DATE OF INSPECTION
Island Grove Park Block 184, Greeley, 4olorado
LOCATION
Bryant Cast Iron Boiler No. Colo.6253
Inspected externally while in service.
The submerged low water cut off works properly when the boiler is
drained down. To assure continued safe operation this control should
be removed form the boiler for overhaul each summer seadon.
The condition outlined was discussed with Mr. Warren, at the time of
inspection.
Fire Tube Loco. "oiler No. Colo. 6061
Inspected externally while in service.
The above object was carefully examined and no conditions were
observed that require attention at this time.
AWB/cm
FTO
Board of County Commissioners
Weld County, Colorado
Greeley, Colorado
Yours ,ery truly,
11 C.
/
Chief Inspector