Loading...
HomeMy WebLinkAbout620128.tiffTHE HARTFORD STEAM BOILER INSPECTION AND INSURANCE COMPANY HARTFORD CONNECTICUT JOHN R. CLINE MANAG ER G. F. WARD CHIEF INSPECTOR DENVER OFFICE 916 GAB AND ELECTRIC BUILDING DENVER 2. COLORADO November 27 1962 REPORT OF INSPECTION 11-20-62 INSPECTOR R.S. Swanson DATE OF INSPECTION Island Grove Park Block 184, Greeley, 4olorado LOCATION Bryant Cast Iron Boiler No. Colo.6253 Inspected externally while in service. The submerged low water cut off works properly when the boiler is drained down. To assure continued safe operation this control should be removed form the boiler for overhaul each summer seadon. The condition outlined was discussed with Mr. Warren, at the time of inspection. Fire Tube Loco. "oiler No. Colo. 6061 Inspected externally while in service. The above object was carefully examined and no conditions were observed that require attention at this time. AWB/cm FTO Board of County Commissioners Weld County, Colorado Greeley, Colorado Yours ,ery truly, 11 C. / Chief Inspector WELD CO. COMMISSIONERS GREELEY, COL_O. RECEIVED N0V3 0 1962 A.M6t7I I1911011111211J2'1g141M I FORM NO. 886 6Jy :) ) Hello