Loading...
HomeMy WebLinkAbout952377.tiffRESOLUTION RE: APPROVE CONTRACT AND ADDENDUM I TO CONTRACT WITH NATIONAL HOG FARMS, INC., AND AUTHORIZE CHAIRMAN TO SIGN - BRIDGE #50-67A WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Contract and Addendum Ito Contract for infrastructure improvements to Bridge #50-67A between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, and National Hog Farms, Inc., with terms and conditions being as stated in said contract and addendum, and WHEREAS, after review, the Board deems it advisable to approve said contract and addendum, copies of which are attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Contract and Addendum Ito Contract for infrastructure improvements to Bridge #50-67A between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, and National Hog Farms, Inc., be, and hereby are, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said contract and addendum. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 27th day of November, A.D., 1995. BOARD OF COUNTY COMMISSIONERS Wei �l bj1 y Clerk to the Board puty Cl= k o the Board APPRS ss AS TO FO y Attorne COUNTY, CQLORADO Dale,. Hall, .)rbara,J. Kirkmeyer % jA rte," • o-Tem /George4.. Baxter W. H. " - 'seer Constance L. Harbert ee,; Nate; nraj1-109Fab ms) ic) 952377 FI0020 CONTRACT Alm miler ) 113 -- THIS CONTRACT, made this' / day of October, 1995, by and between National Hog Farms, Inc., hereinafter referred to as the Firm, and the County of Weld, State of Colorado, hereinafter referred to as the County. WHEREAS, County has received a Community Development Block Grant (CDBG) in the amount of $371,500 for a project that consists of assisting with public infrastructure improvements in support of National Hog Farms, Inc., (the Firm), a hog -growing operation. The Firm has committed to retain its facility in Weld County, Colorado. The purpose of the project is to encourage economic diversification and job creation which addresses the CDBG program objective of benefit to low- and moderate -income persons in Weld County. WHEREAS, The CDBG grant shall assist with the following infrastructure improvements: Replacement of an existing substandard bridge, designated as Bridge #50- 67A, located on Weld County Road 50, east of the intersection with Weld County Road 67. The proposed bridge will span approximately 360' across the South Platte River. The bridge will be constructed of three 120' spans. The project includes realignment and construction of approach roadway sections. The total length of the project is 2,350 feet. The construction of the roadway will provide for 24' wide, 3" thick hot layed bituminous concrete pavement with 6' wide crushed aggregate shoulders. The asphalt will be placed on a6" thickness of Class 6 aggregate base course on the constructed fill and subgrade. NOW, THEREFORE, IT IS HEREBY AGREED THAT: A. The Firm commits to retain a minimum of one hundred sixty-four (164) existing, full- time jobs. At least one hundred thirty-one (80%) of the existing full-time jobs retained by the Firm shall be filled by low- to moderate -income persons. B. The Firm shall make every effort to maintain a level of operation that will support such levels of full employment, hereinafter determined to be at least one hundred sixty-four (164) full-time positions. C. The Firm shall allow County and CDBG program representatives to make on -site visits to verify CDBG program information if reasonable notice has been provided by County. D. The Firm expressly acknowledges that such infrastructure improvements would not have been undertaken but for the Firm's contractual commitment to perform all of the Firm's obligations hereunder. The Firm commits to retain its operations located in Weld County, Colorado, upon timely completion of regulatory and legal aspects and infrastructure improvements required by the project. 952377 CONTRACT - NATIONAL HOG FARMS, INC. PAGE 2 IN WITNESS WHEREOF, the parties hereto have executed this agreement on the date first above written. CONTRACTOR: NATIONAL HOG FARMS, INC. SUBSCRIBED AND SWORN TO before No bsi me this )9'_ day of Oetaber, 1995. Notary P lic My Commission expires: „-z- 9? BOARD OF COUNTY COMMISSIONERS WEL[ZCOUNTY, COLOR1AD BY: Dale K. Hall, Ch ra min "//2-7/9c ATTEST: Weld County Clerk to the Board C BY: J Deputy Ck to the Board 952377 ADDENDUM I TO CONTRACT // w av b >� ,��9� THIS ADDENDUM I TO CONTRACT, made this P7 day of Oeteber, 1995, by and between National Hog Farms, Inc., hereinafter referred to as the Firm, and the County of Weld, State of Colorado, hereinafter referred to as the County. WHEREAS, Firm and County entered into a contract on October _, 1995, for the purpose of a Community Development Block Grant (CDBG) project which consists of assisting with public infrastructure improvements in support of National Hog Farms, Inc. (the Firm), a hog -growing operation. The Firm has committed to retain its facility in Weld County, Colorado. The purpose of the project is to encourage economic diversification and job creation which addresses the CDBG program objective of benefit to low- and moderate -income persons in Weld County. WHEREAS, the CDBG grant shall assist with the following infrastructure improvements: Replacement of an existing substandard bridge, designated as Bridge #50- 67A, located on Weld County Road 50, east of the intersection with Weld County Road 67. The proposed bridge will span approximately 360' across the South Platte River. The bridge will be constructed of three 120' spans. The project includes realignment and construction of approach roadway sections. The total length of the project is 2,350 feet. The construction of the roadway will provide for 24' wide, 3" thick hot layed bituminous concrete pavement with 6' wide crushed aggregate shoulders. The asphalt will be placed on a 6" thickness of Class 6 aggregate base course on the constructed fill and subgrade. NOW, THEREFORE, IT IS HEREBY AGREED THAT: The County shall agree to indemnify and hold Firm harmless for any financial liabilities, payments, or liquidated damages required under the contract. IN WITNESS WHEREOF, the parties hereto have executed this agreement on the date first above written. CONTRACTOR: NATIONAL HOG RMS, INC. BY: T�J ITS7./4,,YvP SUBSCRIBED AND SWORN TO before me this / LI " day of October, 1995. c...:6waYe4r,a otary P,lblic My Commission expires: sY BOARD OF COUNTY COMMISSIONERS WELD.C_QUNTY, COLORADO BY: Dale I$, Hall, C�iaikm�n 71/27/9s ATTEST: Weld County Clerk to the Boarded f Deputy Gf rk to the Board 952377 Hello