HomeMy WebLinkAbout992460.tiff INVENTORY OF ITEMS FOR CONSIDERATION
Applicant Lewis Farm/Golden's Andesite Case Number USR-1243
Mining Company
Submitted or Prepared
Prior to At Hearing
Hearing
1 Planning Commission Resolution
2 Staff Comments (8 pages) X
3 Department of Planning Services field check form X
4 Letter to Applicant X
5 Legal Notifications X
6 Application (177 pages) X
7 Referral List X
8 Referral Letter X
9 Fort Lupton Fire District referral received 8/17/1999 X
10 Weld County Zoning Compliance referral received 8/12/1999 X
11 Division of Wildlife referral received 9/20/1999 (2 pages) X
12 Weld County Public Works Dept. referral received 9/7/1999 X
(2 pages)
13 Weld County Health Dept. referral received 8/24/1999 (2 pages) X
14 City of Brighton Planning Department referral received 9/1/1999 X
(4 pages)
15 Dept. Of the Army, Corps of Engineers referral received X
8/19/1999
16 Maps (2 pages) X
17 Maps submitted by applicant(3 pages) X
18 Contract to purchase(14 pages) X
19 Surrounding Property Owners (6 pages) X
20 Soil Survey (8 pages) X
21 Craven letter x
22
23
24
25
IXHIRIT
992460 ist
Item submitted at planning commission
I hereby certify that the 21 items identified herein were submitted to the Department of Planning Services at
or prior to the scheduled Planning Commission hearing. I further certify that these items were forwarded to
the Clerk to the Board's office.
Sheri Lockman •8 Planner
STATE OF COLORADO )
COUNTY OF WELD )
SUBSCRIBED and SWORN TO BEFORE ME THIS 017 / day of S ,.&. iAS 19. 9 f1
SEAL ��// Lin
y
OAl0YV Ly l ,u/b"F
NOTARY PUBLIC l-/
MY COMMISSION EXPIRES ®a - - aO0d
WIiDcLANDAPPLICATION SUMMARY SHEET
COLORADO
Case Number: USR-1243 Hearing Date: September 21, 1999
Applicant: Lewis Farm/Golden's Andesite Mining Company
Address: P.O. Box 328, 21 South Sunset Street, Longmont, CO 80501
Request: A Site Specific Development Plan and a Special Review Permit for Open Cut Gravel
Mining in the (A) Agricultural zone district.
Legal Description: SE4 of Section 13, Ti N, R67W of the 6th P.M., Weld County, CO
Location: ''A mile East of Weld County Road 23 and north of and adjacent to Weld County
Road 8
Size of Parcel: 160 acres
POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS
The criteria for review of this Special Review Permit is listed in Section 24.3 and Section 44 of the
Weld County Zoning Ordinance.
The Department of Planning Services' staff has received responses from the following agencies:
• Weld County Zoning Compliance referral received 8/12/1999
• Fort Lupton Fire Protection District referral received 8/17/1999
• Department of The Army, Corps of Engineers referral received 8/19/1999
• Weld County Health Department referral received 9/1/1999
• Weld County Public Works Department referral received 9/7/1999
• City of Brighton referral received 9/1/1999
• Division of Wildlife referral received 9/20/1999
The Department of Planning Services'staff has not received responses from the following agencies
• State Water Conservation Board
• Mined Land Reclamation
• City of Fort Lupton
• Platte Valley Soil Conservation District
• Colorado Division of Transportation
Page 1
r
� a
•
SPECIAL REVIEW PERMIT
t' a ADMINISTRATIVE REVIEW
COLORADO
PLANNER: S. L.ockman
CASE NUMBER: USR-1243 HEARING DATE: September 21, 1999
APPLICANT: Lewis Farm/Golden's Andesite Mining Company
ADDRESS: P.O. Box 328, 21 South Sunset Street, Longmont, CO 80501
REQUEST: A Site Specific Development Plan and a Special Review Permit for Open Cut Gravel
Mining in the (A) Agricultural zone district.
LEGAL DESCRIPTION: SE4 of Section 13, T1 N, R67W of the 6th P.M., Weld County, CO
LOCATION: '/ mile East of Weld County Road 23 and north of and adjacent to Weld County
Road 8
SIZE OF PARCEL: 160 acres PARCEL NUMBER: 1469 13 000011 and 043
THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS
REQUEST BE APPROVED FOR THE FOLLOWING REASONS:
1. The submitted materials are in compliance with the application requirements of Section 24.7
and Section 44 of the Weld County Zoning Ordinance, as amended.
2. It is the opinion of the Department of Planning Services's staff that the applicant has shown
compliance with Section 24.3 of the Weld County Zoning Ordinance, as amended, as
follows:
a. Section 24.3.1.1 --That the proposal is consistent with the Weld County
Comprehensive Plan, as amended. CM.Goal 2 states, "Promote the reasonable and
orderly development of mineral resources."
b. Section 24.3.1.2 --That the proposal is consistent with the intent of the A
(Agricultural) Zone District. Section 31.4.1 of the Weld County Zoning Ordinance
provides for mineral resource development facilities as a Use by Special Review in
the A (Agricultural) Zone District.
c. Section 24.3.1.3--That the proposal will be compatible with the existing surrounding
land uses. Surrounding land uses include agricultural land with only one home
Page 2
adjacent to the site. Other residences are located 1/4 mile or more from the site.
Planning Staff has required a landscaping plan which will include sufficient buffering
and screening for the home south of the site. Planning Staff concurs that the
approval of this use with not jeopardize the health, safety and welfare of the
surrounding property owners.
d. Section 24.3.1.4--That the proposed use will be compatible with future development
of the surrounding area as permitted by the existing zoning and with the future
development as projected by the Comprehensive Plan or Master Plans of affected
municipalities. In a referral response dated September 1, 1999, the City of Brighton
stated concerns regarding the wildlife habitat existing on the east half of the property.
Although Planning Staff is not requiring the applicant limit the mining to the west half
of the property, they are requiring more land be included in the reclamation plan for
riparian habitat. Concerns regarding the transportation plan have been addressed
through Conditions of Approval and Development Standards. The City of Fort Lupton
did not respond.
e. Section 24.3.1.5--Most of the site is located within the Flood Hazard Overlay District
area as shown on FEMA Panel Map#080266 0983 C. Conditions of Approval and
Development Standards address the issue of the floodplain. CM.Policy 5.4 of the
Comprehensive Plan states "the operation will comply with County flood hazard
regt,lations".
f. Section 24.3.1.6-- That the applicant has demonstrated a diligent effort has been
made to conserve prime agricultural land. Only the western most portion of the
sect on of the proposed site is designated "prime". The majority is designated "other"
by the USDA Soil Conservation Services.
g. Section 24.3.1.7--The Design Standards (Section 24.5 of the Weld County Zoning
Ordinance, as amended), Operation Standards (Section 24.6 of the Weld County
Zoning Ordinance, as amended), Conditions of Approval, and Development
Standards ensure that there are adequate provisions for the protection of health,
safety, and welfare of the inhabitants of the neighborhood and county.
This recommendation is based, in part, upon a review of the application materials submitted by the
applicant, other relevant information regarding the request, and responses from referral entities.
The Department of Planning Services's staff recommendation for approval is conditional upon the
following:
1. The attached Development Standards for the Special Review Permit shall be adopted and
placed on the Special Review Plat prior to recording the plat. The completed plat shall be
delivered to the Department of Planning Services and be ready for recording in the Weld
County Clerk and Recorder's Office within 30 days of approval by the Board of County
Commissioners. (Planning Dept.)
2. Prior to recording the plat:
Page 3
A. The application materials indicate an existing septic system may be utilized. The
Environmental Health Services Division was unable to locate a septic permit for the
septic system serving the existing structure. The septic system shall be reviewed
by a Colorado Registered Professional Engineer. The review shall consist of
observation of the system and a technical review describing the systems ability to
handle the proposed hydraulic load. The review shall be submitted to the
Environmental Health Services Division of the Weld County Department of Public
Health and Environment. In the event the system is found to be inadequately sized
or constructed the system shall be brought into compliance with current
Regulations. Evidence of Health Department approval shall be submitted to the
Weld County Planning Department. If the current location is not suitable a new
system will be designed, permitted and constructed according to the Weld County
Individual Sewage Disposal System (I.S.D.S.) regulations. (Health Dept.)
B. The plat shall be amended to include a 20 foot mining setback from surrounding
properties. (Public WorldPlanning Dept.)
C. The applicant shall post adequate collateral and enter into a Road Maintenance and
Improvements Agreement to include the following: (Public Works)
1. The applicant shall upgrade and pave Weld County Road 8 between the
main entrance and the existing asphalt adjacent to State Highway 85. This
will be designated as the haul route. The pavement shall be 24 feet wide
with six-foot gravel shoulders. The asphalt shall be four inches deep with
eight inches of Class 6 aggregate base course matching the existing asphalt
grades. An additional two-inch overlay of hot bituminous pavement shall be
placed over the remaining portion of Weld County Road 8. The two bridge
peak areas shall not receive additional asphalt.
2. The applicant shall extend or replace the existing cross culvert at the
entrance to Weld county Road 8. The site access approach shall be
elevated to provide adequate sight distance to the east.
D. The applicant shall submit a copy of an agreement with the property's mineral
owners stipulating that the oil and gas activities have adequately been incorporated
into the design of the site or that the applicant has made reasonable
accommodations. (Planning Dept.)
E. The applicant shall submit a copy of an agreement with the Lupton Meadows Ditch
Company stipulating that the relocation of the existing ditch has adequately been
inco-porated into the design of the site. (Planning Dept.)
F. The applicant shall submit a NPDES Permit to the Water Quality Control Division
of the Colorado Department of Health for proposed discharge into State Waterways.
Evidence of approval shall be submitted to the Weld County Public Works. (Public
Works)
Page 4
G. Upon approval of the NPDES Permit, the applicant shall submit evidence of Weld
County Public Works approval of the storm water drainage plan to the Weld County
Planning Department. (Public Works/Planning Dept.)
H. An Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application must
be submitted to the Air Pollution Control Division, Colorado Department of Health
and Environment for emissions of criteria, hazardous or odorous air pollutants.
Sources of such emissions include but are not limited to the following sandblasting
operations, mining, spray paint booths, dry cleaners, haul road traffic, composting,
boilers and incinerators. A copy of the A.P.E.N. shall be submitted to the Weld
County Health Department. Evidence of Weld County Health Department approval
shall be submitted to the Weld County Planning Department. (Health Dept.)
The applicant shall submit a dust abatement plan to the Weld County Health
Department for review and approval. Evidence of Health Department approval shall
be submitted to the Department of Planning Services. (Health Dept.)
J. The applicant shall receive approval for the Flood Hazard Development Permit
previously submitted for any new structures and any development that will increase
or decrease the base flood elevation in the flood plain as delineated on FEMA Panel
Map#080266 0983 C, dated September 28, 1982. (Planning Dept.)
K. The applicant shall provide evidence to the Department of Planning Services that all
requirements of the Colorado Department of Transportation have been complied
with. (Planning Dept.)
L. The applicant shall submit a landscaping and buffering plan to the Weld County
Planning Department for review and approval. The plan shall include sufficient
buffering for the adjacent home to the south and Weld County Road 8. (Planning
Dept.)
M. The applicant shall submit a revised plan to the Weld County Planning Department
for review and approval. The plan shall indicate areas for the existence of the well
developed riparian forest on the east portion of the property. Also the final ponds
shall be reconfigured to obtain a more natural and appealing appearance for the
future residents of the area. (Planning Dept.)
N. The final ponds shall be reconfigured to include jetty type structures protruding into
the pond as well as several islands to encourae plant and wildlife species. The
ponds shall include shallower areas with a minimum 5:1 slope ratio to encourage
more diverse flora and fauna. (Division of Wildlife)
3. The Special Review activity shall not occur nor shall any building or electrical permits be
issued on the property until the Special Review plat is ready to be recorded in the office of
the Weld County Clerk and Recorder. (Planning Dept.)
Page 5
SITE SPECIFIC DEVELOPMENT PLAN
SPECIAL REVIEW PERMIT
DEVELOPMENT STANDARDS
Lewis Farm/Golden's Andesite Mining Company
USR-1243
1. The Site Specific Development Plan and Special Use Permit#1243 is for Open Pit Gravel
Mining in the "A" (agricultural) Zone District as indicated in application materials on file in
the Department of Planning Services and subject to the Development Standards stated
herein. (Planning Dept.)
2. Approval of this plan may create a vested property right pursuant to Section 90 of the Weld
County Zoning Ordinance, as amended. (Planning Dept.)
3. All operations on said described parcel shall be in conformance with the Weld County Flood
Regulations including:
a. No fill, berms, or stockpiles shall be placed in the one hundred (100) year flood plain
of the St. Vrain River which would obstruct passage of flood flows. (Planning Dept.)
b. All fuel tanks, septic tanks, temporary buildings, and any other hazardous items that
might wash away during flooding shall be securely anchored and adequately flood
proofed to avoid creation of a health hazard. Following completion of mining, all
temporary buildings shall be removed. (Planning Dept.)
4. All liquid and solid wastes shall be stored and removed for final disposal in a manner that
protects against surface and groundwater contamination. (Health Dept.)
5. No permanent disposal of wastes shall be permitted at this site. (Health Dept.)
6. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive
dust, blowing debris, and other potential nuisance conditions. (Health Dept.)
7. The maximum permissible noise level shall not exceed the industrial limit of 80 dB(A), as
measured according to 25-12-102, Colorado Revised Statutes. (Health Dept.)
8. Adequate toilet facilities shall be provided for the employees. (Health Dept.)
9. The applicant shall remove, handle, and stockpile overburden, soil, sand and gravel from
the facility area in a manner that will prevent nuisance conditions. (Health Dept.)
10. The facility shall utilize bottled water for employees. (Health Dept.)
11. Portable toilets may be utilized on the site which are temporary locations of the working
face, for up to six months. (Health Dept.)
Page 6
12. The site shall maintain compliance with all applicable rules and regulations of the Colorado
Division of Minerals & Geology. (Health Dept.)
13. If any work associated with this project requires the placement of dredged or fill material,
and any excavation associated with a dredged or fill project, either temporary or permanent,
in waters of the United States which may include streams, open water lakes, ponds or
wetlands at this location, the applicant shall obtain a Department of Army, 404 Clean Water
Act permit. (Planning Dept.)
14. The facility shall operate in accordance with the approved dust abatement plan at all times.
The facility shall have sufficient equipment available to implement the dust control as
required by the Weld County Health Dept. (Health Dept.)
15. The applicant obtain a demolition permit from the Weld County Building Inspection
Department for the existing residence that is to be removed. (Planning Dept.)
16. The opermion shall comply with all applicable rules and regulations of the Federal
Emergency Management Agency including a Letter of Map revision if determined to be
applicable. (Planning Dept.)
17. "No Trespassing" signs shall be posted and maintained on the perimeter fence to clearly
identify the boundaries of the site. (Planning Dept.)
18. All construction on the property shall be in accordance with the Weld County Building Code
Ordinance. (Planning Dept.)
19. The facility shall operate in accordance with the approved storm water detention plan.
(Public Works)
20. The applicant shall haul only legal limits over the two county bridges identified within the
designated haul route, 8/23A (Lupton Bottom) and 8/25A (South Platte River). (Public
Works)
21. The interna road system shall be treated with chemical stabilization to control dust. (Public
Works)
22. As indicated in the application material hours of operation shall start at 6:00 a.m. Mining
and processing shall cease at 8:00 p.m., maintenance and repair at midnight and hauling
at 5:00 p.m The applicant shall be allowed to operate 24 hours per day, 7 days a week to
fulfill Government Contracts. (Planning Dept.)
23. Lighting provided for security and emergency night operation on the site shall be designed
so that the lighting will not adversely affect surrounding property owners. (Planning Dept.)
24. Existing trees and ground cover along public road frontage and drainage ways shall be
preserved, maintained, and supplemented, if necessary, for the depth of the setback in
Page 7
order to protect against and/or reduce noise, dust, and erosion. (Planning Dept.)
25. Where topsoil is removed, sufficient arable soil shall be set aside for respreading over the
reclaimed areas. (Planning Dept.)
26. Should noxious weeds exist on the property or become established as a result of the
proposed development, the applicant/landowner shall be responsible for controlling the
noxious weeds, pursuant to Ordinance 169A. (Public Works)
27. The sand and gravel operation shall comply with all operation policies identified in Section
44 of the Weld County Zoning Ordinance except 44.4.2 regarding hours of operation which
shall comply with Development Standard 22.
28. The property owner or operator shall be responsible for complying with the Design
Standards of Section 24.5 of the Weld County Zoning Ordinance, as amended.
29. The property owner or operator shall be responsible for complying with the Operation
Standards of Section 24.6 of the Weld County Zoning Ordinance, as amended.
30. Personnel from the Weld County Health Department and Weld County Planning
Department shall be granted access onto the property at any reasonable time in order to
ensure the activities carried out on the property comply with the Development Standards
stated herein and all applicable Weld County Regulations.
31. The Special Review area shall be limited to the plans shown hereon and governed by the
foregoing standards and all applicable Weld County regulations. Substantial changes from
the plans or Development Standards as shown or stated shall require the approval of an
amendment of the Permit by the Weld County Planning Commission before such changes
from the plans or Development Standards are permitted. Any other changes shall be filed
in the office of the Department of Planning Services.
32. The property owner or operator shall be responsible for complying with all of the foregoing
Development Standards. Noncompliance with any of the foregoing Development Standards
may be reason for revocation of the Permit by the Board of County Commissioners.
Page 8
DEPARTMENT OF PLANNING SERVICES
�7 PHONE (970) 353-6100, EXT.3540
FAX (970) 304-6498
17T 1555 N. 17T1-I AVENUE
GREELEY, COLORADO 80631
1111142„
COLORADO
August 10, 1999
Lewis Farm/Andesite Mining Co.
C/o Banks and Gesso, LLC
720 Kipling St., Ste. 117
Lakewood, CO 80215
Subject: USR-1243- Request for a A Site Specific Development Plan and a Use by Special Review for an
Open Cut Gravel Mining Operation in the (A) Agricultural zone district on a parcel of land
described as the SE4 of Section 13, Ti N, R67W of the 6th P.M., Weld County, Colorado.
To whom it may concern:
Your application and related materials for the request described above are being processed. I have scheduled
a meeting with the Weld County Planning Commission for September 21, 1999, at 1:30 p.m. This meeting
will take place in Room 210, Weld County Planning Department, 1555 N. 17th Avenue, Greeley, Colorado.
It is recommended that you and/or a representative be in attendance to answer any questions the Planning
Commission members may have.
It is the policy of Weld County to refer an application to any town or municipality lying within three miles of the
property or if the property is located within the comprehensive planning area of a town or municipality.
Therefore, our office has forwarded a copy of the submitted materials to the The City of Brighton and the City
of Fort Lupton Planning Commission for its review and comments. Please call the City of Brighton at
(303)654-1638 and the City of Fort Lupton at(970)346-0326 for further details regarding the date, time, and
place of this meeting. It is recommended that you and/or a representative be in attendance at the The City
of Brighton and the City of Fort Lupton Planning Commission meeting to answer any questions the
Commission members may have with respect to your application.
A representative from':he Department of Planning Services will be out to the property a minimum of ten days
prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which
identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly
maintained road right-of-way, one sign will be posted in the most prominent place on the property and a
second sign posted a:the point at which the driveway (access drive) intersects a publicly maintained road
right-of-way.
The Department of Planning Services' staff will make a recommendation concerning this application to the
Weld County Planning Commission. This recommendation will be available twenty-four(24) hours before the
scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services' office
before the Planning Commission hearing to make arrangements to obtain the recommendation.
If you have any questions concerning this matter, please call.
R spectfullyt
(G
Lockman
" EXHIBITEXHIBITheri
Planner 1 I
FIELD CHECK inspection date: 9/10/1999
CASE NUMBER: USR-1243
APPLICANT: Lewis Farm/Golden's Andesite Mining Company
LEGAL DESCRIPTION: SE4 of Section 13, T1N, R67W of the 6th P.M., Weld
County, CO
LOCATION: '/z mile east of Weld County Road 23 and north of and adjacent to
Weld County Road 8
Zoning Land Use
N A (Agricultural) N Agricultural
E A (Agricultural) E Agricultural / Residential approximately
1/4 mile
S A (Agricultural) S Norden Farms - approximately 10 semi
trucks and trailers on property / in
pasture with a few cattle in pen /
Residential / small lake (possible old
mining site)
W A (Agricultural) W Agricultural / Residential approximately
1/4 mile
COMMENTS: West portion of the property is in corn. East is pasture
with many large trees. Two home and an oil pump on property. Ditch runs
north/south through property.
LI / -1,(t0e1,41
Sheri Lockman, Planner
Hello