Loading...
HomeMy WebLinkAbout962433.tiffSTATE OF COLORADO COUNTY OF WELD )s.s. Ruth Pelton-Roby, as manager of Pelton Publishing Company LLC, being duly sworn, states that it is publisher of the South Weld Sun, a weekly newspaper published in Keenesburg in said County and State; that said newspaper has a general circulation in said County and has been continuously and uninterruptedly published therein, during a period of at least fifty-two consecutive weeks prior to the first publication of the annexed notice; that said newspaper is a newspaper within the meaning of the act of the General Assembly of the State of Colorado, entitled "An Act to regulate the printing of legal notices and advertisements," and amendments thereto; that the notice of which the annexed is a printed copy taken from said newspaper, was published in said newspaper, and in the regular and entire issue of every nu er thereof, once a week for successive weeks; that said notice was so published in said newspaper proper and not in any supplement thereof, and that the first publication of said notice as accresaid, was on the day of \ c� , 1996, and the last on the S' day of Dc:- , 1996. PELTON PUBLISHING COMPANY LLC BY:_ Ruth Pelton-Roby, Manager Subscribed and sworn to before me this �_ day of ��,,M 6. , 1996. Notary Public fly Contrnission E ire.; March 15, ui�fl ; • • Y ▪ C+O+F5 962433 December 5, 1996 ORDINANCE NO. 191 IN THE MATTER OF ADOPTING THE MIXED USE DEVELOPMENT PLAN BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF WELD, STATE OF COLORADO: WHEREAS, the Board of County Commissioners of the County of Weld, State of Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board of County Commissioners has the power and authority underthe Weld County Home Rule Charter and Article 28 of Title 30, CRS, to adopt zoning regulations for the.unincorporated areas of the County of Weld, and WHEREAS, the Board of County Commissioners of Weld County hereby finds and determines that there --is a need for a Mixed Use Development Plan -to supplement the zoning regulations for the County of Weld, and WHEREAS, the Board of County Commissioners hereby finds and determines that this Ordinance is for the benefit of the health, safety, and welfare of the people of Weld County. NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of the County of Weld, State of Colorado, that the Mixed Use Development Plan on the following pages, be, and hereby is, adopted. BOARD OF COUNTY COMMISSIONERS Barbara Kirkmeyer, Chairman George Baxter, Pro -Tern Dale Hall Connie Harbert -W.H. Webster WELD COUNTY PLANNING COMMISSION Arlan Marrs, Chairman Shirley Camenisch Jack Epple Ann Garrison Marie Koolstra Cristie Nicklas Rusty Tucker Glenn Vaad Fred Walker DEPARTMENT OF PLANNING SERVICES Monica Daniels -Mika, Director Gloria Dunn, Current Planner Shani Eastin, Current Planner Sharyn Frazer, Office Manager Chris Goranson, Current Planner Todd Hodges, Planner II Kerri Keithley, Current Planner Stephanie Van Arsdol, Planning Technician Sharon White, Planning Technician TECHNICAL ADVISORY COMMITTEE Ed Jordan. Weld County Sheriff Michael Kennedy, CDOT Lee Lawson, St. Vrain Sanitation District Bill Meier, United Power Randy Rivers, Colorado Division of Parks Scott Toillion, St. Vrain School District Jerry Ward, Mountain View Fire District Hank Whitler, Little Thompson -Water District John Zadel, Central Weld County Water District COUNTY DEPARTMENTS Bruce Barker, County Attorney Lee Morrison, Assistant County Attorney Don Warden, Director of Finance Drew Scheltinga, Weld County Engineer Jeff Stoll, Director of Environmental Health Table of Contents Section 3. Inventory of Existing Uses 3.1 Intent 3.2 Inventory and Analysis 3.3 Market Factors and Likely Trends 3.4 MUD Structural land Use Plan Section 4. Appendix 4.1 Plant Materials Tables 45 45 46 73 81 102 102 Table 1.1 Existing Service Providers in the Mixed -Use Development Area Table 2.1 Structural Land Use Densities Table 2.2 Common Open Space for Land Use Categories Table 2.3 Maximum Lot Coverage Within the MUD Area Table 2.4 School Allocation Standards in the MUD Area Table 3.1 School Capacity and Projected Enrollments Table 3.2 MUD Water Districts Table 13 Range of Likely MUD Area Residential Development Table 3.4 Land Use Plan Distribution Table 3.5 MUD Area Plan Trip Generation Table 3.6 St. Vrain School Need Projection Factors Table 3.7 IUD Area School Need Projections Table 3.8 MUD Area: 10 -Year Growth Table 3.9 Total Build -out of MUD Area Table 3.10 Law Enforcement Capital Costs Table 3.11 Preliminary Cost Estimates for Transportation Network Table 3.12 Indirect Street Costs Table 3.13 Parks, Trails and Sites with Limiting Factors Table 4.1 Listing of Plant Materials Legend I-35 MUD Ara tannin, gageSlat. W4 • Sea.w • Pin Satlmn/Palrea Stalin+ ▪ G..+Iry Activity Paallties I IM Year PIaNPW. - Can.nbi Scat • Gravel Renames Li:4!-I1 Pit.. Avlmmttaat Lank Mg Primary Dynaa.rays 1 14 IS 20 44 53 62 77 83 84 90 90 96 97 98 99 100 101 102 va• Pa.,, 1-25 Mixed Use Development Area Comprehensive Plan Map 1.1 MUD Planning Boundaries Patient h 4utn•t • Amen.; and LDAw Jae. Section 1. The Mixed Use Development Area 1 1.1 Intent 1 1.2 Community Form and Structure 3 1.3 Public Facilities 7 1.4 Transportation and Circulation 10 Section 2. Development Standards 12 2.1 Intent 12 2.2 Structural Land Use -Categories 14 2.3 Common Open Space Regulations 18 2.4 Maximum Lot Coverage Regulations 20 2.5 Planned Unit Development Districts 20 2.6 Landscaping Regulations 21 2.7 Transportation and Circulation Regulations 31 2.8 Sign Regulations 39 2.9 Utility, Infrastructure and Public Facility Regulations 42 Debbar$14 Maps Map 1.1 MUD Planning Boundaries Map 2.1 Structural Land Use Map Map 2.2 Structural Transportation Network Map 3.1 Existing Land Use and Roadways Map 3.2 Existing Zoning and Permitted Uses Map 3.3 Water Services Map 3.4 Sanitary Sewer Services Map 3.5 Natural Gas Services Map 3.6 Priority for Development Map 3.7 Parks, Recreation, and Floodplain Resources 2 13 34 49 52 60 65 67 69 71 Figures 1.2 Community Form and Structure Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5 Figure 2.6 Figure 2.7 Figure 2.8 Figure 2.9 Figure 2.10 Figure 3.1 Figure 3.2 Figure 3.3 Design Consideration for Subdivisions Common Open Space and Maximum Lot Coverage Berming and Screening Parking Screening Parking from -Roadways Screening Parking. and Structures -1-25 Corridor Treatment 1-25 Corridor Treatment Travel Viewpoint 1-25 Corridor Treatment Frontage -Road Viewpoint State Highway 119 Corridor Treatment 29 30 35 Roadway Cross Sections 58 Proposed CDOT I-25/SH 119 Interchange -Improvements Exterral Trip Distribution Daily Trip Distribution by Purpose 86 87 References 1. Figure 2.1: DeChiara, Joseph and Lee Koppelman. e'' manninv Standards, McGraw-Hill Book Company, 1978. 2. Figures 2.3. 2.4 and 2.5: Rubenstein, Harvey M. of d t?ndscaoe r�o�rruction. Fo nh Fdi[ion, John Wiley & Sons, Inc.. 1996. Acronyms and Abbreviations CDOT Colorado Department of Transportation DIA Denver International Airport DII Dwelling Unit FLMA Federal Emergency Management -Agency FED Fire Protection District HOV High Occupancy Vehicle 1-25 Interstate 25 LOS Level of Service MUD Mixed Use Development MUTCO Manual on Uniform Traffic Control Devices NCWCD Northern Colorado Water Conservancy District PUC Public Utilities Commission PUD Planned Unit Development RTD Regional Transportation District SR State Highway SUP Special Use Permits TDM Transportation Demand Management USR Use by Special Review WCR Weld County Road Section 1 The Mixed Use Development Area 1.1 Intent The Mixed Use Development area (MUD area) provides a unique and challenging opportunity for the establishment of an on -going planning process in an area which is experiencing increased growth and development. The presence of an interstate and state highway system and the external growth pressures from the Longmont Metropolitan Area have added to the interest in land development and population growth within this area. The intent of this policy document is to guide and implement planned land use changes in the MUD area, particularly the conversion of rural lands to more intensive urban -type -land uses. The regulations found in this document are intended to be implemented by the land use and development policies in the Comprehensive Plan, Zoning Ordinance, Subdivision Ordinance, and Planned Unit Development Ordinance, as amended and adopted by the county. 1.1.2 Planning Area Boundaries The MUD area covers approximately 12,110 acres with boundaries at Weld County Road (WCR) 1 on the west, WCR 11 on the east, State Highway (SH) 66 on the north and WCR 20 on the south. The MUD planning area boundaries are shown on Map 1.1. 1.1.3 Amendment Procedure Individuals may submit a proposal to amend the MUD Structural Plan in accordance with the procedures set forth in Section 1-2 of the Weld County Comprehensive Plan, as amended. Any applicant submitting a proposal to amend the MUD Structural Land Use Map 2.1 shall also submit a deed or legal instrument to the Department of Planning Services identifying their interest in the property. 1.1.4 Existing Services The MUD area is intended to be an area which will accommodate development which may occur as a result of the planned infrastructure and services existing and developing in the area. Table 1.1 displays the existing service providers in the MUD area. Table 1.1 Existing Service Providers in the Mixed Use Development Area Domestic Water Sanitation Gas Electric Left Hand Water Supply Company, Little Thompson Valley Water District, Longs Peak Water Association. Central Weld County Water Association St. Vrain Sanitation District Public Service Company of Colorado United Power School Law Enforcement Fire Ambulance Highway & Roads Mixed Use Development Plan St. Vrain (RE -I1) Weld County Sheriffs Department Mountain View Fire Protection District Tri-Town, Longmont Colorado Department of Transportation, Weld County Public Works Pate I 16 1.2.1 Intent 19 23 Today. the MUD area is at the center of the growing municipalities in the southwest region 24 of the county. The commercial node located at 1-25 and State Highway 119 continues to be 24 an important activity center for much of the front range. Defining and shaping communities 27 within the MUD area not only opens the door fonmore functional regional activity, but will improve the sense of place for local residents and -business owners. The following goalsand 28 policies are intended to result in enhanced community form and structure throughout the MUD area. 1.2.2 Goals and Policies MUD. CGoal 1 Establish -a sense of community identity within the Mixed Use Development area by planning and managing residential, commercial, industrial, environmental, aesthetic and economic components of the -area. MUD.CPolicy 1.1 The Mixed Use Development area shall be delineated on the Structural Land Use Map 2.1. MUD.CPolicy 1.2 Development Within the Mixed Use Development area shalladhereto the MUD Structural Land Use Map 2.1 to direct future zoning and land use decisions. MUD.CGoal 2 Newdevelopmentshall occur in a manner that assures an attractive working and living environment. MUD.CPolicy 2.1 .,a Jeisevy.ment shall be encouraged to use innovative siting and design techniques to cultivate an attraictive visual appearance -within the MUD area and preserve prime visual features such as the Front Range and the St. Vrain River. MUD.CPolicy 2.2 Landscaping sha II be designed to promote attractive development. Landscaping requirements shall be determined for the perimeter of the development by reviewing the density of the proposed land -use development. Landscaping shall be designed to protect and preserve the appearance and character of the surrounding area. Mixed Use Development Plan Page 3 MUD.CPolicy 2.3 Residential development shall be encouraged to occur in clustered neighborhood units with a variety of densities ranging from single.family developments of less than one unit per acre to multi -family developments -with much higher densities. MUD.CPolicy 2.4 Adequate pedestrian passageways between and within developments and neighborhoods shall be encouraged. MUD.CPolicy 2.5 Sign regulations shall be strictly enforced within the Mixed Use Development area as outlined and defined in the MUD Development Standards. Signs shall be compatible with the surrounding environment, have a low profile and be shared when possible. MUD.CPolicy 2.6 New development shall be characterized by quality architectural design. Design features shall include: landscaping plans for the entire development, efficient on -site traffic circulation plans with a minimal number of access points to state and county roads, low profile advertising signs, and sensitiive-facade treatment. MUD.CPolicy 2.7 New development shall be designed to compliment the natural environment and exhibit a "campus -like" atmosphere. MUD.CPolicy 2.8 Development shall be required to preserve a portion of the site as common open space as outlined and defined in the MUD Development Standards. MUD.CPolicy 2.9 Existing salvage yards and uses with open storage areas shall be encouraged to visually screen and buffer the storage areas from adjacent properties zoned R-1, R-2, ..-_. _.., .. _ -, 2, or I-1 in accordance with Section 33.5.3.4 of the Weld County Zoning Ordinance, as amended. New junkyards, salvage yards, landfills, and uses with open storage areas shall be encouraged -to locate in areas -where they can be visually screened and can conform to health and safety regulations. MUD.CPolicy 2.10 New developments, including major public utility facilities, shall mitigate adverse visual impacts caused by outside storage, building scale, disturbed native vegetation, and other such activities by screening and/or buffering. MUD.CPolicy 2.11 Density in the Mixed Use -Development area shall be governed by a Maximum Lot Coverage Standard which correlates buildable lot sizes with open space allocations. Mixed Use Development Plan Page 4 December 5, 1996 MUD.CPolicy 2.12 New development designs shall discourage continuous solid fencing adjacent to streets. The South Weld Sun Page 7 1.3 Public Facilities and Services MUD.CGoal 3 Community form and identity shall be encouraged through the enhancement and preservation of natural resources and features. MUD.CPolicy 3.1 All new development shall comply with the Mineral Resource section of the Weld County Comprehensive Plan. This includes locations determined to contain commercial mineral deposits and mineral extraction operations and reclamation plans. MUD.CPolicy 3.2 New development shall preserve identified aquifer recharge areas. Where feasible, drainageways -shall be maintained in their natural state to ensureoptimal re -charge. MUD.CPolicy 3.3 New development shall minimize impacts to air quality. MUD.CPolicy 3.4 Fugitive dust shall be controlled by practices acceptable to the Weld County Health Department and any other relevant agencies. MUD.CPolicy 3.5 Disturbed areas shall be revegetated immediately following construction. In order -to minimize wind and soil erosion, temporary stabilization measures shall be established on all such areas. MUD.CPolicy 3.6 New development shall be encouraged to select native species for re -vegetation. MUD.CPolicy 3.7 State Park and Recreation areas shall not be adversely impacted by new development. MUD.CGoal 4 The coordination of municipal, county, regional, and state growth policies and programs which includes the MUD area shall be evaluated inorderto minimize discrepancies, promote a better understanding of growth dynamics in the area, avoid duplication of services and to provide economies of scale. MUD.CPolicy 4.1 New development shall demonstrate compatibility with existing surrounding land use -in terms of general use, building height, scale, density, traffic, dust and noise. Mixedllse Development Plan Page 5 MUD.CPolicy 4.2 All proposals for development within the MUD area, with the exception of those developments specifically called out and excluded in the MUD Policy Document, shall use the Planned Unit Development (PUD) application process and regulations. The PUD process will allow developers flexibility and variety needed to offer a range of products, services, and uses. It will also give the developer an opportunity to explain the development to surrounding land owners and the county so that important information concerning land use compatibility and needed services, facilities, or utilities to serve the proposal are determined to be adequate. Mixed Use Development Plan Due to the expense and limited available funding,proper and efficient allocation of public facilities and services _is important. Since the adoption of the Home Rule Charter, rising county expenditures have created substantial public interest in how to cut cost and increase efficiency of providing public services and facilities. Revenue to support public services and facilities in unincorporated Weld County is usually generated by levying propertytaxesand user -fees. 1.3.1 Intent The goals and policies in this section are intended to increase the effective and efficient delivery of public services and facilities within the MUD arm. It is the intent of these policies and goals to ensure that appropriate public facilities and services are available for developments in the MUD area. 1.3.2 Goals and Policies MUD.PGoal 1 Provide efficient and cost-effective delivery of adequate public facilities and serviceswhich assure the health, safety, and general welfare of the present and future residents of the area. MUD.PPolicy 1.1 Consolidation of internal Weld County facilities or services shall be encouraged to avoid duplication of costs and promote efficiency. MUD.PPolicy 1.2 Development that requires urban services and facilities shall be encouraged to locate -within a municipality, urban growth boundary area, or an area that can adequately provide infrastructure needs MUD.PPolicy 1.3 New development shall avoid adverse impacts to surface and ground water quality and shall implement techniques to conserve such resources. All Planned Unit Developments (PUDs) within the MUD area shall use the sanitary sewage disposal facilities provided by the St. Vrain Sanitation District. All PUD water supply systems shall be provided by a meal -water district, company, association, or municipality. MUD.PPolicy 1.4 Provide for coordination of solid waste collection services, to include establishment of service standards, approved fee schedules, and recycling requirements. Mixed Use Development Plan Page 7 MUD.PGoal 2 Provide adequate public safety facilities, such as satellite stations for police, fire and ambulance and encourage the siting of co -located facilities and equipment. MUD.PPolicy 2.1 Public safety facilities shall be provided to meet required standards of response times and public safety, maintaining the same level of service that exists throughout.the districts. MUD.PPolicy 2.2 The Weld County law enforcement agencies shall,fpggs on interaction with the public; This focus should facilitate a community -based approach to public safety such as educational programs, neighborhood watch programs and community involvement programs. MUD.PGoal 3 Provide for adequate school facilities conveniently placed central to residential neighborhoods and available for use in -a timely manner. MUD.PPolicy 3.1 Encourage the siting of schools near or adjacent to community parks, open spaces and trail systems. MUD.PPolicy 3.2 Mitigate the cost of land acquisition and capital construction for essential community facilities to the fullest extent consistent with state law and identify any additional costs which will not be mitigated by the development as proposed. MUD.PGoal 4 New development shall provide a mechanism for funding public facility and service expansion and community facilities based on the demand created by the development. MUD.PPolicy 4.1 New development should comply with the public facilities and services section of the Weld County Comprehensive Plan. New development that results in excessive public costs while producing insufficient public revenues should be discouraged unless such development provides adequate guarantees through planning and coordination that public facilities and services are effectively installed, operated, and maintained. MUD.PPolicy 4.2 If it is determined that public facility or service improvements or maintenance are required for or caused by the development, the developer will be required -to pay for the cost of the public facility and service improvement and maintenance. The methodology for compensation shall be determined duringthe land -use application review process. The developer shall submit the following at the PUD sketch plan phase of the development: Page 6 Mixed Use Development Plan Page 8 The South Weld Sun Page 8 December 5, 1996 a. Information which accurately identifies all users of the infrastructure improvements and maintenance; b A proposal which 'equitably distributes the costs of infrastructure improvements and maintenance by user share; and c. A proposal that identifies an appropriate time schedule for infrastructure improvements and maintenance. This information will be reviewed by the Board of County Commissioners in determining an equitable means of distributing infrastructure costs among the county at large, direct users, and the developer. MUD.PPolicy 4.3 All applications shall be referred to the applicable school district for review and recommendation regarding school district requirements. MUD.PPolicy 4.4 Development will he encouraged to pay its proportional share of the -local costs of infrastructure improvements within the MUD area. This includes ongoing operating and maintenance costs required to service such development and any associated impacts resulting from the development. Mixed Use Development Plan 1.4 Transportation and Circulation Page 9 Local residents, commuters, travelers and business owners are dependent on major transportation corridors to access needed commercial and retail services within the MUD area. The physical aspects of the circulation system in the MUD area shall be encouraged to foster travel between residential neighborhoods and the employment, regional and neighborhood centers. These roadways should also be planned to reinforce the boundaries of the MUD area and give a sense of orientation while traveling. 1.4.1 Intent The goals and policies •in this section are intended to foster a more efficient transportation network, provide for the safe and efficient movement of people and goods, and to promote a wide variety of transportation options in the MUD area. 1.4.2 Goals and Policies MUD.TGoal 1 To provide a well -integrated, balanced, transportation system that considers all modes of travel and meets the public need for mobility, comfort, and safety with maximum efficiency and economy within the MUD area. MUD.TPolicy 1.1 The county will plan and maintain a transportation system in the MUD area that unifies and coincides with state and other county, city and community transportation systems within and surrounding the MUD area. MUD.TPolicy 1.2 All new development shall comply with the Transportation Section of the Weld County Comprehensive Plan. Access to properties shall preserve the existing and future function of roads and highways affected by the proposed development. All development circulation systems shall be designated so that they do not disrupt highway travel. Traffic to be generated by the proposed development must conform to the recommendations and requirements of the Weld County Public Works Department and the Colorado Department of Transportation. Dedication and improvements of roads and frontage roads may be required as conditions of development. MUD.TGoal 2 Promote a pedestrian trail system to service transportation and recreation purposes within the MUD area. MUD.TGoal 3 Mixed Use Development Plan New development within the MUD area shall provide a mechanism for balancing relevant fiscal and economic components of transportation systems. MUD.TPolicy 3.1 Require all PUDs to prepare.a traffic impact analysis as outlined in the MUD Development Standards to determine project plus cumulative development impacts created by the PUD and determine appropriate project mitigation. MUD.TPolicy 3.2 Establish a development fee program to collect a fair share dollars -per -trip contribution for constructingshortand long-term circulation improvements. MUD.TPolicy 3.3 The county will require improvement of roads, streets, or highway facilities when dictated by traffic demand and land development patterns in the MUD area. MUD.TGoal 4 As development occurs, the feasibility of a public transit system shall examined in the MUD area. Mired Use Development Plan Page 11 Section 2. Development Standards Recent activity in the MUD area has accelerated and reinforced the need for long-term approaches to planning in the region. This increase in development has resulted in the creation of development standards to regulate this area. These development standards shall apply to all structures and land within the MUD area as shown on the MUD Structural Land Use Map 2.1. These regulations provide development standards to implement the goals and policies in the Mixed Use Development section of the Comprehensive Plan adopted by Weld County. 2.1 Intent The intent of these regulations is to ensure the compatibility of various land uses, buildings or structures within the MUD area. These regulations are intended to allow flexibility and encourage creativity in development of the area in regards to density, height of structures, setbacks and common open space. The development standards found in this plan are the minimal development standards allowed in the MUD area. The land use designations in this plan are grouped into five structural land use categories. These categories are conceptual designations and shall not be interpreted or construed to give rise to any vested rights in the continuation of any particular use, district, zoning classification or any permissible activities therein. Structural Land Use Categories 1. Employment Centers 2. Regional Commercial 3. Neighborhood Centers 4. Residential Neighborhoods 5. Limited Site Factors Each structural category consists of distinct and unique qualities and is established as a matter of policy to guide and implement planned land use development. These categories are further defined in Section 2.2 of this plan and are delineated on the Structural Land Use Map 2.1. The correlation of the categories to generalized zone districts as defined in the Weld County Zoning Ordinance are outlined in Table 2.1. In all cases, the Weld County Zoning, Subdivision and Planned Unit Development Ordinances should be consulted for clarification of specific requirements. Page 10 Mixed Use Development Plan Page 12 December 5, 1996 The South Weld Sun Page 9 2.2.2 Regional Commercial Centers tit Lege d — I -,S MUO Area Boundary ® eroa,..n, c-,ar- .tn Waned, ® Reunion 1,. ,,d Men.. Wenner r`.LxNgnoB..e t -far- loon. Intenn., I I Residential - mono Wenn., UMW, Ph Faders - laves, Intensity Mil net...Park (1) cemuity RarF ;9.Wellborn.vare rr.nm center ® ra.arrey Ate.nans - - teunl Boundary, Fenn, Rood Rgen. tree System Other Gn..u•ty tree - -- Section l. AN Mr. I-25 Mixed Use Development Area Comprehensive Plan Map 2.1 Structural Land Use Map Table 2.1 Structural Land Use Densities Land Use Categories Density and Zoning Designation Employment Center Higher intensity commercial and industrial mix Regional Commercial Medium intensity commercial and industrial mix Neighborhood Center Lower intensity commercial and residential mix Residential Residential mixed density Limited Site Factors Agricultural uses, low density residential, primary drainageways, mature riparian areas, floodplain and floodway overlays. 2.2 Structural Land Use Categories 2.2.1 Employment Centers The Structural Land Use Plan provides a unique opportunity to create major centers of new employment in the MUD.area. The creation of employment centers are linked and orientated toward the network of regional and national roadways serving the area. Employment Centers are orientated around major roadways to allow for goods and services to the traveling public. These Centers may also accommodate high intensity industrial uses which create -minimal negative visual impacts. Employment Centers characteristically have high transportation impacts and environmental concerns such as noise, dust, and pollution. Even with the associated impacts, these Centers are intended to provide pleasant and safe environments for employees and visitors through planning and design standards. Outdoor eating and seating areas, pedestrian routes within parking lots, and other pedestrian amenities should be provided for employees and visitors. Employment Centers include, but are not limited to, the following activities and services in higher density commercial and industrial zone districts. • Hotels and motels • Restaurants, including drive -in -restaurants • Utility service facilities • Police and fire stations • Any use of a research, repairing, manufacturing, fabricating, processing, assembling, or storage nature as long as the use is conducted entirely within enclosed buildings. Regional Commercial Centers are intended to provide safe, efficient areas offering convenience goods and -services to residents of surrounding neighborhoods. These Centers include commercial and industrial activities which are medium intensity levels and have few environmental and -service related impacts. Activities in these Centers may include the following: • Retail shops • Civic uses such as libraries, community centers, churches • Service businessessuch as offices • Public facilities and utility service facilities • Restaurants • Retailandwholesale establishments • Light manufacturing and research facilities 2.2.3 Neighborhood Centers Neighborhood Centers are established to provide convenience goods and services primarily for the residents of a -specific neighborhood. These Centers should be accessible via sidewalks, trails or greenways, creating identity for individual neighborhoods. Neighborhood Centers characteristically have few environmental impacts and rely more upon .service related provisions such as law enforcement and fire protection. New development -within these Centers shall therefore mitigate the impacts associated with its use. Neighborhood Centers include, but are not limited -to the following activities and services: • Small parks • Civic uses, such as places of worship, libraries, and community centers • Public facilities, such as -schools • Service businesses, such as smaller offices • Residential mix 2.2.4 Residential Residential districts within the MUD area are comprised of cohesive, identifiable and diverse neighborhoods. The county encourages comprehensive and coordinated neighborhood design -efforts in developments, especially with regard to circulation provisions, conservation of natural -features, and relationship to established -neighborhood centers. The county also encourages diversity of homing types, including owner -occupied and rental housing, which serve all economic segments of the population and match local incomes and age groups. Higher residential densities shall be situated within close Mined Use Development Plan Page 15 proximity to the designated neighborhood centers. Each neighborhood shall have an interconnected network of local streets that provide direct connections to local destinations. The successful design and development of residential neighborhoods within the MUD area is essential for it to function efficiently and provide a sense of place and community identity. Developments are encouraged to incorporate design features which enhance tht quality of the neighborhood and promote safety for its residents. An example of varioc design considerations for subdivisions is illustrated in Figure 2.1. Keyed to the illustration are twenty-seven important points: Figure 2.1 Design Consideration for Subdivisions lyBtl✓r�tBB� tal .,RPlaL! fir -l. ws,q .Jr l� , fir iy : }^fit I / ly ,, Y p k Yfl� jr "ham, n! � U ` K J 1': 1 I � rya Y Design Considerations for Subdivisions 1. A 15 -foot easement for a planting screen provides protection from nonresidential use. 2. A 10 -foot walk easement gives access to the school. 3. A cul-de-sac utilizes an odd parcel of land to advantage. 4. A turnaround right-of-way is 100 feet in diameter. 5. Street trees are planted approximately 50 feet apart where no trees exist. Mixed.Use➢evelopment Plan. Page 14 Mixed Use Developmeutplan Page 16 The South Weld Sun Page 10 December 5, 1996 6. An additional building setback improves the subdivision entrance. 7. Street intersections at right angles reduce hazards. 8. The lot side line is centered on the street end to avoid car lights' shining into residences. 9. Residences opposite the street end are set back farther -to reduce glare from car lights. 10. Three-way intersections reduce hazards. 11. Property lines are on 30 -foot radii at corners. 12. Lot lines are -perpendicular -to street right-of-way lines. 13. An "eyebrow" provides frontage for additional lots in a deeper portion of the block. 14. A secondary roadway eliminates the hazard of entering a major thoroughfare from individual driveways. 15. There is a provision for access to land now undeveloped. 16. A neighborhood park is located near the center of the track. Adjacent lots are wider to allow fora 15 -foot protective side -line setback. 17. The pavement is shifted within the right-of-way.to preserve existing trees. 18. Aboveground utilities are in rear -line easements. 19. A 10 -foot walk easement provides access to a park. Adjacent lots are wider to allow for a 15 -foot protective side -line setback. 20. Variation of the building line along a straight street create interest. 21. Screen planting gives protection from noise and lights on the thoroughfare. 22. Lots backing to land outside of the subdivision are given greater depth for additional screening. 23. Low planting at street intersections permits clear vision. 24. A wider corner lot permits equal building setbacks on each street. 25. Platting of the block end avoids locating property boundaries and residences directly across the street from one another. 26. Lots are sided to the boundary street where land use across the street is different. 27. Paved sidewalks create a sense of place and allow pedestrians to move safely throughout the subdivision. 2.2.5 Limiting Site Factors Areas comprised of Limiting Site Factors contain certain physical elements that obstruct or are hazardous to certain types of development. These physical elements include floodplain, critical wildlife habitat areas, aquifer recharge, riparian areas, topographical constraints and other similar inhibiting elements. Although these sites contain factors which limit certain types of development, these areas are nevertheless usable for agricultural production, recreational activities and parks, or other functions that cannot damage or be damaged by the constraining site factors. These areas can also enhance the character of the MUD area by providing corridors for trails and wildlife, and for the protection of natural resources, riparian habitats, and natural features essential to the identity of the MUD area. Mixed Use Development Plan Figure 2.2 Common Open Space and Maximum Lot Coverage Note: Open Sj:n : ;u»_cts the dcvubaprenn; by 1,5 enjoyable spat buttering NOM. 15% of the commercial lot is w,m stun rna plantings Page 17 Mixed Use Development Plan Land designated as having Limiting Site Factors on the Structural Land Use Map 2.1, are primarily defused by the 100 -year floodplain (as defined by FEMA Flood Insurance Rate Maps) which comprises approximately 4,500 acres, or 38% of the total designated area in the MUD area. Sites shown with limiting factors also incorporate other important natural features as well, including wildlife habitat, mature riparian areas, primary drainageways and sand and gravel resources. Therefore additional land containing Limiting Site Factors is shown along irrigation canals, ditches and adjacent to lakes. To the maximum extent practical development within areas having Limiting Site Factors shall be located to preserve the natural features of the site, to avoid areas of environmental sensitivity, and to minimize negative impacts and alteration of natural features. 2.3 Common Open Space Regulations All Planned Unit Developments (PUDs) within the MUD area shall preserve a portion of the site as common open space. "Common Open Space" is defined as any usable parcel of land or water essentially unimproved and set aside, dedicated, designated or reserved for public or private use or enjoyment or for the use and enjoyment of owners or occupants of land adjoining or neighboring such an area. Common Open Space includes landscape areas that are not occupied by buildings or uses such as storage or services areas, private courtyards, parking lots and islands. In all PUD districts except for those containing residential uses, common open space may include landscape setbacks adjacent to roadways, where the setbacks are not utilzed as parking or storage areas. Common Open Space is not to be included in the calculation of the maximum coverage per lot. The minimum percentages of each development devoted to Common Open Space are listed in Table 2.2. Common Open Space shall be delineated in the sketch plan phase of the PUD process. In areas preserved as Common Open Space, a detailed description of the type(s) of grass and landscaping which will be utilized and -the maintenance schedule for such landscaping shall be submitted to the Department of Planning Services. Table 2.2 Common Open Space for Land Use Categories Land Use Designation Percent of Common Open Space Required Employment Center -High Intensity 20% Regional Commercial - Medium Intensity 20% Neighborhood Center - Low Intensity 20% Residential - Mixed Intensity 20% Limiting Site Factors - Lowest Intensity 20% tt� �tttttt� 2.4 Maximum Lot Coverage Regulations Page 19 All land use applications in the MUD area shall adhere to the regulations governing the maximum percentage of lot coverage. The maximum lot coverage is defined as the maximum percent of the total area of a lot in a zone district that shall be covered by any structure. Land shall not be deemed covered if it is used for growing grass, shrubs, trees, plants or flowers or if covered by decorative gravels or wood chips, or if it is otherwise suitably landscaped. The percentage of coverage on a lot shall not include the area of the lot or development designated as common open space as outlined in Table 2.2. The percentages outlined in Table 2.3 shall be deemed the maximum lot coverage for each zone district within the MUD area. Table 2.3 Maximum Lot Coverage in the MUD Area Zone District Percent of Maximum Lot Coverage within the PUD District C -1, C-2, C-3, C-4, 1-1. I-2,1-3 85% R -I, Estate, A' 50% R-2, R-3, R-4, R-5 60% gncultural zone districts in planed areas 2.5 Planned Unit Development Districts in the MUD Area 2.5.1 Intent The Planned Unit Development (PUD) provisions shall be applied to all proposals for commercial, industrial, and residential developments within the MUD area, with the exception of those developments specifically called out and excluded in this policy document. All PUD Districts in the MUD area shall adhere to the procedures -and requirements outlined in the Weld County Planned Unit Development Ordinance. 2.5.2. Exemptions from the PUD District Provisions The following uses are exempt from utilizing the PUD process within the MUD area and will require a Use by Special Review (USR) application: 1. Sand and Gravel Mining Operations 2. Home Businesses as defined in the Weld County Zoning Ordinance, as amended 3. Agricultural Service Establishments primarily engaged in performing agricultural, animal husbandry, or horticultural services on a fee or contract basis, including such uses as outlined in section 31.4.2 of the Weld County Zoning Ordinance, as amended. Mixed Use Development Plan Page It Mixed Use Development Plan Page 20 December 5, 1996 The South Weld Sun Page 11 The following land use applications are exempt from utilizing the PUD process in the A (Agricultural) Zone District within the MUD area: 1. Recorded Exemption 2. Subdivision Exemptions 3. Amendments to Recorded and Subdivision Exemptions 4. Zoning Permits -for Mobile Homes 5. Zoning Permits for Accessory Dwellings 6. Manufactured Home Zoning Permits 7. Certificate of Compliance 8. Flood Hazard and Geologic Hazard Development Permits 2.6 Landscaping Regulations 2.6.1 Intent Landscaping is extremely important for ensuring the quality of development in the MUD area. Trees, shrubs, and other plantings add greatly to the aesthetic appeal while controlling erosion, reducing glare, loweringdemperatures, buffering sounds, and blocking or diverting wind. As no single landscaping plan can be prescribed for all developments due to differing land features, topology and soils, the county allows flexibility and encourages creativity in landscape designs. Landscaping must be sensitive to the characteristics and maintenance requirements of the planting selected. Species must be chosen that are hardy for the climate and soil conditions in the MUD area, that can tolerate traffic, are resistant to disease -and insects, and whose maintenance needs can be met The following landscaping standards set minimum requirements for all developments within the MUD area. 2.6.2 Design Criteria I. Landscapes shall utilize the following principles for maximum use of water: (1) well planned and approved planting schemes; (2) appropriate selection of drought tolerant turf species to minimize water needs and the use of water hungry species of turf; (3) mulch to reduce evaporation: (4) zone plant groupings according to their microclimatic needs and water requirements; (5) improvement of the soil with organic matter if needed; (6) efficient irrigation design; and (7) proper maintenance and irrigation scheduling. 2. Landscapes shall consist of a variety of species. A partial list of plant materials that are native or adapted to Colorado's Front Range is included in the appendix. Plant materials that are discouraged within this area include: I. Cotton bearing Cottonwoods (Populus) 2. Siberian and Chinese Elm (Ulmus) Mixed Use Development Plan Page 21 3. Tree of Heaven (Allianthus) 4. Russian Olive (Eleagnus Angustifolia) 5. Purple Loostrife (Lythrum Salicaria) 3. Buildings and parking areas shall be located to preserve and promote the health of existing trees. The applicant shall be responsible for locating and preserving, where feasible, all individual trees of 4 -inch caliper in size or larger, and massed groups of small trees. Before construction, the following precautions shall be taken to preserve quality trees: a. The applicant shall submit to the Department of Planning Services a detailed landscape plan delineating the existing and proposed trees, shrubs, ground covers, mtural features such as rock outcroppings, and other landscaping elements. The plan shall show where landscaping exists or will be located along with planting and construction details. Where existing plantings are to be retained, the applicant shall include in the plans proposed methods of protecting the plantings during construction. b. The applicant shall demonstrate to the Department of Planning Services that the maximum possible landscaping was preserved or relocated through the development process. c. Heavy equipment shall be kept at least 5 feet from tree drip lines to prevent tree roots from being damaged. 4. Whenever the use of the property to be developed or redeveloped will conflict with the use of adjoining property, there shall be an opaque planted screen between the two properties. The screen shall moderate the impact of noise, light, aesthetic concerns, and traffic. 5. All landscapes shall strive to maximize the use of native species. Where native material is not appropriate for the intended use or appearance, plant species that are regionally adapted and non-invasive shall be used. 6. Fescue, brome/fescue, or other turf types shall be used in lieu of bluegrass where heavy foot traffic is not anticipated. Seeding versus sodding of all turf types is preferred when the growing season allows for adequate germination and establishment of the turf to sufficiently control erosion. 7. Landscape areas shall be configured to maximize their interconnectivity within the site, to natural areas. and to landscape areas within existing or future adjacent development. Small isolated islands of landscaping except as required in parking lots and for screening along roadways shall be avoided. Open space shall be provided where significant natural features exist. 2.6.3 Landscaping Requirements for Parking Lots 1. At least ten (10) percent of the area of a parking lot must be landscaped if the lot contains 10 or more spaces. The requirement shall be counted toward the common open space requitement of each zone district. At least seventy five (75) percent of the required landscape area shall include living plant material. 2. Berming and shrub or tree planting shall be used to screen parking lots from view of the roadway. Berms can vary in height depending on location and proximity of existing trees. Berms shall have smooth transitions from the -top of the curb to the setback line so as to not create snow traps, with allowances made for placement of the sidewalk. Grading of berms shall not be lumpy or abrupt. (See Figure 2.3) Figure 2.3 Berming and Screening Parking �aREE'r �` �nn�s.,sPE c.a,,, noENT pwq - n6E.x 3. Landscaping techniques shall be used to alleviate the harsh visual appearance that accompanies parking lots. (See Figure 2.4) At least 75 percent of the length of the frontage of the parking lot must be effectively screened. 4. A minimum of 5 percent of the parking area shall be landscaped exclusive of setback areas. Trees planted in parking areas should be either in bays or planting islands of at least 5 feet by 5 feet. Trees should be distributed throughout the parking area (See Figure 4.5). Mixed Use Development Plan Figure 2.4 Screening Parking from Roadways Page 23 5. Loading, service, or storage areas must be screened with an opaque screen that is an integral par of the building architecture. Chain link fencing with slats or pallets are not an acceptable screening material. Plant material shall be used to soften the appearance of the screen. Figure 2.5 Screening Parking and Structures SiN4 25 , f�EEE' EVP� 15' O � Rp'•vET sFr.cE P.R...,.,, .\\i 111 \ t---._ raaov-.v-__rs Note: Set streetlights 6' from curb in setback Setbacks vary in each zone district Drawing may not depict accurate setbacks Mixed Use Development Plan Page 22 Mixed Use Development Plan Page 24 The South Weld Sun Page 12 December 5, 1996 2.6.4 Landscaping Requirements Along Roadway Corridors 1. Intent The major roadway corridors within the MUD area are I-25, State Highway 119, State Highway 66, and Weld County Road 1. These roadways play an important role in the function and image of the MUD area. The following design standards relate to the visual quality of these four roadways. As the MUD area develops, additional roadways may require similar consideration as these existing major roadway corridors. This determination will be made by the Weld County Department of Public Works and the Colorado Department of Transportation. All roadways that are not considered major roadway corridors are considered secondary roadways. 2. Design Criteria a. Plantings along road right-of-ways shall be integrated with the; rest of the site. b. That portion of a lot in -any zone district which abuts a public or private road right- of-way shall be landscaped with a minimum 2 1h -inch caliper shade tree or 6 -foot minimum height coniferous tree at a distance of ten (10) feet, measured at a right angle from the lot line towards the interior of the lot, for every 40 linear feet of street frontage. Trees may be grouped with a maximum distance of 100 feet between trees or groupings, with exceptions made at entrance drives. c. A minimum landscape setback along 1-25 and SH 119 shall be fifty (50) feet measured from the existing or planned future right-of-way. d. Along 1-25, State Highway 119, State Highway 66, and Weld County Road 1, tree planting distances shall be clustered or grouped from the t'oadway to avoid a straight line of trees. The effectiveness of the screening shall be increased by planting trees and shrubs in layered beds (two or more rows of plant material rather than a single row). A mix of coniferous and deciduous trees and shrubs shall be planted in clusters or groupings. e. Applicants adjacentto I-25 and/or SH 119 shall construct a berm along I-25 and/or SH 119 with maximum 5:1 side slopes to a height sufficient to screen ground plane development (parking lots, storagd $Peas; or other similarrsite elements) as far as 180' from the right-of-way line (50' of landscape setback plus 130' of site development). The maximum height berm required shall be 6' above the existing elevation in the location of the berm. If needed, additional height beyond that which can be achieved with a 6' high berm shall be achieved through dense landscape plantings. Plantings on top of berms shall be designed so as to not create snow traps. A berm may not be required if the subject property is elevated Mixed Use Development Plan Figure 2.6 1-25 Corridor Treatment I Pronpoiul dn,lonnnn,, m 1.15Comdor a«�� 1o,,n .aer ; 525 com1ar Page 25 Mixed Use Development Plan Page 27 above the roadway and it can be demonstrated that views into the site will not be possible for a distance of 180'. Required landscaping and screening within the landscape setback and other portions of the property shall be governed by the landscape standards contained within this document and any other more restrictive requirements contained in the Wq'¢cgprty,_oning and Subdivision Ordinances as amended. f. There shall be a minimum twenty-five (25) foot wide landscape setback along SH 66 and WCR 1 measured from the existing or planned future right-of-way. g. There shall be a minimum twenty (20) foot wide landscape setback measured from the existing or planned future right-of-way to any parking lot, fencing, storage area, or structure. Required landscaping and screening within the landscape setback and other portions of the property shall be governed by the landscape standards contained within this document and any other more restrictive requirements contained the Weld County Zoning and Subdivision Ordinances, as amended. h. Fieures 2.6 through 2.9 illustrate the proposed character, berming and landscape setbacks for the I-25 and SH 119 corridors. Pc.=;^ Ii.� Figure 2.7 1-25 Corridor Treatment Travel Lane Viewpoint Plan _1 ._L! I -2f ver,potr.: . ts:C„e 1 __! o ter_ It St PI di b Mixed Use Development Plan Page 26 Mixed Use Development Plan December 5, 1996 The South Weld Sun Page 13 Figure 2.8 I-25 Corridor Treatment Frontage Road Viewpoint 2.7 Transportation and Circulation Regulations try .vA•V x Plan ro x Section J_ Art,Wia r : poia' • ezd elew zr b<w • 20 r..p tt•.5ore Parm.at edit AVP'-/5550'P Y.<e Oe.W6 P. -2,w2)64 9,r '�EcI.G; /vE sr,�HP'• fe.-94'7//Jdg Mixed Use Development Plan Figure 2.9 State Highway 119 Corridor Treatment 2.7.1 Intent As transportation demands increase in the MUD area, the need to preserve the functional integrity and hierarchy of the existing roadways and provide new roadway capacity is becoming increasingly important. The purpose of this section is to provide for the planning, design and construction of improvements to new and existing roadway facilities consistent with the Weld County Comprehensive Plan, Zoning, Subdivision and PUD Ordinances. The intent of these standards is to provide for a certain level of performance. Consequently, if it can be shown that an alternate design, material or procedure will provide performance equal to or better than the required design, material or procedure, that alternate may be approved by the Weld County Engineer. 2.7.2 Traffic Impact Analysis All significant developments within the MUD area shall be required to prepare a traffic impact analysis. All traffic analysis information and report shall be prepared and certified to by a registered professional engineer competent in traffic engineering. The intent of this analysis is to determine the projects cumulative development impacts, appropriate project mitigation and improvements necessary to offset a specific project's impacts. The county may require the developer to contribute for payment of the costs of said improvements through an improvements agreement. All traffic impact analysis shall contain, as a minimum, the following information: 1. Introduction: a. Describe the proposed development and parameters of the study area. 2. Existing Conditions: a. The street capacity standard in the MUD area is Level of Service C and the intersection capacity is Level of Service D. b. Conduct a.m. and p.m. peak hour turn movements and average daily traffic counts for intersections and links within the study area if there are no available counts collected within the previous 12 months. c. Conduct a peak hour intersection level of service analysis for the intersections. d. Determine whether the existing daily traffic volumes exceed the arterial daily volume standards as identified in the MUD street standards for major arterial, arterial, secondary, collector, and local streets presented in Figure 2.10 Roadway Cross Sections. These standards delineate right-of-way, lane configurations, median treatment, bike lanes and pedestrian sidewalks. Page 29 Mixed Use Development Plan rso;nssm,d:U n 'doing sn uv Page II 3. Cumulative Conditions: a. Identify previously approved or anticipated developments that may affect the study area's circulation system. b. Generate, distribute, and assign traffic to the existing roadway network. c. Determine annual growth rates and project future traffic volumes for the time frame corresponding to project build'outr - d. Identify funded circulation improvements, both public and private, that will be constructed prior to the proposed development's occupancy. e. Conduct a peak hour intersection level of service analysis and compare daily volume -forecasts to street standards assuming cumulative developments, annual growth rates, and funded improvements. f. Determine mitigation measures to offset cumulative conditions if level of service exceeds the MUD area standards. 4. Trip Generation: a. Determine daily and a.m. and p.m. peak hour trip generation for the proposed development using established rates identified in the Trip Generation Manual published by the Institute of Transportation Engineers or as agreed to with county staff. 5. Trip Distribution: a. Based on assumptions contained in the MUD area traffic analysis or market estimates, describe the anticipated trip distribution patterns for the proposed development. 6. Trip Assignment: a. Based on the projected trip generation, assumed trip distribution, and the prevailing roadway network, assign the projected traffic to the intersections and streets within the study area. 7. Existing + Committed + Project (E+ C+ P) Traffic Volumes and Level of Service: a. Add project a.m. and p.m. peak hour and daily traffic volumes to existing plus committed traffic volumes. b. Conduct intersection level of service analysis and determine whether daily traffic volumes exceed street standard thresholds. 8. Signal -Warrant Analysis: a. The I-25 MUD Transportation Network, Map 2.2 identifies future locations for signalization; signals, however, should not be installed prior to when they are needed. b. Using the ASHTO Manual on Uniform Traffic Control Devices (MUTCD), determine whether proposed intersection volumes exceed signal warrants for those locations on the transportation network where signals are proposed. Mixed Use Development Plan Page 30 Mixed Use Development Plan Page 32 9. Access: a. Projects involving access to the state tughw-av ssrsr s:i.. zcase iccr-xrare conformance to the latest revisions of the state htghw-as access ;tis shall discuss how the proposed development meets the access control raaieimes ss presented in Section 3.4.2 of this plan. 10. Mitigation Measures: Mitigation measures will be to implement the needed improvements to offset project impacts as determined by the traffic impact anaylsis. 2.7.3 Design Standards All development within the MUD area shall comply with the Weld County Comprehensive Plan, Zoning, Subdivision and PUD Ordinances, and the Colorado State Highway Access Code 2CCR 601-1. Geometric Design Standards Geometric design for streets and roads shall be in accordance with A Policy on the Geometric Design of Highways and Streets published by the American Association of State Highway and Transportation Officials. Specifications, standards, or design criteria published by the other governmental agencies, professional organizations, or generally accepted authoritative source may be used in geometric design. All specifications, standards, or design criteria shall be referenced and copied as part of the submittal information. Road Structure Structural capacity shall be designed in accordance with the Guide for Design of Pavement Structures published by the American Association of State Highway and Transportation Officials. Specifications, standards, or design criteria published by other governmental agencies. professional organizations, or generally accepted authoritative source may be used in design. All specifications, standards, or design criteria shall be referenced and copied as part of the submittal information. 2.7.4 Circulation System The proposed MUD circulation system is'}14esen[ed on Map 2.2, Transportation Network. The transportation network reflects a hierarchy of roads, from a major arterial which serves both the regional and local traffic with higher speeds and capacities with controlled private access. to a collector which serves local traffic and provides access to future Mined L se Deselopment Plan Page 33 development. The proposed hierarchy of roads includes both reconstruction and/or widening of existing roads and alignments for new roads. The transportation network also identifies locations of future signals. The MUD roadway cross sections are identified in Figure 2.10. Roadway classifications may change as development in the MUD area occurs. Roadway classifications may be re- evaluated by the Weld County Engineer with the results of the Traffic Impact Analysis. Fig. 2.. ROADWAY CROSS SECTIONS Fig. 2IC ,continued) 7 DETAIL s. , _ $$ sH ne wc��za h <r r 41-1 1 ,� ° 7.T� — I r I I • • III i_25 '_� I ♦ I — W m , )i k�_ s I - 4T ��� s 2 1\1 � "'t n 9 ,Nl' ' i ) r; I, I ue, 1 ' , f,, Iw ; ' Legend I-25 MUD Neu Boundary interstate Sane - lector Ngnd 9 e.� SN.• 1-25 Mixed Use Development Area Comprehensive Plan Map 22 Structural Transportation Network *90,15 ,en.nhe,g« rum AS wnCOLCUS Mined Use Development Plan Page 34 December 5, 1996 2.8 Sign District Regulations 2.8.1 Intent Within the MUD area, signage has become an increasing issue, especially along 1-25 and State Highway 119. While signs serve as important directional, informational and advertising tools, the clustering of signs may obscure the landscape and confuse and distract drivers. The following signage controls are intended to protect and preserve the visual quality of the roadways within the MUD area while preventing the obstruction of traffic visibility and confusion from improperly placed and designed signs. These provisions control the magnitude, placement and number of signs in the MUD area. 2.8.2 Sign Provisions and Requirements 1. No sign shall be structurally erected, enlarged, constructed, reconstructed, relocated, refaced or otherwise altered in the MUD area without first obtaining a building permit from the Weld County Department of Planning Services. 2. No sign shall be erected at or near the intersection of any road(s) or driveways(s) in such a manner as to obstruct free and clear vision of motorist or at any location where, by reason of the position, shape or color, it may interfere with, obstruct the view of, or be confused with any authorized traffic sign, signal or device. Signs located at an intersection must be outside of the sight distance triangle. 3. No sign other than traffic control signs shall be erected, constructed, or maintained within, over or upon the right-of-way of any road or highway within the MUD area. 4. All signs and components, including supports, braces, and anchors, shall be of sound structural quality and shall be kept in a state of good repair with a clean and neat appearance throughout the MUD area. If signs are not maintained as described, the Director of Planning or an authorized representative shall have the right to order the repair or removal of any sign which is defective, damaged or deteriorated, has defects which may include holes, cracks, rotted, loose or missing materials or parts of the sign. 5. The following signs are not permitted within the MUD area: a. Roof signs where any sign is mounted and supported wholly upon or over the roof of any structure. For purposes of these regulations, surfaces with slopes less than 75% from horizontal shall be considered to be roof surfaces. Mixed Use Development Plan The South Weld Sun Page 15 constructed or maintained under the standards will comply with the sign regulations of the county in the MUD area and shall be for the purpose of assuring harmony and visual quality throughout a project. Final development plans shall not be approved until the sign standards have been approved by the Board or planning staff. All signs in development complexes shall be designed and constructed of materials which harmonize with the architecture of the site on which the sign is located. Generally, the use of sign materials the same as or similar to the main building materials used on -site shall be found to provide the required level of design harmony. 2. Attached Signs: Size, Height and Design Limitations: a. Awning Signs shall not be larger than twenty-five (25) square feet. nor 10% of the awning surface area whichever is smaller. b. Marquee, Canopy, Overhead Canopy, Under -Canopy, Projecting or Wall Signs: 1) Minimum Height Requirements: These signs shall be mounted at least fourteen (14) feet above any driveway and at least nine (9) feet above any walkway over which they are erected. 2) Maximum Height Requirements: The top line of these signs shall not be higher than the top of the wall, roof eaves, or parapet line of the building to which it is attached. 3. Detached Signs: Location, Size, Height and Design Limitations a. Detached signs shall not be located in the visual sight triangle. b. Off -site detached signs shall have a minimum setback of twenty-five (25) feet and a minimum offset of ten (10) feet from the road right-of-way. c. On -site identification signs shall have a minimum setback of fifteen (15) feet and a minimum offset of ten (10) feet from the road right-of-way. d. Detached signs shall have surrounding landscaping which extends a minimum of three feet from all sides of the sign base. e. The total height of any monument or pole sign shall not exceed twenty-five (25) feet above the adjoining ground elevation. f. Monument signs shall have an enclosed, solid base or structural base with the base at least three -fourths the width of the widest part of the sign face. An enclosed or solid sign base shall not be required if the lower edge of the sign face is not higher than one (1) foot above the finished grade. Monument signs shall be on -premise signs, the sign area shall not exceed twenty-five (25) square feet, and the sign shall not exceed five (5) feet in height above the average adjacent grade, if located fifteen (15) feet from the street right-of-way. For each additional two (2) feet of setback from the street right-of-way, one (1) additional foot may be added to the height of the sign to a maximum of eight (8) feet. 4. The minimum spacing between signs shall be six hundred (600) feet. Page 39 Mixed Use Development Plan Page 41 b. Motor vehicles, trailers or portable bases with wheels or to which wheels may be readily affixed shall not be used as a sign structure for any signs within the MUD area c. Attention attracting devices are prohibited including mechanical or electrical appurtenances, such as "revolving beacons" which are designed to compel attention. This shall not apply to banners used as temporary signs.to announce or promote events of federal or state civic interest provided such banners are attached top and bottom (or two sides) to permanent posts or buildings erected for another purpose, and provided that a building/sign permit is obtained. d. All temporary signs shall be removed within ten (10) days after the event(s) promoted. 2.8.3 Sign Construction Standards 1. All letters, figures, characters, or representations maintained in conjunction with, attached to or superimposed upon any sign shall be safely and securely built or attached to the sign structure. 2. Any openable or removable parts of a sign such as a service opening cover or changeable mechanically affixed lettering, logo, insignia or message shall be securely fastened or be provided with safety chains or hinges. 3. Signs shall be constructed to prevent potential hazards to the public. 4. All permanent signs and sign structures in the MUD area shall be designed and constructed to comply with the Uniform Building Code as adopted by the county. All electrically illuminated signs shall be designed and constructed to conform with the electrical code as adopted by the county. All signs and sign structures shall be also designed and constructed to comply with the design standards set forth in this document. 2.8.4 Design Standards I. Requirements for Signs in the MUD Area The owner, or applicant as agent for the owner, shall prepare a set of sign standards for all exterior signs in any development complex. Such standards shall be included as part of any site plan approved for the overall development complex. The size, colors. materials, styles of lettering, appearance of any logo, type of illumination and location shall be set out in such standards. The standards shall be such that signs 2.8.5 Nonconforming Signs Every legally established sign in existence on the effective date of these regulations within the MUD area may continue in existence subject to the following: 1. A sign shall not be altered structurally or moved unless it is made to comply with the provisions of these regulations. The changing of the movable parts of an existing sign that is designed for such changes, or the repainting or reposting of display matter shall not be deemed a structural alteration. 2. The lawful use of a sign existing on the effective date of these regulations, although such sign does not conform to the provisions hereof, may continue; but if such nonconforming use is discontinued for a period of six (6) months or more, such sign shall not be used until it has been made to conform with the provisions of these regulations. 3. Any sign which has been damaged by fire, wind, explosion, or act of God to the extent that fifty (50) percent or more of the construction value or replacement cost of the sign before it was damaged shall be deemed to have been totally destroyed and the sign shall not be restored except in conformity with these regulations. Any sign which has been damaged to an extent less than fifty (50) percent of the construction value or replacement cost of the sign before it was damaged may be restored to the condition which it existed previously as a nonconforming use prior to its damage. 2.9 Utility, Infrastructure and Public Facility Regulations 2.9.1 Intent By their nature, most utility services are highly regulated. This regulation encompasses ownership, financing, competition, cost recovery, construction, environmental protection and safety. Given this regulatory and legal environment, well -established federal, state, county and industry standards/codes exist that govern most aspects of utility service. The intent of this section is to provide additional regulations and standards for water supply to meet fire flow demands, solid waste collection service, and to provide standards for public facilities and services throughout the MUD area. 2.9.2 Water Supply and Sewage Disposal The specifications of water supply requirements for fire protection within the MUD area is provided by the Mountain View Fire Protection District. The Mountain View Fire Mixed Use Development Plan Page 40 Mixed Use Development Plan Page 42 The South Weld Sun Page 16 Deccrther 5. •'?3f. Protection District shall be consulted concerning the fire district's fire requirements. The Weld County Comprehensive Plan specifies that the water supply system serving a proposed development site or zone district must deliver a minimum of 500 gallons per minute at 20 pounds per square inch residual pressures for 30 minutes. The St. Vrain Sanitation System, a private sanitation system, shall service all sewage disposal within the MUD area for uses except those specifically called out and exempted from the PUD process in Section 2.5 of this plan. 2.9.3 Solid Waste Rcsicentinl and commercial solid waste collection services in the area shall be arranged d.recds between solid waste disposal firms and property owners/managers. Solid waste disposal shall be accomplished by collection firms at licensed disposal facilities. 2.9.4 Storm Drainage Design and Technical Criteria Weld County does not publish technical data or storm drainage design manuals. The consulting engineer for the developer is to use published material by a generally accepted authority approved by the Weld County Engineer. The material used must be referenced and copied as part of the submittal information. All development within the MUD area shall adhere to the Storm Drainage Design and Technical Criteria regulations in Section 10.13 of the Weld County Subdivision Ordinance. 2.9.5 Schools In the fall of 1995, the St. Vrain Valley School District proposed the following standards for consideration by Weld County government. 1. All residential PUD applications shall be referred to the applicable school district for review and recommendation regarding school district requirements. The Department of Planning Services. Planning Commission and Board of County Commissioners shall consider the recommendation of the school district. 2. Elementary schools (grades K-5) will occupy sites with a minimum area of 10 acres, middle schools (grades 6-8) will consist of a minimum of 25 -acre sites, and high schools (grade 9-12) will consist of a minimum of 40-acr9 sites. 3. Schools sites shall be located as required by the St. Vrain Valley School District. They shall be located near established neighborhoods, connected to trail systems and designated bike routes, and adjacent to neighborhood parks whenever possible. Elementary schools shall not border major arterial or collector roadways. Mixed Use Development Plan Page 43 A residential subdivision application shall be referred to the applicable school district for review and recommendation regarding school district requirements. The Department of Planning Services, Planning Commission, and Board of County Commissioners shall consider the recommendation of the school district. Table 2.4 School Allocation Standards in the MUD Area Type of School Students/DU - Minimum School Capacity DU/School Acres/School Elementary K-5 0.35 525 1500 10 Middle School 6-8 0.14 750 5200 25 High School 9-12 0.17 1200 7000 40 Section 3. Inventory of Existing Uses The Mixed Use Development area (MUD area) was recognized in i --- -...c : _ _ Comprehensive Plan as a future urban development corridor within S_s :. ' C _: S - • - a minimal amount of development has occurred; however, recent acts .:. _ _. __t - area and in the surrounding communities. This development activity aLs rem:, -_c.: long-term approaches to planning in the region, and resulted in the iaiaation process. 3.1 Intent This Section of the plan presents a detailed description of the urea's ado. and s: _._. characteristics, regional influences and market trends. The most logical _s, lard of public facilities is presented, so as to create a community structure drat ,s so..:-sesta:ain_. -:..- total build -out of the area in this plan is considered to be 120 dwelling mit Is eve s.._. The stra_:art transportation and roadway plan depicts proposed roadways as bmld-c r. occurs n the area. 3.1.1 Background Planning The preparation of the MUD Plan is a result of several phases. In each phase, constant communication occurred through regular meetings with the Technical Advisory Committee. Weld County Department of Planning Services' staff, County Commissioners and public meetings. Planning for the MUD area began by analyzing a variety of plans, studies, agreements, ordinances and general service information concerning the area. This information was reviewed and evaluated for possible influences on the MUD planning area. Existing conditions were evaluated extensively. With the assistance of key members of the Technical Advisory Committee and Weld County Planning staff, regional influences, existing land uses, zoning and planned developments were identified. The types, numbers and location of services were delineated and evaluated in terms of existing capacity and ability to respond to growth. Services evaluated included utilities, transportation systems, community and civic services, and parks and open space. To understand the market forces influencing the area and project expected growth, a real estate market analysis was conducted during the early phases of the study. Land use plan alternatives were developed and evaluated in terms of population densities and levels of commercial, industrial, and retail development. Each alternative reflected viable growth patterns based on the expected trends in the area, its ability to sustain growth and current planning practices. After careful consideration by commissioners, staff and citizens, a preferred alternative was selected and utilized in the creation of the MUD Plan. Mixed Use Development Plan Page 45 3.2 Inventory and Analysis This section provides an overview of existing conditions in the MUD area that influence planning. Physical characteristics, land use, regional influences, development, zoning and permitted uses defuse the basic structure and point of departure for future planning. Service conditions, including fire protection, law enforcement, and community services are presented in terms of how the area is served today, the general cost of providing services and the ability of existing services to respond to growth. The existing transportation framework is described, including current traffic volumes and planned improvements by the Colorado Department of Transportation (CDOT). Utility infrastructure is evaluated in terms of current ownership, service district boundaries, financing, cost recovery mechanisms, and the ability to support development. Assumptions were made regarding likely development in the MUD area based on the location of existing utilities and the cost for service extensions. Existing parks, recreation and floodplain resources are identified not only within the MUD area but also areas located directly adjacent to it. Plans for improvements to adjacent parks and sites containing Limiting Site Factors are identified to provide a basis for prescribing continuity on a regional basis. 3.2.1 Existing Conditions 3.2.1.1 Regional Influences Regional influences to the MUD area are shown on Map 1.1 on page 2. The major regional elements of influence are Interstate 25 (I-25) and the St. Vrain Creek with its accompanying floodplain. 1-25 is the major highway providing access to Front Range communities. Due to the significant volume of vehicles that travel on this mad daily, each interchange along its length is considered prime for commercial development The two interchanges located within the MUD area at SH 119 and SH 66 provide a focus for regional growth. The St Vrain Creek floodplain cuts a relatively wide path in a general easvwest direction through the area. The associated drainageways and floodplains support important natural features, including native vegetation. riparian forest and wetlands. They also provide important corridors for wildlife migration. These corridors are logical places to designate as buffers to separate one community from another and for regional trail systems. As a related issue- flood control and drainage will need increasing attention as the area develops. Significant portions of the MUD area along St. Vrain, Boulder, and Idaho Creeks are relatively flax with high groundwater levels. Thirty-eight percent of this area (or about 4.500 acres) falls %Mtn the 100 -year floodplain, as defined on FEMA Flood Insurance Rate Maps. Development along Zee Mixed Use Development Plan PnBe 44 Mixed Use Development Plan Pep Se December 5, 1996 The South Weld Sun Page 17 waterways and within the floodplain is subject to a variety of regulatory restrictions, including the Weld County Comprehensive Plan, Clean Water Act and flood insurance policies. The waterways also present constraints for future development of the area. Expensive bridges would have to be constructed to complete major roadway connections. This inhibits efficient circulation, emergency response times and orderly growth. Associated with the floodplain are commercial sand and gravel deposits located along St. Wain, Boulder and Idaho Creeks and along secondary drainageways throughout the region. (Sand, Gravel, and Quarry Aggregate, Resources Maps, Longmont, Gowanda, Frederick, and Erie Quadrangle Maps, 7.5 Minute Series, by Ralph R. Shroba, June 30, 1974, USGS.) These mineral deposits will greatly influence the density and types of uses and restrict the ability to develop portions of the area. There are several towns that influence the MUD area with overlapping urban growth boundaries, recent growth and plans for future annexation. Weld County and these towns are currently developing intergovernmental agreements regarding annexations and urban growth area boundaries. Mead. located on the north side of the MUD area, currently has a citizen initiative to consider annexations and has no plan to extend further south in the future. An initiative was passed by citizens in April 1995 to require that all proposed annexations be subject to voter approvals by town residents. Firestone and Frederick, to the southeast, have been rapidly expanding their boundaries. Both communities are within one-half mile of the MUD area boundary, and may annex portions of the MUD area in the future, particularly areas with good industrial and commercial potential. Erie. located southwest of the MUD area, is more than four miles away and has no plans to extend farther north. Erie has, however, annexed portions of the 1-25 corridor south of the MUD area for uses that will generate sales and/or property taxes to support its community. Much of the region around the MUD area is considered prime agricultural land, having the best physical and chemical characteristics for producing food, feed, forage, fiber and oilseed crops. This land is rapidly disappearing along the Front Range as it is taken out of agriculture and developed for ia-bao use. When development actually occurs along the annexed portions of 1-25, there will be little left of the farmland and open space that has been the dominant landscape feature of this corridor. 3 ::: Sourtarni Lod Uses Mar : Amon the eanra s aujor had tees a the MUD sea As sawed a the previous section, me vQ_?r• ester a aooa. deiced primarily as agricaiod ants ad stated residential dwellings, a m "em >m seams d d:va,p.tm min at 1-255 H 119 ad,tie I-25191 fb thaschthges. The Sans st ales smog St '• =se dal std Sailer Crest midi r• ins a sirens r 102111110 aigasmorc =me es senate mod mi pastel moms Tim mime Mae d mood is sum ass — mem tom stair mesa Slim frame — aid •wed me ms ga-ms are arum: 'u mown mmessima V imam dumbed bed m '< }e _am Ewa sac se Is 1,M518 Vladimir. sere pay i mmgsm mmi ei m tilt. C asa brim mar m m memm et adL` s tea Mrs ad OR mate atipedind As c. Gelded bee gas stations, two motels and the 210 -unit River Valley Mobile Home Part When the 4 Veen Sanitation District was fanned in the mid 1980's, be food regmass, lodging facilities add rerimg service establishments were constructed on the west side of the I-25/SH 119 This has become a highly used stop for travelers. Barbour Ponds State Park, a regional recreational facility, is located as the north of the I-25/SH 119 achange and is a highly used water resource based park. The east side of this interchange features a different type of use. The Colorado National Guard operates a base there, and a number of light industrial uses in the Del Camino Business Park are situated along the frontage road. These businesses include the Hauser Chemical Food Flavoring Division, Gerard's Bakery, Flatiron Structures, Specialty Products (automotive products) and Dovatron Electrical. These facilities are characterized as one to two story light industrial uses. The I-25/SH 66 interchange lies partially inside the Town of Mead. This interchange has fewer retail uses than I-25/SH 199 interchange, with an emphasis on industrial activity. The Sekich Business Park occupies the northeast quadrant of the I-25/SH 66 interchange and features a variety of industrial uses. In the last two years, seven new industrial buildings containing a total of 75,000 square feet have been constructed in this area It also contains a small convenience center with a gas station and sandwich shop. The John Deere/Uniwest farm equipment supply center and a number of vacant panels occupy the southeast area of the interchange. I I ,.ur..i I - tit en,• MIN craw ®avu.r,r r-rlD a.ie.•• I m I nr, ® r•• rt. I It Ir.n c is , —man. • Mal. I.. 1-25 Mixed Use Development Area Comprehensive Plan Map 31 Existing Land Use And Roadways .wr.•r•mimar 3.2.1.3 Planed or Current Developments The following projects are currently seeking development approvals, or are in early stages of development as of September 1996. They are shown on Map 3.2. Long View- This residential project, currently under development by McStain Enterprises, includes 401 manufactured homes on an 80 -acre osrcelgn,thetigrth side of Highway 119 at WCR 3'/. Homes would be priced from 550,000 to 580,000. Meadow Vale: This recently -approved project proposes the construction of 89 dwelling units on a 155 -acre parcel on the north side of SH 119 at WCR 5/i. This development would feature larger homes, expected to range from 1,600 to 2,500 square feet, with prices from $175,000 to $300,000. Homes would be on one -acre lots, and the community would include a 10 -acre elementary school and an adjacent open space area. Other development proposals in the MUD area include a 5 -acre business park with sites for two 4,000 square foot buildings located roughly two miles west of Del Camino. 3.2.1.4 Zoning and Permitted Uses Planned Unit Developments (PUDs) occupy a significant portion of land within the MUD area The general land use within each PUD is shown on Map 3.2. When compared to the Existing Land Use and Roadway Map, Map 3.1, it is apparent that the majority of these PUDs have not yet been developed. The remainder of the MUD area is either still zoned as Agriculture or is zoned in relatively small fragments for Commercial, Highway Commercial, Industrial, or Mobile Home uses. Other areas in the MUD area have received Use by Special Review (USR) permits or Special Use Permits (SUP) to perform different activities other than the uses allowed by right in the Agricultural Zone District. The largest use obtaining a USR or SUP within the MUD area is gravel mining, with operations located on St. Vrain Creek, Boulder Creek, and Idaho Creek. These mines are in various stages of operation, with some completed and others not yet started. Map 3.2 shows the location of permitted gravel mines. Additional gravel mines can be anticipated along all of these drainages and may extendbeyond the floodplain depending on the economic viability of extraction. The Weld County Comprehensive Plan, in compliance with Colorado Revised Statutes (Section 34-1-305, 1995), states the following: "Access to future mineral resource development areas should be considered in all land use decisions in accordance with Colorado State Law. No Weld County governmental authority which has control over zoning shall, by zoning, rezoning, granting a variance. or other official action or inaction, permit the use of any area known to contain a commercial Mixed Use Development Plan Page 48 Mixed Use Development Plan Page 50 The South Weld Sun Page 18 December 5, 1996 3.2.2 Community and Civic Facilities and Services mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor." (Weld County Comprehensive Plan, 6-5.) It is difficult to forecast the life of these mines. They are constrained not only by the depth and quality of mineral reserves, but by market demand for these resources. Since gravel reserves are located below the water table in this area, the reclamation plans for mined lands would likely involve the constriction of man-made lakes. These lakes may eventually provide attractive settings for parks or for residential development. In the interim, however, sand and gravel mining issues may limit land development in these areas. Mixed Use Development Plan ® nu.. Hamra..w" u. a.., o * ./.-+ r.u.a.C.�o.t boa C7 w e. r—oa I a r..ar o,.,. Now MIN sss—, a MN mews nor This section identifies the types, numbers, and location of services that support the MUD area. Included is information regarding schools, law enforcement, fire protection and other community - based services. All services are provided by county agencies and districts. Currently, most facilities providing services are located outside the MUD area. Existing facilities are shown on Map 1.1, MUD Planning Boundaries. 3.2.2.1 Schools The MUD area is serviced by the St. Vrain Valley School District. Students living within the boundaries attend schools in Longmont, Frederick, and Mead. The majority of elementary and middle school students attend schools in the City of Mead Most high school students attend Skyline High School in Longmont. The following table summarizes existing building capacities and projected enrollments based on school district trends. Table 3.1 School Capacity and Projected Enrollments Schools ` Building Capacity Actual 1995 Projected Enrollments Average Yearly Growth Rate 1996 1997 1998 1999 2000 Elementary Mead 456 486 5/6 537 547 564 582 3.7% Frederick 840 813 825 821 849 850 849 0.9% Indian Peaks 480 483 497 528 546 563 607 4 7% Secondary Mead MS 349 3/1 314 330 345 358 359 2.9% Sunset MS 744 751 785 816 821 820 812 1.6% Frederick MS/HS 618 533 56/ 609 606 626 643 3.9% Skyline HS 1323 1082 /115 1/77 /245 1228 1255 3.0% Niwot HS 1152 1025 1048 1081 1099 1135 1290 3.2% Source: Sc Vrain School District Memorandum May 10, 1996 Notes: Italics indicate enrollment exceeds capacity MS = Mead Middle School, HS = High School Of the schools listed above, only two (Mead Middle School and Skyline High) show current enrollments that do not exceed capacity. The others currently exceed capacity or are expected to exceed capacity within the next few years. The most immediate need for additional school facilities is at the elementary level. There are no plans in place for new construction or expansion of existing schools serving the MUD area. School construction would require a future bond issue. Therefore, residential development Page 51 Mixed Use Development Plan 1-25 Mixed Use Development Area Comprehensive Plan Map 3.2 Existing Zoning and Permitted Uses 2.996 Page 53 would have an immediate impact on the schools serving the area. However, there are a number of short term solutions that can be used to mitigate the current over -capacity conditions. Portable classroom units are commonly used in the district and will continue to be used in the immediate future. Other. less popular solutions include busing students to below capacity schools or changing the existing assignment area boundaries. 3.2.2.2 Law Enforcement The Weld County Sheriff's Department's operation currently includes daily law enforcement activities, administration, code enforcement, and civil process. As of August 1996, there are 172 total staff working for the Weld County Sheriffs Department, including 100 swom officers and 72 support and administrative staff. The county is divided into four "beats" based on geographic location and caseload. There are five to eight officers assigned to each "beat." The MUD area is included in a "beat" that covers much of southwestern Weld County. Law enforcement responsibilities are shared by the eight officers assigned to this area. There is currently one satellite facility located just outside the MUD area. This facility is shared with the Mountain View Fire Protection District and is located at WCR 13 and WCR 24. There are physical characteristics inherent to the St. Vrain Creek Valley and adjacent lands tat contribute to the safety vulnerabilities of the area. Approximately 38 percent of the MUD area lies within the 100 -year floodplain of the St. Vrain, Boulder, and Idaho Creek. The threat of potentras flooding is a concern not only to the Sheriff's Department, but to other emergency services as we_. The creek also creates a natural barrier that bisects the MUD area. This limits access from one sx of the river to the other, causing a potential delay in response times by emergency services. A proposal to build a 620 -bed county jail in Greeley was approved by county vote in Novem w 1995. The first phase, 160 -bed unit, will commence construction in 1996 and should be completr= in 1997. This project will meet the incarceration needs throughout the county, including the MC2 area, for a number of years. Subsequent phases will be constructed as need arises and funding becomes available. A 386 -bed pre -parole prison has been proposed for a site north of SH 119, east of 1-25. If built. t-_ will be a private facility that will house state inmates only. It will not alleviate the demand for Wti: County jail facilities. The Weld County Law Enforcement Program encourages the development of policies that w-:. establish community -based law enforcement. These policies will facilitate community-orien•tec policing for the MUD area, with more interaction between law enforcement officers and residerm More responsibility for law enforcement decisions should rest on the community. Sheriffs Department staff will focus on public education and the development of programs that will empower communities to help themselves, such as neighborhood watch programs. ro . in .a.a..Mew .. UMW Mixed Use Development Plan Page December 5, 1996 The South Weld Sun Page 19 1.2.2.3 Fire Protection Fire Protection for the MUD area is provided by the Mountain View Fire Protection District. There are currently two stations serving this area for non -volunteer fire protection staff. Both stations are just outside the MUD area, and provide 24 -hour coverage. There are also five volunteer fire stations within the Mountain View Fire Protection District. Currently, there are an average of 4.29 fire- fighters per 1000 persons, which is well above the national average of 1.63 and the Mountain Region average of 1.51. One paid fire fighter and at least one volunteer fire-fighter respond to each call. Of the current district personnel, approximately 20 percent are career (paid) fire-fighters, and 80 percent are volunteers. Standards for the planning of fire protection facility locations are generally based on response times, with less emphasis given to population requirements. The current response time standard for the Mountain View Fire Protection District is approximately 5 minutes. The district has indicated a desire to maintain an ISO insurance rating of"5", which is assigned to for property located within five miles of a District fire station and within 1,000 feet of a fire hydrant. The addition of the Del Camino station in 1992 resulted in continued highly -rated service standards in the district. The current annual budget for the district is approximately $1.5 million, serving a population of 12,000 persons. All stations, equipment and fire apparatus are purchased through funds provided by the budget from the Mountain View Fire Protection District. Each station conducts fundraisers for additional items. The fire district is adequately staffed to meet the needs of the growing MUD area for some time. Capital improvements will be required in the future to provide at least one additional fire station. This will depend on where development occurs and the resulting response times. General projections of traffic patterns and volumes, along with land use density considerations, should serve as the basis for locating a future fire station facilities. 3.2.2.4 Community Services Community services include community activity centers such as senior centers, youth and recreation centers, libraries. museums and social service agencies. There are currently no community activity facilities in the MUD area. The majority of those living in the MUD area utilize the museum, library and community center located on the east side of the City of Longmont. There is a recreation center in the Town of Frederick, as well. Social Service offices are provided by Weld County, with offices in Greeley and Ft. Lupton. As the MUD area grows, the need for local facilities will increase. 3.2.3 Transportation Primary access to the MUD area is via 1-25. This four -lane interstate provides regional access to Fort Collins to the north and Denver to the south. The primary east -west access is via SH 119 and Mixed Use Development Plan east ramps andthe east frontage road farther east, and constructing a park -n -Ride on the south side of SH 119 between the relocated ramp and the frontage road. Also, the break in the median between Tomer Boulevard and the west ramp intersection will be closed. These modifications are expected to improve operations immediately by providing additional capacity and space to accommodate traffic stopped at the four intersections along SH 119. The widening of the east side of 1-25 and relocation of the eastern frontage road farther to the east will limit the maximum width of the frontage road to two lanes. As development continues to occur, the capacity of the two-lane eastern frontage road will be reached, resulting in congestion and left turn safety problems. It should also be noted that the CDOT 1994 Environmental Assessment stated that this completed improvement would only mitigate current demand and some minor intensification. The proposed interchange improvement will not accommodate the growth proposed for the MUD area, which would suggest planning for additional freeway access capacity other than at SH 119. Page 55 Mixed Use Development Plan SH 66. S18 119 is a four -lane, divided highway with at -grade intersections, except at the grade - separated interchange at 1-25. SH 119 provides access through the MUD area west to Longmont and Boulder. SH 66 is a two-lane highway that provides access to Estes Park to the west and to U.S. 85 on the east. One other notable road is WCR 1, a north/south facility that parallels I-25 four miles to the east. The remaining roadways in the area consist primarily of two-lane local access roads. These are a mixture of paved and unpaved roads. There are four existing signals within the study area, all on SH 119 and maintained by Colorado Department of Transportation (CDOT). These are located at the 1-25 northbound and southbound off ramps, Turner Boulevard and WCR I. The existing roadways within the study area are presented in Map 3.1. To maintain the capacity of arterial roadways, CDOT defines an access category for all state facilities, including I-25, SH 66, and SH 119. Access is limited to provide for the high speed, high volume traffic that the highways are intended to serve. Each is designated for a certain level of allowable public and private access. I-25, a level one designation, does not allow direct private access. Public access is provided via interchanges only. SH 119 and SH 66 have subtle differences in access allowances. In both cases, private access is allowed only if no other reasonable option exists. A 1991 study of the I-25/SH 119 interchange area prepared by Felsburg Holt & Ullevig reported significant congestion during most of the daylight hours. This congestion results from high traffic volumes, including a significant proportion of truck traffic, close intersection spacing that limits space available for storage of turning vehicles and a general lack of capacity to move traffic through the signals. The southbound on ramp has been relocated to the south, which now provides a frontage road with access to the freeway -oriented commercial developments. This frontage road also provides access to Turner Boulevard and the southbound 1-25 on ramp. Traffic volumes in the area are expected to grow significantly over the next twenty-five years. The daily volume along 1-25 south of SH 119 was forecasted by CDOT to increase from the existing 50,000 vehicles per day to 100,000 vehicles per day by the year 2020. CDOT also forecasts increases in daily traffic along SH 66 and SH 119 west of 1-25 of 9,000 to 23,000 and 20,000 to 33,000, respectively (1-25/SH 119 Environmental Assessment, CDOT, 1994). Corresponding increases in peak hour traffic are also anticipated. The 1994 environmental assessment for 1-25 through Weld County recommended the widening of the interstate to six lanes between SH 52 and SH 66 to accommodate imminent traffic growth. This plan includes an 80' envelope to be reserved as a median in the center of the highway for future options such us High Occupancy Vehicle (HOV) lanes or transit. Also recommended was the reconstruction of the I-25/SH 119 interchange. The total estimated costs for the 1-25 improvements from SH 7 to SH 66 is $163,102,000. CDOT currently has funding for improvements to the 1-25 and SH 119 interchange. Construction is expected to begin in 1997. These improvements, as presented schematically on Figure 3.1, include adding through lanes and left turn lanes to SH 119 through the interchange, relocating the Figure 3.1 Proposed CDOT I-25/SH 119 Interchange Improvements Page 57 Median to be closed SH 119 to be widened from Turner Blvd. to East Frontage Road Connector Rd ) •— Ramps and --e\ Frontage Roads to be relocated Existing Ramp Io be removetl I _ ILL A - Pann.Rid.1 Existing :.—Frontage Road V. to be removed / SH 119 Alk LL v`xaaa oirel Aram. Mixed Use Development Plan Page 56 Mixed Use Development Plan Page 58 The South Weld Sun Page 20 December 5, 1996 3.2.4 Utility Infrastructure This section addresses utility systems which presently support the MUD area and are key to its growth and development. Included are water systems. electric power, sanitary sewer, natural gas, and solid waste disposal. These utility systems vary in terms of ownership, financing, cost recovery mechanisms, and ability to support development. This section evaluates the ability of existing utility infrastructure to meet anticipated demands, requirements for utility improvements, the feasibility of such improvements and critical constraints. Water supply is the most significant factor potentially limiting development within the area. Adequate water for fire protection is of particular concern. However, water line construction scheduled for 1996 will improve the situation for easterly and northerly portions of the area, as well as providing a basis for continued development. Other utilities are in a relatively good position to support both current needs and future growth, although this is a function of the timing, extent and location of growth. These and related issues are addressed below. 3.2.41 Rater Stsiems Potable water is needed for both domestic use and fire protection. Domestic use is primarily an issue of distribution, and fire protection is an issue of the extent and duration of peak flows. The components of water supply for residential, commercial, and industrial development include raw water supply, treatment, storage and distribution. The extent to which each of these components influences potential development within the MUD area varies, as discussed below. The MUD area is currently supplied by four water districts on a service area basis, as shown on Map 3.3 and in Table 3.2. Each of these districts is a member of the Northern Colorado Water Conservancy District (NCWCD) of Loveland. The NCWCD supplies raw water from the Colorado Big Thompson and Windy Gap Projects to member municipalities and districts for domestic and agricultural use. Project water is conveyed from the Western Slope through a series of tunnels, supply canals, and reservoirs for further distribution and use on the Eastern Slope. The NCWCD is currently constructing the Southern Water Supply Project to provide year-round deliveries of untreated water by pipeline from Carter Lake to participating entities in the area. Although supply costs will vary, raw water supplies are generally available to support growth and development within the MUD area. Conversion of agricultural water rights to municipal uses will likely continue. Water treatment, storage and distribution capacity are interrelated. The capacity of a water district to serve additional customers is related to existing capacity versus current demands, the extent, timing, and location of additional demands, and the costs for providing service. In the near -term, the districts are able to provide a limited number of taps, with certain exceptions, based upon available capacity. As this available capacity is committed, additional service will become increasingly expensive and may require costly system expansions. In the longer term, demands related to MUD area build -out will compete with regional growth and development pressures. sinma tie De.elnvme . Pt.. Raw water supply for lire protection is an immediate concern, given current capacity restrictions in several of the water district systems in the MUD area The operative Development Standards for Fire Protection, based upon requirements of the Uniform Fire Code, are provided by the Mountain View Fire Protection District. These standards provide minimum flow, pressure and duration requirements for various occupancy classifications and areas, as well as related fire protection guidance. The standards allow some credit for the use of automatic sprinkler systems and automatic detection, and thus provide some flexibility to support development where all of the water supply requirements are difficult to meet. In terms of distribution capacity, the MUD area is at the geographic extremity of three water supply systems. The following is a summary of the current water systems in the MUD area: Little Thompson Water District service within the area consists of a looped, 6 -inch main which serves the business park area to the northeast of the I-25/SH 66 interchange and a series of small -diameter rural water supply lines. • The Central Weld County Water District system, primarily serves an area to the east and south of Del Camino, including the Towns of Frederick, Firestone, and Dacono. The portion of the Central Weld County system serving the east side of 1-25 and south of SH 199 is currently supplied through its own system, and there is a cross -tie with the Left Hand system along the west sideof 1-25. Central Weld County has undertaken considerable system expansion over the last several years. Capacity is limited by current system constraints. • Left Hand Water District has historically supplied the I-25/SH 119 area through an 8 -inch main. This is fed by a trunk line which extends from Niwot. In order to serve new development at WCR 3'/ and SH 119 (Long View PUD), Left Hand acquired the Central Weld cross -tie and built a 16 -inch line extension. Other development may be served by this line; however, extension of service beyond that to the Long View PUD will incur significant costs for pumping and storage. • The portion of the Longs Peak Water District within the MUD consists of approximately two square miles of predominantly rural area north of St. Vrain Creek and west of 1-25. The present water distribution system in this area has small -diameter lines and is currently at capacity. Further information on the water districts which serve the MUD area is given in Table 3.2. Page 59 Mixed Use Development Plan I 1 1 . ! .. r Via. _:.r,. a . I 1 I __ 1 ^1 8 I .. LON WA 1-'2: ; _r ( . �...... I LIME 7710 WATER OL57�ILT 1! In !R* ..< a,, __ ;.! ,r, n _...- 3o �. -ac ✓-- 1-- — —j - t� , n l)l� 'n r l u. LEFT WATER OLA!'Rlf7 ����+ ? ` ,%. 0167 (5 TA/NET IL.�allo � Legend lalmrebuct - Lays r.l WYE' mane' - Gala. Maiay., We.. Lae . ��yr calf 111105 1-25 Mixed Use Development Area Comprehensive Plan Map 3.3 Water Services ...s.. a Ss...•...isy... {DAY r. Table 3.2 MUD Water Districts Water District Raw Water Source Treatment Plante Analysis Left Hand Water District P.O. Box 210 Niwot, CO 80544 Storage at Andrews Storage Tank located southeast of Niwot, 2.0 million gallon capacity. I. Spurgeon Plant north of Boulder 2. Dodd Plant west of Niwot Limited capacity for future growth. Longs Peak Water District 9675 Vermillion Road Longmont, CO 80501 Carter Lake is source for 90,000 gallon storage tank north of Union RtSCIVOIT I. Kugel Plant in Longmont 2. Plant No. I at Tern Lake. N of Lonpooea Currently at capacity for mama customers, expansion required for Knee development. Little Thompson Water 307 Welch Avenue Berthoud. CO 80513 Carter Lake Filter Plant- capacity :5 million gallons per day 1 ;toed capacity for flare growth. Central Weld County Water District 2235 2nd Ave. Greeley, CO 80631 Caner Lake Filter Plant, capacity 25 million gallons per day .:-area capacity for laser growth. at capacity fix fin demands. Source. Balloffet & Associates, Inc., 1995 Page 61 The Weld County Comprehensive Plan includes the following "The water supply system serving the proposed development s .. rde :fiver a minimum of 500 gallons per minute at 20 pounds per square :c- 30 minutes. "([Veld County Comprehensive Plan. 3-16). It should be noted that the Mountain View Development Standards are more - es are genet-att. more stringent than the stated MUD Plan requirement. The Mountain View Fire Pro:eche r D:sm: should be consulted early in the development process to ensure that all water suppl. ^ea - •c"ets are properly met. Financing and Revenue Structure The water districts typically use revenue bonds or notes mortgages i ssith ce::=:= to .`.rarer ins a. expenditures. Water service fees, tap fees and other revenues are used :c :: 5. ct;cs... cc. ,-, are service and operating costs. Water is typically metered and rates ^7 caner.: 7. - -List. ac v six: quantity used. There is an annual allotment which is re:zle,: :nrr. s._r art a s.r.r.u-;_ Sr consumption in excess of the annual allotment. Tap and relate_ ea:: i .r. r:_ —c: re art _se: e provide service connections and yap- with tap size. Adatirus her. a -z c ^_:..-. _- >r .:n tap size, are also typically applied to new service cor.necuors in ::....., _ -s .. arq'n a or time raw water fee. or may require that the des eloper preside rn-u Thompson or Windy Gap Project shares. Fee's an.: rates ant rrrx_._, :-Le_-a:-ace 'e•,+ -a: ,' Mixed Use Development Plan '+tar December 5, 1996 The South Weld Sun Page 21 districts. In general, the districts do not have capital expansion financial plans in place to support longer -term growth in the MUD area. Ability to Respond to Growth Current capacity restrictions within the MUD area will be eased, to an extent, by water line construction in progress by the Little Thompson and Central Weld County Districts. Little Thompson will own the 24 -inch portion of this line north of SH 66 and Central Weld County will own the l8 -inch portion of the line south of SH 66; the latter will form a portion of a loop to the east of 1-25, intended to serve the Firestone, Frederick and Dacono areas, as well as the development around the I-25/SH 119 interchange. The line will provide increased capacity within both service areas, although future distribution system improvements will be needed as development occurs. There is also a relatively recent agreement between Central Weld County and Left Hand Water Districts to make additional capacity available to the latter, through interconnection between their systems in the area. This will take advantage of the additional capacity afforded by the new line; however, its general use within the Left Hand service area beyond Longview PUD may involve pumping the water back uphill. There has also been discussion involving possible Longs Peak interconnection with the new line. This may offer a viable option to support future development in this portion of Longs Peak's service area. 3.2.4.2 Electric Power The MUD area is within the service territory of United Power, Inc. United Power, with headquarters in Brighton, is a public utility and a member of the Tri-State Generation and Transmission Association, Inc. Both are members of the Rural Utility Service (formerly Rural Electrification Association.) The City of Longmont, to the west of the MUD area, has a municipal electric utility, as does the Town of Frederick, to the southeast. Frederick has an agreement for power supply with United Power, whereas residents of Firestone and Dacono are served directly by United Power. The MUD area falls within United Power's "Service Area B." Some transmission facilities pass through this area but are not part of United's system. The three United substations in the vicinity, Mead, Del Camino and Dacono, serve various functions related to supplying power at sub - transmission and distribution voltages. United's rate schedules and service provisions are outlined in current Colorado Public Utility Commission (PUC) filings. Depending upon the classification of service provided, demand and energy charges will be assessed and facility charges may be assessed. Ability to Respond to Growth The electric power distribution system in the MUD area is relatively well developed and can accommodate the future growth and development envisioned. Specifically, United Power has plans for expansion in the area, to include the future installation of a substation about one mile east of the I-25/SH 119 interchange. This substation will be constructed as demand warrants. 3.2.4.3 Sanitary Sewer Mixed Use Development Plan Page 63 The St Vrain Sanitation District provides sanitary sewer service throughout the MUD area, as shown on Map 3.4. The district's service area, in part based upon drainage areas, is considerably large, allowing for future expansion. The district was formed in 1986 to provide sanitary sewage collection, treatment, and disposal service in the Del Camino area. Since that time, the district has expanded its boundaries to provide services to a larger area To date, the system includes a sewer system consisting of lines from 4 to 24 inches in diameter, a lift station to serve the area west of St. Vrain Creek and a treatment plant consisting of two lagoons and related equipment. Treated effluent is returned to St. Vrain Creek downstream of the MUD area. The treatment plant operates at a hydraulic loading of 160,000 gallons per day, as compared to its capacity of 500,000 gallons per day. The district expansion plan, called Phase II Construction, would increase treatment plant capacity to 1.5 million gallons per day. Phase Il Construction would include the installation of two additional lagoons, one chlorine chamber and one blower. The timing of this expansion is uncertain at present, and will be a function of need, among other factors. In addition, the district has plans to extend a line toward SH 66 to serve the northerly portion of the MUD area Map 3.4 shows current district and service area boundaries and proposed sewer trunk lines which would serve the entire MUD area, as dictated by growth needs. Financing and Revenue From a financial standpoint, district capital, maintenance and operations needs are accommodated -by a variety of means, including bonded indebtedness, property tax revenues, plant investment fees and service fees. Funds for major capital expansion are typically acquired by the sale of bonds. The timing and extent of bond sales are dependent upon a combination of the district's bonding capacity, demonstrated need, ability to pay, and bond rates. The district re -financed its existing debt in 1991 and cannot again do so. The district collects property taxes, levied upon properties within its boundaries, to primarily support debt service. In terms of property tax revenues, commercial properties have been the largest source, followed in order by residential, agricultural, oil and gas, and natural reserves. The district has other sources of revenue, including user charges and tap fees. User charges are collected on a monthly basis and depend on the category of development served. Such fees are largely used to cover operating expenses. Developers are required to pay the full cost of construction of all extensions and connections to serve their development. In cases where the district requires construction of an oversized line to serve other development, a developer may be reimbursed by the district for a portion of the cost of the oversized line. The district assumes ownership and maintenance of lines after their construction. Currently, the district charges a $3,200 plant investment fee per single family dwelling unit. The monthly service fee is $22 per single family dwelling unit. --\ T 0 • , ro.. re.. l I 1 ,9 __ 1 Io l m.' . �� \ )- -- SI 1±' na00 Legend .e..e. Mega e..... I-25 Mixed Use Development Area Comprehensive Plan Map 3.4 Sanitary Sewer Services 'Nome. Is setaa • ••••r r eser r Ability to Respond to Growth The Saint Vrain Sanitation District is currently operating at 30-35 percent of treatment capacity. The district has available conveyance and treatment capacity to serve new development occurring along its present system. This assumes that the service can be provided with extensions from the existing system. Development in portions of the MUD area remote from the district's present collection system would require sewer line extensions, assuming the growth could be accommodated within existing treatment capacity. Costs for major system extensions can be on the order of $200,000 per mile, which does not include the costs of lift stations or road and waterway crossings. In terms of treatment capacity, the district estimates that the capacity increment from 500,000 to 1,500,000 gallons per day could be constructed for $250,000. The cost for each 500,000 gallon per day capacity increment beyond 1.5 million gallons per day would be from $1.5 to $3.0 million, depending upon the treatment technology chosen. 3.1.4.4 Natural Gas Natural gas service in the MUD area is currently provided by KN Energy. Their distribution system in the area extends northward along 1-25 and primarily serves the Del Camino area and the development to the north and east of the I-25/SH 66 interchange. Map 3.5 shows approximate line locations, pressures, and sizes. Line capacities are a function of both pressure and size. The base rate for gas service is $3.93 per unit (100 cubic feet), although there are tiers of rates, depending upon usage, and various rate schedules for different classes of customers. Natural gas rates and service provisions are regulated by the Colorado PUC. New gas service extensions are installed by KN as requested by a developer or other party, and the installation cost is paid by the requester on a time and materials basis. Service extensions are normally handled as a part of fees paid out by developers. Ability to Respond to Growth KN Energy has adequate capacity to handle the MUD area's growth in demand for the near future, and there are no expansion plans for this system at the present time. However, there are no constraints against doing so as the need arises. Major System expansions would be constructed by KN Energy, with provisions for cost recovery from developers. Mixed Use Development Plan Page 64 Mixed Use Development Plan Page 66 The South Weld Sun Page 22 December 5, 1996 I 3. 3 t T a afi .. i d ,. � � f ( o� x.sJ ` o o �,~ - - a... ' 1 `.... _ - _ �-s`� tl tj '',L / ;tea v lig -"- J s- I-? ' / L LeSwi SEPIN Popp,. hump _- Wtt PI. POMP '≥�._ owa.�( PPM I-25 Mixed Use Development Area Comprehensive Plan Map 3.5 Natural Gas Services 3.2.4.5 Solid Waste Solid waste collection and disposal services in the MUD area are currently provided by two firms, Western Disposal Services and United Waste. Western Disposal has dumpsters in commercial areas at Del Camino and also provides residential service. United Waste has one dumpster at the M&S Garage and provides some residential service in the Frederick area. Solid waste disposal services in the Del Camino area are arranged directly between property owners/managers and the disposal firms and are generally on the basis of standard rates and service packages. Disposal is at licensed facilities, of which the closest is the Laidlaw landfill east of Erie. Other licensed lat.'tills which may be used are near Ault and in Adams County, near Denver International Airport. Ability to Respond to Growth Solid waste collection and disposal do not provide constraints to future development of the MUD area, although more formalized arrangements for providing service, such as franchise agreements with Weld County, may be beneficial. 3.2.4.6 Influence of Utilities on Development Patterns The costs of utility service extensions can be minimized by locating development in proximity to existing utility infrastructure having available capacity, or in areas where utility extensions are the most cost-effective. To an extent, the location of development can be influenced by this factor. Map 3.6 was prepared to illustrate this and to suggest a sequence of development in the MUD area based on utility services. Mixed Use Development Plan Page 68 0 a . G .,I .ue o �• TQI t S IJ « aD I.,„,„, _ _, 1! ght ° ,r GIs 1-25 Mixed Use Development Area Comprehensive Plan Map 3.6 Priority for Development, based on Utility Services n,p.t M YY11w . •sW. W MAW ,s 3.2.5 Existing Parks, Recreation and Floodplain Resources PP.., Mil The existing resource opportunities for the MUD area are wildlife habitats, reclamation of gravel extraction areas, and regional parks. There are excellent opportunities for future resource developments such as community parks and the development of trail linkages. Existing parks, recreation, and floodplain resources are shown on Map 3.7. Wildlife The St. Vrain Creek and its associated riparian area provide habitat for a variety of species, including white tailed deer and bald eagle. Riparian areas along any of the major drainages and ditches are used by many species as travel corridors, food, cover and nesting. Gravel pits in the area'afe Med by water fowl. Reclaimed pits can provide recreational fishing opportunities. Sand and Gravel Extraction Sand and gravel extraction areas can be reclaimed for habitat preservation, and public recreational purposes if the owner is willing. Reclaimed pits also are used as water storage reservoirs, water features in residential developments and private duck clubs. The St. Vrain Creek and Boulder Creek provide excellent sand and gravel extraction potential. These resources can be found predominantly within the 100 -year floodplain. There are approximately nine active pits within the study area, with an additional seven permitted. Weld County also owns and operates pits east of Barbour Ponds along the St. Vrain Creek which will be reclaimed as park land. Regional Parks Currently there is one regional park in operation within the MUD area. Barbour Ponds State Recreation Area is managed by the Colorado Division of Parks and Outdoor Recreation and is very highly used (200,000 visitors in 1994). It is approximately 80 acres in size and is used by tourists and local residents for fishing and camping. The management plan for the Recreation Area calls for expansion east and west as opportunities arise. One such opportunity may be to incorporate the Weld County gravel pits east of 1-25 when they are reclaimed. Union Reservoir, located immediately north of the MUD area, provides additional recreational opportunities to residents within the MUD area. The City of Longmont operates Union Reservoir Park on the southwest shore. The City owns over half of the surface water rights in the lake and leases and/or owns the land for the 736 -acre park. Visitors enjoy fishing, wakeless boating, windsurfing, swimming, camping, picnicking and wildlife viewing. The northwest portion of the reservoir is reserved as a bird sanctuary. Water sports equipment may be rented at the marina area. A boat ramp and accessible fishing pier are located on the western shore. As money becomes available and as landowners are willing, the City of Longmont intends to acquire additional park lands in fee or through lease agreements. Mixed Use Development Plan Page 70 December 5, 1996 The South Weld Sun Page 23 Leged MN dna w.. - e.rive...A F ansbanmaA. n..aw. — — Sir W..• ....a 1, A- 1-25 Mixed Use Development Area Comprehensive Plan Map 3.7 Parks, Recreation and Floodplain Resources e...a S SWAY. a ....Ya r era. Inv Neighborhood and Community Parks Neighborhood and community parks are those facilities that typically serve an urbanized area and may include facilities such as swimming pools, recreation and senior centers, ballfrelds and playgrounds, basketball and tennis courts. There are no neighborhood or community parks within the MUD area. The closest facilities are in the City of Longmont. Limiting Site Factors There is no designated public open space within the MUD area. However, there are several plans that identify areas within and adjacent to the MUD area that contain natural elements that obstruct or are hazardous to certain types of development. These sites are categorized as having Limiting Site Factors which include floodplains, critical wildlife habitat areas and topography constraints. These areas allow the lowest intensity of development in the MUD area. The Weld County Open Space Plan identifies the St. Vrain Creek corridor as a potential open space area. In its Comprehensive Master Plan (January, 1995), the City of Longmont has identified the area south of Union Reservoir and along SH 119 as its eastern buffer. According to the city's plan. this land would be preserved to maintain the city's identity and enhance the visual quality of its entrance corridor. The land would not necessarily be open for public tress. A variety of techniques would be used to protect the land, including acquiring title, development rights, and easements. Boulder County has identified the St. Vrain Creek and Boulder Creek corridors within the Boulder County Comprehensive Plan as providing wildlife habitat, community buffers and trail corridors. Protection of these corridors could occur with development, as developers dedicate land for trails and/or open space. or as opportunities to acquire lands or easements are present. The Structural Land Use Plan for the MUD area also identifies land along the St. Vrain Creek corridors as containing Limiting Site Factors which would serve as a deterrent for intensive development. The Structural Land Use Plan encourages this land to be utilized by the lowest intensity of uses in the MUD area. Trails The St. Vrain Creek has been designated as a greenway in the St. Vrain Greenway Master Plan, adopted by the City of Longmont. Development includes a pedestrian and bike trail along the river through Longmont and into the MUD area. The City of Longmont has prioritized development of the trail through the city center and will implement connections to the east and west as these areas are developed. In addition, the Longmont Comprehensive Master Plan identifies the St. Vrain Creek, Dry Creek No. 2, and Spring Gulch ditch as primary greenways. Greenways are linear open space corridors that permit public access, connect residential areas to the bikeway network and with community activity areas, and accommodate trail -oriented recreation. The Spring Gulch trail would link Union Reservoir Park with trails along the St. Vrain. Boulder County has identified trail corridors along the St. Vrain and Dry Creek No. 2 up to the Boulder/Weld County line. As mentioned previously, reaches of these trails would be implemented as development occurs or as acquisition opportunities arise. Historic Sites One historic site is currently known to exist within the MUD area. The site is on private land and is noted with a historic marker, which identifies "Fort Junction," built in 1864 by pioneers of the Boulder Creek and St. Vrain Creek Valleys. This was a sod enclosure garrisoned by home guards as protection against hostile Indians. It stood about 200 feet east of the current east frontage road paralleling 1-25. and about one quarter mile north of SH 119. 3.3 Market Factors and Likely Trends 3.3.1 Market Conditions The following presents a summary of the major market conditions that will influence the types of development and likely trends in the MUD area. 3.3.1.1 Location The MUD area: while rural in character, lies within 30 miles of all major employment centers and product markets on the Northern Front Range. 1-25 provides convenient access to these cities and gives the MUD area a strategic location for providing retail goods and services to increasing traffic volumes along the interstate. The MUD area occupies a strategic location for commuters. The area, surrounded by larger cities, is approximately 5 miles from the urbanized areas of Longmont, 15 miles from Loveland, 15 miles from Boulder. 30 miles from Greeley, and 25 miles from Fort Collins to the north and Denver to the south. Residential developments in the incorporated towns -around the MUD area support persons commuting to all of these cities. 3.3.1.2 Transportation As previously stated, 1-25 has a major influence on the MUD area. From a market perspective, increasing traffic volumes and regional growth along the I-25 corridor will influence the market conditions in the MUD area. The following are additional factors related to transportation issues that influence market conditions. • The MUD area lies approximately 10 miles north of the proposed E-470 highway, which will link 1-25 to the Denver International Airport (DIA) and enhance the convenience of access from DIA and the entire Denver metro area to Weld County and the Northern Front Range. Mixed Use Development Plan Page 73 Trucking industry experts' state that truck traffic along the MUD area portion of I-25 is not sufficient to support new trucking service facilities. These sources characterize existing truck traffic in this area as `local," with most truckers distributing products to Northern Front Range destinations. Truckers serving local routes generally require fewer services than truckers on nationwide routes: while the North American Free Trade Agreement may eventually generate increased north -south truck traffic along 1-25, over the next ten years truck traffic is not likely to support significant additions to the existing service base. 3.3.1.3 Utilities This market analysis proceeds under the assumption that issues involving sanitary sewer and water infrastructure will not preclude development. Nonetheless, in reality, this issue is likely to exert significant influences on the timing, location and character of development in the MUD area In regard to industrial, retail and lodging development, the current availability of water and sewer infrastructure gives the Del Camino area a significant advantage among the various interchanges along I-25. Conversely, the unavailability of such infrastructure may constrain development hi other parts of the MUD area. 3.3.1.4 Regional Development Trends Residential Development New residential development has not occurred in the MUD area in recent years, but activity is increasing with projects such as the Longview and Meadow Vale PUDs. In surrounding towns such as Erie, Frederick and Mead, however, residential growth has accelerated. New housing products have occupied two price ranges: a starter home market priced from below $100,000 to $130,000, and an upscale niche, with large homes priced from $200,000 to $300,000. Some recent starter home projects in these towns have achieved average absorptions of three to four homes per month, and one project in Erie has averaged seven sales per month in its first four months. Additional residential developments have been proposed in these and other surrounding area towns. In recent years, high housing and land costs and protracted development requirements have pushed residential growth from the City of Boulder to nearby municipalities such as Lafayette, Louisville and Superior. As development has proceeded, some of these communities have responded with growth limitations of their own. The Boulder -area growth maybe increasingly directed to outlying communities such as Longmont. northern Broomfield, Erie, Weld County and the MUD area. In the fall of 1995, Longmont passed an initiative to limit residential building permit issuances to 1 percent of the previous year's residential base. This measure would limit annual residential constr- uction to 220 homes in 1996, driving significant residential development to other market areas. Forrest Baker, Transportation Research & Marketing, a consulting firm based in Idaho. referred by NATSO, National Association of Truck Stop Operators. Also Conoco representative, John Bennett. Mixed Use Development Plan Page 72 Mixed Use Development Plan Page 74 The South Weld Sun Page 24 December 5, 1996 While the MUD area occupies a strategic location for new development, there are other development areas that will compete for residential markets. Ample land near I-25 and the proposed W-470 and E-470 highways is available for development in the northern reaches of Broomfield, Westminster and Thorton. These areas might attract home buyers employed in the Denver/ Boulder corridor, in the DIA area or other locations in the Denver metropolitan area. Similarly, other rural Weld and Larimer County communities are likely to compete for home buyers working in Fort Collins, Greeley and Loveland. Commercial Development While an industrial company may wish to maintain its office headquarters in a high profile location in Denver or Boulder County, there is an attraction for location and cost advantages of Weld County and the MUD area. In the last two years, approximately 235,000 square feet of new industrial space has been developed at the Del Camino and I-25/SH 66 interchanges. In the last five years, new development at I-25/SH 119 interchange has included two motels and three new industrial buildings, including Hauser Chemical, Dovatron Electric, and Gerard's Bakery. All of these businesses relocated or expanded to the Del Camino Business Park from Boulder County. The Indian Peaks Industrial Park in Frederick similarly reports that many of its occupants relocated or expanded from bases in Denver. The MUD area presents a number of strategic advantages for attracting nonresidential development. • The MUD area can attract manufacturers and distributors sending products to markets throughout the Northern Front Range. The MUD area's location provides convenient connections to corporate administrative office bases in Front Range cities. Housing, labor, utilities, and other such costs are less expensive in the MUD area than in more urban employment centers such as Boulder, Denver or Longmont. Land is less expensive in the MUD area. In the Longmont area in eastern Boulder County, nonresidential land sells in the range of $1 to $2 per square foot. This area represents the lower end of the Boulder County industrial land market; areas along Highway 36 command higher prices, and prices in the City of Boulder range from $3.50 to $5.00, a few high end parcels may sell for as much as $10.00 per square foot. In comparison, within the MUD area, the most expensive land is located at the Del Camino interchange, where retail land may sell for up to $4.00 per square foot. Industrial land along the frontage roads near Del Camino has sold for SI to $2 per square foot, which is competitive with the Longmont area. In the industrial areas at the SH 66/1-25 interchange, recent industrial land sales have occupied the $0.50 to $1.00 per square foot price range. The vacant agricultural land along Highway 119 has generally sold at even lower rates, generally below $0.35 per square foot. Mixed Use Development Plan Scenario Annual Growth ill Dwelling Units Tea -Year Growth in Dwelling Units Buis for Projection Conservative 20 200 1990-1993 growth rates in surrounding area towns. Moderate 100 1,000 MUD Arm capture of long-range growth in Longmont area and southwest Weld County. Aggressive 150 1,500 Current development trends and expected high absorption of low-cost dwelling writs. Range 60-150 600.1,500 Lower range based on average of conservative and moderate scenarios: upper range based on aggressive scenario. Source: Coley/Forrest. Inc., 1995 3.3.3 Likely Trends This section identifies the type of real estate development likely to occur in the MUD area over the next ten years and projects an approximate range of the volume of development. 3.3.3.1 Residential Neighborhood Development Trends Likely trends in the residential development sector focus on three issues: (1) the type of residential development likely to occur in the MUD area and its surrounding communities; (2) the most likely locations in the MUD area for residential development; and (3) an approximate range of likely growth rates. Home buyers seeking housing in the MUD area are likely to occupy three distinct market niches: (1) Homes priced from below $100,000 to $150,000, appealing to first-time home buyers employed in Longmont, Boulder, Denver and other nearby employment centers, (2) Homes priced from roughly $200,000 to $300,000, appealing to higher income householders recognizing the higher housing values available outside the expensive markets in Denver, Boulder and the Denver/Boulder corridor. Residential development in this niche will occur in rural, removed areas, as most custom home buyers will seek rural, secluded settings. (3) Manufactured homes, offering the most affordable housing product in the market. State-of- the-art manufactured homes can range in price from $30.000 to $80,000. Modern manufactured home communities often feature homes situated on permanent foundations at densities of 5 or 6 units per acre. Leased manufactured home communities along the Page 75 Mixed Use Development Plan Page 77 Besides the advantages for commercial development, there are other factors that will influence nonresidential development in the MUD area. The City of Boulder recently passed a measure to restrict nonresidential construction. This measure will eventually limit such construction to levels that are significantly below recent rates, and is likely to drive significant volumes of nonresidential development to outlying areas. A new major factory outlet mall/mixed use development has been proposed for the northeast comer of the I-25/WCR 8 interchange in Dacono. If this development proceeds, it could become the central location for retail and tourist -related development for the southwestern part of Weld County. 3.3.2 MUD Area Growth Projections In establishing a reasonable level of expected growth in the MUD area three scenarios were examined: conservative, moderate and aggressive projections. Of the three development scenarios, the moderate scenario relies most heavily on long-term patterns. The approach applies growth rates that were originally prepared for a twenty-five year period (1990 to 2015), and also makes adjustments based upon a nine-year development trend in the City of Longmont. To the extent that longer histories produce more reliable long-term indicators, this scenario may represent the most reliable forecast. In contrast, the aggressive scenario relies exclusively on short-term rends, projecting recent development trends into the future. While the te..ert past may sometimes provide the most accurate indication of developing new patterns, short-term trends may not endure: the 1994 development of two motels at Del Camino, for instance, does not mean that two additional motels will be developed in subsequent years. The conservative scenario involves perhaps the least reliable basis for projection. This projection relies on 1990-1993 growth patterns in the surrounding area towns - not a long-term trend. Weld County building permit records show the construction of only one new residence in 1993 and four new residences in 1994. While the figures appear to contradict recent indications regarding future residential development, this scenario should not be dismissed entirely. In weighing these three scenarios, this analysis calculates the lower range of development as an approximate average of the conservative and moderate scenarios. This calculation yields a lower range of development at roughly 60 dwelling units per year, or 600 units over ten years. Thus, this analysis identifies an overall range of 60 to 150 units has been established as a reasonable range of expected residential development, as summarized in Table 3.3. Table 3.3 Range of Likely MUD Area Residential Development Northern Front Range are 99.7 percent occupied.' Several modular home projects have been proposed, and one such project has recently been developed within the MUD area This type of housing may be attractive to home buyers who work in the relatively low -wage industrial occupations that have comprised significant portions of employment in both Longmont and Weld County. 3.3.3.2 Shopping Centers Shopping center development is not likely in the MUD area until it has developed a substantial housing base. Three factors would constrain such development: Residential growth patterns. Over the next ten years. likely residential development in the MUD area would consist of 600 to 1,500 homes, dispersed in separate areas, none of which will offer concentrations sufficient to support a neighborhood shopping center. While the necessary concentration of unserved "rooftops" varies, one retail expert estimates that new development is not likely to occur without a surrounding community of roughly 1,500 homes. The Urban Land Institute's Shopping Center Development Guide sets forth a rough rule of thumb requiring a minimum of 2,500 persons (approximately 1,000 homes) within 1.5 miles or a five to ten minute drive of the center. The Denver metropolitan area provides numerous examples of communities comprising of one to two thousand homes that do not contain neighborhood retail centers. These include the communities of Superior, Lone Tree, Stonegate and Roxborough Park in the southern Denver metropolitan area. • Convenience to existing retail centers. New developments in the western parts of the MUD area along SH 66 and SH 119 would be conveniently situated (within fifteen minutes drive time) to Longmont area stores, thus constraining additional retail market opportunities. • Available sites. Given the relatively low concentrations of residential densities that are likely to occur. new retail developments will most likely seek sites with high visibility along high traffic corridors. In the MUD area, the primary traffic corridors are located along 1-25 and along SH 66 and SH 119. Retail development at the 1-25 interchanges would most likely be within the convenience/highway-service niche. In the areas along SH 119 or SH 66 to the west of I-25, retail development would have to compete with a broad range of shopping centers in Longmont. ' Denver Post newspaper article. Steve Raabe reporter, 9/19/95. Quote from article: "and if you're looking for a space in northern Colorado, good luck. Out of the 8,066 spaces in the Greeley -Loveland -Longmont -Fort Collins area, you'll find only 13 vacant spaces - an amazing occupancy rate of 99.7 percent." Mr. Raabe references Ralph Melden as his source. Ralph Melden is with Melden Realty. a firm specializing in manufactured housing properties. Mixed Use Development Plan Page 76 Mixed Use Development Plan Page 78 December 5, 1996 3.3.3.3 Commercial Development Trends The South Weld Sun Page 25 3.4 MUD Structural Land Use Plan Substantial office development is not likely to occur in the MUD area. While some industrial buildings offer office space, the MUD area's industrial image and its distance from upper income housing areas will hinder its ability to attract substantial office development Convenience .stores and service establishments, such as gas stations and fast food restaurants, will continue to represent the principal type of retail development in the MUD area. This type of development will likely occur primarily on the east side of the Del Camino interchange, and will begin after the realignment of the Del Camino interchange. Some neighborhood service establishments may also begin to appear as residential growth occurs, but development of new neighborhood shopping centers is unlikely until some time in the future. It is more likely that small strip centers at the SH 66 and Del Camino interchanges may begin to feature stores that can serve local residents as well as tourists and truckers. Examples of such stores might include drugstores, video stores, laundromats, bakeries, ice cream parlors, auto parts stores, and film developing stores. Over the next ten years it is reasonable to anticipate retail development in the MUD area to include three to five new restaurants (including fast food restaurants); two to three gas stations (with convenience stores); and five to ten miscellaneous service retail stores, with a total square footage estimated at 30,000 to 50,000. 3.3.3.4 Lodging Lodging in the MUD area includes five facilities at Del Camino. These facilities are all limited service motels with 40 to 80 rooms. Interviews with motel operators reveal the following: During the summer months. Del Camino motels operate at high or full occupancies. Guests include a varying mix of business travelers, vacationing families, and truckers. The recently opened Days Inn and Comfort Inn receive higher levels of tourist traffic, often hosting weekly stays for families visiting various locations along the Front Range. In contrast, the older Super 8, Budget Host/Longmont Inn, and First Inn facilities serve more truckers, who prefer their lower rates and superior proximity to truck parking. All facilities report travelers with business in Longmont or Boulder, as well as some tourists unable to find accommodations in Boulder or Longmont. Occupancies are considerably lower during the winter months. While operators were unwilling to provide occupancy estimates, they qualitatively report low occupancies, with greater reliance upon truck traffic. The Days Inn and Comfort Inn facilities opened in 1995 and at the time of this analysis, had not been open during a winter season. This has created some uncertainty regarding the strength of the lodging market during the winter season, which may not support additional lodging development in the near future. Despite these possible constraints, two market factors will likely continue to support some type of lodging development at Del Camino: (I) Projected traffic increases on I-25 traffic may strengthen demand for lodging facilities. Mixed Use Development Plan Page 79 (2) Del Camino's location at SH 119 may give it an advantage for travelers seeking direct proximity to Longmont, Boulder, or Estes Park. Where a lodging operator can assemble enough land for truck parking, and perhaps provide services such as a restaurant and bar, there may be a marketing opportunity to serve a combination of tourists and truckers.' During the next ten years it is reasonable to anticipate the development of one or two additional lodging facilities containing a total of 60 to 80 rooms on the east side of Del Camino. 3.3.3.5 Industrial Development Trends Industrial development will likely continue in the MUD area. The major attractions for industrial users include: Access to I-25. This connection provides convenience for trucking operations and access to markets including Denver, Fort Collins, Boulder, Greeley, Longmont, and Loveland. Industrial operations in the MUD area are thus conveniently linked to their product markets and to other office or industrial bases located in those cities. Costs involving land, tax incentives, labor and power: industrial operations in the MUD area can realize considerable cost savings relative to costs incurred at more urban locations. The availability of sanitary sewers, which would extend south from SH 66 to SH 52. This stretch would be the only portion of I-25 in Weld County with this infrastructure. Industrial development in the last two years has included nearly 235,000 square feet in 10 new buildings, a rate likely to continue. In addition to the above, new favorable market factors might include the construction of highway E-470 linking the MUD area to the Denver International Airport, and the possible implementation of nonresidential growth constraints in the City of Boulder. Given this recent history and the MUD area's market advantages, it is reasonable to anticipate new industrial development to proceed at an average rate of 100,000 to 150,000 square feet per year, generating a total of 1,000,000 to 1,500,000 square feet over the next ten years. While highway motels will not turn truckers away, there are specific improvements and programs a motel could activate to improve its truck business. Parking suitable for large trucks is an important amenity that could be offered. Walk -access to truck maintenance facilities could be a significant amenity for truckers with trucks needing work. Other operators utilize special incentives/discounts specifically for truckers using the motel. The MUD Plan is intended to provide a foundation to enable the county and its citizens to make appropriate decisions regarding future development. Preservation of natural resources, development of quality communities, provision for regional services and employment opportunities and maintaining fiscal integrity are the key factors driving this plan. This will ensure that development is planned in advance, rather than left to chance. The land uses delineated in the Structural Land Use Map 2.1 promote appropriate levels of facilities and services for the entire MUD area. It is important to remember that it is the coherence of community structure and the quality of the built and natural environment that will determine whether growth in the MUD area will represent a positive act of building a community, or the loss of identity and diminished character of the region. The MUD Plan shows a proposed configuration for land uses and street systems, as well as suggested sites for community facilities. The plan represents maximum "build -out" of the region which, depending on the rate of growth in the area, may take 25-50 years to achieve. As a result, the plan will need to change and respond in the future as the development patterns. resources, and needs of society change. There area number of principles and themes upon which the plan is based. As the region develops. these principles.can serve as planning goals and policies today and into the next century. The principles utilized in this plan include the overall development of the MUD area, the major transportation network, the linking of community nodes and the consistency of land use and zoning standards. 3.4.1 Principles for Community Structure and Growth The Structural Land Use Plan has evolved out of extensive discussion and analysis. County officials have tackled the difficult questions of how to grow, where to grow, and how growth can either benefit or distract from the area's quality of life. Addressing these questions has required balancing complex, and often conflicting issues. What has emerged is a set of principles - about the stability of the area's economic base, the structure of the community, appropriate land use classifications, and the transportation needs of the region. The Structural Land Use Plan presents the opportunity to intermix land use with established zoning standards in order to minimize the externalities of the uses. The principles of this plan are as follows: Land Use Principles Mixed Use Development Plan Page 81 A. Employment Center Development. The Structural Land Use Plan provides a unique opportunity to create a major center of new employment in the area. The creation of the employment center is located and oriented toward the network of regional and national roadways serving the area. This center needs to be carefully planned to ensure that it will take advantage of the many attributes and opportunities in the area, without detracting from the overall image and vital linkages throughout the MUD. B. Interconnection of Community. Liveable neighborhoods are critical factors in the future quality of life in the area. Interconnectivity of commanity nodes and activity centers will aid in the viability of the area. Alternative means of transportation and opportunities for those who seek to walk or ride their bicycles should be increased, providing safe and pleasant pathways to interconnect neighborhoods with community facilities and employment centers. New residential growth should be configured as neighborhoods, not isolated enclaves. The location of neighborhood centers in residentially designated areas is intended to provide community services within walkable destinations for the residents within the MUD area. C. Consistent Land Use Standards. The Structural Land Use Plan outlines standards which are intended to shape and enhance communities within the MUD area. These standards also are intended to support and implement the land use and development policies in the Weld County Comprehensive Plan, Zoning and Subdivision Ordinances, and the Planned Unit Development Ordinance. In all cases, these Ordinances should be consulted for clarification of specific requirements. D. E. Appropriate Zoning Mixture. The Structural Land Use Plan provides a mixture of conceptual land use categories throughout the MUD area. These categories are grouped by the intensity of the land use. with the majority of the high intensity uses being clustered within the vicinity of I-25 and SH 119. In contrast, lands with limiting site factors such as floodplain and wildlife habitat, correlate with the lowest intensity land uses. Planned Transportation Network. The major roadway corridors, including 1-25, SH 119, SH 66, and WCR 1, are the primary roadway structures for the MUD area. They play an important role in the function and image not only of the MUD area, but for Weld County, as well. For this reason, special attention must be given to access controls and design treatment, to ensure that these roadways will function well over time, and that visual quality of the major highway corridors will be improved and enhanced. The following Table 3.4 provides approximate acreage for each of the land uses and maximum density statistics that could occur at full build -out of the MUD area. Table 3.4 Land Use Plan Distribution Mixed Use Development Plan Page 80 Mixed Use Development Plan Page 82 • 1 [ The South Weld Sun Page 26 December 5, 1996 Land Use/ Intensity Acres % Total Ares Remarks Employment Center- High Intensity 2,700 22% 27 million sq. ft. of floor space Regional Commercial- Medium Intensity 200 2% 2 million sq. ft of floor space Neighborhood Center- Low Intensity 80 I% 800,000 sq. ft. of floor space Residential- Mixed Intensity 4,500 37% maximum population: 30,000 people, and approximately 13,500 dwelling units. Limiting Site Factors- Lowest Intensity 4,630 38% All areas delineated are within the 100 year floodplain or have elements that obstruct or are hazardous to certain types of development. Total 12,110 100% nurse: nallottet and Assooates. Inc. Assumptions: • Residential densities were calculated using an average of 4 dwelling units per acre for all development throughout the MUD area. It was assumed that 25 percent of the gross land area in residential areas would account for roadways, neighborhood parks, and various residential amenities. • Employment Center calculations are based on an average of 15,000 square feet of floor area per acre. • Regional Commercial calculations are based on an average of 10,000 square feet of floor area per acre. 3.4.2 Transportation As the MUD area develops, it is critical that a transportation network be sized to accommodate both short-term demand and future build -out. The process of developing the network includes trip generation, distribution/assignment and transportation sizing for roadways, transit, bicycling, pedestrians and transportation demand management (TDM). TDM programs encourage alternatives to the single occupant vehicle such as carpooling and transit, as well as physical improvements such as park -n -ride. To size the circulation system, it is necessary to estimate the traffic that will be generated and determine the transportation relationships of linkages between the various land uses within the MUD area. Projected trip generation resulting from the build -out of the proposed 1-25 MUD Plan is presented in Table 3.5. The trip generation rates are based on the most recent edition of the Institute of Transportation Engineers Trio Generation Manual. It should be noted that these reflect the average of the rates for uses that could be expected. As an example, single family residential areas Mixed Use Development Plan As can be seen in Figure 3.2, build -out of the MUD area residential developments will yield approximately 130,000 daily trips. These trips are further stratified by trip type, such as shopping, work, schools/parks, social, and other. Based on the non-residential land uses proposed, it is estimated that fifty percent of the residential trips will remain internal to the MUD area and fifty percent will exit the area. It is similarly estimated that approximately 50 percent of the employment trips will remain internal and fifty percent will travel externally to the study area. The internal employment area will be trips to/from the residential developments within the study area, other employment areas, and the commercial centers. The commercial trip distribution patterns will be to/from the residential and employment areas. In addition, there will be a portion of the trips that will be pass -by trips. Pass -by trips are those that are already on the street systems within the study area, and because of the intervening opportunity of the commercial centers, will be attracted into them. These pass -by trips will not be new trips to the study area, but will need to be accounted for when developing access plans for the commercial centers. Page 83 Mixed Use Development Plan Page 85 typically experience 10 trip ends per dwelling unit, whereas condominiums and townhouses tend to be smaller, and generate 8 trip ends per dwelling unit. The 9.55 trip ends per dwelling unit used here reflect a weighted average between the single family and multi -family mix that maybe anticipated. Similarly, the commercial retail and employment categories have been averaged. Based on the ITE trip generation manual, trip generation rates for commercial developments decrease as the center's size increases. The average trip generation rates for commercial centers reflect a midpoint in the size -versus -trip -generation curve. Employment centers cover a wide range of uses, from office parks (which generate 10 to 12 trip ends per 1,000 square feet) down to industrial uses at two trip ends or less per day. The average of five trip ends per day reflects a midpoint of generation to permit flexibility in future planning, yet reasonably, anticipate the trip generation which may result from project build -out. It should be noted that the trip generation rates reflect one end of the trip. If a person travels between one trip end at a home to a second trip end at a school, this reflects one trip, with both trips internal to the I-25 MUD Area. Table 3.5 MUD Area Plan Trip Generation Trip Generation Rates Use Units ADT AM IN AM OUT PM IN PM OUT Residential DU's 9.55 0.19 0.55 0.66 0.35 Commercial Total sq. ft. 40.00 0.40 0.40 1.80 1.80 Emp. Center Total sq. ft. 5.00 0.80 0.15 0.20 0.80 Residential Emp. Center Region. Comm. Neigh. Com. ADT AM IN AM OUT PM IN PM OUT DU's 1)]00 sq. ft. 1,000 sq. ft. 1,000 sq. ft. Total 13,500 27,000 2,000 800 375,000 25,300 12,600 19,300 31,300 Total Residential 130,000 2,600 7,400 8,900 4,700 Total Employment 135,000 21,600 4,100 5,400 21,600 Total Commercial 110,000 1,100 1,100 5,000 5,000 Source: Institute of Transportation Engineers, Trio Generation Manw The resulting daily trip distributions are presented in Figure 3.2, which shows the relationship of trips by purpose and the proportion of internal and external travel. Figure 3.2 External Trip Distribution Mixed Use Development Plan Page 84 Mixed Use Development Plan Page 86 1 he south Weld Sun Page 27 Figure 3.3 Daily Trip Distribution by Purpose N 3% N 8% S 25% E 2% W 5% SW 10% External 50% EXTERNAL TRIPS INTERNAL TRIPS Commercial 110,000 INTERNAL 3590 External 40% S 10% E 1% W 2% SW 4% Residential 130,000 Social 0% Employment V135,000 External 50% N 8% S 28% E 3% W 5% SW 11% Local Business 25% Mixed Use Development Plan Turner Boulevard and the west I-25 frontage road presently terminate just south of SH 119. To improve local traffic circulation, the existing western frontage road should be extended to the south to tie into the future employment area local circulation network. Because access to the arterial street system significantly affects capacity, it is proposed that private property access be restricted as follows: • Major Arterials (SH 119): Signalized intersections as per the MUD Plan Transportation Network. Access to private development shall be restricted per the CDOT Highway Access Code. Arterial: Intersections with other streets at one-fourth mile or greater. Private access shall comply with the CDOT Highway Access Code for state facilities and be discouraged on non - state facilities. Secondary: Intersections with other streets at one -eighth mile or greater. Private access shall be discouraged. Collector: Access is permitted to local streets and private legal parcels. Access shall be encouraged at 300 feet or greater. Local: Private access is encouraged to legal parcels. 3.4.3.2 Public Transit The MUD area is not currently served by public transit and is not within the Denver Regional Transportation District (RTD). Through negotiations, it may be possible to obtain RTD buses to pick up and drop off passengers at the Park -n -Ride and transit centers within the MUD area, similar to Douglas County's negotiations to have RTD provide service to Highlands Ranch. It is critical, however, to plan for future transit opportunities in context with urban development. The strategic placement of future transit and park -n -ride locations will be the foundation for both regional and local transit service. Three transit and park -n -ride locations have been identified in the plan to provide for future transit service. The first is located at the I-25/SH 66 interchange. The second is along SH 119 east of 1-25. The third site is proposed along SH 119. east of WCR 5. The objective is to capture traffic to/from Longmont to avoid additional traffic impacts to the MUD area. Page 87 Mixed Use Development Plan Total new trips anticipated will be 275,000, of which 100,000 will remain internal to the MUD area and 175.000 will travel externally. Based on the regional distribution of residential and non- residential developments, it is estimated that fifty percent (50%) will travel to/from the Denver area, fifteen percent (15%) to/from the north on 1-25, ten percent (10%) to Longmont, twenty percent to/from the Boulder area, and the remaining five percent (5%) to/from the east. This regional distribution is presented in Figure 3.3. 3.4.3.1 Proposed Circulation System Transportation planning traditionally examines the relatively short-term twenty to twenty-five year build -out. Based on market potential, the build -out of the MUD area will occur significantly later than the traditional planning horizon. Without a long-term vision of how an area develops, the circulation system can be undersized and congestion will result. Therefore, the proposed circulation system was developed to accommodate build -out of the MUD area land use plan, yet be flexible enough to respond to short-term market demands. Critical to this long- term vision is to preserve the right-of-way to accommodate the future circulation system in the event that the improvements are necessary. Arterial Circulation System The foundation of the circulation system within the MUD area will be SH 119. Although this highway will be significantly improved with the proposed revisions to the 1-25/SH 119 interchange, this interchange could possibly fail with build -out of the MUD area. Therefore, it is recommended that land be preserved at WCR 20 and 1-25 to accommodate a future interchange with I-25. In emerging development areas along highways, development traditionally occurs along the frontage road system. These frontage road systems typically fail because of the short distances between the frontage road and the freeway. Problems already exist at frontage road intersections on OH 119 east of 1-25. With the widening of I-25 to the east and the proposed I-25/SH 119 interchange improvements. the eastern frontage road will be severely constrained to a maximum of two lanes which will ultimately experience traffic that will exceed its capacity. The proposed ultimate frontage road system will be to shift the eastern frontage road approximately one-half mile to the east and the western frontage road approximately one-third mile to the west The right-of-way will be preserved to accommodate a higher -capacity four -lane facility with left turn lanes. These new facilities will become entries to employment areas. Portions of the current frontage road system can be retained as access to existing and future development, however, these facilities would be looped back to the north/south employment center roads. 3.4.4 Community Services Page 89 Facilities are incorporated into the plan for the MUD area to provide an adequate level of community service. This section includes information regarding schools, fire protection, law enforcement, and other community services as they relate to the land use plan. Projected needs are identified and appropriate locations for service facilities are discussed. 3.4.4.1 Schools School Projections Based on school trends, student demand potential for the MUD area is indicated in the following tables. Table 3.6 identifies the criteria from which school projections are made, and Table 3.7 shows what the needs for schools will be after 5 years, after 10 years, and at total build -out of the development area. These calculations are based on the assumption that an average of 120 dwelling units will be built per year. Table 3.6 St. Vrain School Need Projection Factors Grade Level Students per Dwelling Unit Average Students per School Acreage needed per school K-5 0.35 525 10 6-8 0.14 750 25 9-12 0.17 1200 40 Table 3.7 MUD Area School Need Projections Grade 5 Year Growth: 600 DU 10 Year Growth: 1200 DU Full Build Out: 13,000 DU Students Schools Acres Students Schools Acres Students Schools Acres K-5 210 0.4 4 420 0.8 8 4550 8.6 86 6-8 134 0.18 4.5 168 0.22 5.5 1820 2.42 60.5 9-12 102 0.08 3.2 204 0.17 6.8 2210 1.84 73.6 Total 446 0.66 11.7 792 1.19 20.3 8580 12.86 220.1 Source: Balloffet & Associates, Inc. 1995 Table 3.7 above demonstrates that an additional elementary school will be required sometime between the 5 and 10 year build -out horizon when the total number of dwelling units reaches approximately 1.200 in the MUD area. Middle and high school students will continue to attend the Mixed Use Development Plan Page 88 Mixed Use Development Plan Page 90 The South Weld Sun Page 28 December 5, 1996 existing schools in the St. V min District during this time. If the MUD area is built out to maximum potential outlined in this plan, an additional nine elementary schools, two middle schools and two high schools will be required. To plan for this, approximately one acre of land should be designated for schools for every 20 acres of residential development in the MUD area. Siting criteria In general. schools should be situated within a 1 to 1.5 mile radius of neighborhood centers. Elementary schools should be placed adjacent to neighborhood parks that are central to neighborhoods, away from busy streets and intersections for easy and safe access by students. Middle and senior high schools are placed along collector roadways, but remain within the 1-2 mile radius of the neighborhood centers. In all cases, schools should be easily accessed by alternative transportation systems such as bike/pedestrian trails and public transport systems, to reduce dependency on cars in the MUD area. 3.4.4.2 Fire Protection The Mountain View Fire Protection District is adequately staffed to meet the needs of the MUD area at this time. In the future, 1 I to 12 additional firefighters will be required to meet needs at the 10 - year growth horizon, and 100 to 110 additional firefighters will be required at full build- out of the MUD area, if current standards of 4.29 firefighters per 1000 persons stay the same. The current standard could increase due to the significant amount of Employment Center development planned for the area. 3.4.4.3 Law Enforcement Police protection coverage for growth in the MUD area will result in increased staff in at the administration office located in Greeley, increased need for incarceration facilities (also located in Greeley) increased need for patrol vehicles and officers and an adequate transportation system. Satellite facilities may be required for law enforcement in the future. The siting for this facility will depend on growth patterns and available funding. Due to the administrative function of this facility, its placement should not affect response times or level of service of law enforcement officers. It is for this reason siting of law enforcement facilities is not shown on the Structural Land Use Map 2.1. 3.4.5 Parks, Trails, and Open Space A combination of parks, trails, and open space areas is integrated into the MUD land use plan. These features provide a balanced system of preserved natural environments and opportunities for recreation and alternative transportation. 3.4.5.1 Parks Mixed Use Development Plan Page 91 Currently there is a regional park, Barbour Ponds State Park, located north of SH 119 just west of 1-25. This is a highly used facility, providing camping, picnicking, nature observation and fishing opportunities for over 200,000 visitors per year. A proposed extension of this park is indicated on the other side of 1-25 to the east, where the county currently is operating sand and gravel extraction. Development at this site is envisioned to be of the same character as at the Barbour Ponds site, and has been identified as a possible expansion area by Colorado State Parks. A community park is conceptually located near the center of the MUD area. Community parks typically provide more intensively developed facilities than regional parks and are intended to serve the recreational needs of residents within the entire MUD area. Facilities may include ballfields, soccer fields, tennis courts, swimming pools, community gardens. amphitheaters, group and individual picnic areas and open play areas. A more detailed description of community parks is included in the next chapter. Based on the maximum build -out population of 30,000 and a level of service of 4 acres per 1000 persons, this park should be approximately 120 acres in size. However, it is very possible that the area will not develop to its maximum density. If the area develops in a relatively low density manner, the demand for community parkland would be reduced. Therefore, it is recommended that the entire 120 acres of community parkland be acquired, but development should occur in phases to allow for flexibility of selling unneeded land or using it for other community purposes in the future. Neighborhood parks are intended to serve the recreational and social needs of residents who are within approximately % mile (walking distance) of the park. They contain leisure time and recreational facilities that generally do not attract large numbers of users from outside the neighborhood, such as plazas for neighborhood events, open play areas, multi -purpose practice fields for soccer and baseball, tennis and basketball courts, picnic shelters and playgrounds. To accommodate a multi -purpose play field and other more passive uses, a neighborhood park is ideally 5 to 8 acres in size. Neighborhood parks arc shown on the Structural Land Use Map 2.1 based on maximum build -out densities. As with community parks. the range of potential needs for neighborhood parks will vary with actual population and location of that population within the MUD area. Based on the maximum build -out and a level of service of two acres per 1000 population, the total neighborhood parkland need would be 60 acres, or seven to ten parks. Nine parks are shown on the plan. A lower density development scenario would reduce the total acreage and number of parks. Because of this potential range, it is recommended that the need for neighborhood parks be tracked with development proposals, and park sites acquired when approximately one-half of the need for a park is demonstrated within a one-half or three-quarter mile radius (e.g. 1,200-1,500 people). A regional trail system is shown that follows St. Vrain Creek, the canal between Union Reservoir and St. Vrain Creek, the railroad right-of-way south of the creek and along Boulder Creek. These trails are logical extensions of the trails planned by adjacent communities and Boulder County, and are important regional and local resources. Additional trails are shown throughout the MUD area to provide connections between residential areas and other attractions. 3.4.5.3 Floodplain The majority of the land associated with Limiting Site Factors is located along St. Vrain, Boulder and Idaho Creeks. Its outermost limits is defined by the FEMA 100 -year floodplain. Although some development has been approved by the county within the floodplain and the lowest intensity development may also occur in these areas in the future. land directly along the creeks and drainages within the MUD area should be preserved as open space. Any development that is proposed within the floodplain should demonstrate that it is designed to be above the 100 -year floodplain elevation and that the development has no significant upstream or downstream effects on the floodplain. Due to the cumulative impact of small development which may not be detectable on a case by case basis, the county should prepare a regional study to further define the apparent 100 -year floodplain and to establish a baseline for evaluating the effect of proposed development. All development within the 100 -year floodplain must adhere to the regulations and restrictions in the Flood Hazard Overlay District, as outlined in the Weld County Zoning Ordinance, as amended. The land around Foster Reservoir designated as having Limiting Site Factors, includes the area that is inundated at high water, wetlands and wildlife habitat that should be preserved, and a narrow area between the reservoir and I-25 that affords high quality views to the mountains and is strategically placed to provide a break in development along the 1-25 corridor. The area is not currently served with utilities and is not a good location for medium or high density residential development due to its proximity to the interstate. The land along the irrigation canals and ditches is important to provide corridors for wildlife movement between major habitat areas. The tights -of -ways associated with canals are rarely adequate to provide cover and forage for wildlife. After the crops that are currently in production adjacent to the canals are gone and development has taken its place, it will be important to provide an adequate buffer for wildlife. Canals and ditches also provide linear corridors for trails and opportunities for defining edges of neighborhoods. Mixed Use Development Plan 3.4.6 Development Cost Considerations Over time, development of the MUD area will require a large outlay of public expenditures to provide for the basic infrastructure and community services required to meet the needs of the residents, visitors, and employers located within the region. As a part of this planning process, the costs of providing the needed services for build -out of the MUD area have been estimated: When reviewing this cost information, it should be kept in mind that the development of this area is expected to occur over 25 to 50 years; thus, construction of major infrastructure elements is likely to occur in increments over time to minimize capital investment risk. The cost estimates are of necessity in 1995 dollars, and may assume a higher degree of economies of scale than is likely to occur with development over time. 3.4.6.1 Utility Infrastructure This section provides an assessment of utility infrastructure costs associated with the development of the MUD area and the manner in which they may affect development patterns. Of the utility systems considered in this study, water supply and sanitary sewer will most directly affect development. Other types of utilities, electric power, natural gas and solid waste, are more market - driven. Specifically, electric power and natural gas are less supply or capacity limited, and their rate structures and capacity or service expansion charges are well -established and regulated. Also, costs are absorbed by developers/property owners as the need for service emerges. Solid waste collection services are not a major factor limiting development, from either a cost or an availability standpoint. In other words, there is the assurance that solid waste collection services will be available when needed, and the issues surrounding this service are more associated with service standards and rate and service uniformity. The regulation of solid waste disposal is already well established, by virtue of existing federal, state and county requirements. Growth Scenario For purposes of the development of utility systems to support projected residential and comm- ercial/industrial/retail growth, it is necessary to postulate a planning framework. For this analysis of utility infrastructure needs and costs, the ultimate development was used. There is a time frame associated with this scenario. Utility Costs The overall assumptions forming the basis upon which utility costs were analyzed in this study include: • The use of historical development trends and present conditions, as they form the basis for assessing the ability of existing utility systems and providers to support development. • The assumption that development will occur in an efficient manner, from the standpoint of utility economics, to include utilizing available, relatively low-cost capacity before exercising more costly options. 3.45.2 Trails • The assumption that the sequence and timing of development are also relatively predictable, given the uncertainties associated with such projections. Mixed Use Development Plan Page 92 Mixed Use Development Plan Page 94 December 5, 1996 The South Weld Sun Page 29 The assumption that the costs of service extensions are relatively predictable, at least for the near term. The assumption that sewage conveyance and treatment capacity are relatively unconstrained in the long term and are not subject to influences which would significantly affect availability and prices (e.g., service area capture). The assumption that water supply is relatively unconstrained and not subject to regional competition which would significantly affect availability and prices. This assumption is increasingly less valid as existing capacity is committed and the need for major water supply system expansions emerges. As there is not a specific time frame associated with this growth scenario, costs and related factors were prepared on a present-day basis. The following is a summary of present-day (non -escalated) water supply and wastewater costs associated with ultimate development. Wastewater Conveyance and Treatment: Wastewater Treatment: $10,750,000 Collection System Extension: $15,414 000 Total Costs: $26,164,000 It should be noted that these water supply and development costs represent a conceptual estimate of service extension costs to be home by developers/property owners as a part of the development process in the MUD area; they are not costs to be borne by Weld County or its taxpayers. They also do not reflect water supply system expansion costs which will likely have to be absorbed, in part, by developers under cost -sharing arrangements with the water districts. These costs expressed on a present-day basis, are associated with ultimate development. Supply Costs: Development Costs: Total Costs: $ 12,002,000 $111.000.000 $123,002,000 Anticipated growth in the demand for wastewater collection and treatment capability can be accommodated by fee structures and cost recovery mechanisms which are currently in place. This is also the case for water supply service extensions which can be accommodated without major capital outlay. Development that requires or significantly contributes to the need for water system expansions will likely be asked to contribute to financing the capital costs of such expansions; this would be negotiated at the time the developments are approved. Mixed L'se Do,cIcyoc t ['Ian 3.4.6.2. Schools Table 3.9 Total Build -out of MUD Area Service Units/ 1000 Total Units Unit Cost Total Cost for MUD Area Operations: Expenses Capital lmprov. Staff 1.2 30 $48,000/yr $1,440,000 $300,000 (admin. bldg.) Overheads 21.5% of Total Operations Budget $396.298 Civil Process (papers) 49.2 1,230 $6.50/paper $7,995 Incarceration (inmates) 2.2 55 $45/day (included in operations) $1,072,500 (Julibuilding) Total Operations 365 calls 9,125 $202 $1,843,250 Code Enforcement 0.61 calls 16 $830/call $12.657.50 Animal Control 9.2 calls 230 $62.00/call $14,260 Total Cost $3,326,583/yr 81,372,500 ounce: Weld County Local Emergency Operation Plan (Draft) 8/22/95 Assumptions: • The maximum population potential for the MUD area at build -out is 25-30 thousand people. The calculations listed above are based on 25 thousand people, and costs are calculated using present day costs. This is simply a model to be used in a comparison between projected costs and potential revenues. Capital improvement costs include jail expansion and a new satellite office facility. Costs for office facilities are calculated by multiplying the required staff x 200 square feet per person x $100 per square foot. The Weld County Local Emergency Operation Plan indicates a desire to house approximately half of the required personnel for the MUD area in close proximity, while remaining staff will be housed in the Greeley facility. • Jail expansion capital costs are calculated by multiplying the total number of inmates by $19,500 per bed. As a means of estimating the impact on development if costs for law enforcement facilities were to be totally funded by new development, an estimate of law enforcement costs was prepared for various types of development (Table 4.7). Costs were estimated based upon average population figures for each type of use. The total law enforcement costs are then divided by the total estimated population of the planning area to derive a per -capita cost. Based upon a projected total population for the study area of 115,000 persons. the preliminary cost per person is $26. Costs per dwelling unit or square foot of retail, office, or industrial uses are based upon their estimated population times the cost per person. These costs are shown in Table 3.10. Page 95 Mixed Use Development Plan The St. Vrain School District anticipates the need for 9 elementary schools, 2 middle schools and I high school within the MUD area at build -out. Capital costs in 1995 dollars for these schools would total $87.000,000. Capital costs for individual, fully -equipped schools (excluding land) are one elementary school one middle school one high school $4,500,000 $13,500,000 $19,500,000 As discussed in previous sections, the growth projections at build -out prepared as a part of this planning effort indicate the need for two high schools. 3.4.6.3 Lao' Enforcement Tables 3.8 and 3.9 illustrate the projected needs, yearly costs, and capital improvements costs to maintain the present level of service and at the maximum build -out potential of the MUD. Table 3.8 MUD Area: 10 -Year Growth service Units Total Unit Cost Total (Cost for MUD) Operations: Expenses Staff 1.2 3 $48,000/yr $144,000 Overheads 21.5% of total Operation Budget $54,135 Civil Process (papers) 49.2 133 $6.50/paper $865 Incarceration (inmates) 2.2 6 $45/day (included in operations) Total Operations 365 calls 986 $202 $199,000 Code Enforcement 0.61 calls 2 $830/call $1,660 Animal Control 9.2 calls 25 $62.00/call $1,550 Total Cost $202,210/yr Weld County Local Emergency Operation Plan (Dra Assumptions: • Projected population after 10 years is 2700 people • There will be no capital improvements needed at the 10 -year growth horizon, assuming that the proposed Weld County Jail is constructed as planned and approved. Table 3.10 Law Enforcement Capital Costs Estimates Land Use Population Cost per Unit Residential 2.6 per dwelling $31 per dwelling Retail Commercial 7.5 per 1.000 s.f. $90 per 1,000 s.f. Employment 5 per 1,000 s.f. $60 per 1,000 s.f. Source: Balloffet and Associates, Inc. Page 97 3.4.6.4 Fire Protection Capital improvements will be required sometime after the 10 -year horizon to provide at least one additional fire station. This will depend on where development occurs and the resulting response times. General projections of traffic patterns and volumes, along with land use density consid- erations. should serve as a basis for the location of future fire station facilities. 3.4.6.5 Transportation Street improvements comprise the largest category of funds to serve the MUD area. Weld County's general fund revenue sources will be inadequate to cover the infrastructure costs associated with roads required to meet the needs of new development. As a part of this planning effort, the costs to meet the needs of the MUD area at build -out were estimated at $50 to $80 million dollars. The low end of this range is based on the use of rural street sections for collectors and four -lane undivided arterials without curb, landscaping, or street lighting. The higher end of the cost estimate assumes that all streets have curbs, landscaping, and street lights. These costs were based on applying a unit cost to construct one linear foot of a given roadway type times the total length of roadways required to construct the entire 1-25 MUD transportation network. These costs also include signals and bridges. A low and high estimate by facility type is presented in Table 3.11. The I-25/SH 119 interchange improvements currently funded by CDOT and the 1-25 widening improvements from SH 7 to SH 66 are not included. It should be noted that SH 119 and SH 66 within the MUD area have been separated from non-CDOT facilities. Because streets comprise the largest costs of infrastructure improvements, a critical issue becomes how to fund these improvements. Some jurisdictions have required developers to construct their half section of roadway at the time of development. The problems that have arisen from this approach are that I) capacity improvement from new growth traffic is often required at locations where developments have not yet occurred nor are they planned for development in the immediate future, and 2) costs for signals, bridges, and segments of roadways not adjacent to future developments (i.e. adjacent to floodplains. government lands, or existing development) are not funded and either become a burden to the local jurisdiction or are not constructed. Mixed Use Development Plan Page 96 Mixed Use Development Plan Page 98 The South Weld Sun Page 30 December 5, 1996 One approach to funding the future circulation in a timely manner is to have two funding programs. The first program (direct costs) would require developers to build 2 lanes of pavement, curb, gutter, sidewalk, streetlights, and landscaping for adjacent 2, 4 and 6 -lane roads as designated in the MUD area plan standards. The second program (indirect costs),would be to adopt impact fees to finance the interior lanes of four and six -lane highways, medians, signals, major bridge and drainage improvements, and segments of roadways adjacent to non -developable lands that would be attributable to new growth. The resulting preliminary low and high cost estimates for direct and indirect costs per funding category for the MUD area are based on separation of linear cost. The results are presented in Table 3.11. Table 3.11 Preliminary Cost Estimates for Transportation Network Facility t.ow Cost Estimate (millions) High Cost Estimate (millions) SH 119 Widening 58.1 $9.4 SH 66 Reconstruction & Widening $3.7 $4.5 4 Lane Divided - Other $8.8 $10.9 4 Lane Undivided - Other $21.5 128.7 2 lane Collector 08.2 027.5 Totals $50.3 $81.0 Funding Category Direct Costs - Adjacent Development Cost $30 $56 Indirect Costs- New Growth Required $20 $25 Source: Halloffet and Associates, Inc. 1996 As a means of estimating the "indirect cost" of roadways attributable to new development growth, road costs were estimated based on the number of daily vehicle trips generated. Based on a projected 275,000 additional daily trips for the study area, the estimated indirect cost per trip for the low and high estimate of $20-$25 million would be between $73 and $90 per daily trip generated. The "indirect cost" per dwelling unit and square foot of retail, office or industrial uses are based on their daily trip generation rates times the estimated cost per trip. These costs areshown in Table 3.12. Table 3.12 Indirect Street Costs Land Use Daily Trips Per Unit Low Cost Per Unit $20 Million High Cost Per Unit $25 Million Low Density Residential 9.6 per DU $700 per DU $865 per DU Medium Density Residential 6.5 per DU $475 per DU $585 per DU Mixed Use Development Plan Table 3.13 Parks, Trails and Sites with Limiting Factors Anticipated Costs Acquisition and Construction Costs Parks Neighborhood Parks (Acquisition and construction of 60 acres at $70,000 per acre) $ 4,200,000 Community Parks (Acquisition and construction of 120 acres at $100,000 per acre) $12,000,000 Trails (25 miles of construction only at $150,000 per mile) $ 3,750,000 Limiting Site Factors (Canals, ditches and ' of floodplains dedicated with developments. All of sites with limiting factors around Foster Res. and Union Res. purchased. Total approximately 2,100 acres purchased at avg. $2,800 per acre) $ 6,300,000 Total Acquisition and Construction Costs $24,450,000 Annual Operations and Maintenance Costs Parks 180 acres developed parkland at $3,500 peracre $ 630,000 Trails 25 miles at $8.000 / mile $ 200,000 Limiting Site Factors 4,500 acres at $25 per acre $ 112,500 Total Annual Operations and Maintenance Costs 5 992,500 ource: FDAW Inc.. 1996 Costs are approximate and are based on historical costs experienced by the Cities of Fort Collins and Greeley and Larimer County in 1994 and 1995. Page 99 Mixed Use Development Plan High Density Residential 5.9 per DU $430 per DU $530 per DU Commercial Retail 39 per 1,000 SF $2.85 per SF $3.50 per SF Office 9.5 per 1,000 SF $ .70 per SF $0.85 per SF Industrial 3.3 per 1,000 SF $ .24 per SF $0.30 per SF Source: Halloffet and Associates, toe. 19 DU = Dwelling Unit SF = Square Foot It should be noted that because of the high daily trip generation rates for retail, the correspondingly high indirect unit costs, and the concern that retail development may not locate within a given area if higher fees are imposed, some jurisdictions have elected to subsidize the commercial retail indirect costs. Sales tax from the commercial retail uses could provide a revenue stream into the community to pay for the improvements. 3.4.6.6 Parks, Trails, and Limiting Site Factors Development and maintenance of the parks, trails and sites with limiting factors must be considered to comprehensively assess the cost of development in the MUD area. Table 3.13 is a summary of the anticipated costs associated with the parkland required for a maximum build -out population of 30,000. Many of the sites with limiting factors and trails corridors could cost little or nothing because they may be dedicated as part of a common open space requirement, or public access achieved through purchase of easements or other means. Floodplain property also is typically less expensive to purchase because its development potential is greatly restricted. Parkland may also be dedicated: however. historically this has resulted in less than desirable park sites or properties that are too small. Instead, most communities have opted for an impact fee system that gives them more flexibility in selecting appropriate park sites. Section 4. Appendix Page 101 4.1 Plant Materials The following is a partial list of plant materials that are native or adapted to Colorado's Front Range in the MUD area. This is not an all inclusive list and is intended only to act as a general resource. New plant materials are being made available on a commercial basis and local nurseryment are a valuable resource when trying to determine the appropriateness and adaptability of plant materials to a particular location. Table 4.1 Listing of Plant Materials Common Name I Botanical Name Evergreen Trees: Douglas Fir Eastern Red Cedar White Fir Rocky Mountain Juniper Oneseed Juniper Austrian Pine Ponderosa Pine Bristlecone Pine Pinyon Pine Colorado Spruce Pseudunsmga manziesi Juniperus virginiana Abies Concolor Juniperus scopuloram Juniperus monosperma Pious nigra Pious ponderosa Pious aristada Pious cembroydes edulis Picea Pungens Ornamental Trees Hawthorn varieties Flowering Crabapple Native Plum Chokecherry Golden Raintree Callery Pear Newport Plum Grabel Oak Crataegus var. Malus var. Prunus Americana Prunus virginiana Koclreutnria paniculata Pyrus calleryana Prunus Americana 'Newport' Qurecus gambelli Mixed Use Development Plan Page 100 Mixed Use Development Plan Page 102 December 5, 1996 The South Weld Sun Page 31 Common Name I Botanical Name Deciduous .Trees Green Ash Autumn Purple Ash Western Catalpa Hackberry Honey locust Bur Oak Horse chestnut Ketuucky Coffetree Fraxinus penmylvanica lanceolate Frasinus Americana Catalpa speciousa Celitus occidentalis Gleditsia tricanthos inermus Quercus macrocarpa Aesculus hippocastanum Gymtwcladus diacius Shrubs Barberry var. Common Buckthorn Buffalo berry Siberian Peashmb Blue Mist Spirea Cistern Cherry Sand Cherry Potentilla Hancock Coralberry Comelian Cherry Cottoneaster var. Alpine Current Red Osier Dogwood Euonymus var. Forsythia var. Oregon Grape Honeysuckle var. Juniper var. Lilacs var. Berberis var. Rhamnus cathartica Sheperdia canadensis Caragana arboremis Caryopteris clandonensis Prunus cistena Primus besseyi Potentilla fmiticosa var. Symphoricarpos orbiculantus 'Hancock' Comm mas Cottoneaster var. Ribies alpinum Comas stolonifera Euonymus var. Forsythia var. Mahonia aquifolium Lomcera var. Juniperus var. Syringa var. Mixed Use Development Plan Page 103 Common Name I Botanical Name Shrubs Mountain Mahogany Cerocarpus ledifolius Ninebark Psycocarpus monogynus Privet var. Ligustrum var. Rabbitbeush Chrysathamnus nauseousus Austrian Copper Rose Rom foetida bicolor Rugosa Rose var. Rosa engosa Sage var. Artemisia var. Serviceberry Amalanchier alnifolia Spirea var. Rhus var. Sumac var. Rhus var. Vibrunum var. Vibrunum var. Blue Stem Willow Salix irroram RE: ORDINANCE NO. 191 PAGE 2 BE IT FURTHER ORDAINED by the Board if any section, subsection, paragraph, sentence, clause, or phrase of this Ordinance is for any reason held or decided to be unconstitutional, such decision shall not affect the validity of the remaining portions hereof. The Board of County Commissioners hereby declares that it would have enacted this Ordinance in each and every section, subsection, paragraph, sentence, clause, and phrase thereof irrespective of the fact that any one or more sections, subsections, paragraphs, sentences, clauses, or phrases might be declared to be unconstitutional or invalid. First Reading: December 2, 1996 Publication: December 5, 1996 Second Reading: January 6, 1997 Publication: January 9, 1997 Final Reading: January 29, 1996 Publication: February 6, 1997 Effective: February 11, 1997 NOTICE PURSUANT to the Weld County Home Rule Charter, Ordinance Number [Ord. Number] published above, was introduced and, on motion duly made and seconded, approved upon first reading on December 2, 1996. A public hearing and second reading is scheduled to be held in the Chambers of the Board, First Floor Hearing Room, 915 10th Street, Greeley, Colorado 80631, on the 6th day of January, 1996. All persons in any manner interested in the reading of said Ordinance are requested to attend and may be heard. Please contact the Clerk to the Board's office at phone (970) 356-4000, Extension 4226, or fax (970) 352-0242 prior to the day of the hearing so that reasonable accommodations can be made if, in accordance with the Americans with Disabilities Act, you require special accommodations in order to participator in this hearing as a result of a disability. BE IT ALSO KNOWN that any backup material or information presented to the Board of County Commissioners concerning this matter may be examined in the office of the Clerk to the Board of County Commissioners, located in the Weld County Centennial Center, Third Floor, 915 10th Street, Greeley, Coloardo. 962117 ORD191 RE: ORDINANCE NO. 191 PAGE 3 ORDINANCE NO. 191 ORDINANCE TITLE: IN THE MATTER OF ADOPTING THE MIXED USE DEVELOPMENT PLAN DATE OF NEXT READING: January 6, 1996 TIME: 9:00 a.m. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO BY: DONALD D. WARDEN, CLERK TO THE BOARD BY: Carol A. Harding DEPUTY CLERK TO THE BOARD DATED: December 2, 1996 PUBLISHED: December 5, 1996, in the South Weld Sun Mixed Use Development Plan Page 1O4 962117 ORD191 NOTICE OF SECOND READING OF ORDINANCE Pursuant to the Weld County Home Rule Charter, Ordinance Number 191 was introduced on first reading on December 2, 1996, and a public hearing and second reading was held on January 6, 1997, with changes made to the text, as attached. A public hearing and third reading is scheduled to be held in the Chambers of the Board, First Floor Hearing Room, 915 10th Street, Greeley, Colorado 80631, on January 29, 1997. All persons in any manner interested in the next reading of said Ordinance are requested to attend and may be heard. Please contact the Clerk to the Board's Office at phone (970) 356-4000, Extension 4226, or fax (970) 352-0242 prior to the day of the hearing if, as a result of a disability, you require reasonable accommodations in order to participate in this hearing. Any backup material or information previously submitted to the Board of County Commissioners concerning this matter may be examined in the office of the Clerk to the Board of County Commissioners, located in the Weld County Centennial Center, 915 10th Street, Third Floor, Greeley, Colorado, between the hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday. ORDINANCE NO. ORDINANCE TITLE: DATE OF NEXT READING: TIME: BY: 191 IN THE MATTER OF ADOPTING THE MIXED USE DEVELOPMENT PLAN January 29, 1997 9:00 a.m. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO DONALD D. WARDEN CLERK TO THE BOARD DATED: January 6, 1997 PUBLISHED: January 9, 1997, in the South Weld Sun CHANGES TO TEXT Page 13: Addition of Mayeda Annexation to Longmont; list Rinn Church as community/historical site (Map 2.1, Structural Land Use Map) Section 2.6.3.1 Change in verbiage from shall to may and from common open space to maximum lot coverage. Section 2.6.3.4 Correction of figure number from 4.5 to 2.5. Section 2.6.4.2C Addition of 1-25 and State Highway 119 frontage roads in landscape setback requirements. Page 35: Addition of wording "Raised" to 4 -Lane Arterial with Median (Map 2.2, Structural Pages 36-38: Transportation Network) Labeling of Curb and Gutter on each cross section; addition of a Local Employment/Regional Commercial road cross section (Figure 2.10, Road Cross Sections) Section 2.5.2 Addition of wording "in the A (Agricultural) Zone District" under exemptions to the PUD process, Recorded Exemption. Throughout: Change requirement for common open space to 30 percent in Limiting Site Factors area. January 9, 1997 STATE OF COLORADO _COUNTY OF WELD )s.s. Ruth Pelton-Roby, as manager of Pelton Publishing Company LLC, being duly sworn, states that it is publisher of the South Weld Sun, a week. newspaper published in Keenesburg in said County and State; that said newspaper has a general circulation in said County and has been continuously and uninterruptedly published therein, during a period of at least fifty-two consecutive weeks prior to the first publication of the annexed notice; that said newspaper is a newspaper within the meaning of the act of the General Assembly of the State of Colorado, entitled "An Act to regulate the printing of legal notices and advertisements," and amendments thereto; that the notice of which the annexed is a printed copy taken from said newspaper, was published in said newspaper, and in the regular and entire issue of every number thereof, once a week for 1 successive weeks; that said notice was so published in said newspaper proper and not in any supplement thereof, and that the first publication of said qnotice T as aforesaid, was on the day of — , :199 , and the last on the —1- day of , 1997 PELTONPUBLISHING COMPANY LLC BY:_ ICLC n -e Ruth Pelton-Roby, Manager Subscribe and sworn to before me this %?fday of 1A���2 , 1997. =VArLh. efrly,a/d11/4 Notary Public NOTICE OF SECOND READING OF ORDINANCE Pursuant to the Weld County Home Rule Charter, Odcaroe Number 191 was Moduad on het reading on December 2, 1990. end • pubs headily and second reading wea held on Jwwsty 6, 1907, wth changes made to the text, as attached. A pubfb hearing and NM reading Is scheduled to be held In the Chentws of the Scald, Fat Floor Hearing Room, 915 10th Street, Greeley, Colorado 60481, on Jemmy 29, 1997. AI poisons In any manner (Wrested In the next reading of said Ordinance are requested to attend end may be Said. Platte canted the Clark to the Board* Olllca at phone (970) 3564000, Eldeneon 4226, or fax (970) 3620242 prior to the day of the headily I. es a meal of a dleebllty, you require renorwble a coMmodaSdn In order to pamdpste In this heualy. My backup materiel or blonnelon previously submBed to the Baal of County Commissioners oo oernsly this ratter may be examined In the dike d the Oak to the Bawd of Comfy Ccrnehstone s. located te the Weld Corley Centennial Center, 915 10th Street, Ted Pear. Greeley, Colorado. between the hove of 9:00 am. aid 640 p.m., Monday text Fdeay. ORDINANCE Na. 191 ORDINANCE TITLE: N THE MATTER OF ADOPTING THE MIXED USEDEVB.O MENT PLAN DATE OF NEXT READING: Jamey 29, 1997 TIME: 9:00 a.m. BOARD OF COUNTY COMMISSIONERS WELD COUNTY. COLORADO BY: DONALD D. WARDEN CLERK TO THE BOARD BY: SHELLY K. MILLER DEPUTY CLERK TO THE BOARD DATED: January 6, 1997 PUBLISHED: January 9. 1997, In the South Weld Sun CHANGES TO TEXT Page 13: Section 2.6.3.1 Addition of Mayeda Amtoiatlon to Longmont; St Rim Chun:h at ooamxipNrwa m Map 2.1. Structural Led Use beep) Charge in verbiage hom shall to may and horn common open space to medmum lot coveys. Section 2.0.3.4 Correction of Rgn number horn 4.6 to 2.6. Section 2.6.4.2C Page 36: Pages 3636. Section 2.52 Throughout: Addition of 425 and State Highway lie homage roes o brderape eemedt requkatr9.. A0B in d wofdrg'FY W d' a 4 Lane AnwW with Median 4M'ip 22, SbtMWS Trntgoiron Labeling of Curb and Geer on each ems section; **Won of • Local Employment/Regiona Commercial road woes section (Figure 2.10, Read Cross Section) Addition et wording 9n the A (Agriculture!) Zone DRWIt under exemptions to the PUD process, Recoiled Eoimpflon. Change regJntnnn for ragman open space to 30 percent in Limiting Site Factors area. NOTICE OF THIRD READING OF ORDINANCE Pursuant to the Weld County Home Rule Charter, Ordinance Number 191 was introduced on first reading on December 2, 1996, and a public hearing and second reading was held on January 6, 1997. A public hearing and third reading was completed on January 29, 1997, with changes being made to the text, as listed below and, on motion duly made and seconded, was adopted. Effective date of said Ordinance is listed below. Any backup material or information previously submitted to the Board of County Commissioners concerning this matter may be examined in the office of the Clerk to the Board of County Commissioners, located in the Weld County Centennial Center, 915 10th Street, Third Floor, Greeley, Colorado, between the hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday. ORDINANCE NO. 191 ORDINANCE TITLE: IN THE MATTER OF IN THE MATTER OF ADOPTING THE MIXED USE DEVELOPMENT PLAN CHANGES TO TEXT Replace 1-25 Mixed Use Development Area Structural Plan, Map 2.1 "Structural Land Use Map" dated January, 1997. Page 15 - Addition of language promoting the continuance of the agrarian lifestyle in the area: 2.2.4 Residential: Residential districts within the MUD area are comprised of encouraged to be cohesive, identifiable and diverse neighborhoods, While retaining the current;agrarian lifestyle of :residents in:the :area. The county encourages comprehensive and coordinated neighborhood design efforts in developments, especially with regard to circulation provisions, conservation of natural features, and relationship to established neighborhood centers. The county also encourages diversity of housing types, including owner -occupied and rental housing, which serve all economic segments of the population and match local incomes and age groups. Higher residential densities shall be situated within close proximity to the designated neighborhood centers. Each neighborhood shall have an interconnected network of local streets that provide direct connections to local destinations. Page 18 - Addition of verbiage allowing greater flexibility in evaluating proposals containing less than the percentage of Common Open Space delineated in Table 2.2: 2.3 Common Open Space Regulations: All Planned Unit Developments (PUDs) within the MUD area shall preserve a portion of the site as common open space. "Common Open Space" is defined as any usable parcel of land or water essentially unimproved and set aside, dedicated, designated or reserved for public or private use or enjoyment or for the use and enjoyment of owners or occupants of land adjoining or neighboring such an area. Common Open Space includes landscape areas that are not occupied by buildings or uses such as storage or services areas, private courtyards, parking lots and islands. In all PUD districts except for those containing residential uses, common open space may include landscape setbacks adjacent to roadways, where the setbacks are not utilized as parking or storage areas. Common Open Space is not to be included in the calculation of the maximum coverage per lot. The minimum percentages of land in each development devoted to Common Open Space are listed in Table 2.2. Department of Planning. Services' staffreserves the ability,to evaluate:rtdevelopment design proposals with' less,: Common Open Space.thanrlisted in, Tat le'2.2.,: Staffiwill determine if= the proposed' Common Open Space meets the intent of the! requirements of this Ordinance,. Page 23 - Addition of verbiage to ensure that plantings in parking areas do not obstruct visibility: 4. A minimum of 5 percent of the parking area shall be landscaped exclusive of setback areas. Trees planted in parking areas should be either in bays or planting islands of at least 5 feet by 5 feet. Trees should be distributed throughout the parking area,:however, they shall be placed so that:they do not obstruct visibility for cars and pedestrians.. (See Figure 2.5). Page 42 - Addition of regulations for a development complex sign in order to address the identification signage for Planned Unit Developments: 4. Development Complex Signs; ,.Definition,.Sizeond Design limitations: a. A development complex sign.is a :detached signpn the+premise of the development which primarily identifies. or directs=attention to the, namesymbol` or location of the development complex. b. A development complex is, a group of free-standing: buildings or, buildings constructed in :such a' way as, to give an appearance ,of being inter -related due to architectural similarity, inte€connected drives, parkingFareas.:and/or yplatting,of the development. ;A developmenticomplex includes uses which; provides a combined:! sense of place,such as office or business parks;: shopping centers, industrial°pairks, apartment complexes and hotels c. One development complex sign:per street frontage,,.rs;allowed:in.the Planned Unit Development Zone District, -regardless of tWnumber..offilings; orphasing of,.the development.. ;The total ieightof;the'sign shall not exceed twenty -lie (25) feet above the adjoining. ground, elevation. The totersign area` shall: hot exceed otter hundred'fifty (150) squar*feet 4.5. The minimum spacing between signs shall be six hundred (600) feet. Page 53 - Update of school capacity and projected enrollments in Table 3.1: Table 3.1 School Capacity and Projected Enrollments Schools Building Capacity Actual 1995 Actual 19% Projected Enrollments Projected Avg. Yearly Growth Rate 1997-2001 1997 1998 1999 2000 2001 Elementary Mead 456 486 528 559 587 618 645 673 4.7% Frederick 864 813 822 835 848 855 874 902 2.0% Indian Peaks 504 483 476 498 514 517 541 552 2.6% Secondary Mead MS 349 311 317 327 338 359 380 396 4.9% Sunset MS 768 751 759 748 764 798 826 826 2.5% Frederick MS/HS 589 533 544 588 588 613 629 634 1.9% Skyline HS 1299 1082 1149 1205 1274 1251 1270 1308 2.1% Niwot HS 1127 1025 1021 1043 1055 1074 1125 1158 2.7% Source: St. Vrain Schoo District Memorandum May 10, 1996 Notes: Italics indicate enrollment exceeds capacity MS = Middle School, HS = High School Page 73 - Addition of verbiage identifying the Rinn Chaurch as a historic site in the MUD area: Historic Sites: One Two historic siteiss!are currently known to exist within the MUD area. The One site is on private land and is noted with a historic marker, which identifies "Fort Junction," built in 1864 by pioneers of the Boulder Creek and St. Vrain Creek Valleys. This was a sod enclosure garrisoned by home guards as protection against hostile Indians. It stood about 200 feet east of the current east frontage road paralleling 1-25, and about one quarter mile north of SH 119. The second historic site located within the,MUD.area is the Community Church has;been'an important comnrunitylan since the early t900's Prior to thevestabiishment orithe.c servicea were held in a smallechoot hp9W.aty,ldaholcree grown and services were b'eing,held notiStrO there, but Schools,: The need: for a; church was oftenµ discussed• by' dedicatedat the;junction: of:Weld.County Roads:20 and 9;f nity Church., The: Rinn, vesfemWeld County School, and;religious Sunday :School. had iiley. Stone and a Vrain �'C0mmunity ,In,:1905, land was r the church's' construction, Completed and paid for in 1906, the Rinn Community Methodist Church:was dedicated in the summer of 1907,. The building was.2p'x30'with a small erttiryway. ;The=t hurch,had,an organ homemade altar rail; folding chairs'and a:coal burning stonsticWatiijia in 1911 so that a full-time: pastor; could be invited, to.serve.:On Christmas ve:of:1924,:however a fire consumed:the church.:,ByAugust of:1925 a:, new.,apildling,was ready.In 1936,a new Colorado, Highway 87 was°built north from Denver and both: the church. and: par'sonage.were moved, :The construction,et laldliii8:1eqteeitateGenettier2retrelocation ofthechurch to its present location immediately westiof 1-25: on the north side of. Weld; County, Road 20..,.Today, the Rinn Methodist Church serves as an important historical lart : . olfortriefporarnunWand Weld County, Page 89 - Addition of verbiage indicating the intention of the County that Turner Boulevard should be extended to the south and tie into the proposed north/south four -land arterial to the west: Turner Boulevard and the west 1-25 frontage road presently terminate just south of SH 119. To improve local traffic circulation, the existing western frontage road should be extended to the south to tie into the future employment area local circulation network. Turner, Boulevard should be extended .south. into the future employment area. and connect -to the proposed north/south four -lane arterial that will: be located;to the west. EFFECTIVE DATE: DATED: PUBLISHED: February 11, 1997 January 29, 1997 February 6, 1997, in the South Weld Sun BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO STATE OF COLORADO ) )s.s. COUNTY OF WELD ) Ruth Pelton-Roby, as manager of Pelton Publishing Company LLC, being duly sworn, states that it is publisher of the South Weld Sun, a weekly newspaper published in Keenesburg in said County and State; that said newspaper has a general circulation in said County and has been continuously and uninterruptedly published therein, during a period of at least fifty-two consecutive weeks prior to the first publication of the annexed notice; that said newspaper is a newspaper within the meaning of the act of the General Assembly of the State of Colorado, entitled "An Act to regulate the printing of legal notices and advertisements," and amendments thereto; that the notice of which the annexed is a printed copy taken from said newspaper, was published in said newspaper, and in the regular and entire issue of every number thereof, once a week for 1 successive weeks; that said notice was so published in said newspaper proper and not in any supplement thereof, and that the first publication of said notice as afopesaid, was on the L day of tcb , 1997,, and the last on the b day of 1-4 , 1997. PELTON PUBLISHING COMPANY LLC M Ruth Felton -Roby, Manager Subscribed and sworn tq before me this th day of 7162a44.13(7162a44.13( , 1997. BY: Notary Public lor nre'ac 2-1 R-1200 Co L`, 943 NOTICE OF THIRD READING OF ORDINANCE Pursuant to the Weld County Home Rule Charter, Ordinance Number 191 was introduced on Bret reading on December 2, 1996, and a public hearing and second reading was held on January 6, 1997. A pudic hearing and tract reading was omelet. on January 29, 1997, with °hang. Ming made to the text, as listed below and, on motion duty made and seconded, watt adopted. Effective date of said Ordinance Is toted below. Any backup material or information previously submitted to the Board of County Commissioner. concerning this matter may be examined n the office of the Clerk to the Board of County Commissioners, located in the Weld County Centennial Center, 916 10th Strew, Third Floor, Greeley, Colorado, between the hours of 9:00 a.m. and 5:00 p.m., Monday ihru Friday. ORDINANCE NO. ORDINANCE TITLE: 191 IN THE MATTER OF IN THE MATTER OF ADOPTING THE MIXED USE DEVELOPMENT PLAN CHANGES TO TEXT Replace I-26 Mixed U. Development Area Structural Plan, Map 2.1 °Sinoturel Lend Use Map" dated January, 1997. Page 16 - Addition of language promoting the continuance of the agrarian lifestyle in the area: 2.2.4 Residential: Residential districts within the MUD area area..mpneedMenwumged to be cohesive, identifiable anddNeree cure...ag.arianiresty!e Mresidems inihearea. The county encourages comprehensive and coordinated neighborhood design efforts in developments, especially with regard to okculstion provisions, conservation of natural features, and relationship to established neighborhood centers. The county also encourages diversity of housing types, including owner -occupied and remel housing. which serve all sconenio segments of the population and match soul incom. and age groups. Hgher residandal densities shall be situated within does proximity to the dsslgnated neighborhood centers. Each neighborhood shall haw an interconnected network of lops streets that provide direct connections to local destination. Page 18 - Addition of verbiage silvering greater flexibility in evaluating procoews containing lees then the percentage of Common Open Space delineated in Table 2.2: 2.3 Common Open Space Regulations: Al Planned Unit Developments (PUDe) within the MUD area 'hell preserve a portion of the site as common open space. -Common Open Space' 'e defined a. any usable panel d land or water essentially unimproved and set aside, dedicated, designated or reserved for public or private use or enjoyment er forihe use and enjoyment of owners or occupants d land adjoinIng er neighboring such an area. Common Open Space includes landscape areas that are not occupied by buildings or osse such as storage or..ndo.. area., Wade courtyards, parking lots and islands. In ail PUD distress except for those c.nulrurg rwid..N teee, commis open space may :neWe landscape setbacks adjacent to roadways. where the setback are not uttsed aspadatg or stops areas. Common Open Space is not to be Included in the calculation of the m W mum coverage per la. The minimum percentages of land In each development devoted to Common Open Space an listed in Table 2.2. Depamnent d Planning Services. teat reserves the ability to evaluate development design proposals with law Common Open Space than listed In Table 22. Stall will det.rmM If the proposed Common Open Space mews the intent of the requirements Of Me Ordinance. Page 23 - Addition al verbiage to ensure that planing. in parking area. do not oketrud oWtlllyi 4. A minimum of 6 percent dew peeing area Mel be land..p.d exclusive el .0 tell areas. Tree. Melded In peddng areas Mould be eked in keys or planting islander/fat Ire 61ew by 6 feet. Trees should be dletdpdad throughout the pe l g area, however, they shell be placed so that they do not Weiud visibility for can end pedestrians. (See Figure 2.-1 Page 42 - Addition of regulation for a dewbpmwn tempi. sign in order to addre.s the IO Abellon Ngnge for Planned Una DevtloPmnp: 4. Development Complex Signs: Definition, Sea and Design Linntions: a. A development complex .fpm le • detached sign an the premise of the deeaopnwn what, prlmely Monta n or direct. attention to the name, symbol or location at the development complex. b. A development complex is • group al he►Nandirg bul6gp on buildings wnNtWed In such • way u to get an appear...al being inter -related den to arditedual Nmieray, Interconnected dew., paddling areas aide *ling of the development. A development complex I ndu.es cos which provid. a combined sew at place such se lab or buttons paid, shopping center., laedblai parks, apsrtmert complexes and N.M. One development oomph. align per strut frontage is Glowed at the Planned Una Development Zane Dleetes, rowdies* of the number of bongs or phasing of the ddWNopnm. The NMI height of the sign slid not ewe. twenty -M (26) IM above the adjddng wound elevation. The total sign area she. net exceed one hundred filly (160) square lest. 4:6. The minimum epadtg between signs ehea be .t henaed (BEE) feel. Page 63 - Update of acted capacity and proles.. enrolments In Table 3.1: Table 3.1 SMod Capacity and Profaned Enrollments Soho.. Elementary Mead Frederick Indian Peals Secondary Mead MS Sunset MS Frederick MS/HS Skyline HS Nwot HS Building C.pwity 456 884 504 349 758 569 1299 1127 Actual 1900 466 813 483 311 751 533 1002 1025 Aetwl 1000 528 822 478 317 759 544 1149 1021 Projected Enrollment. 1007 559 835 498 327 748 588 1205 1043 1900 587 848 514 338 760 588 1274 1055 1009 618 85.5 517 360 798 813 1251 2000 645 874 541 380 826 629 1270 2001 673 802 552 306 826 594 1308 1074 1125 1158 PrWwMd Avg. Werth Growth Rego 1007.2001 07% 2.0% 2.6% 4.9% 25% 1.9% 2.1% 2.7% Source: St. Vain School Dietnct Memorandum May 10. 1996 Notes: Italics indicate entailment exceeds capacity MS • Middle School. HS . High School Page 73 - Addition of verbiage Identifying the Rlnn Chaurch . a historic she in the MUD area: Historic Sites: OrrrTw'o histor'O siteiss are currently known to exist within the MUD area. i11'One she non private lend sad noted with a historic marker, which identifies "For. Junction,' built in 1864 by pioneers d the Boulder Creek and St. Vain Creek Valleys. This was a cod enclosure garrisoned by hone guards as protection against hostile Indians. ff aloud about 200 tea east of the current cert frontage road paralleling 1-25, and about one quarter mile north of SH 119. The second historic site located wthin the MUD area is the Rinn Community Church. The Rinn Community Church has been an important community landmark in southwestern Weld County since the early 1900.. Prior to the establishment al the church, Sunday School and religious services ware held in a smell school house et Idaho Creek. By 1900, the Sunday Schuh had grown and services were being hold not only there, but also N Dailey Stone and St. Vrein Schools. The reed fora church was often discussed by the oommunity. In 1905, land was dedicated at the jumxen d Weld County Roads 20 and 9 for the ch10011'0 construction. Completed and pad for in 1906, the Rinn Community Methodist Church was dedicated in the summer al 1907. The building was 20'x30' with a small entryway. The church had en organ. homemade altar rail, hewing chairs and a coal burning stove. The first parsonage was buih in 1911 so that a full-time pastor could be invited to serve. On Christmas Eve of 1924, however, s the consumed the church. By August of 1925 a new buildling was ready. In 1936 • new Colorado Highway 87 was buk north from Denver and both the church and parsonage were moved. The construction of I-25 in 1958 necessitated another rNwetlon of the church to its present location immediately west of I-25 on the nonh sided Weld County Road 20. Today, the Rinn Methodist Church sear. as an important historical landmark for the community and Weld County. Page 89 - Addition of verbiage indicating the intention of the County that Turner Boulevard should to extended to the south and tie into the proposed north/south four -lend arterial to 1M west: Turner Boulevard end the west 126 frontage road presently terminate just south of 011 119. To improve local traffic circulation, rea local circulation nebnm. ...riding no wisdom nonage aroad should to nto the future the wino to . into the future coto du proposed north/south four -lane Turns Boulevard should be extended mouth into the future smpbym,em area and errand that nil be boded to the weet. EFFECTIVE DATE: February 11.1997 DATED: January 29, 1597 PUBLISHED: February 6, 1097, in the South Weld Sun BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Hello