I reside in Johnson Subdivision, Weld County,
Greeley. In 1993 our neighbors formed a special
improvement district to pave our roads. We followed
required proceedures including meeting with Drew
Scheltinga, County Engineer. Questions about future
use of the roads were raised.
At that time traffic into and out of the subdivision
was monitored. The specs for the roads were determined
by the roads'! use at that time.
Now, just two years later, the Larson Subdivision
to our west is expanding. It appears the city of
Greeley has plans to connect with our streets at B and
at 2nd Street.
This section of the city has experienced much
construction and thus when these roads are opened
our traffice will increase tremendously. Also since
it will be a straight shot in, I forsee many of the
construction deliveries in very weighty trucks being
made using 40th Ave. I'm not sure the road will hold
up to the weight and increased use.
I and other neighbors question the specs meeting
additional traffic and why we musticoay for the
city to have access to the subdivision and otherby using
roads we financed. If these connections were planned
before we asked to be paved, we should have been so informed.
Attached is a map showing location of the area
in question.
Your consideration in addressing these issues is
greatly appreciated.
Sincerely,
.L./26/14 --a
Dorothy Ilindahl
351-8652
950974
rscc - ve
4-7
V`,
17N-
950974
ROAD AND BRIDGE/ENGINEERING RESPONSE
RECOMMENDED ACTION:
Narrative:
II jf i
Ste- Q etc.k erk (c- �`Gs
1.\\,c) I 'rckG DcA-Ly b./ phc't c
Method of Response:
Board Action
Worksession
Letter (Attached)
Telephone Call
No Response
C
Staff Signature
o ti
4(/3/9s
950974
Istr"
11Me
COLORADO
April 14, 1995
Mayor William Morton
City of Greeley
1000 10th Street
Greeley, CO 80631
OFFICE OF BOARD OF COUNTY COMMISSIONERS
PHONE (303) 356-4000, EXT. 4200
FAX(303) 352-0242
P.O. BOX 758
GREELEY, COLORADO 80632
Dear Mayor Morton:
The Board of Weld Commissioners has received letters and telephone calls from residents in the
Johnson Subdivision concerning a proposed street connection into the Larson Subdivision. It is our
understanding that the City is requiring the developer of the Larson Subdivision to build a street
connection to "B" Street approximately 300' west of 40th Avenue. Presently, the Larson
Subdivision has only one access, 43rd Avenue. If the proposed street connection were made, 40th
Avenue would be a second access to the Larson Subdivision.
In 1993, the residents of Johnson Subdivision created a local improvement district to pay the cost
of paving their streets. They are concerned that the extra traffic created by a second access into the
Larson Subdivision will deteriorate the condition of their streets. They are particularly concerned
about heavy vehicles because of the construction activity in the Larson Subdivision.
950974
Mayor William Morton
April 14, 1995
Page 2
The Commissioners believe that the concerns of residents living in the Johnson Subdivision are
legitimate. We request the proposed street connection not extend into the Johnson Subdivision and
connect to "B" Street.
Sincerely,
BOARD OF WELD COUNTY COMMISSIONERS
Dale K. Hall
Chairman of the Board
cc: Dorothy Lindahl
Drew Scheltinga, County Engineer
Bill Sterling, Director of Public Works
Steve Bagley, Deputy Director of Public Works
Road files: "B" St., 40th Ave.