Loading...
HomeMy WebLinkAbout991755.tiff talc-cis:14'N?) MEMORANDUM TO: Eric Jerman, W.C. Planning DATE: February 18, 1999 FROM: Sheble McConnellogue, W.C. Health Department COLORADO CASE NO.: USR-1220 NAME: Ademar Construction Environmental Protection Services has reviewed this proposal for a concrete batch plant. The following conditions are recommended to be part of any approval: 1) A NPDES Permit shall be obtained from the Water Quality Control Division of the Colorado Department of Health for any proposed discharge into State Waterways. 2) An Air Pollution Emission Notice(A.P.E.N.)and Emissions Permit application must be submitted to the Air Pollution Control Division,Colorado Department of Health for emissions of criteria, hazardous or odorous air pollutants. Sources of such emissions include but are not limited to the following: sandblasting operations,mining, spray paint booths,dry cleaners,haul road traffic,composting,boilers and incinerators. 3) No permanent disposal of wastes shall be permitted at this site. 4) Waste materials shall be handled, stored,and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. 5) All liquid and solid wastes shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 6) Adequate toilet facilities shall be provided for the employees and drivers. 7) The maximum permissible noise level shall not exceed the industrial limit of 80 db(A) as measured according to 25-12-102, Colorado Revised Statutes. 8) A dust abatement plan shall be submitted to the W.C. Health Department for approval prior to operation. The facility shall have sufficient equipment available to implement the dust control as required by the W. C. Health Department. 9) The applicant shall remove, handle, and stockpile overburden , soil, sand and gravel from the facility area in a manner that will prevent nuisance conditions. 10) The facility shall utilize the existing water supply(Little Thompson Water District). 11) An individual sewage disposal system is required for the proposed residence and shall be installed according to the Weld County Individual Sewage Disposal Regulations. Weld County Planning Dept. EXHIBIT FEB 26 1999 991 '55 I � ' RECEIVED Ademar Consrtuction Page 2 12) An individual sewage disposal system is required for the proposed control dispatch office and shall be installed according to the Weld County Individual Sewage Disposal Regulations. The septic system shall be designed to accomodate the proposed hydraulic load for the employees including the mechanics and drivers (35 people). The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. 13) The applicant proposes to use the existing residence as an office. The septic system has been been evaluated by our office and is adequate to handle up to five office workers. 14) In accordance with the Above Ground Storage Tank Regulations(7 CCR 1 101-14)a spillage retention berm shall be constructed around the tank battery. The volume retained by the spillage berm should be greater than the volume of the largest tank inside the berm. Alternative protective measures may be allowed provided they comply with the Above Ground Storage Tank Regulations. 15) All fly ash shall be contained inside the batch plant while on site. sm/273 y\ MEMORANDUM TO: Eric Jerman, Planner DATE: March 5, 1999 CO FROM: Donald Carroll, Engineering Administrator r . SUBJECT: USR-1220; Ademar Construction COLORADO The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the purview of Use by Special Review Permit for a Batch Plant located in the MUD. Our requirements are as follows: 1. I-25 Frontage Access: The applicant has submitted a State Highway Access Permit Application. Verification of approval shall be provided prior to recording the plat. 2. Internal Circulation: Due to the proposed Waterside PUD projecting 600-800 residential and commercial uses, the applicant shall be required to hard surface (asphalt or concrete)the circulation pattern throughout the concrete batch area. Adjacent parking areas shall be controlled with dust suppressant. 3. Storm Water Retention: The applicant is indicating that a detention pond will be constructed at the southeast corner of the proposed batch plant area. All storm water detention facilities shall be designed to contain the storm water runoff from the fully developed site from a 100-year storm and release the detained water at a quantity and rate not to exceed the quantity and rate of a five-year storm falling on an undeveloped site. The applicant shall submit a storm water drainage report to verify the proper sizing of the detention pond. This report shall be prepared and signed by a registered professional engineer in the State of Colorado. 4. Parking The applicant is indicating that there will be 25-35 employees. Additional parking shall be identified to accommodate the maximum number of employees. 5. WCR 9.5 Realignment: Would the applicant be willing to reserve 40 feet of future right-of-way adjacent to the property line to accommodate the realignment of WCR 9.5? The Waterside PUD has proposed a collector status road that would run parallel to your property line. Future development of the 115 acres could utilize this new road to relieve additional traffic on the 1-25 frontage road. cc: USR-1220 plan14 planning Dept Weld County OR 0 8 19`79 RECEIVED EXHIBIT 1 / STATE OF COLORADO DEPARTMENT OF TRANSPORTATION �. Region 4 ,l_ SOT 1420 2nd Street inter_-' Greeley,Colorado 80631 (970)353-1232 Weld County, 1-24 BFR Ademar Construction S of WCR 28 February 16, 1999 N of Del Camino Weld County Planning Dept. Eric Jerman Weld County Department of Planning Services 1400 N. 17th Avenue FEB 1 9 1999 Greeley, CO 80631 SUBJECT: Ademar Construction Special Use Review HbLtI V ED Eric, I have reviewed this proposal and have talked with Francisco Martinez on several occasions. Based upon those conversations and the submittal, I offer the following comments: RIGHT-OF-WAY CDOT advised Mr. Martinez that we would need additional right-of-way for the proposed widening of 1-25. The projected need for that widening would be approximately 90 additional feet. He advised me that he would not set any permanent structures within that area. Any projected need should be protected by reservation or preferably, dedication as permitted by County regulations. ACCESS We had a few problems with the accesses for this proposal. Initially two permits were issued, one was to the house(an existing access proposed for widening) and the other for a new access to the batch plant. Mr. Martinez constructed the hatch plant access at an unauthorized location and was reluctant to relocate it to the agreed upon location. I advised him that I would allow the batch plant access to remain provided he remove the access to the house. He agreed to those terms and I believe that he has removed the access to the house. My concerns with this proposal revolve around the volumes of traffic that Mr. Martinez is proposing under the special use review. He states in the narrative the possibility of 25-35 employees. Total traffic authorized by our access permit is 21. I think Mr. Martinez needs to be aware that given the volumes he's proposing to the County and the vehicle types used at a batch plant, it is very likely that he will be responsible for improvements to the frontage road. The 90 feet of ROW that we are asking, for includes width for auxiliary lanes. If possible, the County may want to put their own cap on the amount of traffic using the access without any improvements. Our access permit will allow 18 cars and light trucks,2 multi-unit vehicles and 5 pieces of construction equipment before we will require re-evaluation and most likely, auxiliary lanes. I think it is very important that Mr. Martinez know what he will be responsible for should his business grow the way he thinks it may. Thank you for the opportunity to review the Ademar proposal. i i G(oyia Hice-Idler Assistant Access Manager (970)350-2148 xc: Hem file (2) STATE OF COLORADO OFFICE OF THE STATE ENGINEER OF COC ov Division of Water Resources ��s� Ro� Department of Natural Resources b�ooyy 469 , 131 3 Sherman Street, Room 818 « cam+/ Denver,Colorado 80203 y*-jeas_1,1 Phone:(303)866-3581 - FAX_(303)866-3589 Bill Owens C,uvernor http//water.slate.co.us/defaulthtm Greg F.welcher EWC lltIVe Daector February 22, 1999 Rd 0_Simpson. P I state Engineer Eric Jerman Weld County Planning Den, Weld County Planning Department 1400 N. 17th Ave. FEB 2 4 7999Greeley, CO 80631 FitRe: Ademar Construction, USR-1220 e t I tI E D Dear Mr. Jerman: Pursuant to the State Engineer's August 7, 1995 memorandum to county planning directors (copy enclosed for your information), this office is no longer providing comments on land use actions that do not involve a subdivision as defined in Section 30-28-101 (10)(a), C.R.S. This referral does not appear to qualify as a "subdivision." Returned herewith are the materials submitted to this office in the above referenced matter. If you have any questions in this matter, please contact this office at 303/866-3581 . Sincerely, , ) Megan Sullivan Water Resource Engineer Enclosures cc: Richard Stenzel, Division Engineer MAS/mas/Ad emarR.doc .... ja........ .. ofEChs'.�1 �(,.....ers ._,.2 ., .. y11 Weld County Referral I , O MAR February 8, 1999 4 , IINif•COLORADO o pry The Weld County Department of Planning Services has received the following item for review:: Applicant Ademar Construction Case Number USR-1220 I Please Reply By March 1, 1999 Planner Eric Jerman i Project Site Specific Development Plan and Use by Special Review Permit for a Batch Plant located in the MUD . 3 Legal Part of the NW4 of Section 35, T3N, R68W of the 6th P.M., Weld County, €, Colorado. I Location East of and adjacent to 1-25 Frontage Road and south of and adjacent to WCR 28. I Parcel Number 1207 35 200055 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 6, 1999 U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan U We have reviewed the request and find no conflicts with our interests See attached letter. Comments: —' l Signature -, r-r. . L �: �, _ up. 1„,,,, Sri) Date ;1 3 /J Agency ' Weld County Planning Dept. 4,1400 N. 17th Ave.Greeley,CO. 80631 v(970)353-6100 ext.3540 +(970)352-6 / If Longmont Soil Conservation District 9595 Nelson Road, Box D -Longmont, CO 80501 - (303) 776-4034 SITE REVIEW MEMO March 1 , 1999 TO: Weld County Planning Services 1400 N. 17th Avenue Greeley, CO 80631 FROM: Luke Stromquist, Vice President Longmont Soil Conservation District SUBJECT: The following cire our comments and recommendations related to Case Number USR-1200 , a Site Specific Development Plan and Use by Special Review Permit for a ready-mix batch plant . The reclamation and landscaping plans are vague regarding the establishment of grasses and trees to the site . We would like to see more detailed information regarding species selection & the timing of all planned grass seeding and tree planting activities . Thank you for the opportunity to comment . >tG c o J C - Luther Stromquist , Vice President. Longmont Soil Conservation District CONSERVATION - DEVELOPMENT - SELF-GOVERNMENT 6 Weld County Planning OW, fittir 1.11 MAR 01 1999Weld County Referral o rle eR Y " D February 8, 1999 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Ademar Construction Case Number USR-1220 Please Reply By March 1, 1999 Planner Eric Jerman Project Site Specific Development Plan and Use by Special Review Permit for a Batch Plant located in the MUD . Legal Part of the NW4 of Section 35, T3N, R68W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to I-25 Frontage Road and south of and adjacent to WCR 28. Parcel Number 1207 35 200055 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any fu ether questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 6, 1999 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. gSee attached letter. Comments: Signature c _ ) ,Q�J \ _ Date & 'a S I ` t Agency (`(1k . Q v e‘,.) t L )t Sit 1 .c� 4Weld County Planning Dept. +1400 N. 17th Ave.Greeley,CO.80631 +(970)353-6100 ext.3540 +(970)352 I51E. . . XHIBIT 15 tsouNlT4, MOUNTAIN VIEW FIRE PROTECTION DISTRICT a Administrative Office: 9119 County Line Road• Longmont, CO 80501 (303) 772-0710• FAX (303) 651-7702 VIE`N • February 25, 1999 • Mr. Ben Patton Weld County Planning Department 1400 North 17th Avenue Greeley, CO 80631 Dear Mr. Patton: I have reviewed the submitted material pertaining to the special use request for the construction of a batch plant to be located east of I-25 and south of Weld County Road 28 (Case Number: USR-1220, Case Name: Ademar Construction). The property named is within the boundaries of the Mountain View Fire Protection District and receives service from the District. The Fire District does not object to this request if the requirements of the District can be met. Based on my review,I have the following comments and stipulations: Construction shall be in accordance with the provisions of the 1994 Edition of the Uniform Fire Code, as ratified by the Weld County Commissioners, and the 1994 Edition of the Uniform Building Code, as enforced by Weld County. In accordance with Section 903.2 of the Uniform Fire Code, an approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. The batch plant is considered a facility and will also have buildings on the site. A minimum fire flow of 1,500 gallons of water per minute, measured at a residual pre:ssure of 20 pounds per square inch (p.s.i.), will be required. Water supply must be provided by a hydrant located within 450 feet of the facility as measured along the fire apparatus access road and around the exterior of the facility. A letter must be provided to the Fire District from the water supplier that the required fire flow is available. Before contraction may begin, fire department apparatus access must be provided for all structures in excess of 150 feet from a public access road. Fire apparatus roads shall be extended so fire apparatus may reach to within 150 feet of all portions of buildings or facilities. Apparatus access roads shall be a minimum of 20 feet in width and be designed and maintained to support the imposed loads of fire apparatus (60,000 pounds). Roads must have a surface that provides all-weather driving capabilities. Roads in excess of 150 feet in length must be provided with approved provisions for the turning around of fire apparatus. The minimum turning radii for all turns shall be thirty-five (35) feet inside turning radius and forty-eight (48) feel: outside turning radius. Station 1 Station 2 Station 3 Station 4 Station 5 Station 6 Station 7 9119 Cnty Line Rd. 10971 WCR 13 P.O.Box 575 P.O.Box 11 10911 Dobbin Run P.O Box 6F6 P.O.Box 40 Longmont CO Longmont,CO 299 Palmer Ave. 8500 Niwot Road Lafayette.CO 000 Briggs; 100 So.Forest St. 80501 80504 Mead.CO 80542 Niwot CO 80544 800213 Erie,CO 80516 Dacnno,CO 80514 Mr. Ben Patton February 25, 1999 Page Two • Approved address numbers shall be placed on the building or at the entrance to the site in such a position to be plainly visible and legible from the street fronting the property. Address numbers or letters shall contrast with their background. A final site plan showing the location of existing fire hydrants or proposed fire hydrants, waterline sizes, and available fire flows must be submitted to the Fire District for review and approval. A final inspection of the facility will be required by a member of the Fire District before operations commence. The Fire District reserves the right to make further comments as the project proceeds. Nothing in this review is intended to authorize or approve of any aspect of this project that does not comply with all applicable codes and standards. We appreciate being involved in the planning process. Should you have any questions, please contact me at(303) 772-0710. Sincerely, \)\sca LuAnn Penfold Fire Marshal LMP/lp • cc: Roger Vigil, Weld County Building Department, 1400 N. 17th Avenue, Greeley, 80631 Francisco Martinez,Ademar Construction,P.O. Box 334, Firestone, CO 80520 project file file 1p02.21.99 a f &t1' Weld County Referral O February 8, 1999 ' COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Ademar Construction Case Number USR-1220 Please Reply By March 1, 1999 Planner Eric Jerman Project Site Specific Development Plan and Use by Special Review Permit for a Batch Plant located in the MUD Legal Part of the NW4 of Section 35, T3N, R68W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to I-25 Frontage Road and south of and adjacent to WCR 28. Parcel Number 1207 35 200055 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would he appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 6, 1999 ❑/We have reviewed the request and find that it does/does not comply with our Comprehensive Plan G7 We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. • / Comments: FOCI4daTIOelS UM/ ,6P reD'wered' ro ,6.a q,C� id.�-0rad V _ Signature Date d Agency 12 •or1 •-Weld County Planning Dept. +•1400 N. 17th Ave.Greeley,CO.80631 :•(970)353-6100 ext.3540 •:•(970)352-6312 fax Hello