Loading...
HomeMy WebLinkAbout970813.tiffRESOLUTION RE: GRANT SITE SPECIFIC DEVELOPMENT PLAN AND PUD (PLANNED UNIT DEVELOPMENT) FINAL PLAN, S #420, FOR SECOND FILING (78 LOTS), MEADOW VALE SUBDIVISION - MEADOW VALE FARM, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, a public hearing was held on the 30th day of April, 1997, at 10:00 a.m. for the purpose of hearing the application of Meadow Vale Farm, Inc., 4250 West 16th Street, Greeley, Colorado 80634, requesting a Site Specific Development Plan and PUD (Planned Unit Development) Final Plan, S #420, for Second Filing (78 lots), Meadow Vale Subdivision, for a parcel of land located on the following described real estate, to -wit: Part of the SW1/4 of Section 4, Township 2 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS, the applicant was represented by Floyd Oliver, owner, and WHEREAS, Section 28.14 of the Weld County Zoning Ordinance provides standards for review of such a PUD Final Plan, and WHEREAS, the Board of County Commissioners heard all the testimony and statements of those present, studied the request of the applicant and the recommendations of the Weld County Planning Commission, and, having been fully informed, finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 28.9 et seq., of the Weld County Zoning Ordinance. 2. The request is in conformance with Section 28.14 of the Weld County Zoning Ordinance as follows: A. The proposed PUD Final Plan is consistent with the Weld County Comprehensive Plan and is compatible with the future development as permitted by the existing PUD District and plans of affected municipalities. The Cities of Longmont and Mead have reviewed the request. The City of Mead found no conflict with its interest with the First Filing; a response for the Second Filing was not received. Longmont returned a favorable referral with no conflicts. B. The PUD Plan conforms to the approved PUD District. The Utility Coordinating Advisory Committee reviewed and conditionally approved the PUD utility plan at its February 27, 1996, meeting. The concerns of the Utility Coordinating Advisory Committee are addressed in the Conditions of Approval. (! ; PL5 Fw],Vt1 /1S /�1ee�d6wG/ce% ��rm 970813 PL1010 PUD FINAL PLAN - MEADOW VALE SUBDIVISION, SECOND FILING (S #420) PAGE 2 C. The uses, buildings, and structures shall be compatible with the existing and future development of the surrounding area as permitted by the existing zoning and with the future development projected by the Comprehensive Plan or Master Plan of affected municipalities. D. The proposed PUD Final Plan conforms with the performance standards in Section 35.3 of the Weld County Zoning Ordinance. E. The proposed PUD Final Plan will be in compliance with the Weld County Zoning Ordinance, Section 50, Overlay Districts. The site is not located within any Overlay Districts. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Meadow Vale Farm, Inc., 4250 West 16th Street, Greeley, Colorado 80634, requesting a Site Specific Development Plan and PUD (Planned Unit Development) Final Plan, S #420, for Second Filing (78 lots), Meadow Vale Subdivision, on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. Prior to recording the PUD Final Plan plat: A. The Board of County Commissioners shall review and approve the subdivision improvements agreement for off -site and on -site improvements and the form of collateral. The security for the agreement shall be tendered and accepted by the Board of County Commissioners for the subdivision improvements agreement. B. The applicant shall submit evidence to the Department of Planning Services that the proposed PUD Final Plan will meet the Standards of the Mountain View Fire Protection District, as listed in the letter from Charles Boyes dated February 20, 1997. C. The PUD Final Plan shall be amended to comply with conditions of approval required by the Weld County Utility Advisory Committee in the July 25, 1996, meeting, as follows: (1) A fifteen- (15) foot perimeter utility easement shall be placed on the plat. (2) Lots located adjacent to an open space shall have a ten- (10) foot utility/drainage easement located on each side of the rear lot line. (3) Front lot lines shall have a fifteen- (15) foot utility easement. (4) The following note shall be placed on the plat: Interior lot line utility easements shall be required only when needed by the utility or service company. 970813 PL1010 PUD FINAL PLAN - MEADOW VALE SUBDIVISION, SECOND FILING (S #420) PAGE 3 D. The applicant shall submit evidence to the Department of Planning Services that the PUD Final Plan meets the requirements of the St. Vrain Sanitation District as listed in the referral letter from L.D. Lawson dated July 5, 1996. E. The applicant shall comply with the requirements listed in the memo from Don Carroll of the Weld County Public Works Department dated February 27, 1997. F. The applicant shall add to the plat the location of the mail center/school-bus stop, plans for which were presented at the April 30, 1997, hearing. 2. The following notes shall be placed on the PUD Final Plan plat prior to recording: A. The uses permitted within the PUD Final Plan for the Second Filing, Meadow Vale Subdivision, include 78 residential lots and recreational/open space uses which comply with the PUD Zone District requirements and as described in the application materials. B. Approval of this plan may create a vested property right pursuant to Section 90 of the Weld County Zoning Ordinance. C. Left Hand Water District shall provide domestic water service to all residential uses within the PUD Zone District. D. St. Vrain Sanitation District shall provide sewage disposal to all residential uses within the PUD Zone District. E. Installation of all utilities shall comply with Section 10 (Design Standards) of the Weld County Subdivision Ordinance. F. All uses within the PUD Final Plan shall comply with the requirements of the Mountain View Fire Protection District. G. Access to the development shall be from Weld County Road 5.5. A temporary access to Weld County Road 5.5 shall be in compliance with the Weld County Public Works Department requirements concerning the design of the road and length of time granted for the temporary access. After expiration of the temporary access permit, the access shall be for emergency access only and shall be gated according to the Mountain View Fire Protection District requirements/standards. H. All uses within the PUD Final Plan, Second Filing, shall maintain compliance at all times with the U. S. Army Corp of Engineers' requirements and standards. I. Street signs and lot identification shall be in place prior to release of building permits. 970813 PL1010 PUD FINAL PLAN - MEADOW VALE SUBDIVISION, SECOND FILING (S #420) PAGE 4 J. Exterior illumination of homes, yards, garages, and driveways shall be restricted as follows: (1) Sources of light shall be shielded so that beams of light will not shine directly onto adjacent properties. (2) Neither the direct or reflected light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets. K. All liquid and solid wastes shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. L. No permanent disposal of wastes shall be permitted at this site. M. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. N. Fugitive dust shall be controlled on this site. O. Interior lot line utility easements shall be required only when needed by the utility or service company. P. Landscaping including, but not limited to, trees, shrubs, fencing, and entry signs or walls, will not be allowed within the 100 -foot right-of-way of Weld County Road 5.5. Q. The uses within the PUD Final Plan, Second Filing, shall at all times maintain compliance with the Colorado Division of Water Resources requirements and standards. R. Prior to the issuance of each building permit, the Architectural Control Committee shall provide a letter to the Department of Planning Services indicating its approval of the proposed structure. S. No lot other than Block 13, Lots 3 and 4, Block 16, Lots 8 and 9, and Block 17 may be conveyed unless an improvements agreement for the construction phase the lot is in has been approved and collateral accepted or the improvements serving the lot completed. No building permits shall be released for Block 13, Lots 3 and 4, Block 16, Lots 8 and 9, or Block 17 until improvements serving the lots have been completed. 3. The applicant shall comply with the requirements/standards of the Colorado Department of Transportation. 970813 PL1010 PUD FINAL PLAN - MEADOW VALE SUBDIVISION, SECOND FILING (S #420) PAGE 5 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 30th day of April, A.D., 1997. Deputy Clerk J' the Board BOARD OF COUNTY COMMISSIONERS WELDOUNTY, COLDO George E. Baxter, Chair ance L. Hrbyrt, Pro-Tem Dale K. Hall EXCUSED DATE OF SIGNING Barbara J. Kirkmeyer 1 if W. H. Webster r (AYE) 970813 PL1010 Hello