HomeMy WebLinkAbout992665.tiff ORDINANCE NO. 211
IN THE MATTER OF APPROVING AND IMPLEMENTING THE SOUTHWEST WELD
SERVICE AREA ROAD IMPACT FEE PROGRAM
BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF
WELD, STATE OF COLORADO:
WHEREAS, the Board of County Commissioners of the County of Weld, State of
Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with
the authority of administering the affairs of Weld County, Colorado, and
WHEREAS, Title 29, Article 20, C.R.S., as amended, authorizes and encourages local
governments to cooperate and contract with each other for the purpose of planning and
regulating the development of land by the joint and coordinated exercise of planning and related
regulatory powers, and
WHEREAS, the Board of County Commissioners desires to adopt and implement a
program for the imposition of road impact fees within an area located in the southwestern
portion of Weld County, Colorado, hereby entitled "the Southwest Weld Service Area," to
assure that new development contributes its proportionate share of the cost of providing, and
benefits from, the provision of road capital improvements identified as needed to be built in the
Road Capital Improvement Plan of the Southwest Weld Service Area, and
WHEREAS, in order to fully implement said road impact fee program in the Southwest
Weld Service Area, various municipalities located therein either have entered into or intend to
enter into intergovernmental agreements with the Board to define their relative roles and
responsibilities with respect to said program, and
WHEREAS, the attached document, entitled "SOUTHWEST WELD SERVICE AREA
ROAD IMPACT FEE ORDINANCE," details the program and the mechanics of its
implementation.
NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of the
County of Weld, State of Colorado, that the attached document, entitled "SOUTHWEST WELD
SERVICE AREA ROAD IMPACT FEE ORDINANCE," is, and shall be, approved.
BE IT FURTHER ORDAINED by the Board that Weld County staff is hereby directed to
begin implementing the Southwest Weld Service Area Road Impact Fee Program upon the
effective date stated herein, including, but not limited to, the negotiation of intergovernmental
agreements with the various municipalities located within said Service Area for final approval by
the Board.
BE IT FURTHER ORDAINED by the Board that the effective date of this Ordinance
shall be December 1, 1999.
111111111111 HI EN 111111 IIII 111111 III 11111 Ilil mill 992665
ORD211
2735949 12/01/1999 04:37P JA Suki Tsukamoto
1 of 26 R 0.00 D 0.00 Weld County CO
RE: ORDINANCE NO. 211
PAGE 2
BE IT FURTHER ORDAINED by the Board if any section, subsection, paragraph,
sentence, clause, or phrase of this Ordinance is for any reason held or decided to be
unconstitutional, such decision shall not affect the validity of the remaining portions hereof. The
Board of County Commissioners hereby declares that it would have enacted this Ordinance in
each and every section, subsection, paragraph, sentence, clause, and phrase thereof
irrespective of the fact that any one or more sections, subsections, paragraphs, sentences,
clauses, or phrases might be declared to be unconstitutional or invalid.
The above and foregoing Ordinance Number 211 was, on motion duly made and
seconded, adopted by the following vote on the 17th day of November, A. D., 1999.
BOARD OF COUNTY COMMISSIONERS
D COUNTY, CO RADO
ATTEST: Id
, vr al K. Hall, Chair
Weld County Clerk to the1 Rg • r..o• /
BY. arbar J. KirkmeyertP�° Tem ,
Deputy Clerk to the Boat• ( �� /, ,451
George axter
APPR9V5D AS RM:
. Geile
County Attorney 4./1/142
Glenn Vaad
First Reading: September 22, 1999
Publication: September 29, 1999
Second Reading: October 18, 1999
Publication: October 23, 1999
Final Reading: November 3, 1999, continued to
November 17, 1999
Publication: November 25, 1999
Effective: December 1, 1999
11111111111111111111111111111IIII 111111 III Hill IIII Ili/ 992665
ORD211
2735949 12/01/1999 04:37P JA Suki Tsukamoto
2 of 26 R 0.00 0 0.00 Weld County CO
SOUTHWEST WELD SERVICE AREA
ROAD IMPACT FEE ORDINANCE
Table of Contents
I. Findings. 2
II. Short Title, Authority, and Application 3
III. Intent and Purpose 4
IV. Intergovernmental Agreement. 4
V. Level of Service (LOS) Standard. 6
VI. Definitions 6
VII. Imposition of Fee 8
VIII. Independent Fee Calculation Study 10
IX. Credits. 13
X. Benefit Areas. 15
XI. Refund of Fees Not Spent 17
XII. Review Every Five Years 18
Exhibit "A," Map, SOUTHWEST WELD SERVICE AREA AND ROAD SYSTEM . 19
Exhibit "B," Table, SOUTHWEST WELD SERVICE AREA ROAD CAPITAL
IMPROVEMENTS PLAN 20
Exhibit "C," Map, SOUTHWEST WELD SERVICE AREA BENEFIT AREAS 24
IIIIII IIIII 11111111111111111 IIII 111111 III III1I IIII IIII
2735949 12/01/1999 04:37P JA Suki Tsukamoto
3 of 26 R 0.00 D 0.00 Weld County CO
Page 1 of 24 Pages
Findings.
A. Boundaries of Southwest Weld Service Area. The boundaries of the
Southwest Weld Service Area are identified on Exhibit "A," which is attached
hereto and is incorporated herein by reference. The boundaries include
Weld County Road ("WCR") 1 (County Line Road), Colorado State Highway
7, WCR 19, and Colorado State Highway 66. The requirements of this
Ordinance shall apply to all properties located in the unincorporated areas
enclosed by said boundaries. Additionally, all properties which are located in
the unincorporated areas east of WCR 19, but having primary access(es)
onto WCR 19, shall be subject to the requirements of this Ordinance.
B. Efficient Use of Powers to Plan for and Fund Regional Roads. It is the
objective of the Board of County Commissioners of Weld County and the
governing bodies of those municipalities which participate in the Southwest
Weld Service Area Impact Fee Program (the municipalities being collectively
referred to hereinafter as "Participating Southwest Weld Service Area
Municipalities") to make the most efficient use of their powers by jointly
implementing planning, zoning, and subdivision requirements for the
provision of road capital improvements for the Southwest Weld Service Area
in order to maintain an adopted Level of Service (hereinafter referred to as
"LOS") on the Southwest Weld Service Area Road System.
C. Intergovernmental Agreement. Pursuant to Col. Const., Art. XIV, Sec.
18(2)(a) and (b), and C.R.S. §§ 29-20-105 and 29-1-201, Weld County and
the Participating Southwest Weld Service Area Municipalities have entered
into, or intend to enter into, the Southwest Weld Service Area Road Impact
Fee Intergovernmental Agreements (hereinafter referred to as the
"Southwest Weld Impact Fee IGA's") to regulate the development of land for
a N— the purpose of providing road capital improvements for the Southwest Weld
Service Area Road System in order to maintain an adopted LOS.
co—
��a D. Weld County/Coordination. Pursuant to the Southwest Weld Impact Fee
Na IGA's, the Participating Southwest Weld Service Area Municipalities have
0 0. designated Weld County to coordinate their joint efforts.
J�
aam
coo
o"� E. Roadway Improvement Plan and Road Impact Fee Study. Weld County
8c, and the Participating Southwest Weld Service Area Municipalities, pursuant
w= to their authority to cooperate, have prepared a Roadway Improvement Plan
to and Road Impact Fee Study for the Southwest Weld Service Area.
o. a
_' C,a l F. New Growth and Development. The Roadway Improvement Plan and
xa Road Impact Fee Study project that there will be a significant amount of new
o w�= growth and development in the Southwest Weld Service Area over the next
d twenty (20) years.
a
o
i G. Need for Capacity Expansion. The Roadway Improvement Plan and Road
Impact Fee Study have determined that the projected new growth and
development in the Southwest Weld Service Area will require a substantial
expansion in road capital facilities if an adequate LOS is to be maintained.
H. Road CIP. The Roadway Improvement Plan and Road Impact Fee Study
have identified the improvements required to maintain adequate LOS on the
Southwest Weld Service Area Road System. The list of these improvements
Page 2 of 24 Pages
for the Southwest Weld Service Area along with descriptions and cost
estimates is referred to as the Southwest Weld Service Area Road Capital
Improvement Plan (hereinafter referred to as "the Southwest Weld Service
Area Road CIP"), which is attached hereto as Exhibit "B,"and incorporated
herein by reference.
Additional Revenue Needed. The Road Impact Fee Study demonstrates
that the existing revenue generated by the projected new growth and
development in the Southwest Weld Service Area will not be adequate to
fund the needed road capital improvements necessary to accommodate the
projected new growth and development in this area if the desired LOS on the
Southwest Weld Service Area Road System is to be maintained.
J. Proportionate Share Policy. In order to address this problem, Weld County
and the Participating Southwest Weld Service Area Municipalities have
determined that new land development activity in the Southwest Weld
Service Area shall bear a proportionate share of the cost of the provision of
new road capital improvements required by such development.
K. Road Impact Fee Method. Weld County and the Participating Southwest
Weld Service Area Municipalities have determined that the imposition of a
road impact fee in the Southwest Weld Service Area is one of the preferred
methods of regulating land development in order to ensure that new
development bears a proportionate share of the costs of the road capital
improvements necessary to accommodate new development while at the
same time maintaining adopted LOS on the Road Systems within the Area
and promoting and protecting the public health, safety and welfare.
L. Authority. Weld County and the Participating Southwest Weld Service Area
Municipalities have the authority to adopt a road impact fee for the Southwest
Weld Service Area, pursuant to the Colorado Constitution and the Colorado
statutes.
M. Coordinated Provision of Services. In order to implement this policy, Weld
County adopts this Ordinance establishing the Southwest Weld Service Area
Roadway Improvement Plan, Road CIP, Road Impact Fee Study and road
impact fee.
N. Assist in Master Plan Implementation. The Roadway Improvement Plan,
Road CIP and road impact fees within the Southwest Weld Service Area
assist in the implementation and are consistent with the comprehensive plans
of Weld County and the Participating Southwest Weld Service Area
Municipalities, and the MUD Plan.
II. Short Title, Authority, and Application
A. Title. This Ordinance shall be known and may be cited as the "Southwest
Weld Service Area Road Impact Fee Ordinance."
B. Authority. The Board of County Commissioners has the authority to adopt
this Ordinance pursuant to the Colorado Constitution and Colorado statutes.
Page 3 < HBO 1111111111111111111111 ���� 11111111111111IIIIIIII
2735949 12/01/1999 04:37P JA Suki Tsukamoto
5 of 26 R 0.00 D 0.00 Weld County CO
C. Application. This Ordinance shall apply to all lands within unincorporated
portion of Weld County, within the Southwest Weld Service Area, and those
incorporated portions of municipalities which have signed a Southwest Weld
Impact Fee IGA.
III. Intent and Purpose
A. Intent. This Ordinance is intended to implement and be consistent with the
Roadway Improvement Plan, Road CIP and Road Impact Fee Study for the
Southwest Weld Service Area, the comprehensive plans of Weld County and
the Participating Southwest Weld Service Area Municipalities, and the MUD
Plan.
B. Purpose. The above stated intent is accomplished in this Ordinance by the
establishment of a system for the imposition of road impact fees within the
Southwest Weld Service Area to assure that new development contributes its
proportionate share of the cost of providing, and benefits from, the provision
of Road Capital Improvements identified as needed to be built in the Road
CIP of the Southwest Weld Service Area.
IV. Intergovernmental Agreement.
A. General. Weld County and the Participating Southwest Weld Service Area
Municipalities have entered into, or intend to enter into, the Southwest Weld
Impact Fee IGA for the purposes of making the most efficient use of their
powers by jointly implementing planning, zoning, and subdivision
requirements for the provision of road capital improvements for the
Southwest Weld Service Area Road System in order to maintain the adopted
LOS on those roads. The Southwest Weld Impact Fee IGA provides for its
implementation through the terms of the IGA and through the adoption of this
Ordinance and similar ordinances by the Participating Southwest Weld
Service Area Municipalities.
B. Weld County Coordination. The Southwest Weld Impact Fee IGA provides
Weld County authority to coordinate the joint efforts of Weld County the
Participating Southwest Weld Service Area Municipalities in the
administration of the transportation planning and road impact fee program in
the Southwest Weld Service Area. The administration of this impact fee
program will be carried out as follows:
1. A Road Impact Fee Committee shall be responsible for the
administration of the Southwest Weld Service Area Road Impact Fee
Program. The Road Impact Fee Committee shall consist of the public
works directors, county/municipal engineers and planning directors of
each participating local government.
2. The Road Impact Fee Committee shall be responsible for
administering independent fee calculation studies, credits, and
refunds. A Road Impact Fee Board shall serve as the appeal board
for all decisions on independent fee calculations, credits, and refunds
made by the Road Impact Fee Committee. The Southwest Weld
111111111i 3111 1110 111111 IIII 111111 III 11111 11 24 Pages
9 121
K 0.00 D 0.00 Weld Coun
c nf 96 ty CO
273594
Service Area Road Impact Fee Board shall consist of a member of
the Board of County Commissioners and one elected official from
each of the Participating Southwest Weld Service Area Municipalities.
3. The Weld County Building Inspection Department (hereinafter
referred to as "the Building Department") shall be responsible for
collecting the fees in unincorporated Weld County and placing them
in the County's Southwest Weld Service Area Road Impact Fee Trust
Fund. Each Participating Southwest Weld Service Area Municipality
shall be responsible for collecting the road impact fees within its
jurisdiction and then transmitting the fees on a quarterly basis to the
Building Department. The Building Department shall deposit the fees
transmitted from the Participating Southwest Weld Service Area
Municipalities into the appropriate Southwest Weld Service Area
Road Impact Fee Benefit Area Trust Fund.
4. The expenditure of road impact fee funds shall be recommended by
the Road Impact Fee Committee on an annual basis and shall be
approved by the Road Impact Fee Board. Road impact fee
expenditures shall be limited to projects included in the Road CIP that
are on the Southwest Weld Service Area Road System. The funds
shall be spent within the Benefit Areas within the Southwest Weld
Service Area from which they are collected.
5. The Road Impact Fee Committee shall prepare an annual report to
Weld County and the Participating Southwest Weld Service Area
Municipalities identifying the projects for which the Road Impact Fee
Board has approved road impact fee funds.
6. The Road Impact Fee Committee shall be responsible for initiating a
review every five (5) years of the Roadway Improvement Plan, Road
Impact Fee Study, Road OP and the ordinances of Weld County and
the Participating Southwest Weld Service Area Municipalities to
determine if any modifications need to be made. The results of this
evaluation shall be submitted to the Board of County Commissioners
and the governing bodies of the Participating Southwest Weld Service
Area Municipalities. To be amended, the Roadway Improvement
Plan, Road Impact Fee Study, Road CIP and the ordinances must be
approved by the Board of County Commissioners and the governing
bodies of all the Participating Southwest Weld Service Area
Municipalities.
C. Effective Date. This Southwest Weld Service Area Road Impact Fee
Ordinance shall become effective December 1, 1999.
D. Termination.
1. Any of the Participating Southwest Weld Service Area Municipalities
may terminate their participation in the program if any of the other
participating Municipalities materially modify the Roadway
1111111 11111 111111111111111111II1111111 III HMI IIII of 24 Pages
2735949 12101/1999 04:37P JA Suki Tsukamoto
7 of 26 R n nn n n nn Wald 'Munn, rn
Improvement Plan, Road Impact Fee Study, Road CIP and the Road
Impact Fee Ordinance within their jurisdiction.
2. If a Participating Southwest Weld Service Area Municipality
terminates its participation in the Southwest Weld Impact Fee IGA,
the local government shall provide written notice of their termination
to the Board of County Commissioners and the governing bodies of
the other Participating Municipalities, including the reasons therefor, a
minimum of 120 days prior to the termination. The terminating
Municipality shall have no right to a refund of any road impact fee
funds collected.
3. If for any reason the road impact fee program in the Southwest Weld
Service Area is disbanded, any remaining funds after refunds, shall
be spent on Road Capital Improvements in the Road CIP.
E. Duration. The duration of the Southwest Weld Impact Fee IGA shall be for
twenty (20) years. It may be renewed pursuant to State law.
V. Level Of Service Standard (LOS). Weld County and the Participating Southwest
Weld Service Area Municipalities have determined that the Southwest Weld Service
Area Road System shall operate at LOS of"C" or better.
VI. Definitions. Certain words or phrases unique to this Section shall be construed as
herein set out unless it is apparent from the context that they have a different
meaning.
A. "Building Permit" means that building permit issued in accordance with the
Weld County Building Code Ordinance before any building or construction
activity can be initiated on a parcel of land.
B. "Capacity" means the maximum number of vehicles that have a reasonable
expectation of passing over a given section of a road during an average
week day at the desired LOS, expressed in terms of vehicles per day.
C. "Existing Traffic-Generating Development" means the most intense use
of land within the twelve (12) months prior to the time of commencement of
Traffic-Generating Development.
D. "Expansion" of the capacity of a road includes any widening, intersection
improvement, signalization or other capital improvement designed to
increase the existing road's capacity to carry vehicles.
E. "Fee Payer" means a person commencing Traffic-Generating Development
who is obligated to pay a road impact fee in accordance with the terms of this
Ordinance.
F. "Level of Service (LOS)" means a qualitative measure describing
operational conditions, from "A" (best) to "F" (worst), within a traffic stream.
111111111111 111111 11111111111 ���� 11111111111111 ���� viii ,f 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
8 of 26 R 0.00 D 0.00 Weld County CO
G. "Non-Site Related Improvements" mean Road Capital Improvements and
right-of-way dedications for roads that are in the Road CIP that are not site-
related improvements.
H. "Person" means an individual, corporation, governmental agency or body,
business trust, estate, trust, partnership, association, two (2) or more
persons having a joint or common interest, or any other entity.
" Road System, Southwest Weld Service Area" means all major roads,
excluding state or federal highways, identified by the Roadway Improvement
Plan in the Southwest Weld Service Area. The Southwest Weld Service
Area Road System is identified in Exhibit "B," which is attached hereto and
incorporated herein by reference.
J. "Road Capital Improvement" includes the transportation planning,
preliminary engineering, engineering design studies, land surveys, alignment
studies, right-of-way acquisition, engineering, permitting, and construction of
all necessary features for any road on the Road CIP, undertaken to
accommodate additional traffic resulting from new traffic-generating
development, including but not limited to: (a) construction of new through
lanes, (b) construction of new bridges, (c) construction of new drainage
facilities in conjunction with new road construction, (d) purchase and
installation of traffic signals, including new and upgraded signalization, (e)
construction of curbs, gutters, sidewalks, medians and shoulders, (f)
relocating utilities to accommodate new road construction, (g) the
construction and reconstruction of intersections, (h) the widening of existing
roads, (I) bus turnouts, (j) acceleration and deceleration lanes, (k)
interchanges, and (I) traffic control devices.
K. "Road Impact Fee Board, Southwest Weld Service Area" shall serve as
the appeal board for all decisions on independent fee calculations, credits,
and refunds made by the Southwest Weld Service Area Road Impact Fee
Committee. The Southwest Weld Service Area Road Impact Fee Board shall
consist of a member of the Board of County Commissioners and one elected
official from each of the Participating Southwest Weld Service Area
Municipalities.
L. "Road Impact Fee Committee, Southwest Weld Service Area" shall be
responsible for administering independent fee calculation studies, credits,
and refunds for the Southwest Weld Service Area Impact Fee Program. The
Southwest Weld Service Area Road Impact Fee Committee shall consist of
the public works directors, county/municipal engineers and planning directors
of each participating local government.
M. "Site-Related Improvements" mean those road capital improvements and
right-of-way dedications that provide direct access to the development.
Direct access improvements include, but are not limited to, the following: (a)
driveways and streets leading to and from the development; (b) right and left
turn lanes leading to those driveways and streets; (c) traffic control measures
for those driveways; and (d) internal streets. Credit is not provided for site-
related improvements under the terms of this Ordinance.
1111111 11111 11111 11111 111111 IIII IIIIII III 11111 itll IIII 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
9 of 26 R 0.00 0 0.00 Weld County CO
N. "Traffic-Generating Development" is land development designed or
intended to permit a use of the land that will contain or convert to more
dwelling units or floor space than the most intensive use of the land within
the twelve (12) months prior to the Commencement of Traffic-Generating
Development in a manner that increases the generation of vehicular traffic.
O. "Traffic-Generating Development, Commencement of," occurs upon the
issuance of a final plat for subdivision, a final plan for planned unit
development (PUD), or the issuance of a building permit, whichever occurs
first after the effective date of this Ordinance.
P. "Trip" means a one-way movement of vehicular travel from an origin (one
trip end) to a destination (the other trip end).
Q. "Trip Generation" means the attraction or production of trips caused by a
certain type of land development.
R. "Vehicle-Miles of Travel (VMT)" means the combination of the number of
vehicles traveling during a given time period and the distance (in miles) that
they travel.
VII. Imposition of Fee.
A. Time of Fee Obligation and Payment.
1. After the effective date of this Ordinance, any person or government
body who causes the Commencement of Traffic-Generating
Development within that portion of unincorporated Weld County within
the boundaries of the Southwest Weld Service Area shall be
obligated to pay a road impact fee, pursuant to the terms of this
Ordinance. The fee shall be determined and paid to the Building
• Department at the time of issuance of a building permit for the
development. If any credits are due pursuant to Section IX.,Credits,
they shall also be determined at that time. The fee shall be computed
separately for the amount of construction activity covered by the
permit, if the building permit is for less than the entire development. If
the fee is imposed for a Traffic-Generating Development that
increases traffic impact because of a change in use, the fee shall be
determined by computing the difference in the fee schedule between
the new Traffic-Generating Development and the Existing Traffic-
Generating Development. The obligation to pay the impact fee shall
run with the land.
2. Any person who, prior to the effective date of this Ordinance, agreed
as a condition of development approval to pay a road impact fee,
shall be responsible for the payment of the fee under the terms of any
such agreement, and the payment of such fee by the developer will
be offset against any impact fees due pursuant to the terms of this
Ordinance.
MHO 11111 111111 11111 I OII IIII 1111II III IIIIII III Iiil 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
10 of 26 R 0.00 D 0.00 Weld County CO
B. Exemptions. The following shall be exempt from the terms of this
Ordinance. An exemption must be claimed by the Fee Payer at the time of
application for a building permit.
1. Alterations or expansion of an existing building where no additional
dwelling units are created, the use is not changed, and where no
additional vehicular trips will be produced over and above that
produced by the existing use.
2. The construction of accessory buildings or structures which will not
produce additional vehicular trips over and above that produced by
the principal building or use of the land.
3. The replacement of a destroyed or partially destroyed building or
structure with a new building or structure of the same size and use,
provided that no additional trips will be produced over and above that
produced by the original use of the land.
C. Establishment of Fee Schedule.
1. Any person who causes the Commencement of Traffic-Generating
Development, except those persons exempted or preparing an
independent fee calculation study pursuant to Section VIII.,
Independent Fee Calculation Study, shall pay a road impact fee in
accordance with the following fee schedule. The descriptions of the
land use codes in the most current edition of the report titled Trip
Generation, prepared by the Institute of Transportation Engineers
(ITE), shall be used to determine the appropriate land use type.
Land Use Type Unit Fee
Single-Family Detached Dwelling $2,031
Multi-Family Dwelling $1,408
Mobile Home Park Site $1,018
Hotel/Motel Room $1,747
Retail/Commercial
Shop Ctr/Gen Retail <100,000 sf 1000 sq. ft. $8,815
Shop Ctr/Gen Retail <500,000 sf 1000 sq. ft. $6,182
Shop Ctr/Gen Retail <1 million sf 1000 sq. ft. $5,080
Shop Ctr/Gen Retail 1 million sf+ 1000 sq. ft. $4,507
Auto Sales 1000 sq. ft. $3,897
Auto Service/Repair/Tire Store 1000 sq. ft. $2,688
Bank 1000 sq. ft. $7,590
Bldg Materials/Hardware/Nursery 1000 sq. ft. $5,156
Convenience Store 1000 sq. ft. $11,734
Discount Store 1000 sq. ft. $4,978
Furniture Store 1000 sq. ft. $967
Movie Theater 1000 sq. ft. $7,448
Restaurant, Fast Food 1000 sq. ft. $10,517
ALUM 1111 111111011 HMI III IIIIII III I'll 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
�� of 9R R n nn n n nn Wnld rummy CO
Land Use Type Unit Fee
Restaurant, Sit-Down 1000 sq. ft. $7,246
Office/Institutional
Office, General <100,000 sf 1000 sq. ft. $3,430
Office, General <200,000 sf 1000 sq. ft. $2,557
Office, General 200,000 sf+ 1000 sq. ft. $2,116
Office, Medical 1000 sq. ft. $7,662
Hospital 1000 sq. ft. $3,557
Nursing Home 1000 sq. ft. $1,035
Church/Synagogue 1000 sq. ft. $1,933
Day Care Center 1000 sq. ft. $2,016
School 1000 sq. ft. $632
Industrial
General Light Industrial 1000 sq. ft. $1,476
Warehouse 1000 sq. ft. $1,052
Mini-Warehouse 1000 sq. ft. $530
2. If the type of Traffic-Generating Development for which a building
permit is requested is not specified on the above set forth fee
schedule, the Road Impact Fee Committee shall determine the fee on
the basis of the fee applicable to the most nearly comparable type of
land use on the fee schedule. The Road Impact Fee Committee shall
be guided in the selection of a comparable type of land use by:
a. Using trip generation rates contained in the most current
edition of the report titled Trip Generation, prepared by the
Institute of Transportation Engineers (ITE), articles or reports
appearing in the ITE Journal, or studies or reports done by the
U.S. Department of Transportation or Colorado Department of
Transportation, and applying the formula set forth in Section
VIII.B.; or
b. Computing the fee by use of an independent fee calculation
study as provided in Section VIII., Independent Fee
Calculation Study.
D. Pre-Development Review Impact Fee Calculation. Any person
contemplating establishing a Traffic-Generating Development may
request a preliminary determination of the impact fees due from such
development. A person requesting a pre-development review impact
fee calculation shall complete and submit to the Building Department
the proper application form and an application fee. Using the
information regarding the proposed traffic generating land
development activity as submitted on the application, the Building
Department will provide, within fifteen (15) days of the date of
submittal of the completed application, a preliminary calculation of the
road impact fees due for the proposed Traffic-Generating
Development.
111111111111111111 1111113 IIII 111111 III 111111 III IIII A 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
12 of 26 R 0.00 0 0.00 Weld County CO
VIII. Independent Fee Calculation Study.
A. General
1. The impact fee may be computed by the use of an Independent Fee
Calculation Study at the election of the Fee Payer, or upon the
request of the Road Impact Fee Committee, for any proposed land
development activity interpreted as not one of those types listed on
the fee schedule or as one that is not comparable to any land use on
the fee schedule, and for any proposed land development activity for
which the Road Impact Fee Committee concludes the nature, timing,
or location of the proposed development make it likely to generate
impacts costing substantially more to mitigate than the amount of the
fee that would be generated by the use of the fee schedule.
2. The preparation of the Independent Fee Calculation Study shall be
the sole responsibility and cost of the Fee Payer.
3. Any person who requests to perform an Independent Fee Calculation
Study shall pay an application fee for administrative costs associated
with the review and decision on such Study.
B. Formula.
1. The Independent Fee Calculation Study for the road impact fee shall
be calculated by the use of the following formula:
FEE = VMT x NET COSTNMT
VMT = TRIPS x % NEW x LENGTH +2
NET = COSTNMT - CREDIT/VMT
COSTNMT
COSTNMT = COSTNMC x VMCNMT
CREDITNMT = DEFICIENCY + REVENUE
DEFICIENCY = EXCESS VMT+TOTAL VMT x COSTNMT
Where:
VMT = Vehicle-miles of travel placed on the major road system
during an average week day
TRIPS = Average daily trip ends
% NEW = Percent of trips that are primary trips, as opposed to
passby or diverted-link trips
LENGTH = Average length of a trip on major road system
+ 2 = Avoids double-counting trips for origin and destination
COSTNM = Average cost to create a new vehicle-mile of capacity
C (VMC) based on planned improvements in Roadway
Improvement Plan
VMCNMT = The system-wide ratio of capacity to demand in the
major roadway system, which is the lower of the existing
ratio or the ratio of new VMC to new VMT provided in
the Roadway Improvement Plan
11111111111111111111111111111IIII 111111 III 111111 III IIII A 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
13 of 26 R 0.00 D 0.00 Weld County CO
REVENUE = Revenue credit per VMT, based on percent of cost
anticipated to be paid with other revenues
EXCESS VMT = The sum of existing VMT on individual segments of
major road system that is in excess of existing capacity
TOTAL VMT = Total existing VMT on the major road system
2. The fee calculation shall be based on data, information, or
assumptions contained in this Ordinance or independent sources,
provided that:
a. The independent source is an accepted standard source of
transportation engineering or planning data; or
b. The independent source is a local study on trip characteristics
carried out by a qualified traffic planner or engineer pursuant
to an accepted methodology of transportation planning or
engineering; or
c. The percent new trips factor used in the Independent Fee
Calculation Study is based on actual surveys prepared in
Weld County.
C. Procedure.
1. An Independent Fee Calculation Study shall be undertaken through
the submission of an application for an independent fee calculation.
A potential Fee Payer may submit such an application. The Road
Impact Fee Committee shall submit such an application for any
proposed land development activity interpreted as not one of those
types listed on the above set forth fee schedule or as one that is not
comparable to any land use on the fee schedule, and for any
proposed land development activity for which it is concluded the
nature, timing, or location of the proposed development make it likely
to generate impacts costing substantially more to mitigate than the
amount of the fee that would be generated by the use of the fee
schedule.
2. Within ten (10) days of receipt of an application for Independent Fee
Calculation Study, the Road Impact Fee Committee shall determine if
the application is complete. If the Road Impact Fee Committee
determines that the application is not complete, a written statement
specifying the deficiencies shall be sent by mail to the person
submitting the application. The application shall be deemed complete
if no deficiencies are specified. The Road Impact Fee Committee
shall take no further action on the application until it is deemed
complete.
3. When the Road Impact Fee Committee determines the application is
complete, the application shall be reviewed and the Road Impact Fee
Committee shall render a written decision in thirty (30) days on
whether the fee should be modified and, if so, what the amount
11111111111111111111111111111 Mtn III 11111 111H H of 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
�a of 26 R 0.00 D 0.00 Weld County CO
should be, based on the standards in Section VIII.D., below.
D. Standards. If on the basis of generally-recognized principles of impact
analysis it is determined the data, information and assumptions used by the
applicant to calculate the Independent Fee Calculation Study satisfies the
requirements of this Section, the fee determined in the Independent Fee
Calculation Study shall be deemed the fee due and owing for the proposed
Traffic-Generating Development. The adjustment shall be set forth in a Fee
Agreement. If the Independent Fee Calculation Study fails to satisfy the
requirements of this Section, the fee applied shall be that fee established for
the Traffic-Generating Development in Section VII.C., above.
E. Appeal of Independent Fee Calculation Study Decision.
1. A Fee Payer affected by the administrative decision of the Road
Impact Fee Committee on an Independent Fee Calculation Study may
appeal such decision to the Road Impact Fee Board, by filing with the
Road Impact Fee Committee within ten (10) days of the date of the
written decision, a written notice stating and specifying briefly the
grounds of the appeal. The Road Impact Fee Committee shall place
the appeal on the Road Impact Fee Board's agenda for the next
regularly scheduled meeting.
2. The Road Impact Fee Board, after hearing, shall have the power to
affirm or reverse the decision of the Road Impact Fee Committee. In
making its decision, the Road Impact Fee Board shall make written
findings of fact and conclusions of law, and apply the standards in
Section VIII.D., above. If the Road Impact Fee Board reverses the
decision of the Road Impact Fee Committee, it shall direct the
Committee to recalculate the fee in accordance with its findings. In
no case shall the Road Impact Fee Board have the authority to
negotiate the amount of the fee or waive the fee. The decision of the
Road Impact Fee Board shall be final and not subject to further
administrative appeal.
IX. Credits.
A. General Standards.
1. Any person initiating Traffic-Generating Development may apply for
credit against road impact fees otherwise due, up to but not
exceeding the full obligation for impact fees proposed to be paid
pursuant to the provisions of this Ordinance, for any contributions,
construction, or dedication of land accepted or received by Weld
County for Non-Site Related Road Capital Improvements that are
identified in the Road CIP that are on the Southwest Weld Service
Area Road System.
2. Credits for contributions, construction or dedication of land for Non-
Site Related Road Capital Improvements on the Southwest Weld
Service Area Road System identified on the Road CIP shall be
HUM 11111 111111 11111 DIN IIII 111111 III 111111 III IIII f 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
15 of 26 R 0.00 D 0.00 Weld County CO
transferable within the same development, but shall not be paid for
other public facilities. The credit shall not exceed the amount of the
impact fees due and payable for the proposed Traffic-Generating
Development.
3. Weld County may enter into a Capital Contribution Front-Ending
Agreement with any person initiating Traffic-Generating Development
who proposes to construct Non-Site Related Road Capital
Improvements on the Road CIP that are on the Southwest Weld
Service Area Road System. To the extent that the fair market value
of the construction of these Road Capital Improvements exceed the
obligation to pay impact fees for which a credit is provided pursuant to
this Section, the Capital Contribution Front-Ending Agreement shall
provide proportionate and fair share reimbursement linked to new
growth and development's use of the Road Capital Improvement
constructed.
B. Credit Against Fees. Credit shall be in an amount equal to fair market value
of the land dedicated for right-of-way at the time of dedication, the fair market
value of the construction at the time of its completion, or the value of the
contribution or payment at the time it is made for construction of a Non-Site-
Related Capital Road Improvement on the Road CIP identified on the
Southwest Weld Service Area Road System.
C. Procedure for Credit Review.
1. The determination of any credit shall be undertaken through the
submission of an Application for Credit Agreement, which shall be
submitted to the Road Impact Fee Committee.
2. The application for a Credit Agreement shall include the following
information
a. If the proposed application involves a credit for any
contribution, the following documentation must be provided:
I. A certified copy of the development approval in which
the contribution was agreed;
i. If payment has been made, proof of payment; or
If payment has not been made, the proposed method
of payment.
b. If the proposed application involves credit for the dedication of
land:
A drawing and legal description of the land;
ii. The appraised fair market value of the land at the date
a building permit is proposed to be issued for the traffic
1111111111111111111111111111 IIII 111111 III 111111 III IIII f 24 Pages
2735949 12101/1999 04:37P JA Suki Tsukamoto
16 of 26 R 0.00 D 0.00 Weld County CO
generating land development activity, prepared by a
professional Real Estate Appraiser who is a member of
the Member Appraisal Institute (MAI) or who is a
member of Senior Residential Appraisers (SRA), and if
applicable, a certified copy of the development permit
in which the land was agreed to be dedicated.
c. If the proposed Application for Credit Agreement involves
construction:
I. The proposed plan of the specific construction
prepared and certified by a duly qualified and licensed
Colorado engineer or contractor;
ii. The projected costs for the suggested improvement,
which shall be based on local information for similar
improvements, along with the construction timetable
for the completion thereof. Such estimated cost shall
include the cost of construction or reconstruction, the
cost of all labor and materials, the cost of all lands,
property, rights, easements and franchises acquired,
financing charges, interest prior to and during
construction and for one (1) year after completion of
construction, costs of plans and specifications, surveys
of estimates of costs and of revenues, costs of
professional services, and all other expenses
necessary or incident to determining the feasibility or
practicability of such construction or reconstruction.
3. Within ten (10) days of receipt of the proposed Application for Credit
Agreement, the Road Impact Fee Committee shall determine if the
application is complete. If it is determined that the proposed
Agreement is not complete, the Road Impact Fee Committee shall
send a written statement to the applicant outlining the deficiencies.
The Road Impact Fee Committee shall take no further action on the
proposed Application for Credit Agreement until all deficiencies have
been corrected or otherwise settled.
4. Once the Road Impact Fee Committee determines the proposed
Application for Credit Agreement is complete, it shall be reviewed
within thirty (30) days. The Application for Credit Agreement shall be
approved if it complies with the standards in Section IX.A. and B.,
above.
5. If the Application for Credit Agreement is approved by the Road
Impact Fee Committee, a Credit Agreement shall be prepared and
signed by the applicant and Weld County. It shall specifically outline
the contribution, payment, construction or land dedication, the time by
which it shall be completed, dedicated, or paid, and any extensions
thereof, and the dollar credit the applicant shall receive for the
contribution, payment or construction.
1 111111 11111 111111 131111111 IIII 111111 III IIII"I III IIII 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
17 of 26 R 0.00 0 0.00 Weld County CO
D. Appeal of Credit Decision. A Fee Payer affected by the decision of the
Road Impact Fee Committee regarding credits may appeal such decision to
the Road Impact Fee Board by filing with the Road Impact Fee Committee,
within ten (10) days of the date of the written decision, a written notice stating
and specifying briefly the grounds of the appeal. The Road Impact Fee
Committee shall place such appeal on the Road Impact Fee Board's agenda
for the next regularly scheduled meeting. The Road Impact Fee Board, after
a hearing, shall affirm or reverse the decision of the Road Impact Fee
Committee based on the standards in Section IX.A. and B., above. If the
Road Impact Fee Board reverses the decision, it shall direct the Road Impact
Fee Committee to readjust the credit in accordance with its findings. The
decision of the Road Impact Fee Board shall be final.
X. Benefit Areas.
A. Establishment. For the purpose of further ensuring Fee Payers receive
sufficient benefit for fees paid, three benefit areas are established in the
Southwest Weld Service Area. The benefit areas are defined as follows, and
are shown on Exhibit "C," which is attached hereto and incorporated herein
by reference.
1. Benefit Area 1 is the area west of 1-25 and north of Highway 52;
2. Benefit Area 2 is the area west of 1-25 and south of Highway 52;
3. Benefit Area 3 is the area east of 1-25.
B. Expenditure. Impact fee funds shall be spent within the Benefit Area
wherein the Traffic-Generating Development paying the fee is located.
C. Establishment of Trust Fund. Weld County shall establish three (3)
Southwest Weld Service Area Benefit Area Road Impact Fee Trust Funds for
the purpose of ensuring that Fee Payers receive sufficient benefit for road
impact fees paid.
D. Deposit in Trust Fund/General Requirements for Trust Fund
1. All road impact fees collected by Weld County shall be immediately
deposited into the appropriate Southwest Weld Service Area Road
Impact Fee Benefit Area Trust Fund.
2. All proceeds shall be invested in an interest-bearing account. All
income derived from these investments shall be retained in the
appropriate Trust Fund until transferred. Record of each Trust Fund
account shall be available for public inspection.
3. Quarterly, and pursuant to the Southwest Weld Impact Fee IGA's, the
Participating Southwest Weld Service Area Municipalities shall
transfer the impact fee funds they have collected to the Building
Department for deposit in the appropriate Southwest Weld Service
Area Road Impact Fee Benefit Area Trust Fund. All proceeds in the
111111111111111111 11111111111 IIII 111111 III 111111 III 1111 of 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
18 of 26 R 0.00 D 0.00 Weld County CO
Southwest Weld Service Area Road Impact Fee Benefit Area Trust
Funds not immediately necessary for expenditure shall be invested in
an interest bearing account. All income derived from these
investments shall be retained in the Trust Funds. Record of the
Southwest Weld Service Area Road Impact Fee Benefit Area Trust
Funds shall be available for public inspection in the Accounting Office
of Weld County during normal business hours.
E. Limitations on Expenditures. Road impact fee funds spent within the
Southwest Weld Service Area shall only be expended from funds drawn from
the appropriate Southwest Weld Service Area Road Impact Fee Benefit Area
Trust Funds. For the purposes of determining whether impact fee funds
have been spent or encumbered, the first fees collected shall be considered
the first monies spent or encumbered.
F. Annual Recommendation for Expenditure of Fees. Each year, at the time
the annual budget is reviewed, the Southwest Weld Service Area Road
Impact Fee Committee shall recommend appropriations to be spent from the
Southwest Weld Service Area Benefit Area Trust Funds to the Southwest
Weld Service Area Road Impact Fee Board. After review of the
recommendation, the Southwest Weld Service Area Road Impact Fee Board
shall approve or modify the recommended expenditures of the Trust Fund
monies. Expenditures shall be made from the County's Southwest Weld
Service Area Benefit Area Trust Funds only for those capital road
improvement projects on the Road CIP for the Southwest Weld Service Area.
Any amounts not appropriated from the Southwest Weld Service Area
Benefit Area Trust Funds together with any interest earnings shall be carried
over to the following fiscal period.
G. Annual Report on Expenditures. Each year, after the decision of the
Southwest Weld Service Area Road Impact Fee Board about the expenditure
of impact fee appropriations, the Road Impact Fee Committee shall prepare
an annual report to Weld County and the Participating Southwest Weld
Service Area Municipalities identifying the projects for which the Road Impact
Fee Board has approved funds.
XI. Refund of Fees Not Spent.
A. General. Any fees collected shall be returned to the Fee Payer or the Fee
Payer's successor in interest if the fees have not been spent within ten (10)
years from the date the building permit for the development was issued,
along with interest of five percent (5%) a year. Fees shall be deemed to be
spent on the basis of the first fee collected shall be the first fee spent.
B. Refund Procedure. The refund shall be administered by the Southwest
Weld Service Area Road Impact Fee Committee, and shall be undertaken
through the following process:
1. A Refund Application shall be submitted within one (1) year following
the end of the tenth (10th) year from the date on which the building
permit was issued on the proposed development. The Refund
MID 1111111111111111111111IIII111111 III111111 III IIII f 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
19 of 26 R 0.00 D 0.00 Weld County CO
Application shall include the following information:
a. A copy of the dated receipt issued for payment of the fee;
b. A copy of the building permit; and
c. Evidence that the applicant is the successor in interest to the
fee payer.
2. Within ten (10) days of receipt of the Refund Application, the Road
Impact Fee Committee shall determine if it is complete. If the Road
Impact Fee Committee determines the application is not complete, a
written statement specifying the deficiencies shall be forwarded by
mail to the person submitting the application. Unless the deficiencies
are corrected, the Road Impact Fee Committee shall take no further
action on the Refund Application.
3. When the Road Impact Fee Committee determines the Refund
Application is complete, it shall be reviewed within thirty (30) days,
and shall be approved if it is determined the Fee Payer or a
successor in interest has paid a fee which has not been spent within
the period of time permitted under this section. The refund shall
include the fee paid plus interest of five percent (5%) a year.
C. Appeal of Refund Decision. A Fee Payer affected by a decision of the
Road Impact Fee Committee may appeal such decision to the Road Impact
Fee Board by filing with the Road Impact Fee Committee within ten (10) days
of the date of the written decision, a written notice stating and specifying
briefly the grounds of the appeal. The Road Impact Fee Committee shall
place such appeal on the Road Impact Fee Board's agenda. The Road
Impact Fee Board, after a hearing, shall affirm or reverse the decision of the
Road Impact Fee Committee based on the standards in this Section. If the
Road Impact Fee Board reverses the decision of the Road Impact Fee
Committee, it shall direct the Committee to readjust the refund in accordance
with its findings. In no case shall the Road Impact Fee Board have the
authority to negotiate the amount of the refund. The decision of the Road
Impact Fee Board shall be final.
XII. Review Every Five Years. At least once every five (5) years, the Road Impact Fee
Committee shall recommend to the Road Impact Fee Board and to the Board of
County Commissioners and the governing bodies of the Participating Southwest
Weld Service Area Municipalities whether any changes should be made to the
Roadway Improvement Plan, Road Impact Fee Study, and Road CIP, this
Ordinance, and the Ordinance of the other Participating Municipalities. The purpose
of this review is to analyze the effects of inflation on actual costs, to assess potential
changes in needs, to assess any changes in the characteristics of land uses, and to
ensure that the road impact fees will not exceed a proportionate share. To be
amended, the Roadway Improvement Plan, Road Impact Fee Study, Road CIP and
the Ordinances must be approved by the Board of County Commissioners and the
governing bodies of all Participating Southwest Weld Service Area Municipalities.
111111111111111111111111111111111111 n1111111 )f 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
20 of 26 R 0.00 D 0.00 Weld County CO
Exhibit A
SOUTHWEST SERVICE AREA AND ROAD SYSTEM
LAWMEN COUNTY 4 Mead ' 1
u
Wcw30 t L , N N
I
I
1 ,
U
Longmont:
WCR 24://,� i Lr_ _
J
/®
y]p)Z , I
l � F--
Ii
� 'I .,r
k
_ ,
•
WCR 141 St VIZ •"• A 1 ^ 1 'y'
•
i -e-d.
WCR8:
f
•
•
•
•
WCR2 +r 7 1 i
x Broomfield Northgiennr a•
U ¢ D' G
O O O
LEGEND T 3 3 3 3
= Paved Roads
Grant Roads
Study Ana Boundary
1111111 11111 Eli 111111 IIII IRE III 1111111111111 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
21 of 26 R 0.00 D 0.00 Weld County CO
Exhibit B
SOUTHWEST WELD SERVICE AREA
ROAD CAPITAL IMPROVEMENTS PLAN
Road From To Miles Im rovement Cost
WCR 1 Erie CL Arapahoe Rd. 0.54 Widen-4 Lane $860,000
WCR 1 Arapahoe Rd. Erie CL 0.51 Widen-4 Lane $820,000
WCR 1 Erie CL Erie CL 0.50 Widen-4 Lane $800,000
WCR 1 Erie CL Isabelle Rd. 0.50 Widen-4 Lane $800,000
WCR 1 Isabelle Rd. Jay Rd. 1.05 Urban 2 Lane $1,050,000
WCR 1 Jay Rd. Erie CL 0.76 Urban 2 Lane $760,000
WCR 1 WCR 20.5 1500' s SH 119 1.22 Urban 2 Lane $1,220,000
WCR 1 1500's SH 119 RR n/o SH 119 0.81 Widen-4 Lane $1,300,000
WCR 1 RR n/o SH 119 St. Hwy. 66 2.53 Widen-4 Lane $4,040,000
WCR 1.5 Erie CL WCR 3 0.40 Pave-Urban $400,000
WCR 3 WCR 8 WCR 10 1.00 Pave-Rural2 $500,000
WCR 3 WCR 10 WCR 12 1.00 Pave-Rurall $250,000
WCR 3 WCR 12 St. Hwy. 52 1.00 Pave-Rurall $250,000
WCR 3 WCR 28 St. Hwy. 66 1.00 Pave-Rurall $250,000
WCR 3.25 St. Hwy. 52 WCR 16.5 1.50 Pave-Rurall $380,000
WCR 3.5 WCR 24.5 WCR 26 0.50 Pave-Urban $500,000
WCR 4 WCR 13 WCR 15 1.00 Pave-Rurall $250,000
WCR 4 WCR 15 WCR 17 1.00 Pave-Rurall $250,000
WCR 4 WCR 17 WCR 19 1.00 Pave-Rurall $250,000
WCR 4 1-25 County Line 4.40 New 2-L Rural $5,500,000
WCR 5 St. Hwy. 52 WCR 16.5 1.50 Pave-Rural1 $380,000
WCR 5 WCR 18.5 WCR 20 0.75 Pave-Urban $750,000
WCR 5 WCR 26 St. Hwy. 66 2.00 Pave-Rurall $500,000
WCR 6 WCR 5 WCR 7 1.00 Pave-Rurall $250,000
WCR 6 WCR 7 I -25 0.96 Urban 2 Lane $960,000
WCR 7 WCR 2 WCR 2.5 0.50 Widen-4 Lane $800,000
WCR 7 WCR 2.5 WCR 4.5 1.02 Widen-4 Lane $1,630,000
WCR 7 WCR 4.5 WCR 8 1.49 Widen-4 Lane $2,390,000
WCR 7 5430's SH 119 St. Hwy. 119 1.03 Urban 2 Lane $1,030,000
WCR 7.5 SH 119 WCR 24.5 0.50 New 2-L Urban $875,000
WCR 7.5 SH 119 1-25 Fr. Rd 2.70 New 4-Lane $5,265,000
WCR 8 County Line Ex Terminus 0.80 New 4-Lane $1,560,000
WCR 8 Coal Creek WCR 3 0.32 Widen-4 Lane $510,000
WCR 8 WCR 3 WCR 5 1.00 Widen-4 Lane $1,600,000
WCR 8 WCR 5 WCR 7 0.99 Widen-4 Lane $1,590,000
WCR 8 WCR 7 WCR 9 (1-25) 1.00 Widen-4 Lane $1,600,000
WCR 8 WCR 9 (1-25) RR-X 0.58 Pave-Rura12 $290,000
1110111111111111 111111111 Ell 111111 III 1111111 II 1111 f 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
22 of 26 R 0.00 D 0.00 Weld County CO
Exhibit B
SOUTHWEST WELD SERVICE AREA
ROAD CAPITAL IMPROVEMENTS PLAN
Road From To Miles Im rovement Cost
WCR 8 RR-X RR-X 0.71 Pave-Rural2 $360,000
WCR 8 RR-X Dacono CL 0.47 Pave-Rural2 $240,000
WCR 8 Dacono CL WCR 13 0.13 Pave-Rural2 $60,000
WCR 8 WCR 13 WCR 15 1.00 Pave-Rural/ $250,000
WCR 8 WCR 15 WCR 19 2.00 Pave-Rural/ $500,000
WCR 9.5 1-25 Fr. Rd WCR 24.5 3.40 New 4-Lane $6,630,000
WCR 9.75 WCR 24 WCR 24.75 0.75 Pave-Urban $750,000
WCR 10 WCR 7 WCR 90-25) 1.00 Pave-Urban $1,000,000
WCR 10 WCR 90-25) SRFCH 0.50 Pave-Urban $500,000
WCR 10 SRFCH WCR 11 0.49 Pave-Urban $490,000
WCR 10 WCR 11 WCR 15 2.00 New 2-L Rural $2,500,000
WCR 10 WCR 15 WCR 19 2.00 Pave-Urban $2,000,000
WCR 11 WCR 2 WCR 4 1.00 Pave-Rural/ $250,000
WCR 11 WCR 4 WCR 8 2.00 Pave-Rurall $500,000
WCR 11 WCR 8 WCR 10 1.00 Pave-Urban $1,000,000
WCR 11 WCR 10 WCR 12 1.00 Pave-Urban $1,000,000
WCR 11 WCR 12 St. Hwy. 52 1.00 Pave-Urban $1,000,000
WCR 11 St. Hwy. 52 WCR 16 1.00 Pave-Urban $1,000,000
WCR 11 WCR 16 WCR 18 1.00 Pave-Urban $1,000,000
WCR 11 WCR 18 WCR 18.25 0.30 Pave-Rural/ $80,000
WCR 11 WCR 18.25 WCR 18.5 0.20 Pave-Rural/ $50,000
WCR 11 WCR 18.5 WCR 22 1.50 Pave-Rural1 $370,000
WCR 11 WCR 22 WCR 22.5 0.45 Pave-Urban $450,000
WCR 11 WCR 22.5 WCR 24 0.55 Pave-Urban $550,000
WCR 11 WCR 28 WCR 30 1.00 Pave-Urban $1,000,000
WCR 11.25 WCR 24.75 WCR 26 0.25 Pave-Urban $250,000
WCR 12 WCR 3 WCR 9 3.00 Pave-Rural/ $750,000
WCR 12 WCR 9 WCR 15 3.00 Pave-Urban $3,000,000
WCR 13 WCR 2 WCR 6 2.00 Pave-Rural2 $1,000,000
WCR 13 WCR 6 WCR 6.5 0.50 Pave-Rural2 $250,000
WCR 13 WCR 6.5 WCR 10 1.50 Pave-Urban $1,500,000
WCR 13 WCR 10 WCR 12 1.00 Pave-Urban $1,000,000
WCR 13 St. Hwy. 52 Frederick CL 0.55 Urban 2 Lane $550,000
WCR 13 St. Hwy. 52 WCR 16 1.00 Urban 2 Lane $1,000,000
WCR 13 WCR 16 STR 0.96 Urban 2 Lane $960,000
WCR 13 STR WCR 180.05 0.05 Urban 2 Lane $50,000
WCR 13 WCR 18 WCR 20 1.01 Urban 2 Lane $1,010,000
WCR 14 WCR 17 WCR 19 1.00 Pave-Rural1 $250,000
111111111111 111111 11111111111 IIII 111111 III 1111111111111 >f 24 Pages
2735949 12/01/1999 04:37P JA Suki Tsukamoto
22 of 26 R 0.00 D 0.00 Weld Count, CO
Exhibit B
SOUTHWEST WELD SERVICE AREA
ROAD CAPITAL IMPROVEMENTS PLAN
Road From To Miles Im rovement Cost
WCR 15 WCR 2 WCR 6 2.00 Pave-Rural2 $1,000,000
WCR 15 WCR 6 WCR 12 3.00 Pave-Urban $3,000,000
WCR 15 Hwy 52 1st St. 1.00 Pave-Urban $1,000,000
WCR 15 1st St. Split 0.25 Pave-Urban $250,000
WCR 15 Split Frederick CL 0.25 Pave-Urban $250,000
WCR 15 Firestone CL Grant Ave 0.50 Pave-Urban $500,000
WCR 15 WCR 18 WCR 20 1.00 New 2-L Urban $1,750,000
WCR 15 WCR 20 WCR 24 2.01 Pave-Urban $2,010,000
WCR 16 WCR 7 WCR 9 1.00 Pave-Urban $1,000,000
WCR 16 1-25 Frederick CL 0.63 Pave-Urban $630,000
WCR 16 Frederick CL WCR 11 0.37 Pave-Urban $370,000
WCR 16 WCR 11 WCR 13 1.00 Pave-Urban $1,000,000
WCR 16 WCR 15 WCR 15.5 0.50 Pave-Urban $500,000
WCR 16 WCR 15.5 WCR 19 1.50 Pave-Rurall $380,000
WCR 16.5 WCR 1 WCR 5 2.00 Pave-Rurall $500,000
WCR 17 WCR 2 WCR 4 1.00 Pave-Rurall $250,000
WCR 17 WCR 4 WCR 6 1.00 Pave-Rural1 $250,000
WCR 17 WCR 6 WCR 8 1.00 Pave-Rurall $250,000
WCR 17 WCR 8 WCR 10 1.00 Pave-Urban $1,000,000
WCR 17 WCR 10 WCR 12 1.00 New 2-L Rural $1,250,000
WCR 17 WCR 12 St. Hwy 52 1.00 Pave-Urban $1,000,000
WCR 18 WCR 1 WCR 3 1.00 Pave-Rurall $250,000
WCR 18 WCR 15 WCR 17 1.00 Pave-Urban $1,000,000
WCR 18 WCR 17 WCR 19 1.00 Pave-Urban $1,000,000
WCR 20 WCR 90-25) WCR 13 2.00 Pave-Urban $2,000,000
WCR 20.5 WCR 1 C & M Pit Ent. 1.53 Urban 2 Lane $1,530,000
WCR 20.5 C & M Pit Ent. WCR 7 1.49 Urban 2 Lane $1,490,000
WCR 20.5 WCR 7 E.to Dead End 1.00 Pave-Urban $1,000,000
WCR 22 SRFCH WCR 17 2.65 Pave-Urban $2,650,000
WCR 22 WCR 17 WCR 19 1.00 Pave-Urban $1,000,000
WCR 24 WCR 9 ( 1-25 ) WCR 15 2.71 Widen-4 Lane $4,340,000
WCR 24.5 WCR 7 Park Entrance 0.75 Pave-Urban $750,000
WCR 24.5 1-25 Front. Rd. WCR 9.75 0.75 Pave-Urban $750,000
WCR 24.75 WCR 9.75 WCR 11.25 0.50 Pave-Urban $500,000
WCR 26 WCR 1 WCR 3 1.00 Pave-Urban $1,000,000
WCR 26 WCR 3 WCR 7 2.00 Pave-Urban $2,000,000
WCR 26 WCR 11.25 WCR 13 0.75 Pave-Rurall $190,000
WCR 26 WCR 13 WCR 15 1.00 Pave-Rurall $250,000
111111111111111111 CUM] 1111 MOM Hit HIE 124 Pages
2735949 12/01/1999 04:37F JA Suki Tsukamoto
24 of 26 R 0.00 D 0.00 Weld County CO
Exhibit B
SOUTHWEST WELD SERVICE AREA
ROAD CAPITAL IMPROVEMENTS PLAN
Road From To Miles Improvement Cost
WCR 26 WCR 15 WCR 19 2.00 Pave-Rural1 $500,000
WCR 28 WCR 1 WCR 3 1.00 Pave-Rurall $250,000
WCR 28 WCR 3 WCR 5 1.00 Pave-Rurall $250,000
WCR 28 WCR 5 WCR 7 1.00 Pave-Rurall $250,000
WCR 28 WCR 7 WCR 9 1.00 Pave-Urban $1,000,000
WCR 28 WCR 9 WCR 11 1.00 Pave-Urban $1,000,000
WCR 28 WCR 11 WCR 13 1.00 Pave-Rurall $250,000
SOUTHWEST WELD Service Area Total $120,850,000
Notes: "Pave-Rurall" is paving a gravel road and providing 4' shoulders; "Pave-Rural2"
is paving a gravel road and providing 6' shoulders; "Pave-Urban" is paving a gravel road
to urban standards with curb and gutter and underground drainage; "Urban 2 Lane" is
converting a rural 2-lane road to an urban standard with two through lanes and a center
turn lane.
HBO 11111 111111 1111 111111 IIII MI III 1111111 Hill
2735949 12/01/1999 04:37P JA SukiTsukamoto
25 of 26 R 0.00 D 0.00 Weld County CO
Page 23 of 24 Pages
Exhibit C
SOUTHWEST WELD SERVICE AREA BENEFIT AREAS
I I` Mead F' A
1 LA RIMER COUNTY r ••• • 1 - `R WC 30 \ i I r
25 , ;
_ _ _���_t_-L_ 1Kri
-__ -1___Li
i J '
Longmont:1/2//// i
�WCH24I `°1 I I
1: d Area 1
sc,
s K
o: 3 / /r ' .
, A
A ,
WCR 14 52 t___ . .4-
i irry ' i
,7 '
i JArea 3
r
WCRBI/ S Area 2
/. J
3 ////r \ i i
7,
WCR 2
L cc Broomfield Northglenn:2 °'
Q U lL ¢ It
LEGEND
U 3 O O
Paved Roads
= Gravel Roads Benefit Area Boundary
Study Area Boundary
I II 11111 11111 11111 11111 III1111111111111111111 II
26 35949 at 261R00.0099 D 0.0037P JA Suki kamoto
Weld County C
Page 24 of 24 Pages