(18;1997
S-418, Flatiron Structures Company, c/o Quinlan Construction
PT in Plan for a C-'i Commercial l ice I.ot 7 of RF: 1701
I have reviewed the application and the accompanying drawings and have the following comments:
Access:
The access is from the east I-25 Frontage Road. This access point has been upgraded and paved with
adequate radiuses; it falls under the jurisdiction of the Colorado Department of Transportation
(CDOT). This site has previously been evaluated. As each lot is developed, it will go through the
review process.
Stormwater Drainage:
In July of 1994, the applicant submitted the urban stormwater drainage plan for the six acres at the
Flatiron Structures' facility. This report covered the historic and developed run-off from the site and
will be directed by on -site swales to detention ponds located within the development. These
developed ponds have been sized to retain the 100 -year run-off and release at the five-year historic
run-off rate. The run-off from the ponds will be directed to the pond located adjacent to the frontage
road and released through two 12 inch PVC pipes into the borrow pit ditch along the I-25 Frontage
Road. The applicant has submitted drainage calculations and the site drainage and grading plan for
the development. This has been certified and stamped by a professional engineer. We have
reviewed the calculations and have no conflict with the drainage.
Commercial Access:
The applicant has submitted a typical cross section for the access drive identifying the width of the
drive at 27 feet with six inches of asphalt per the soils engineer specification. The cross section
shows a compacted subgrade per the soils report, with 4:1 grassline slopes.
Off -Street Parking:
The applicant has adequately addressed the off-street parking and the accommodating handicap
areas. Any future expansion to the existing facility has been addressed on the plans. The
calculations are based on square footage of office buildings.
Improvements Agreement:
The Improvements Agreement is in regards to the collateral for improvements for private road
maintenance. The applicant has supplied Exhibit A, which identifies improvements unit price in
construction costs for Flatiron PUD. I have reviewed the unit costs and the items, and I find no
971026
EXHIBIT
Gloria Dunn, Current Planner
February 18, 1997
Page 2
conflict with these costs. In Exhibit B for the time of construction, the applicant has indicated that
these items will be complete upon issuance of the first building permit. The applicant has signed
and notarized the Improvements Agreement.
cc: Commissioner Harbert
S-418
plan9
97102G
DEPARTMENT OF PLANNING SERVICES
PHONE (970) 353-6100, EXT.3540
FAX (970) 352-6312
WELD COUNTY ADMINISTRATIVE OFFICES
Weld County Planning Dept. 1400 N. 17TH AVENUE
GREELEY, COLORADO 80631
FEB 0 6 1997
RECEIVED
January 31, 1997
Case Number: S-418
TO WHOM IT MAY CONCERN:
PARCEL NUMBER: 131311000067
Enclosed is an application from Flatiron Structures Company, c/o Quinlan Construction, Inc., for a Site
Specific Development Plan and Planned Unit Development Plan for C-3 (Commercial) uses. The parcel of land
is described as Lot 2 of RE -1201, in part of the W2 SW4 of Section 11, T2N, R68W of the 6th P.M., Weld
County, Colorado. The location of the parcel of land for which this application has been submitted is north
of Weld County Road 22; east of and adjacent to 1-25 Frontage Road. For a more precise location, see legal.
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Your prompt reply will help to facilitate the processing
of the application and will ensure prompt consideration of your recommendation. Please reply by February
21, 1997, so that we may give full consideration to your recommendation. The failure of any agency to
respond within 21 days may be deemed to be a favorable response to the County. Please call, Gloria Dunn,
Current Planner, if you have any questions about the application.
Check the appropriate boxes below and return to our address listed above.
1
x
MfiPeit.
We have reviewed this request and find that it does/deae-net comply with our cornprohcnofre
Plan for the following reasons.
nee gtoAlt? RA sMC0 Da
r;OnTU►1LSys,u w. .G •
We do not have a Comprehensive Plan, but we feel this request is/is not compatible with the
interests of our town for the following reasons:
3. We have reviewed the request and find no conflicts with our interests
4. A formal recommendation is under consideration and will be submitted to you prior to
5. K Pleas
Signed:
Date:
closed letter.
Agency Sr. OR A..O PAParr/1414a) pt6 Tt
971026
EXHIBIT
1
cSt. Tzciin cSanitation 1�1�.t2Cet
(cSaint cSan)
-'- 'JEIE`zhone
(303) 776-9570
February 3, 1997
Ms. Gloria Dunn, Current Planner
Department of Planning Services
Weld County Administrative Offices
1400 N. 17th Avenue
Greeley, Colorado 80631
Re: Parcel No. 131311000067 - Flatiron Structures, P.U.D.
Dear Ms. Dunn:
I have reviewed the Case Number S-418 referral material and offer the following:
515(6nhazi st., cCuite 109
lon9mont, CO 80501
- A 400 -foot, 8 -inch sewer line and manhole to serve Lot 1 has not been constructed.
See attached. The two required easements have been acquired/dedicated as part of the
Lot 2 development in 1995.
- Perhaps this work should be included in your Improvements Agreement. The estimated
cost is:
400' @ $16.00 = $6,400
1 Manhole 600
Total $7,000
- This District needs to approve its design prior to construction. The manhole cover
should be flush with the paved access road. The manhole would connect to existing
District Manhole D-21-5 and terminate at new District Manhole D-21-5-1. Suggest a
4 -inch building service stub be installed to serve Lot 1 prior to access road paving.
- Lot 4 may be served from either this new line or the existing north -south line running
along the east side of the lot.
971026
Ms. Gloria Dunn, Current Planner
February 3, 1997
Page 2
- A two-year warranty and dedication of the completed line is required.
- Individual sewer taps for each lot must be applied for and granted prior to connection to
the District's system.
Please contact me if you have any questions.
Very truly yours,
ST. VRAIN SANITATION DISTRICT
L. D. Lawson, P.E.
Manager
Attached: Marked -up Map.
LDL:mcj
cc: Jana S. Chameroy,
Quinlan Construction, Inc.
971026
11 10 .4 1. ....
_ .:%1118PT A2 - Attached to and made a part of that letter
C1% agreement dated 10/28/96 between North American ftesourses
von : Company and Flatirons Structures Company LLC. The krs.
_
A" 8 :>arcal set forth below is also known as
mm„ --'-'- _ 'Io. 1313-11-3-fiE1201. 0
ir-&Iegi '0s:ac'09: `.._...-__�-25 FRONTgGE- Raw, ~
.__ —J9600'_
e;a 4 .%
I�
ig
O2
.21O
rnm
V.
c 2S
4
ate= N
a2- I
;In
5! q it:,
7
18 '96 1148
'A'
- - -SOS' 92it---
: _-may fi
•
4
1
• 1e__..a
"am;:
3034441910 PRISE.07
971026
MOUNTAIN VIEW FIRE PROTECTION DISTRICT
Administrative Office:
9119 County Line Road • Longmont, CO 80501
(303) 772-0710 Metro (303) 666-4404 FAX (303) 651-7702
February 20, 1997
Ms. Gloria Dunn
Weld County Department of Planning
1400 N. 17th Ave.
Greeley, CO 80631
Re: Flatiron Structures Company
S-418
Dear Ms. Dunn:
The Mountain View Fire Protection District is in receipt of the Flatiron Structures
Company site specific development plan and has no conflicts provided the following
requirements are met.
1. All applicable fire codes be met.
2. All building construction plans be sent to the Fire District prior to construction of
building to insure compliance with the adopted codes.
Sincerely,
Mark A. Lawley
Acting Fire Marshal
ML:tke
LAWLEY\FLATIRON.DOC
Station 1
9119 Cnty Line Rd.
Longmont, CO
80501
Station 2
10971 WCR 13
Longmont, CO
60504
Station 3
P.O. Box 575
299 Palmer Ave.
Mead, CO 80542
Station 4
P.O. Box 11
8500 Niwot Road
Niwot, CO 80544
Station 5
10911 Dobbin Run
Lafayette, CO
80026
EXHIBIT
Station 6
P.O. Box 666
600 Briggs
Erie, CO 80516
Station 7
P.O. Box 40
100 So. Forest St.
Dacono, CO 80514
971026
REPLY TO
ATTENTION OF
Ms. Jana S. Chameroy
Quinlan Construction Inc.
5540 Central Avenue
Boulder, Colorado 80301
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, OMAHA DISTRICT
TRI-LAKES PROJECT OFFICE, 9307 STATE HWY 121
LITTLETON, COLORADO 80123-6901
February 12, 1997
RE: Quinlan Construction Inc. Flatiron PUD Project, Weld County Planning Dept. Case No. S-418,
Reauthorization of Corps Nationwide Permit 26, File #199580073
Dear Ms. Chameroy:
We have reviewed Weld County Planning Department's request on your behalf for Department of the
Army authorization to impact 0.17 acre of a wetlands drainage ditch while performing the Flatiron PUD
project located in Section 11, Township 2 North, Range 68 West, Weld County, Colorado.
Based on the information provided, this office has determined that the work can be verified by the
Department of the Army Nationwide Permit found at 33 CFR Part 330 Appendix A, (B)(26). Enclosed is a
fact sheet which describes this Nationwide Permit and lists the General Conditions and Section 404 Only
Conditions which must be followed in order for this verification to remain valid.
This Nationwide permit verification is valid until February 12, 1999. The enclosed certification form
(blue sheet) must be signed and sent back to this office within 30 days after completion of the authorized
work.
This permit verification does not eliminate the requirement that other applicable federal, state, tribal,
or local permits be obtained if needed. Please be aware that changes from the original plans and
specifications of your project could require additional authorization from this office.
If you have any questions concerning this verification, please call Mr. Terry McKee at (303) 979-
4120 and reference Corps File #199580073.
Sincerely,
Timo
Project Manager
Enclosures
Copies Furnished:
U.S. Fish & Wildlife Service
Colorado Department of Public Health & Environment
Environmental Protection Agency
Colorado Division of Wildlife
Ms. Gloria Dunn
Weld County Department of Planning Services
Weld County Administrative Offices
1400 N. 17th Ave
Greeley, CO 80631
Printed on
n
•U •
Recycled Paper
971026
EXHIBIT
I d
STATE OF COLORADO
DEPARTMENT OF TRANSPORTATION
Region 4
1420 2nd Street
Greeley, Colorado 80632-0850
(970) 353-1232
March 31, 1997
Gloria Dunn, Current Planner
Weld County Planning
Weld County Administrative Offices
1400 N 17th Avenue
Greeley, CO 80631
Subject: Access Needs
Weld County, I-25 EFR OT
Access for Flatiron Structures Company Ewa
(Related to Permit # 494125) -MP 239
South of Del Camino
AFkr Ls y 51
Gloria, the current proposal for construction at Flatiron Structures Company identified as
Planned Unit Development II shows details of activities on the lot south of the Flatiron access
which was authorized by Access Permit 494125. That permit mentioned the addition of auxiliary
lanes along the frontage road to accommodate traffic at this access. In 1994 when we discussed
this access, we determined that it was reasonable to delay the addition of turn lanes until the new
east frontage road is constructed under a CDOT project. We also made it clear at that time that
the Permittee shall bear all the costs for design and construction of auxiliary lanes which are
necessary to accommodate traffic in and out of this access. It is now time for the Permittee to
plan those auxiliary lane improvements. The Permittee or Applicant should contact me to begin
that coordination effort. The auxiliary lanes must be constructed in a single phase along with the
new frontage road. The Permittee must obtain a new access permit. Their application shall
include detailed plans for construction of those improvements.
We request the County's cooperation in seeing that these lane improvements are authorized prior
to further development of this site. The CDOT construction project will begin in the near future
so the Permittee should begin coordination efforts with us immediately. Please have them call
me at (970) 350-2163. Upon request, I will provide the engineers with a detailed plans Checklist
for their use.
1e_ss
Tess M. Jones
Region Development/Access Coordinator
(970) 350-2163
TMJ:blg
copy: M. Fanning
G. Hice-Idler
file
9'71.0 i ,.;