HomeMy WebLinkAbout992445.tiff INVENTORY OF ITEMS FOR CONSIDERATION
Applicant Hoshiko Farms Case Number Z-529
Submitted or Prepared
Prior to At Hearing
Hearing
1 Board of County Commissioners Comments
2 Staff Comments (3 pages) X
3 Department of Planning Services field check form X
4 Letter to Applicant X
5 Legal Notifications (1 pages) X
6 Application (4 pages) X
7 Referral list X
8 Weld County Health Department referral received 7/30/99 X
9 West Greeley Soil Conservation District referral received 8/9/99 X
10 Eaton Fire Protection District referral received 7/30/99 X
11 Weld County Zoning Compliance referral received 7/26/99 X
12 Weld County Public Works Dept. referral received 8/13/99 X
13 Colorado Department of Transportation (CDOT) referral received X
8/16/99
14 Planning Commission Field Check referral received 8/2/99 X
15 8 Y2 X 11 maps submitted by applicant(3 pages) X
16 Deed (6 pages) X
17 Surrounding Property Owners (8 pages) X
18 Utilities (6 page) X
992445
EXHIBIT
A
1 eoz #5,2q
I hereby certify that the 18 items identified herein were submitted to the Department of Planning Services at
or prior to the scheduled Board of County Commissioners hearing. I further certify that these items were
forwarded to the Clerk to the Board's office. Atte-
Eric A. Jerman ❖ Pla er
STATE OF COLORADO )
COUNTY OF WELD )
SUBSCRIBED and SWORN TO BEFORE ME THIS SA day of &o-e,/
SEAL
NOTARY PUBLIC
MY COMMISSION EXPIRES A040/2GbL Wak
•
•4.06 g 44444444
•• i
Is A O10
t r
t% o•:;13.1::•••Ot or
Page 1
ftt*;ii
WIiDc LANDAPPLICATION
SUMMARY SHEET
COLORADO
Case Number:Z-529 Hearing Date:September 21, 1999
Applicant: Hoshiko Farms, Inc.
Address: 28607 WCR 50 Kersey, CO 80644
Request: Change of Zone from Ag. To 1-3
Legal Description: P.t.. SW4, NW4, Section 29, Township 6 North, Range 65 West of the
6th PM, Weld County, Colorado.
Location: East of and adjacent to Hwy 85 and approximately % mile south of WCR 66.
Size of Parcel: .9 acres
POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS
The criteria for review of this Change of Zone application is listed in Section 21.4 of the Weld
County Zoning Ordinance.
The Department of Planning Services' staff has received responses from the following agencies:
• Weld County Department of Public Health & Environmental referral received 7/30/99
• West Greeley Soil Conservation District referral received 8/9/99
Eaton Fire Protection District referral received 7/30/99
• Weld County Zoning Compliance referral received 7/26/99
• Weld County Department of Public Works referral received 8/13/99
Colorado Department of Transportation (CDOT) referral received 8/12/99
• Weld County Planning Commission referral received 8/2/99
' t CHANGE OF ZONE
ADMINISTRATIVE RECOMMENDATION
COLORADO
CASE NUMBER: Z-529
PLANNER: Eric Jerman
APPLICANT: Hoshiko Farms, Inc.
ADDRESS: 28607 WCR 50 Kersey, CO 80644
REQUEST: Change of Zone from Agricultural to 1-3
LEGAL DESCRIPTION: Part of the SW4, NW4, Section 29, Township 6 North, Range 65
West of the 6th P.M., Weld County, Colorado.
LOCATION: east of and adjacent to Hwy 85 and approximately/ mile south of WCR 66
ACRES: .9 PARCEL# 0803 29 000091
THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST
BE APPROVED FOR THE FOLLOWING REASONS:
1. The submitted materials are in compliance with the application requirements of Section 21.4
of the Weld County Zoning Ordinance, as amended.
2. The submitted materials are in compliance with Section 21.5 of the Weld County Zoning
Ordinance, as amended as follows:
A. Section 21.5.1.1 - That the proposal is consistent with the Weld County
Comprehensive Plan.
1) A.Goal 1 states "Preserve prime farmland for agricultural purposes which
fosters economic health and continuance of agriculture." While the lot is
situated on farmground labeled as Prime by the United States Department
of Agriculture, dated 1979, the lot has been used to store pipe for at least six
years and the land is no longer being used for farming.
B. Section 21.5.1.2 - The uses which would be allowed on the subject property by
granting the change of zone will be compatible with the surrounding land uses.
Parcels to the south and west are zoned commercial and industrial. The site has
been used historically to store pipe for Big R manufacturing. The Department of
Planning Services believes that the granting of this change of zone will have a
minimal impact on the surrounding land uses.
C. Section 21.5.1.3 -Adequate water and sewer service can be made available to the
site to serve the uses permitted within the proposed zone district. There will be no
additional water requirements for this site as it will be used principally as a storage
area for pipe. ,� 1
D. Section 21.5.1.4 - Street or highway facilities providing access to the property are �J
saw
Service,Teamwork, Integrity, Quality
adequate in size to meet the requirements of the proposed zone districts. The Weld
County Public Works Department reviewed this request and indicated that the
requirements of Site Plan Review (SPR-188) shall be followed for this site.
E. Section 21.5.1.5 - In those instances where the following characteristics are
applicable to the rezoning request, the applicant has demonstrated compliance with
the applicable standards:
1) Section 21.5.1.5.1 - The proposed change of zone does not lie within any
overlay district identified by the maps officially adopted by Weld County.
2) Section 21.5.1.5.2 -The proposed rezoning does not contain the use of any
area known to contain a commercial mineral deposit in a manner which
would interfere with the present or future extraction of such deposit by an
extraction to any greater extent than under the present zoning of the
property.
3) Section 21.5.1.3 - Soil conditions on the site are not such that they present
moderate or severe limitations to the construction of structures of facilities
proposed for the site.
This recommendation is based, in part, upon a review of the application materials submitted by the
applicant, other relevant information regarding the request, and responses from referral entities.
The Change of Zone from A (Agricultural) to 1-3 Industrial is conditional upon the following:
1. The change of zone plat map shall be submitted to the Department of Planning Services for
recording within 30 days of approval by the Board of County Commissioners.
2. Prior to recording the Change of Zone plat:
A. The following notes and information shall be delineated on the Change of Zone plat::
1) The Change of Zone allows for Industrial uses which shall comply with the
1-3 Zone District requirements as set forth in Section 34 of the Weld County
Zoning Ordinance. This lot shall not be a separate, build able lot; SE-784
shall adjust the lot line to include this .9 acre lot with parcel # 0803 29
000102. (Dept. of Planning Services)
2) Any signage located on the property shall require building permits and
adhere to Section 42.2 of the Weld County Zoning Ordinance. (Dept. of
Planning Services)
3) The site shall maintain compliance at all times with the requirements of the
Weld County Public Works Department, Weld County Health Department,
and the Weld County Department of Planning Services.
Service,Teamwork, Integrity,Quality 2
4) If applicable, installation of utilities shall comply with Section 12 of the Weld
County Subdivision Ordinance. (Dept. of Planning Services)
5) The applicant shall adhere to Site Plan Review-188, with no outside storage
on the newly I-3 zoned land, or submit an application and pay the appropriate
fees to amend Site Plan Review-188 for the existing pipe fabrication
business. Recording the plat for Z-529 will be contingent on the completion
and approval and recording of the amended Site Plan Review.
6) Any future changes or expansion of this site may require an amendment to
Site Plan Review -188.
Service,Teamwork, Integrity,Quality 3
FIELD CHECK
FILING NUMBER: Z-529 DATE OF INSPECTION:
APPLICANT'S NAME: Hoshiko Farms, Inc.
PLANNER: Eric Jerman
REQUEST: Change of Zone from Agricultural to 1-3.
LEGAL DESCRIPTION: Part of the SW4 of the NW4 of Section 29, T6N, R65W of the 6th P.M., Weld
County, Colorado.
LOCATION: East of and adjacent to highway 85 and approximately %mile south of Weld County Road
66.
LAND USE:
N
E
V
S -c ee
W
ZONING: N A (Agricultural)
E A (Agricultural)
S A (Agricultural)
W A(Agricultural)
CO-MIM�ENTS:��./]• Q, _�/_'S��, ��'y,����� f-%i
l AT`�"\ (! /�-'�,(.c,o "/�/( 35l C ww2tCa'.c-c.v` wLli�'G<
c LS .
P.C. Member
EXHIBIT
("et DEPARTMENT OF PLANNING SERVICES
PHONE (970) 353-6100, EXT.3540
'1 FAX 17T 304-6498
1 1555 N. 17TH AVENUE
GREELEY, COLORADO 80631
C.
COLORADO
July 23, 1999
Hoshiko Farms, Inc.
28607 WCR 50
Kersey, CO 80644
Subject: Z-529 - Request for a Change of Zone from Agricultural to 1-3 on a parcel of land described as
Part of the SW4 of the NW4 of Section 29, T6N, R65W of the 6th P.M., Weld County, Colorado.
Dear Mr. Hoshiko:
Your application and related materials for the request described above are being processed. I have scheduled
a meeting with the Weld County Planning Commission for September 21, 1999, at 1:30 p.m. This meeting
will take place in Room 210, Weld County Planning Department, 1555 N. 17th Avenue, Greeley, Colorado.
It is recommended that you and/or a representative be in attendance to answer any questions the Planning
Commission members may have.
It is the policy of Weld County to refer an application to any town or municipality lying within three miles of the
property or if the property is located within the comprehensive planning area of a town or municipality.
Therefore, our office has forwarded a copy of the submitted materials to the City of Greeley Planning
Commission for its review and comments. Please call the City of Greeley at(970)350-9780 for further details
regarding the date, time, and place of this meeting. It is recommended that you and/or a representative be
in attendance at the City of Greeley Planning Commission meeting to answer any questions the Commission
members may have with respect to your application.
A representative from the Department of Planning Services will be out to the property a minimum of ten days
prior to the hearing to post a sign adjacent to and visible from a publicly.maintained road right-of-way which
identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly
maintained road right-of-way, one sign will be posted in the most prominent place on the property and a
second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road
right-of-way.
The Department of Planning Services' staff will make a recommendation concerning this application to the
Weld County Planning Commission. This recommendation will be available twenty-four(24) hours before the
scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services' office
before the Planning Commission hearing to make arrangements to obtain the recommendation.
If you have any questions concerning this matter, please call.
Respectfully,
Eric Jerman �� �
Planner `/, EXHIBIT
FIELD CHECK inspection date: August 16, 1999
CASE NUMBER: Z-529
APPLICANT: Hoshiko Farms, Inc.
LEGAL DESCRIPTION: Pt. SW4, NW4, Section 29, Township 6 North,
Range 65 West of the 6th PM, Weld County, CO.
LOCATION: east of and adj. To Hwy 85 and approx. 1/2 mile south of WCR
66
Zoning Land Use
N A(Agricultural) N A�
E A(Agricultural) E � /&&sh'i Ice 6(i rwi / ;"b . Stich
S A (Agricultural) S A JJsir:
W A(Agricultural) W A t-i w I E5
COMMENTS:
fraf w ,lie, ti duty
5na- czwtfio.dt (40 ,A
2-. ru'
4/44. 6 r cA__
Eric A. Jerman, P a ner
EXHIBIT
Hello