RESOLUTION
RE: APPROVE RELEASE OF COLLATERAL - PHASE 1 OF DOS RIOS ESTATES,
SECOND FILING, CIO JOYCE J. ALLELY(S #385)
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, by Resolution dated March 18, 1996, the Board did approve an
Improvements Agreement According to Policy Regarding Collateral for Improvements (Publicly
Maintained Roads) with Joyce J. Allely, for Phase 1 of Dos Rios Estates, Second Filing
(S #385), concerning property described as a portion of Section 34, Township 5 North,
Range 66 West of the 6th P.M., Weld County, Colorado, and
WHEREAS, pursuant to said Improvements Agreement, an Agreement dated
February 26, 1996, among Norwest Bank Colorado, NA, the Weld County Board of County
Commissioners, and Joyce Allely, as an alternative form of collateral, for an amount up to
$63,507.00, was submitted to Weld County, and
WHEREAS, Don Carroll, Project Coordinator for the Weld County Public Works
Department, has conducted a visual inspection and recommends release of said collateral for
improvements completed, and
WHEREAS, upon recommendation of Lee Morrison, Assistant County Attorney, and the
Planning staff, the Board deems it advisable to release $44,880.16 of said collateral, in
accordance with the terms of said Improvements Agreement.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Weld County, Colorado, that $44,880.16 from the Agreement among Norwest Bank Colorado,
NA, the Weld County Board of County Commissioners, and Joyce Allely, be, and hereby is,
released for improvements completed in Phase 1 of Dos Rios Estates, Second Filing (S#385).
BE IT FURTHER RESOLVED by the Board that the Clerk to the Board be, and hereby
is, directed to return said collateral to the appropriate issuing party.
961895
Lc : PL5 12a-eZ y r-/ SUBD
2519845 B-1576 P-526 11/08/96 02:29P PG 2 OF 2
RELEASE PORTION OF COLLATERAL - PHASE 1, DOS RIOS SECOND FILING (S #385)
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 28th day of October, A.D., 1996.
BOARD OF COUNTY COMMISSIONERS
z WELD COUNTY, COLORADO
4 EL
,4 4Z
Barbara J. Kirkmeyer,Chairman 'J
1861
0 . ..� ty Clerk to the Board
Ivt
z orge Baxter, Pro-( m
VII
— Deputy Cler l o the Board
Dale K. Hall
APP AS TO M: (4ancfii
rbert
ty ttorn I 'I,C/u.-.))1k
W. H. esterr
961895
SUBD
n TNT
!7
`,:CIF,TTO: Board of County Commissioners
FROM: Gloria Dunn,Current Planner
SUBJ: S-385, Dos Rios Second Filing, Phase One
•
COLORADO DATE: October 28 , 1996
A request has been submitted from Lonnie Ochsner of Norwest Bank for Weld County to authorize release
of funds by the bank for completed improvements to Dos Rios Second Filing, Phase One. The completed
improvements for which a draw is being requested include construction of paved streets and fire hydrants.
Don Carroll of the Weld County Public Works Department has inspected the items and in his memorandum
of October 25, 1996, indicates that he has no conflict with the release of funds. Lee Morrison,Assistant
County Attorney, has advised that the release of funds would be in accordance with the terms of the
Improvements Agreement.
Staff recommends that the Board consent to draw on the construction loan in the amount of$44,880.16, as
requested by Norwest Bank, for improvements completed in Phase One of Dos Rios Subdivision, Second
Filing.
iii I
961895
(isiii , mEmoRAnDum
III Vc. Gloria Dunn, Current Planner October 25, 1996
To Date
COLORADO Don Carroll, Project Coordinator Dit&
From
Dos Rios, Second Filing (Phase I Improvements)
Subject: Request for Release of Collateral
At the request of the applicant (Joyce Allely), I performed a site inspection on Phase I
Improvements. The following items have been field verified to my satisfaction and may be released
from Exhibit "A" or Exhibit "A-1" dated June 29, 1996. The improvements are street grading, street
base, street paving, culverts, fire hydrants, and erosion control (straw bale dikes).
The remaining improvements on the Exhibit "A" have not been field verified or do not exist at this
time.
See the attached Exhibit "A" and Exhibit "A-1" for verification.
cc: Commissioner Hall Weld Col inty Planning Dept.
Dos Rios, Second Filing file
plan3 OCT 2 8 1996
tv 3,. nb :Al q !
EXHIBIT
MFR 11 ' 96 16: 34 FROM W' D COUNTY GOUT PRGE . 002
rs.
TO: Weld County Board of County Cramnissioners
PROM: Lonnie Ochsner,Vice President,Nonvest Bank Colorado,NA
RE: Dos Rios Subdivision(Improvements Agreement)
This agreement dated February 26,1996 between Norwest Banc Colorado,NA(The Bank);the
Weld County Board of County Commissioners(The County);and Joyce Allely(The Borrow)is
mutually recognized and agreed upon by all parties as of this date.This agreement is entered into as an
alternative form of collateral under the Weld County Improvements Agreement northing collateral An
mad improvements of the Dos Rion Estates Second Filing(Phase 1)development.
.
Norwest Bank Colorado.NA.agrees to unconditionally advance up to,but not exceeding, ---
$63,507.00 as per the Borrower's construction budget and approved plat,for the roads portion of the Dos
Rios Estates Second Piling(Phase 1)development.For disbursement control purposes,the Bank will
review the monthly progress of the road construction with a designated representative of the County and
will disburse for payment only idler the County has approved said disbursement.Any remaining
undisbursed drone of the$63,507 budgeted,will be available for construction of the roads should the
Borrower be in dathuit of the Weld County Improvements Agreement with respect to construction of the
roads.The Bank and Borrower understand the County will require an Irrevocable Letter of Credit for 10%
($6,400)as a contingency fund which will be available to the County for one year commencing on the day
the roads are accepted for temporary maintenance by the County.(Please provide the Bank with your
desired Letter of Credit format,and the stated terms under which said letter could be drawn.)
This agreement pertains only to the roads portion of the project,and all other loan funds
committed for this development will be disbursed as per the loan agreement entered into between the
Bank and Borrower.No other ccntmitmettta are implied by this agreement
Agreed upon and accepted this day of March,1996.
Weld County Board of County Commissioners
BY:
MAR 1 z 1995.
Joyce Allely
BY:
est B1 CA]Efado,N.A.
BY:BY: yrrs7 /Y� -===—>
t Ochsner,Vice prey dent
03/11/96 16:42 TX/RX NO.3356 P.002
NORWEST GREELEY TEL : 303—.59 5—(06".71•
TO: Gloria Dunn/Weld County Planning Dept.
FROM: Lonnie Ochsner.Norwest Bank
RE:Dos Rios Subdivision
SUBJECT:Road Paving disbursement
As per our agreement with Weld County,Norwest Bank will disburse funds to pay for road
preparation and paving only after the County has given consent for said disbursements. This
work has been completed and Don Carrot with your office has indicated to me that this portion of
the project has been completed as per the County's requirement. I ant therefore requesting
approval to pay Rest Way Paving$44,880.16 as per the al NOW l bill,
Additionally,the project has gone as planned, with in budget, and only the phone lines remain to
be installed. All other work has been completed. If you need any additional information please do
not hesitate to contact me.
Thattkyou, 000`9
�s'Ck•
Sincere , oN ;4, '"".
�� 4 (096
Lonnie Wisner '„,
Vice President z
Post-it^Fax Note 7671 °romd/s)/ IPL a49ar1"
n �-I - fG�•/nrti
'coiDupt. -On. AID r t✓C S f`- ,
Plane I qq Plane N
ax# 3S��— J/^*--_ FaxN
10/24/96 15:07 TX/RX NO.5338 P.001
NORWEST GREELEY TEL : 303-395-7069 Oct 24 ,96 16 :08 No .004 P .02
1 VUIVII NLUV,1.,.1 Obi GRCELEY.COLORADO
21P CODE 60633
��p V1/ BEST - WAY PAVING CD. Gp NVEP
B 623.9436
FAX 3534089
e ,-99
b
Norwest sant
1025 9th Ave
Greeley. Colo. 8Vh3t1
Ke; DOS Rios Ytreet Construction
Dear Mr. Lonny Ochsner
This letter is to inform you that the above referenced
project is complete and final billing has been made to
Mrs. Allely. The work was done in accordance ce to the by Weld
and specs of Landmark Z+,ngineering and app
county. During preparation of the sub grade all soft
spots were excavated and backfilled with crushed concrete.
Best WaY Paving will warranty its workmanship and material
(Asphalt) for two years . Best-way Paving does not warranty
any failures due to insufficient design.
Yours Truly
rgot-Tfr—
HermanC
Vice President
nnjOeCt
OCR 1996
10/24/96 15:07 TX/RX NO.5338 P.002
NQRIJJEST GREELEY TEL : 303-395-7069 Oct 24 , 96 16 :08 No . 004 � . ci-
BEST WAY PAVING CO. INVOICE
7O 353-1654
53.1 54.-fltW Ju�!AVYmC CUSTOMER r 115428
V O.so.)!x!I—151 N.3GV1 Aix- 11.501:1.Culunado scG]33I xR
*
CmeRl.A,,,n pm 353.19141 35.1•50141.3 ver �Mil 623.0.13U
A 31629
DATE August 29, 1996
-I
if tilt OWE:r AC MET FROM Six Oro
Dos Rios
Joyce Various Streets
1117 Doss Rios
Greeley, Colorado 80634
•
,w I.
Nan ENTEPEP
GOIJ)8V OUP.WOPx NV W6T ORDER NV.‘
96370 a uNIT
AMOUNT
DESCRIPTION QUANTITY UNII. PRICRIC E
I
Contract Work - Final Billing Lump
08-19-96 Grading Sum $15,500.00 '
Lump
Sum 3,900.00 "
Culvert _ _
•
Straw Bale Dykes 22 EA 95.00 2,090
1
Paving 6455 SY 5.65 36.470.75•'
Shoulder Base 4437 LF 1.25 5.546.25b
--'Lerxp'r .
Extra Work Sum 773 16
Total $64,280. 16
Less Previous Billing /Si, 400.00) ti
Total This Billing (/((� $44,880.16
1.:=1rnnflg: Dept )01._ vilt, ,../
UCT 2 4 1996
•
•
CITY
TAX
__-.- . . ..._.__. .. STATE
TAX
..... .- _>:441 880: 16
— HOLE Ex Y.*(11. A F14I mu1M1Il.W tin I ',Id..n I' SERVICE CHARGE ..? m.. W 4a-Moonlit P M I1"nour I' U I I""" .umpA. S 1001w ,:ii. k SS/111)
..lu:h..m ANNUAL EEPCENrAt HAVE 0/2.1%gntd lu the pevn•s4 '+'.••.Inv y,.mg cwle•1 PNu•4n..nl/ n.,,,.
THANK YOU-WE APPRECIATE YOUR BUSINESS.
10/24/96 15:07 TX/RX NO.5338 P.004 II
•
EXHIBIT"A"
Name of Subdivision: Dos Rios Second Filing
Filing: Second (Phase 1 Improvements)
Location: Section 34. T5N. R66W of the 6th P.M. .. Weld County, Co .
Intending to be legally bound, the undersigned Applicant hereby agrees to provide throughout this
subdivision and as shown on the subdivision final plat County dated 19
recorded on , 19_, in Book , Page No. , Reception No.
, the following improvements.
(Leave spaces blank where they do not apply)
Estimated
Improvements Unit Cost Construction Cost
Street grading lump sum $15. 500 . 00
Street base 4437 LF @ $1 . 25 $5546 .25
Street paving 6455 Sq. Yd. @ $5.65 $36,470.75
Curbs, gutters.&culverts
Sidewalk
Storm sewer facilities I ump sum $3900.no
Retention ponds
•
Ditch impmvements
Subsurface drainage
Sanitary sewers
Sanitary sewers
Trunk & forced lines
cn Mains
Laterals (house connected)
On-site sewage facilities
w
On-site water suoolv& storage
Water mains-Includes Bore lump sum . $1 25, 230.on
Fire hydrants $2000 . 00 $6000 .00
cn Survey&street monuments&boxes $157 .00 $1732. 00
Street lighting
Street name sips
Fencinglequirements
J.andscaping
N Park improvements
Road Culvert
Grass Lined Swale
Telephone $1520.00
Gas $4000. 00
Electric $22, 365.00
r Water Transfer
co
c
N
N
SUB-TOTAL $222. 264.00 —�
2482429 B-1539 P-186 03/25/96 03:20P PG 9 OF 12
EXHIBIT "A-1"
Name of Subdivision: Dos Rios Second Filing
Filing: • Second (Phase 1 Improvetneni-c)
Location: Section 34, T5N, R66W of the 6th P.M. . Weld County, Colorado
Intending to be legally bound, the undersigned Applicant hereby agrees to provide throughout this
•
subdivision and as shown on the subdivision final plat County dated , 19
recorded-on , 19 , in Book , Page No. Reception No.
. the following improvements. '
(Leave spaces blank where they do not apply)
Estimated
Improvements Unit Cost Construction Cost
Street grading Lump Sum $15 , 500 . 00
Street base • 4437 LF @ $1 . 25 9, 946 95
Street paving 6455 Sq. Yd. @ $5 . 65 36 , 470 . 75
Curbs. gutters. & culverts
Sidewalk
m Storm sewer facilities Lump Slim 3 , 900 00
'i Retention ponds
o Ditch improvements
Subsurface drainage
rl
'i Sanitary sewers •
rR Sanitary sewers
a Trunk & forced lines
In Mains •
m Laterals (house connected)
a
On-site sewage facilities
°' On-site water supply & storage
i° Water mains-Includes Bore
g Fire hydrants
0
Survey& street monuments& boxes
w Street lighting
v
r' Street name signs •
a
Fencing requirements
w j,andscaoing
"'-t park improvements
m Road Culvert
Grass Lined Swale
o Telephone
i 0 Gas
N Electric ' •
Water Transfer •
SUB-TOTAL $61 , 417 . 00
2482429 B-1539 P-186 03/25/96 03:20P PG 11 OF 12
Engineering and Supervision Costs $3 , 070 . 00
(testing, inspection. as-built plans and work in addition to preliminary and final plat: supervision of actual
construction by contractors)
TOTAL ESTIMATED COST OF IMPROVEMENTS AND SUPERVISION $ `f yr 7
The above improvements shall be constructed in accordance with all County requirements and specifications,
and conformance with this provision shall be determined solely by Weld County. or its duly authorized
agent.
Said improvements shall be completed according to the construction schedule set out in Exhibit "B".
(-7te E.- (25(271ES
(In corporation- to be signed by President and attested to by Secretary, together with corporate seal.)
Dat€$ 7O47 to /er.
•
•
2482429 B-1539 P-186 03/25/96 03:20P PG 12 OF 12
2486071 B-1542 P-746 04/16/96 03:52P PG 12 OF 13
17 Vrv!<rd 12/95
Hello