RE: Notification of Project Approval
Structure No. WEL019.5-036.0B
Dear Board Members:
I am pleased to inform you that your project referenced above was authorized for funding from the Special
Bridge Fund Account by the Colorado Transportation Commission in June 1996.
The maximum funding level from this account has been set at $700,000.00 and this project authorization is
subject to the following conditions:
A. The approved maximum funding limit on any project cannot exceed 80 percent of the
actual project cost.
B. The approved maximum funding limit will not be increased to cover increased costs or cost
overruns.
C. No State funds will be paid for any costs, including engineering cost, unless and until
actual construction on the project is started.
D. A "Certification of Intent to Proceed' must be submitted to this office within 45 days of
1 (see the Colorado Da f
the date of this letter, step 5 on page 2 :rf enclosed Department of
Highways "Procedural Directive No.43.1")
If you have any further questions or desire additional information please contact Micki
Hackenberger,CCI, at(303) 861-4076.
Since y
.c . Hacken rger
Legislative Coordinator
961241
m
Pre nt Marsha W.Osborn,Summit County•First Vice President Robert"Chris**Christensen,Douglas County•Second Vice President R.A."Rikki"Santelli,Gunnison County
C,L,( „ Third Vice President Rod Ilines,Saguache County•Fourth Vice President Mark A.Arndt,Morgan County•Treasurer Loren Whittemore,El Paso County
Q Secretary Doralyn Genova,Mesa County•Past President Stan Shafer,Yuma County
7�1$ P(` : rL 1 �0��
Hello