Loading...
HomeMy WebLinkAbout951276.tiffBEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Bud Clemons that the following resolution be introduced for passage by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: CASE NUMBER: S-377 NAME: Continental View Ponds do Jack Olberding, Bill Bedell, John C. Widerquist & Terry A. Henze ADDRESS: 825 Grape, Boulder, CO 80304 REQUEST: A Site Specific Development Plan and a Planned Unit Development Plan. LEGAL DESCRIPTION: NW4 SW4 of Section 29, T2N, R68W of the 6th P.M., Weld County, Colorado. LOCATION: West of and adjacent to Weld County Road 3 1/4 and south of and adjacent to Weld County Road 16 1/2. be recommended favorably to the Board of County Commissioners for the following reasons: 1. The submitted materials are in compliance with the application requirements of Section 28.9 et seq., of the Weld County Zoning Ordinance. 2. The request is in conformance with Section 28.14 of the Weld County Zoning Ordinance as follows: a. The proposed P.U.D. Plan is consistent with the Weld County Comprehensive Plan and is compatible with the future development as permitted by the existing P.U.D. District and plans of affected municipalities. The Tri-City Planning Commission has reviewed the request and found no conflict with its interest. b. The P.U.D. Plan conforms to the approved P.U.D. District. The Utility Coordinating Advisory Committee reviewed and conditionally approved the P.U.D. utility plan at its March 9, 1995, meeting. c. The proposed P.U.D. Plan conforms with the performance standards in Section 35.3 of the Weld County Zoning Ordinance. d. Portions of the P.U.D. Plan site are located in the Flood Hazard Overlay District area. Structures associated with this development shall conform with the regulations of this overlay district. 951276 lile LW- a RESOLUTION, S-377 Jack Olberding, Bill Bedell, John C. Widerquist, Terry A. Henze Page 2 This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding this request, and responses from referral entities. The Planning Commission's recommendation for approval is conditional upon the following: 1. Prior to recording the P.U.D. Plan plat: a. The Board of County Commissioners shall approve the subdivision improvements agreement and the form of collateral. The security for the agreement shall be tendered and accepted by the Board of County Commissioners for the subdivision improvements agreement. b. Evidence shall be submitted to the Department of Planning Services staff that the Division of Water Resources has approved a plan for the responsibility for the maintenance of the contract with the Association of District 6 for ongoing water supplies to augment stream depletions caused by the pond evaporation. Should the responsible party be the homeowners, the responsibility shall be included in the Homeowners Agreement/Covenants. c. The applicant shall submit evidence to the Department of Planning Services that the covenants approved by the Weld County Attorney's Office are ready to be recorded. d. Utility easements on the plat shall be amended as follows: A 15 -foot utility easement shall be added around the perimeter of the cul-de-sac. A 15 -foot utility easement shall be added along the south boundary of the property, from the southwest corner east to the cul-de-sac. A 20 -foot utility easement, 10 feet apportioned equally on Lots 3 and 4, shall be added between Lots 3 and 4. 2. The following notes shall be placed on the P.U.D. plat prior to recording: a. The uses permitted within the P.U.D. plan include rural residential and recreational land uses which comply with the P.U.D. zone district requirements and as described in the application materials. 951.276 RESOLUTION, S-377 Jack Olberding, Bill Bedell, John C. Widerquist, Terry A. Henze Page 3 b. Approval of this plan may create a vested property right pursuant to Section 90 of the Weld County Zoning Ordinance. c. Left Hand Water District shall provide domestic water to the residential uses on the property. d. Sewage disposal shall be provided by Individual Sewage Disposal Systems (I.S.D.S.). Each Individual Sewage Disposal System shall be designed by a Colorado Registered Professional Engineer. In accordance with Weld County I.S.D.S. regulations, no more than one I.S.D.S. shall be designed as an evapotranspiration system. e. Installation of utilities shall comply with Section 10 of the Weld County Subdivision Ordinance. f. All lots within the P.U.D. Plan shall comply with the requirements of the Mountain View Fire Protection District. g. The P.U.D. plan shall consist of eight lots as follows: Lots 1-5 for residential use Outlot A for private recreational use and open space Outlot B, parcel reserved for dedication for public use with future use in Boulder Creek open space corridor Outlot C, cul-de-sac providing access from Weld County Road 3 1/4 to Lots 2-5 Weld County Road 16 1/2 shall provide access to Lot 1. Ingress and egress to Lots 2, 3, 4 and 5 shall be provided by an internal street from one access on Weld County Road 3 1/4. There will be no direct access from Outlot A to the County road system. No other accesses to the property shall be allowed All streets within the P.U.D. plan are private and shall be built to County standards. The streets shall be maintained by the homeowners association, lot owners or developer. Each residence within the P.U.D. plan shall be set back no less than 100 feet from the property lines which lie adjacent to Weld County roads. Each residence within the P.U.D. plan shall be constructed with a minimum ground floor area of 1,500 square feet. 951276 RESOLUTION, S-377 Jack Olberding, Bill Bedell, John C. Widerquist, Terry A. Henze Page 4 Each structure within the P.U.D. plan shall have a maximum building height of 30 feet. m. Maximum lot coverage shall not exceed ten percent. The remainder of each lot shall be open space. n. Outside storage of equipment, boats, recreational vehicles, automobiles or machinery shall not permitted. o. Outlots A and B shall be owned and maintained jointly by the homeowners association. At such time that ownership of Outlot B is accepted by a public entity for public use, maintenance of Outlot B shall be discontinued by the homeowners association. P. No livestock, poultry or animals of any kind may be kept on any lot, except for two dogs or two cats over eight weeks old. q. Residential construction within the P.U.D. plan is encouraged to incorporate designs to prevent radon accumulation. r. Detached storage sheds shall not be allowed on any lot within the P.U.D. plan. s. Exterior illumination of homes, yards, garages and driveways shall be restricted as follows: Sources of light shall be shielded so that beams of light will not shine directly onto adjacent properties. Neither the direct or reflected light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets. t. A qualified soils and foundation engineer shall both design and supervise the construction of all building foundations within the P.U.D. plan. The engineer's report shall be submitted with all building permit applications. u. All liquid and solid wastes shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. v. No permanent disposal of wastes shall be permitted at this site. w. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. 951276 RESOLUTION, S-377 Jack Olberding, Bill Bedell, John C. Widerquist, Terry A. Henze Page 5 x. Fugitive dust shall be controlled on this site. y. A stormwater discharge permit shall be obtained from the Water Quality Control Division of the Colorado Department of Health for on -site construction activities if required. z. Any work on -site requiring the excavation in or placement of dredged or fill material, either temporary or permanent, into wetlands adjacent to the pond shall necessitate contacting the Department of the Army Corps of Engineers for permits pursuant to Section 404 of the Clean Water Act. 3. Prior to the issuance of each building permit, the Architectural Control Committee shall provide a letter to the Department of Planning Services indicating its approval of the proposed structure. 4. Prior to the issuance of building permits for Lot 1, the landowner shall submit to and have approved by the Department of Planning Services a Flood Hazard Development permit. Motion seconded by Jack Epple. VOTE: For Passage Curt Moore Judy Yamaguchi Jack Epple Marie Koolstra Bud Clemons Richard Kimmel Against Passage Ron Sommer 951276 Wendi Swanson Secretary RESOLUTION, S-377 Jack Olberding, Bill Bedell, John C. Widerquist, Terry A. Henze Page 6 The Chairman declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioners for further proceedings. CERTIFICATION OF COPY I, Wendi Swanson, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution, is a true copy of the Planning Commission of Weld County, Colorado, adopted on March 21, 1995. Dated the 21st of March, 1995. 951276 Hello