Loading...
HomeMy WebLinkAbout972750.tiffLD To -N t o 2c 0 W\-6 6 lrr7 ",' " enci �J i'�Lr7ry .tab TO TEE ., m C\\'yCv AC 4 \cc r o g3 otrd sV. Tin uxtnAikn (dot CAn �a coo n� Z0- C� le off. q 0 to l.ah and !qt.!l ann--- oJ ow 1 ob < - , u3hai- J can aio pet-orpub U c coo a.kie ? Spar -1 cz h dam? 1l J(o aoF ? 101-40-A? kW() `-h2d 4/ Sat p?t (o c 0 , u c ) vn .-2 (an Q!e ahmi I aao wr lib mp bads a] a wwo Ise tiod 0/o/ 111 CO sows /9 /2/i7/47 8o&31 Brands /l% brut._ Ce OCc� rC� 972750 COLORADO December 11, 1997 Brandi Martinez 2280 1st Avenue, Sp. 101 Greeley, CO 80631 Dear Ms. Martinez: PUBLIC WORKS DEPARTMENT PHONE (970) 356-4000, EXT. 3750 FAX: (970) 352-2868 933 NORTH 11TH AVENUE P.O. BOX 758 GREELEY, COLORADO 80632 After the recent fatal accident at the intersection of 83rd Avenue and 20th Street, the Weld County Public Works Department evaluated the warrants for a four-way stop in accordance with the Manual for Uniform Traffic Control Devices. The warrants appropriate for consideration in this case are the number of accidents and the amount of traffic entering the intersection. The same procedure was followed after a fatal accident at the same intersection approximately one year ago. At that time, the warrants for a four-way stop were not met. The amount of traffic entering the intersection still does meet the four-way stop warrants. However, after researching the records, the Colorado Highway Patrol reported five accidents between February 6, 1997, and November 3, 1997. That accident history does meet the four-way stop warrants. On November 24, 1997, the Board of Weld County Commissioners passed a resolution approving installation of a four-way stop at 83rd Avenue and 20th Street. The traffic control devices have been installed. Simply installing additional signs is not the solution to the traffic safety. Drivers must act responsibly and obey traffic control devices. Sincerely, BOARD OF COUNTY COMMISSIONERS /ei1 George E. Baxter, Chair cc: Commissioner Harbert 83rd Ave, 20th St. file Drew Scheltinga, County Engineer m:wpfiles\drew \83ave PUBLIC WORKS RESPONSE RECOMMENDED ACTION: rl or Narrative: - I r `_)cdCt. •�-cam. L \,� e. ct METHOD OF RESPONSE: Board Action Worksession Letter (Attached) Telephone Call No Response Staff Signature Hello