HomeMy WebLinkAbout950161.tiffRESOLUTION
RE: APPROVE CERTIFICATION OF INTENT TO PROCEED AND SPECIAL BRIDGE FUND,
BRIDGE PROJECT ESTIMATE, AND AUTHORIZE CHAIRMAN TO SIGN
BRIDGE #33/86A
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with a Certification of Intent to Proceed and a
Special Bridge Fund, Bridge Project Estimate, from the County of Weld, State of Colorado, by and
through the Board of County Commissioners of Weld County, on behalf of the Public Works
Department, and the Colorado Department of Transportation, and
WHEREAS, after review, the Board deems it advisable to approve said certification and
estimate, copies of which are attached hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the Certification of Intent to Proceed and the Special Bridge Fund, Bridge
Project Estimate, from the County of Weld, State of Colorado, by and through the Board of County
Commissioners of Weld County, on behalf of the Public Works Department, and the Colorado
Department of Transportation be, and hereby are, approved.
BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized
to sign said certification and estimate.
The above and foregoing Resolution was, on motion duly made and seconded, adopted by
the following vote on the 6th day of February, A.D., 1995.
BOARD OF COUNTY COMMISSIONERS
ATTEST:
Weld County Clerk to the Board
BY'
Deputy Clerk to the Board
APPROVED AS TO FORM:
toy Attorney'
� �.. Pi u (e -C
WELD COUNTY, COL RA O
Dal, K. Hall, Chairman
J. Kirkmeyer,
Gem:gest. Baxter
lr ,r ��Sri �` -C/7Z
Constance L. Harbert
Sod /! ` r // X.//
..
950161
EG0033
CERTIFICATION OF INTENT TO PROCEED
The County of Weld hereby certifies to the Colorado
,,y�eepp rtmen of Transportation
47c8ck' 3'x lcan that it intends to proceed with the Bridge Project,
Structure Number WEL 033.0-086.0A , for which it received Special
Bridge Fund Account monies; and certifies that it has,or will have
62,800 (date), the required twenty percent local
matching funds. Attached is a design engineer's preliminary cost estimate
and a specific construction schedule, including a project start date and a
projected project completion date, pursuant to the State Department of
Highway's Procedural Directive Number 43.1, paragraph 5*.
By: 7 \�
(count j+ official) 02/08/95
Dale K. Hall
(official's name printed)
Chairman, Weld County Board of Commissioner!
(title)
Date: February 6, 1995
* This attachment is a requirement unless good cause is shown for a
delayed transmittal.
950 161
SPECIAL BRIDGE FUND
BRIDGE PROJECT ESTIMATE
Structure Number WEL 033.0-086.OA County
Engineering:
Preliminary Engineering
Weld
$ 2,000
Design Engineering 20,000
Construction Engineering
and staking 15,000
Project Engineering
Final Inspection
TOTAL ENGINEERING COSTS:
Labor'- Materials - Equipment:
Mobilization
Site Preparation
Excavation
Abutments/Piers/Piling
Structure/Deck/Guard Rail
Approaches
Pavement
TOTAL LABOR — MATERIALS — EQUIPMENT COSTS:
Contingencies:
TOTAL PROJECT COST
Date of Bid Proposal:
Project Start Date:
Project Completion Date:
Estimate Prepared By:
15,000
2,000
$ 7n_1oo
20.000
25.000
45.000
90.000
15,000
10,000
(1,,Inct 1, 1 QQS
not^ber
1 1045
Tanry 1S1QQ5
Approved Chairman,
Board of County Commissioners:
9501G1.
$ 54 000
$ 225,000
$ 35,000
$ 314,000
Civil EngineerII
(signature and title)