HomeMy WebLinkAbout950161.tiffRESOLUTION RE: APPROVE CERTIFICATION OF INTENT TO PROCEED AND SPECIAL BRIDGE FUND, BRIDGE PROJECT ESTIMATE, AND AUTHORIZE CHAIRMAN TO SIGN BRIDGE #33/86A WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Certification of Intent to Proceed and a Special Bridge Fund, Bridge Project Estimate, from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Public Works Department, and the Colorado Department of Transportation, and WHEREAS, after review, the Board deems it advisable to approve said certification and estimate, copies of which are attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Certification of Intent to Proceed and the Special Bridge Fund, Bridge Project Estimate, from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Public Works Department, and the Colorado Department of Transportation be, and hereby are, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said certification and estimate. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 6th day of February, A.D., 1995. BOARD OF COUNTY COMMISSIONERS ATTEST: Weld County Clerk to the Board BY' Deputy Clerk to the Board APPROVED AS TO FORM: toy Attorney' � �.. Pi u (e -C WELD COUNTY, COL RA O Dal, K. Hall, Chairman J. Kirkmeyer, Gem:gest. Baxter lr ,r ��Sri �` -C/7Z Constance L. Harbert Sod /! ` r // X.// .. 950161 EG0033 CERTIFICATION OF INTENT TO PROCEED The County of Weld hereby certifies to the Colorado ,,y�eepp rtmen of Transportation 47c8ck' 3'x lcan that it intends to proceed with the Bridge Project, Structure Number WEL 033.0-086.0A , for which it received Special Bridge Fund Account monies; and certifies that it has,or will have 62,800 (date), the required twenty percent local matching funds. Attached is a design engineer's preliminary cost estimate and a specific construction schedule, including a project start date and a projected project completion date, pursuant to the State Department of Highway's Procedural Directive Number 43.1, paragraph 5*. By: 7 \� (count j+ official) 02/08/95 Dale K. Hall (official's name printed) Chairman, Weld County Board of Commissioner! (title) Date: February 6, 1995 * This attachment is a requirement unless good cause is shown for a delayed transmittal. 950 161 SPECIAL BRIDGE FUND BRIDGE PROJECT ESTIMATE Structure Number WEL 033.0-086.OA County Engineering: Preliminary Engineering Weld $ 2,000 Design Engineering 20,000 Construction Engineering and staking 15,000 Project Engineering Final Inspection TOTAL ENGINEERING COSTS: Labor'- Materials - Equipment: Mobilization Site Preparation Excavation Abutments/Piers/Piling Structure/Deck/Guard Rail Approaches Pavement TOTAL LABOR — MATERIALS — EQUIPMENT COSTS: Contingencies: TOTAL PROJECT COST Date of Bid Proposal: Project Start Date: Project Completion Date: Estimate Prepared By: 15,000 2,000 $ 7n_1oo 20.000 25.000 45.000 90.000 15,000 10,000 (1,,Inct 1, 1 QQS not^ber 1 1045 Tanry 1S1QQ5 Approved Chairman, Board of County Commissioners: 9501G1. $ 54 000 $ 225,000 $ 35,000 $ 314,000 Civil EngineerII (signature and title) Hello