Loading...
HomeMy WebLinkAbout991604.tiff CHANGE OWNER I ARCHITECT 0 y ORDER CONTRACTOR [] • FIELD O / { OTHER PROJECT: Landscape and CHANGE ORDER NO: 1 IrrigationSystem for Weld County Public Works DATE: 06/03/1999 ServiceCenter Weld County Business Park ARCHITECTS PROJECT NO: 58024 Greeley, Colorado 80631 TO CONTRACTOR: Boda-Galey Landscape CONTRACT DATE: 06/03/1999 Construction 5268 Highway 66 CONTRACT FOR: Landscape & Irrigation Longmont, Colorado 80504 Attn: Ms. Cindy Galey The Contract is changed as follows: Drawing Sheets L1 and L2, originally dated 04/26/1999, revision number one, dated 05/25/1999, attached to this Change Order, reflect the Addition of a 106 space parking lot and removal of 3 islands. Resultant landscape/irrigation changes are as follows A thru E. A. Relocation of Rock Path Add: $ _) >. B. Relocation of Plants (same#) L_ _0- C. Change Area of Sod Add: $ —ter D. Change Area of Native Grasses Deduct: $ — 317 . 00 E. Add one Planting Bed Add: $ D — - OO 7 " ), flt-ki _l,..r C t- otQ)cot ,cc. B ZC(_) . UL Total this Change Order: Add: $ /2, OP, JZ1;i;'7. The original Contract Sum was $ 143,771.11 CEP" Net change by previously authorized Change Orders $ -0- The Contract Sum prior to this Change Order was $ 143,771.11 The Contract Sum will be increased by this Change Order in the amount of $ f�`-,��O v /z i i8-1 - si 5:.�1 ,!I The new Contract Sum including this Change Order will be $ —,-�ci_ .�—Al The Contract Time will not change as a result of this Change Order. (0) days The date of Substantial Completion as of the date of this Change Order therefore is August 17, 1999 Not valid until signed by the Owner,Architect and Contractor. ARCHITECT CONTRACTOR OWNER Roberts Architect Boda-Galey Landscape Construction County of Weld 921 3&'Avenue Court 5268 Hiohwav66 915 10th Street Greeley, Colorado 80634 Longmont, Colorado 80504 Greeley, Colorado 80631 r BY( a'EOM en *-t-«a BY & h BY _ _ p 7 p Da a , C air y DATE l / z / f DATE_ 1 - Zi- / ' DATE 07/19/99 _ 991604 Hello