HomeMy WebLinkAbout991604.tiff CHANGE OWNER
I ARCHITECT 0 y
ORDER CONTRACTOR []
• FIELD O /
{ OTHER
PROJECT: Landscape and CHANGE ORDER NO: 1
IrrigationSystem for Weld
County Public Works DATE: 06/03/1999
ServiceCenter
Weld County Business Park ARCHITECTS PROJECT NO: 58024
Greeley, Colorado 80631
TO CONTRACTOR: Boda-Galey Landscape CONTRACT DATE: 06/03/1999
Construction
5268 Highway 66 CONTRACT FOR: Landscape & Irrigation
Longmont, Colorado 80504
Attn: Ms. Cindy Galey
The Contract is changed as follows:
Drawing Sheets L1 and L2, originally dated 04/26/1999, revision number one, dated 05/25/1999, attached to this
Change Order, reflect the Addition of a 106 space parking lot and removal of 3 islands. Resultant
landscape/irrigation changes are as follows A thru E.
A. Relocation of Rock Path Add: $ _) >.
B. Relocation of Plants (same#) L_ _0-
C. Change Area of Sod Add: $ —ter
D. Change Area of Native Grasses Deduct: $ — 317 . 00
E. Add one Planting Bed Add: $ D —
- OO
7 "
), flt-ki _l,..r C t- otQ)cot ,cc. B ZC(_) . UL
Total this Change Order: Add: $ /2, OP, JZ1;i;'7.
The original Contract Sum was $ 143,771.11 CEP"
Net change by previously authorized Change Orders $ -0-
The Contract Sum prior to this Change Order was $ 143,771.11
The Contract Sum will be increased by this Change Order in the amount of $ f�`-,��O v /z i i8-1 -
si 5:.�1 ,!I
The new Contract Sum including this Change Order will be $ —,-�ci_ .�—Al The Contract Time will not change as a result of this Change Order. (0) days
The date of Substantial Completion as of the date of this Change Order therefore is August 17, 1999
Not valid until signed by the Owner,Architect and Contractor.
ARCHITECT CONTRACTOR OWNER
Roberts Architect Boda-Galey Landscape Construction County of Weld
921 3&'Avenue Court 5268 Hiohwav66 915 10th Street
Greeley, Colorado 80634 Longmont, Colorado 80504 Greeley, Colorado 80631
r
BY( a'EOM en *-t-«a BY & h BY _ _
p 7 p Da a , C air
y DATE l / z / f DATE_ 1 - Zi- / ' DATE 07/19/99 _
991604