HomeMy WebLinkAbout971063.tiffHEARING CERTIFICATION
DOCKET NO. 97-24
RE: SITE SPECIFIC DEVELOPMENT PLAN AND PLANNED UNIT DEVELOPMENT (PUD)
FINAL PLAN, S #422, FOR REDESIGN OF RADEMACHER BUSINESS PARK PUD
(26 LOTS) - ZEEK PROPERTIES, LTD., C/O LANDMARK ENGINEERING, LTD.
A public hearing was conducted on June 4, 1997, at 10:00 a.m., with the following present:
Commissioner George E. Baxter, Chair
Commissioner Constance L. Harbert, Pro-Tem
Commissioner Dale K. Hall
Commissioner Barbara J. Kirkmeyer
Commissioner W. H. Webster
Also present:
Acting Clerk to the Board, Shelly Miller
Assistant County Attorney, Lee Morrison
Planning Department representative, Todd Hodges
The following business was transacted:
I hereby certify that pursuant to a notice dated April 28, 1997, and duly published May 1, 1997, in
the South Weld Sun, a public hearing was conducted to consider the request of Zeek Properties,
Ltd., c/o Landmark Engineering, Ltd., for a Site Specific Development Plan and Planned Unit
Development (PUD) Final Plan, S #422, for redesign of Rademacher Business Park PUD (26 lots).
Lee Morrison, Assistant County Attorney, made this a matter of record. Todd Hodges, Department
of Planning Services representative, presented a brief summary of the proposal and entered the
favorable recommendation of the Planning Commission into the record as written. He explained
the history of the property entails a Change of Zone to Commercial/Industrial and a Final Plan in
1984, and this request will redesign the business park and add two lots. Mr. Hodges further
explained a ditch is being constructed, roads are being redesigned, and a cul-de-sac and two lots
are being added. He stated open space will be gained and noted this property is adjacent to the
MUD Area. He said the dedication of Weld County Road 9.5 has been attained for the future four -
lane, in which the applicant has been very cooperative. Mr. Hodges explained Lot 10 was sold and
is being used for a residence; however, that will change when the property is developed, to which
the property owner has consented. He confirmed most Conditions of Approval have already been
met and the applicant is diligently working with the State. Mr. Hodges stated the Board will not
review the improvements agreement at this time. Don Leffler, Landmark Engineering, Ltd.,
represented the applicant and reiterated he has been working with staff, the State of Colorado
Geological Society, and CDOT (Colorado Department of Transportation) to meet all Conditions of
Approval. He stated the improvements to the business park will greatly enhance the area, and the
drainage ditch has already helped. Responding to questions from the Board, Mr. Leffler confirmed
971063
- e : PL
PL0381
HEARING CERTIFICATION - ZEEK PROPERTIES, LTD., C/O LANDMARK ENGINEERING, LTD.
(S #422)
PAGE 2
he has had no problems with the Mountain View Fire Protection District, to which he has supplied
all necessary information. Mr. Hodges stated the District indicated no conflict; however, this is the
first time he has seen such a referral from said District. He noted issues may occur during the Site
Plan Review process; therefore, Commissioner Kirkmeyer's suggestion to add the words "attempt
to" before the word "comply" in Condition of Approval #2.G. may be appropriate. Responding to
further questions of the Board, Mr. Leffler addressed the access off Weld County Road 9.5 to
Lot 10 and explained as long as the grandfathered use is maintained, the access will be
maintained. He explained, however, that once the use is changed, the access will be removed. Mr.
Leffler agreed to all Conditions of Approval, and no public testimony was offered concerning this
matter. Mr. Hodges clarified for Commissioner Kirkmeyer that Condition of Approval #2.S.
addresses the access to Lot 10 as a note on the plat. Commissioner Kirkmeyer then moved to
approve the request of Zeek Properties, Ltd., c/o Landmark Engineering, Ltd., for a Site Specific
Development Plan and Planned Unit Development (PUD) Final Plan, S #422, for redesign of
Rademacher Business Park PUD (26 lots), based on the recommendations of the Planning staff
and the Planning Commission, with the Conditions of Approval as entered into the record, including
the addition of the words "attempt to" after "shall" and before "comply" in Condition of Approval
#2.G. The motion was seconded by Commissioner Hall, and it carried unanimously.
This Certification was approved on the 9th day of June, 1997.
ty Clerk to the Board
eputy Clerto the Board
TAPE #97-16
DOCKET #97-24
APPROVED:
BOARD OF COUNTY COMMISSIONERS
WELD OUNTY, C7RADO
Ge�or e E' Baxter, Chair a
fairce
Constance L. Harbert, Pro-Tem
g r\. nail
Barbary J. Kirkmeyer
W. H. Webst r
971063
PL0381
EXHIBIT INVENTORY CONTROL SHEET
Case _
Exhibit
A.
B.
C.
D.
E.
F.
G.
H.
J.
K.
L.
M.
O.
P.
Q.
R.
S.
T.
U.
L5114 —tolt P
Submitted By
«t f
(_C/.e2,e k .BoaAct
w.
Exhibit Description
?Th/let, orj. Aleiuto*,)
ATTENDANCE RECORD
HEARINGS ARE AS FOLLOWS ON THIS 4TH DAY OF JUNE, 1997:
DOCKET #97-24 - S #422 --ZEEK PROPERTIES, LTD., C/O LANDMARK ENGINEERING, LTD.
PLEASE legibly print your name and complete address and the DOCKET # (as
listed above) or the name of the applicant of the hearing you are attending.
NAME AND ADDRESS (Please include City and Zip Code) HEARING ATTENDING
/Y, /i Ge SAC 1 Gl
bncr,-7,
Hello