HomeMy WebLinkAbout972801.tiffREPLY TO
ATTENTION OF
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, OMAHA DISTRICT
TRI-LAKES PROJECT OFFICE, 9307 STATE HWY 121
LITTLETON, COLORADO 80128-6901
October 17, 1997 'Rs,
OCT 2 1. 1997
Ms. Shani L. Eastin
Weld County Planning Department
1400 North 17th Avenue
Greeley, Colorado 80631
RE: Hall -Irwin Construction Company, Case Number USR-1172,
Corps File No. 199780467
Dear Ms. Eastin:
Reference is made to the Hall -Irwin Construction Company project (your Case
Number USR-1172) located in Sections 31 and 36, Township 1 North, Range 67 West, Weld
County, Colorado.
This office is aware of this activity. Mr. Bret Hall has been informed of the need for
a Department of the Army permit for this project and is acting accordingly.
If there are any questions concerning this matter, please contact Mr. Terry McKee at
303-979-4120 and reference Corps File No. 199780467.
Sincerely,
Tim y T Ca
Project anager
972801
EXHIBIT HI
U 0-- III
a MP
ADAMS C O U N T Y, COLORADO
DEPARTMENT OF PLANNING AND DEVELOPMENT
ROBERT D. CONEY, DIRECTOR
October 7, 1997
Shani L. Eastin
Department of Planning Services
Weld County Administrative Offices
1400 N. 17th Avenue
Greeley, Colorado 80631
4955 EAST 74TH AVENUE
(303) 853-7000
FAX (303) 853-7015
Re: Hall -Irwin Construction, Weld County Case Number USA 1172
Dear Ms. Eastin
COMMERCE CITY, COLORADO 80022-1535
Weld County Planning Dept.
OCT 1 01997
This Department has finished reviewing the sand and gravel mining case you have forwarded to this
Department for comment. The proposed gravel mine is located north of Baseline Road and east of WCR
23 1/2.
In that same general area, south of Baseline Road and east of Tucson St., Adams County permitted a
mine, operated at this time by Hall -Irwin Company, named Tucson Pit, Adams County Case Number 11-
92-C. In deference to citizen sensitivities regarding ground water levels and damages to ground water
wells from gravel mines, Adams County's Board of County Commissioners made the permit for the
Tucson Pit conditional upon the pit owner providing a signed well protection agreement with well users
surrounding the mine. That legally binding well protection agreement included several residents and
agri-businesses in Weld County.
Hall -Irwin Company has worked with the signatories of the well agreement and, for the most part, has
instituted mitigation procedures for well damages. This Department asks Weld County to insure ground
water levels, well protection, and water delivery for surrounding well users are protected with procedures
to mitigate damages. We suggest that the procedures be in place prior to the start of mining.
The application report for this mine does not include a traffic study. Adams County's Public Works
Department has indicated that if the haul route chosen for this mine is 168th Ave. (Baseline Road) from
WCR 23 1/2 to Highway 85, that it be specified in the permit that no other roads in Adams County be
used as haul routes. Specifically, Tucson St., between 168th St. and Highway 7 is not to be used as a haul
route.
Public Works Department requests a pavement analysis be done to 168th Ave. and that Hall -Irwin
demonstrate that their truck traffic will not damage 168th Ave. They suggest that conditions to the Weld
County mining permit place Hall -Irwin Construction Company directly responsible for the maintenance of
168th Ave., throughout the life of the mine. Also, 168th Ave. should be overlaid from WCR 23 1/2 to
Highway 85 prior to a mining permit being issued by Weld County.
BOARD OF COUNTY
COMMISSIONERS
ELAINE T. VALENTE TED STRICKLAND
DISTRICT I DISTRICT 2
PEOPLE, PRIDE AND PROGRESS
C\ CRAIG \ LETTER \STORAGE\W ELD.COUAINES\BASELINE. DOC
972801
MARTIN J.
DISTRICT 3
EXHIBIT
$415
LCsa-flit
1313 IFPIIN
Ill r,t l.I:1]rAWIIl
Thank you for allowing this Department to review the mining application submitted to you. Should you
have any questions regarding our concerns please contact me at (303) 853-7003.
Sincerely,
y -7
Craig Tessme
Enviromnental Analyst
cc: County Administrator
Director, Planning and Development
Director, Public Works
C:\CRAIGW ETTER\STORAGE\ WELD -CO \MINESBASELIN EDOC
972801
REC _
n3
-Mze
Wilk -
COLORADO
Weld County Referral
September 19, 1997
oC, T 0 2'1997
The Weld County Department of Planning Services'ha5'-feceived the following item for review:
Applicant
Company
Please Reply By October 10, 1997
Hall -Irwin Construction
Case Number USR-1172
Planner Shani L. Eastin
i
Project Site Specific Development Plan and Special Review Permit for a Sand and Gravel Mining
Operation in the A (Agricultural) Zone District.
Legal W2NW4 of Section 31 and SE4 and S2NE4 of Section 36 all in Ti N, R67W of the 6th
P.M., Weld County, Colorado.
Location North of and adjacent to Weld County Road 2; east of and adjacent to Weld County
Road 23-1/2.
Parcel Number 1469-36-000014 and 011; 1471-31-000001
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full
consideration to your recommendation. Any response not received before or on this date may be deemed to be a
positive response to the Department of Planning Services. If you have any further questions regarding the application,
please call the Current. Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) November 4, 1997
❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan
❑ We have reviewed the request and find no conflicts with our interests.
xSee attached letter.
Comments:
Signature
Agency
�.up P
ct{
Date /o -2-'1r
+Weld County Planning Dept. O1400 N. 17th Ave. Greeley, CO. 80631 O(970) 353-6100 ext.3540 O(97
972891
t I
EXHIBIT
#b
usa-n'z.
COLORADO
MEMORANDUM
TO: Shani Eastin, Current Planner DATE: October 2, 1997
FROM: Don Carroll, Project Administrator W�
SUBJECT: USR-1172; Hall -Irwin Construction Company
(Sand and Gravel Mining Operation)
The Weld County Public Works Department has reviewed this proposal; the following requirements are
recommended to be a part of any approval:
COMMENTS:
The applicant is indicating that the access from WCR 2 (168th Ave.) will be paved with a 24 -inch CMP culvert to
carry storm water.
WCR 2 (168th Ave.), at this location, falls under the jurisdiction of Adams County for maintenance. Please contact
Adams County for concerns on a designated haul route or possible road improvement agreements.
REQUIREMENTS:
WCR 2 (168th Ave.) is designated on the Transportation Plan Map as an arterial status road that would require
a future right-of-way of 100 feet. The applicant needs to dedicate an additional 20 feet of right-of-way for future
expansion through their facility. The existing right-of-way at this location is 60 feet.
Acceleration and deceleration lanes will be required at the access point to accommodate asphalt/concrete plants,
shops, etc. This needs to be identified and placed on the plat.
Setbacks for mining/reclamation should be dimensioned from future rights -of -way. The standard typical setback
would be 25 feet from the property line for mining operations.
There will be no heavy hauling permitted on WCR 23'/2 adjacent to the proposed gravel operation. All ingress and
egress will occur onto WCR 2 (168th Ave.).
cc: Commissioner Harbert
USR-1172
plan24
nri 0 21997
972801
WI"
COLOR AD
Dept.
MEMORANDUM
0T17Shani L. Easton, W. C. Planning DATE: October 3, 1997
FRAM: $hJble McConnellogue, W. C. Health Department
CASE NO.; USR-1172 NAME: Hall -Irwin Construction Co.
Environmental Protection Services has reviewed this proposal; the following conditions are recommended to
be part of any approval:
1) All liquid and solid wastes shall be stored and removed for final disposal in a manner that protects
against surface and groundwater contamination.
2) No permanent disposal of wastes shall be permitted a this site.
3) Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust,
blowing debris, and other potential nuisance conditions.
4) Fugitive dust shall be controlled on this site.
5) The maximum permissible noise level shall not exceed the industrial limit of 80 dB(A), as
measured according to 25-12-102, Colorado Revised Statutes.
6) A NPDES Permit shall be obtained from the Water Quality Control Division of the Colorado
Department of Health for any proposed discharge into State Waterways.
7) The applicant shall remove, handle, and stockpile overburden, soil, sand and gravel from the
facility area in a manner that will prevent nuisance conditions.
8) An Air Pollution Emission Notice and emission permit shall be obtained from the Air Pollution
Control Division of the Colorado Department of Public Health for emissions from the mining
operations. The site shall operate in accordance with all applicable rules and regulations of the Air
Pollution Control Division.
9) The operator shall submit a dust abatement plan for approval to both the W.C. Planning
Department and the W.C. Health Department.
10) No permanent structures are proposed for this site. Portable toilets may be utilized on sites which
are temporary locations of the working face and portable processing equipment, etc. for up to six
months at each location.
11) Drinking water shall be supplied at the aggregate processing plants by delivered bottled water.
12) The facility must comply with the rules and regulations of the Colorado Division of Minerals and
Geology.
SM/vh2921
97",01
EXHIBIT
#r7
u.sQ-n7-7
STATE OF COLORADO
OFFICE OF THE STATE ENGINEER
Division of Water Resources
Department of Natural Resources
1313 Sherman Street, Room 818
Denver, Colorado 80203
Phone (303) 866-3581
FAX (303) 866-3589
September 26, 1997
Shani Eastin, Planner
Weld County Planning Department
1400 N. 17th Ave.
Greeley, CO 80631
fanning Dept.
PDT 011997
Re: Baseline Resource Special Review, USR-1172
Dear Ms. Eastin:
Roy Romer
Governor
James S. Lochhead
Executive Director
Hal D. Simpson
State Engineer
Pursuant to the State Engineer's August 7, 1995 memorandum to county planning
directors (copy enclosed for your information), this office is no longer providing comments
on land use actions that do not involve a subdivision as defined in Section 30-28-
101(10)(a), C.R.S. This referral does not appear to qualify as a "subdivision." Returned
herewith are the materials submitted to this office in the above referenced matter.
If you have any questions in this matter, please contact Megan Sullivan of this
office.
PD/MAS
Enclosures
cc: Richard Stenzel, Division Engineer
baselinegpweldr.doc
Purushottam Dass
Supervising Professional Engineer
972801
EXHIBIT
I
use-Ir7t
OCT 1 119S7
Weld County Referral
September 19, 1997
The Weld County Department of Planning Services has received the following item for review:
Applicant Hall -Irwin Construction Case Number USR-1172
Company
Please Reply By October 10, 1997 Planner Shani L. Eastin
Project Site Specific Development Plan and Special Review Permit for a Sand and Gravel Mining
Operation in the A (Agricultural) Zone District.
Legal W2NW4 of Section 31 and SE4 and 52NE4 of Section 36 all in T1 N, R67W of the 6th
P.M., Weld County, Colorado.
Location North of and adjacent to Weld County Road 2; east of and adjacent to Weld County
Road 23-1/2.
Parcel Number 1469-36-000014 and 011; 1471-31-000001
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full
consideration to your recommendation. Any response not received before or on this date may be deemed to be a
positive response to the Department of Planning Services. If you have any further questions regarding the application,
please call the Current Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) November 4, 1997
J❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan
)11, We have reviewed the request and find no conflicts with our interests.
❑ `See attached letter.
Comments: Ann /yn1 w es Oit et
Signature
Agency
Date
+Weld County Planning Dept. O1400 N. 17th Ave. Greeley, CO. 80631 O(970) 353-6100 ext.3540 O(9
972801
EXHIBIT
14f9
usr'2.-In-,
Dept.
AUG 2 5 1997 Weld County Referral
'NA
E
July 24, 1997
The Weld County Department of Planning Services has received the following item for review:
Applicant Hall -Irwin Construction Co. Case Number USR-1164
Please Reply By August 14, 1997 - 0 Planner Shani L. Eastin
Project A Site Specific Development Plan and Special Review Permit for a Sand and Gravel
Mining Operation in the A (Agricultural) Zone District.
Legal
Location
I
The SE4 of Section 36, Ti N, R67W of the 6th P.M., Weld County, Colorado.
North of and adjacent to Weld County Road 2; east of and adjacent to Weld County
Road 23-1/2.
Parcel Number 1469-36-000011
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full
consideration to your recommendation. Any response not received before or on this date may be deemed to be a
positive response to the Department of Planning Services. If you have any further questions regarding the application,
please call the Current Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) September 4, 1997
O We have reviewed the request and find that it does / does not comply with our Comprehensive Plan
iLWe have reviewed the request and find no conflicts with our interests.
0 See attached letter.
Comments:
Signature
Agency
f ig LD1 09*t.&a6 6 hru
t
cia2 ocLoi,± `r( aikotatik. Q c4cotte OA,
Date
*Weld County Planning Dept. O1400 N. 17th Ave. Greeley, CO. 80631 O(970) 353-6100 ext.3540 O(970) 352.6312 fax
972801
Hello