HomeMy WebLinkAbout960379 CHANGE ORDER CHANGE ORDER NO. 1 DATE: February 19, 1996 PROJECT: CONSTRUCTION OF WELD COUNTY BRIDGE WEL 050.0-067.0A TO (CONTRACTOR): Les Matson Construction Inc. JUSTIFICATION: Additional quantities were needed for construction changes in the field. You are directed to make the following changes in the work. All other terms and conditions of the contract not expressly modified hereby shall remain in full force and effect. ITEM NO. DESCRIPTION EST. OTY. UNIT UNIT COST AMOUNT 203 Embankment Material 2344 C.Y. $3.40 $7,969.60 206 Structure Excavation 1071 C.Y. $5.75 $6,158.25 304 Aggr. Base Course 153 Ton $10.50 $1,606.50 403 HBP (asphalt) 334 Ton $30.50 $10,187.00 502 Steel Piling 1909.15 L.F. $28.00 $53,456.20 603 30" Concrete Pipe 88 L.F. $48.00 $4,224.00 603 End Sections 2 Ea. $775.00 $1,550.00 The original contract sum was $ 1,136,136.63 Net change by previous change orders $ 0.00 The contract sum prior to this Change Order was $ 1,136,136.63 The contract sum will be Hummed) (decreased) or(unchanged) by this Change Order $ 85,151 55 The contract sum including this Change Order will be $ 1,221,288.18 The new contract time will be(inereand) (decreased) or(unchanged) by thirty-three (33) days. The date of completion as of the date of this Change Order is therefore February 23, 1996 960379 EGG5 aIa X%3 ACCEPTED BY: BOARD OF COUNTY COMMISSIQQNERS WELD COUNTY,COLORADO%" By Matson Construction. Inc. /� 1 ^,{ BY, J4 Jza (it_'/ T J77-1G//L_ NAME /25 MA is a.V Barbara J. Kir eyer, C n 0/x/74 (Please Type) ADDRESS R O i? x / 8 6 o / 4u• (Seal) 1861 O) V2-- moils ' WA ATTEST .+ �O 1rs`� e► D? �J �+ CONTRACTOR: �� C//1� —. ty Clerk to the Board BY oi tss /A 7S a BY F ��,L k 11,, (Please Type) Deputy( Jerk to the Board TITLE 19/2 .S/nal /Lir LES MATSON CuilSTRUCTION INC. MATSON P.G. Box 1830 • Greeley, CO 80632 Phone )303) 356-3201 January 31, 1996 Weld County Engineering 933 North 11th Avenue Greeley, Colorado 80631 Attention: Wayne Howard Re: Weld County Bridge Project Wel 50.0-067.0 We request that additional time be added to the contract time allowed for the completion of this project. The number of days requested and the reasons these extra days are being requested are as follows: (1) There was an increase of 51% in the amount of H-piling driven from the stated contract amount. Days added to completion date 15 days (2) The water table was higher than normal during key phases of pier construction causing delays. Days added to completion date 14 days (3) Additional items added to the project: 321 tons of asphalt Base preparation for asphalt Surveying necessary for base preparation Days added to completion date 4 days TOTAL DAYS REQUESTED 33 days Thank You, Les Matson ��� mEmoRA(1DU !� I E nr frcou Mt. 122 PM 1-1• ' 0 February 22, 1996 Clerk to the Board to CLERK W �. To , L THE COLORADO From Drew Scheltinga, County Engineer Subject: Consent Agenda Item Please place the following item on the Board's next agenda: Consent signature of the Chair for change order approval on Bridge 50/67A contract with Les Matson Construction. The appropriate documentation is attached. cc: 50/67A bridge file engineer\agenda.ds Hello