WHEREAS need has been recognized for approximately 111 miles of
defense access roads to serve the Francis E. Warren A.F.B. Minuteman Missile
Complex in Weld County, Attachment "A" shows the locations of these defense
access roads within the said county. .
WHEREAS the United States Air Force and the Bureau of Public Roads\
have made an examination of the area and have determined the necessity of
establishing, improving and constructing the defense access roads as shown/
on Attachment "A".
WHEREAS it is necessary that adequate and satisfactory arrangement
and assurances be made and given for continuing maintenance and snow removal
on the above mentioned roads after their construction, and the Board of
Commissioners of Weld County, Colorado, is prepared to assume that
responsibility to the same extent that it performs maintenance and snow
removal on other county roads, and it is understood that no specific
maintenance priority is to be given these roads by reason of this Resolution,
and now, Therefore be it
RESOLVED, That for and in consideration of the construction of
defense access roads shown on Attachment "A" in Weld County, Colorado, by
the Bureau of Public Roads, acting in conjunction with the United States
Air Force, the County of Weld in the State of Colorado, by its Board of
County Commissioners, shall, and it does hereby agree to maintain said roads
and keep them in suitable repair for such use as the roads were constructed
and in the manner set forth above.
ATTEST;
Approved and adopted this 3rd day of
7URc
Deputy County Clerk
April
1963.
BOARD OF COUNTY COMMISSIONERS OF
WELD COUNTY, COLORADO
By
Chairman
1, Ann Spomer , hereby certify that I am the duly
qualified and acting County Clerk of the County of Weld in the State of
Colorado and the Clerk of the Board of County Commissioners of that County
and State, that the above and foregoing is a true and correct copy of the
Resolution adopted by the Board of County Commissioners of the said County
and State, and that the said Resolution was duly passed and adopted at the
regular meeting held on the 3rd day of April , 1963 in the
Commissioner's Room at the County Courthouse in Greeley, Weld County,
Colorado.
Dated and signed the 3rd day of April L940.9p
County Clerk
�,m
Minute Book 32: Page
Eacf'o
630148
flCCIOM MIME
COLORADO
NEW MEXICO
UTAH
WYOMING
Colorado Division
Room 267, Building 40
Denver Federal Center
Denver 25, Colorado 80225
Weld County Commissioners
Court House
Greeley, Colorado
U. S. DEPARTMENT OF COMMERCE
BUREAU OF PUBLIC ROADS
August 22, 1963
09-05
IN REPLY REFER TO:
Dear Sirs:
Subject: Colorado Project R -AD 36(1)
The enclosed construction schedule is for your information on Colorado
Project R -AD 36(1). We will notify you when each road or group of roads
have been completed and accepted by the Colorado Department of Highways.
Maintenance of these completed roads will be the responsibility of the
county as stated in the Maintenance Agreement, dated April 3, 1963.
Prior to actual construction of each road or group of roads, the county
is responsible for normal road maintenance.
Sincerely yours,
&7'PeeCeetOir
A. R. Abelard
Division Engineer
Enclosure:
Construction Schedule
WELD CO. COMMISSIONERS
GRECLFY, cow.
RECEIVED
AUG261963
A.M. P.M.
617181,11PIM4111911141610
to M.e elvlsfsa
hes S. Ileildiee 40
Dame istteal Coats
e
IMwse S, Coln flat
Alen 22, 1!b
41!•06
tie Cam, C deolawas
sat Ilse
/eeeley, Cabers
Sear Sias s
M}ets Cakede lasrjsst fWt !0(1)
The auelassi ameteeetles oelsdelu is One pees tsbeeetfaa ern Cebe rda
Pasjsst 1.01 31(1), Rh s111 sat14 yes Sea alai sea es nay of resit
ben isee aegland alai aeegtei by an Caketssie lelsetaeet of >dtlimeys.
ileiswesseese of then assSlsted nab will be the ,salaoefkiltty of the
en as stated le the lielataasaase yssesssa, dotal *en s, ifis.
Perim is astesl eastrestlse of seek nfl or tea* of reds, the rusty
Is sea eaefkls fee eseeeed seed ales.
sheet sly yaoaaas,
A. R. Abelard
A. s.. Sled
Wham inn
llelsseess
th eetwetfes lekeedele
4
SPECIAL CONSTRUCTION REQUIREMENTS
COLORADO PROJECT NO. R -AD 36(1)
CONSTRUCTION SCHEDULE
August 12, 1963
The work on this project shall not begin prior to September 15, 1963, and
shall progress in groups according to the following sequence:
A. 1963 Construction Season
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
Roads 38, 39 and 40 in Area I
Roads 41, 42 and 30 in Areas N and J
Roads 37, 36 and 25 in Areas J and L
Roads 31, 32 and 35 in Area M
Roads 27 and 28 in Areas L and M
Roads 16, 19 and 18 in Area N
If a prolonged Fall construction season developes, the work
into the following schedule B after approval by the Engineer.
B. 1964 Construction Season
Phase 1 Roads 34, 33 and 43 in Areas L and M
Phase 2 Roads 26, 24 and 23 in Area L
Phase 3 Roads 22 and 21 in Area L
Phase 4 Roads 13, 12 and 14 in Area N
Phase 5 Roads 15 and 20 in Area N
Phase 6 Roads 9, 8, 7, 6, 5 and 17 in Area 0
Phase 7 Roads 10, 3, 4, 2 and 1 in Area 0
COMPLETION
may progress
As the Contractor nears completion of one road and equipment becomes avail-
able, he may begin work on the next scheduled road after approval of the Engineer.
The Department will authorize final inspection, acceptance and payment as
each road or group of roads is completed, as covered in the Standard Specifications
under section 7.14.