Loading...
HomeMy WebLinkAbout630148.tiffRESOLUTION WHEREAS need has been recognized for approximately 111 miles of defense access roads to serve the Francis E. Warren A.F.B. Minuteman Missile Complex in Weld County, Attachment "A" shows the locations of these defense access roads within the said county. . WHEREAS the United States Air Force and the Bureau of Public Roads\ have made an examination of the area and have determined the necessity of establishing, improving and constructing the defense access roads as shown/ on Attachment "A". WHEREAS it is necessary that adequate and satisfactory arrangement and assurances be made and given for continuing maintenance and snow removal on the above mentioned roads after their construction, and the Board of Commissioners of Weld County, Colorado, is prepared to assume that responsibility to the same extent that it performs maintenance and snow removal on other county roads, and it is understood that no specific maintenance priority is to be given these roads by reason of this Resolution, and now, Therefore be it RESOLVED, That for and in consideration of the construction of defense access roads shown on Attachment "A" in Weld County, Colorado, by the Bureau of Public Roads, acting in conjunction with the United States Air Force, the County of Weld in the State of Colorado, by its Board of County Commissioners, shall, and it does hereby agree to maintain said roads and keep them in suitable repair for such use as the roads were constructed and in the manner set forth above. ATTEST; Approved and adopted this 3rd day of 7URc Deputy County Clerk April 1963. BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY, COLORADO By Chairman 1, Ann Spomer , hereby certify that I am the duly qualified and acting County Clerk of the County of Weld in the State of Colorado and the Clerk of the Board of County Commissioners of that County and State, that the above and foregoing is a true and correct copy of the Resolution adopted by the Board of County Commissioners of the said County and State, and that the said Resolution was duly passed and adopted at the regular meeting held on the 3rd day of April , 1963 in the Commissioner's Room at the County Courthouse in Greeley, Weld County, Colorado. Dated and signed the 3rd day of April L940.9p County Clerk �,m Minute Book 32: Page Eacf'o 630148 flCCIOM MIME COLORADO NEW MEXICO UTAH WYOMING Colorado Division Room 267, Building 40 Denver Federal Center Denver 25, Colorado 80225 Weld County Commissioners Court House Greeley, Colorado U. S. DEPARTMENT OF COMMERCE BUREAU OF PUBLIC ROADS August 22, 1963 09-05 IN REPLY REFER TO: Dear Sirs: Subject: Colorado Project R -AD 36(1) The enclosed construction schedule is for your information on Colorado Project R -AD 36(1). We will notify you when each road or group of roads have been completed and accepted by the Colorado Department of Highways. Maintenance of these completed roads will be the responsibility of the county as stated in the Maintenance Agreement, dated April 3, 1963. Prior to actual construction of each road or group of roads, the county is responsible for normal road maintenance. Sincerely yours, &7'PeeCeetOir A. R. Abelard Division Engineer Enclosure: Construction Schedule WELD CO. COMMISSIONERS GRECLFY, cow. RECEIVED AUG261963 A.M. P.M. 617181,11PIM4111911141610 to M.e elvlsfsa hes S. Ileildiee 40 Dame istteal Coats e IMwse S, Coln flat Alen 22, 1!b 41!•06 tie Cam, C deolawas sat Ilse /eeeley, Cabers Sear Sias s M}ets Cakede lasrjsst fWt !0(1) The auelassi ameteeetles oelsdelu is One pees tsbeeetfaa ern Cebe rda Pasjsst 1.01 31(1), Rh s111 sat14 yes Sea alai sea es nay of resit ben isee aegland alai aeegtei by an Caketssie lelsetaeet of >dtlimeys. ileiswesseese of then assSlsted nab will be the ,salaoefkiltty of the en as stated le the lielataasaase yssesssa, dotal *en s, ifis. Perim is astesl eastrestlse of seek nfl or tea* of reds, the rusty Is sea eaefkls fee eseeeed seed ales. sheet sly yaoaaas, A. R. Abelard A. s.. Sled Wham inn llelsseess th eetwetfes lekeedele 4 SPECIAL CONSTRUCTION REQUIREMENTS COLORADO PROJECT NO. R -AD 36(1) CONSTRUCTION SCHEDULE August 12, 1963 The work on this project shall not begin prior to September 15, 1963, and shall progress in groups according to the following sequence: A. 1963 Construction Season Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Roads 38, 39 and 40 in Area I Roads 41, 42 and 30 in Areas N and J Roads 37, 36 and 25 in Areas J and L Roads 31, 32 and 35 in Area M Roads 27 and 28 in Areas L and M Roads 16, 19 and 18 in Area N If a prolonged Fall construction season developes, the work into the following schedule B after approval by the Engineer. B. 1964 Construction Season Phase 1 Roads 34, 33 and 43 in Areas L and M Phase 2 Roads 26, 24 and 23 in Area L Phase 3 Roads 22 and 21 in Area L Phase 4 Roads 13, 12 and 14 in Area N Phase 5 Roads 15 and 20 in Area N Phase 6 Roads 9, 8, 7, 6, 5 and 17 in Area 0 Phase 7 Roads 10, 3, 4, 2 and 1 in Area 0 COMPLETION may progress As the Contractor nears completion of one road and equipment becomes avail- able, he may begin work on the next scheduled road after approval of the Engineer. The Department will authorize final inspection, acceptance and payment as each road or group of roads is completed, as covered in the Standard Specifications under section 7.14. 0 Hello