HomeMy WebLinkAbout660232.tiffJr)I IN It. (:1.1X1:
(:.F.U:ARI)
Chid —Inspector
DATE OF JNSI'I•:cTIUN
THE HARTFORD STEAM BOILER
INSPECTION and INSURANCE COMPANY
HARTFORD • CONNECTICUT 06102
DENVER 0Ii'1i'ICE
I\SURA\CI: rcX(:I IANG1 BUIl DING
IWN 'UR, (:()l.()R.\I)() i+O O?
July 19, 1966
REPORT OF INSPECTION
July 13, 1966
UWATIUN County Jail, 91$ - 9th Street, Greeley,
1NSP1.C•i'olt Mr. R. S. Swanson
Colorado
Your insured boiler and pressure vessel equipment was inspected on the
above date and no conditions were observed that require attention at
this time.
Yours very truly,
Chief Inspector
bow/dm
T()
Board of County Commissioners,
Weld County, Colorado
Greeley, Colorado
WEL/ CO. CommrsimorFts
ORICELEY. COL('
JUN12 1 1966
i1PI#lifNI f1P111f . �1�
Hello