HomeMy WebLinkAbout650259.tiffENDORSING PRIMARY, SECONDARY AND URBAN PROJECTS
ALSO ADDITIONS TO THE STATE HIGHWAY SYSTEM:
WHEREAS, the Board of County Commissioners of Weld County,
Colorado, has reviewed the primary, secondary and urban projects, also
the addition of certain County Roads to the State Highway system; and
WHEREAS, after due consideration, the Board feels that the
projects described or outlined in the attached brochure would benefit Weld
County, and would serve the needs, safety and welfare of the people of Weld
County and the users of the roads in said County.
NOW, THEREFORE, BE IT RESOLVED, by the Board of County Commissioners
of Weld County, Colorado, that said proposals be and the same are hereby
endorsed.
The above and foregoing resolution was, on motion duly made and
seconded, adopted by the following vote:
DATED: NOVEMBER 3, 1965
AYES: -7
K L'
'THE BOARD OF
)% i-
7
-
COUNTY-'COMMISSIONERS
WELD COUNTY, COLORADO
6,50 DS9
ENDORSING PRIMARY, SECONDARY AND URBAN PROJECTS;
ALSO ADDITIONS TO THE ST^TE HIGHWAY SYSTEM:
WHEREAS, the Board of County Commissicners of Weld County,
Colorado, has reviewed the primary, secondary and urban projects, also
the addition of certain County Road to the State Highway system; and
WHEREAS, after due consideration the Board feels that the
projects described or outlined in the attached brochure would benefit
Weld County, and would serve the needs, safety and welfare of the peo—
ple of Weld County and the users of the roads in said County;
NOW, THEREFORE, BE IT RESOLVED, by the Board of County Com-
missioners of Weld County, Colorado, that said proposals be and the
same are hereby endorsed.
The above and foregoing resolution was, on motion duly made
and seconded, adopted by the following vote:
DATED: NOVEMBER 3, 1965
AYES:
�
� i��
/7 , a4 ;-1� ,✓h ;1 � ✓
THE BOARD OF CC)UNtY COMMISSIONERS
WELD COUNTY, COLORADO
i✓ ate,-:�-� �%
PROPOSED PRIMARY PROJECTS:
1. Continue with four -lane U. S. #85 through Ault
2. Continue U. S. #34 Bypass from 35th Avenue
Greeley West to Junction of U. S. #34
3. Four -lane U. S. #34 access road from Interstate
80 at Wiggins Junction
PROPOSED SECONDARY PROJECTS:
1. Continuing to rebuild SH #257 from Windsor,
North to SH #14
2. Continuing to rebuild SH #14 from Briggsdale
East
3. Reconstruct SH #37 North and South through Gill
from SH #292 to SH #263
4. Four -lane SH #119 from Interstate #25 or U. S.
#87 to Longmont
PROPOSED URBAN PROJECT:
1. Rebuild SH #263 East from U. S. #85 to U. S.
#85 Bypass: four -lane including new bridge
1 mile
7 miles
4 miles
10 miles
2 1/2 miles
5 1/2 miles
ADDITIONS TO STATE HIGHWAY SYSTEM
1. Return Keenesburg Cut-off to State System
2. Designate County Road from Briggsdale North to
Hereford as State Highway
3. Extend State Highway 4119 from Interstate 25 -
U. S. #87 East to U. S. 485
Hello