HomeMy WebLinkAbout982226.tiff BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Jack Epple that the following resolution, with the change for patio home lot sizes from 1200-1300, to 4000 square feet, be introduced for passage by the Weld County Planning Commission that the application for: CASE NUMBER: Z-513 APPLICANT: Floyd Oliver, The Elms ADDRESS: Longmont, Colorado 80501 PLANNER: Monica Daniels-Mika REQUEST: PUD Change of Zone from A(Agricultural ) to PUD for single family and patio home uses. (not to exceed 87 single family units and 137 patio units for a total of 224) LEGAL DESCRIPTION: Part of the NW4 of Section 4, T2N, R68W of the 6th P.M., Weld County, Colorado. LOCATION: South of and adjacent to WCR 26; west of and adjacent to WCR 5.5. be recommended favorably to the Board of County Commissioners for the following reasons: 1. The submitted materials are in compliance with Section 6.4.2.6 of the Weld County Planned Unit Development Ordinance, as amended as follows: A. Section 6.4.2.6.1. -The proposal is consistent with the Weld County Comprehensive Plan, MUD Ordinance, if applicable,and any Intergovernmental Agreement in effect influencing the PUD, and the Weld County Zoning and Subdivision Ordinances. Comp Plan 1) PUD. Goal 2 states"encourage creative approaches to land development which will result in environments of distinct identity and character." Comp Plan 2) A.Policy 7 states"Weld County recognizes the"right to farm". In order to validate this recognition Weld County has established an example covenant which should be incorporated on all pertinent land use plats. The Department of Planning Services will require the covenant to appear on the recorded final plat. Comp Plan 3) OG. Goal 1 states"Oil and gas exploration and production should occur in a manner which minimizes the impact to agricultural uses and the environment and reduces the conflicts between mineral development and current and future surface uses." Comp Plan 4) No intergovernmental agreements presently influence this site. B. Section 6.4.2.6.2-The uses which would be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Section Two of the PUD. 1) 2.1 Access Standards-Access to this PUD will be from WCR 5.5 and WCR 26. (See Condition of Approval 10F). =Milan 982226 tottSig RESOLUTION, Z-513 Floyd Oliver Page 2 2) 2.2 Buffering and Screening- USES, BUILDINGS or STRUCTURES within and adjacent to a PUD Zone District shall be adequately buffered and SCREENED to make their appearance and operation harmonious with the surrounding USES. The site will maintain compliance with the MUD standards regarding screening and buffering of property. (See Condition of Approval 10C) 3) 2.3 Bulk Requirements - The normal Bulk Requirements for minimum SETBACK, minimum OFFSET, minimum LOT size, minimum LOT area per STRUCTURE, maximum height of BUILDINGS, and LOT coverage may be varied as specified in a PUD Final Plan. (All other performance standards applicable to a PUD Zone District may be required to be as strict as the performance standards contained in the zone district in which the USE would usually be allowed). Based on the information submitted the applicant is requesting a variation For Patio Home Lots: 2.3.1 Lot Size: 4000 sf per lot 2.3.2 Minimum Offset: 5 feet 2.3.3 Minimum Setback 15 feet 2.3.4 Minimum lot area per structure: 50% of the site proposed for structural improvements. The proposed residential lots shall adhere to the bulk requirements of the R1 Zone District. 4) 2.4 Circulation -Development within a PUD Zone District shall be designed and constructed to include adequate, safe and convenient arrangements for pedestrian and vehicular circulation, off-street parking and loading space. Pedestrian and vehicular circulation shall relate to the circulation system external to a PUD Zone District. All STREETS within the PUD Zone District, whether private or PUBLIC shall be designed and constructed to meet the requirements of the Weld County Public Works Department, the Subdivision Ordinance and the MUD Ordinance, if applicable. The applicant will be responsible for designing the cross sections according to Figure 2.10 of the Mixed Use Development Plan. Final plan submittal will require a traffic analysis. Additionally, the applicant is responsible for meeting the requirements of the July 22, 1998 letter, from Weld County Public Works. 5) 2.5 Common Open Space - is defined as any usable parcel of land or water unimproved and set aside, dedicated, designated or reserved for public or private USE or for the USE and enjoyment of owners or occupants of land adjoining or neighboring such area. Common Open Space includes landscape areas that are not occupied by building or USES such as storage or service areas, private court yards, parking lots and islands. The amount and type of COMMON OPEN SPACE provided in a PUD Zone District shall be proportioned according to the intensity of the zone districts called for in the PUD or USES specified in the application, unless specifically delineated in the MUD Ordinance. COMMON OPEN SPACE shall be designed to be useful to the occupants and/or residents of the PUD Zone District for recreational and scenic purposes. COMMON OPEN SPACE in the PUD Zone District shall be owned and maintained in perpetuity by an organization established specifically for such ownership and maintenance purposes. As proposed the site does meet the open space requirements of the MUD Plan. ygaaG RESOLUTION, Z-513 Floyd Oliver Page 3 7) 2.7 Design Standards and Improvement Agreements -The Design Standards and Improvement Agreements of Section 10, 12 and 13 of the Subdivision Ordinance shall be utilized. Certain PUD Final Plan requirements may differ from those specifically listed in the Subdivision Ordinance. (Final recording shall not occur until the required improvements agreement has been approved and collateral tendered). 8) 2.8 Filing -A Final Plan may develop in filings within a PUD. A filing is where only a portion of the development is platted at a time. An Improvements Agreement is required only for the filing being platted and developed. Development of the site may only occur within the approved and platted filing(s). Most recently, the applicant has chosen to develop this site in two filings. The applicant will be responsible for demonstrating the filings location not to exceed 124 units for the first filing. 9) 2.9 Landscaping Standards-No building permit shall be issued for any building or any portion of a PUD until the landscaping required by the landscape plan map is in place and/or an on-site Improvements Agreement has been entered into which complies with the requirements in Weld County MUD and PUD Ordinances. 10) 2.11 Mixed Use Development Area - All development located within the MUD area, as delineated on the MUD Structural Map 2.1, shall be subject to the additional development criteria as indicated in the MUD Ordinance#191. This proposal is located within the MUD area and does propose to adhere to the MUD standards when attached conditions are met. 11) 2.12 Monuments-Permanent reference monuments shall be set on the Planned Unit Development according to the Subdivision Ordinance and Section 30- 51-101, et seq., of the Colorado Revised Statues. 12) 2.14 Parking Requirements -All parking and loading areas within a PUD shall comply with Section 41 of the Weld County Zoning Ordinance, as amended, and landscaping parking lot standards of the MUD Plan, as amended. All parking and loading areas shall be paved and striped. 13) 2.15 Phasing -A Final Plan may develop in phases within a PUD. Phasing the construction of the development may occur within separate filings or for the entire subdivision. An Improvements Agreement is only required for the phase being developed. 14) 2.16 Public Water Provisions - Public water systems serving PUD's must be capable of meeting State drinking water regulations, (Colorado Primary Drinking Water Regulations) and have adequate provisions for a 300-year supply of water. This application is intended to be served by Left Land Water District, and the Weld County Health Department reviewed this case in accordance with this consideration in place. In a letter from Left Hand Water District (July, 20,1998), it appears that 124 lots can be adequately served with water. Water service will be through a master meter. RESOLUTION, Z-513 Floyd Oliver Page 4 15) 2.18 Urban Scale Development- Developments exceeding 5 lots and/or located in close proximity to existing PUD's, subdivisions, municipal boundaries, or urban growth corridors and boundaries. All urban scale developments shall pave the internal road systems of the development. For the purpose of review, this application is considered urban scale and shall adhere to the requirements of urban type developments. 16) 2.19 USES - USES within a PUD Zone District shall be described by filings, phases, blocks and lots within a PUD. This description shall give a clear indication of the type of USE to take place and a description of the type of BUILDINGS and STRUCTURES to be associated with those USES. This description shall be in adequate detail to determine density, COMMON OPEN SPACE, major vehicle and pedestrian circulation, water and sewer facilities, the buffering or SCREENING of the USE and the time frame for construction of the USE. This application does not propose an estimate for time frame for construction, nor does the application establish filings for this PUD. (See Condition of Approval 9D & 10L) 17) 2.20 Water and Sewer Provisions- A PUD Zone District shall be serviced by an adequate water supply and sewage disposal system. Sewer for this site is proposed by St Vrain Sanitation District. St Vrain Sanitation District has commented that they have the ability to provide service to this site. C. Section 6.4.2.6.3-The uses which would be permitted shall be compatible with the existing or future development of the surrounding area as permitted by the existing zoning, and with the future development as projected by the Comprehensive Plan or Master Plans of affect municipalities. The proposed PUD site does meet compliance with the Weld County MUD structural 2.1 Land Use Map, for residential development. Presently, the site is adjacent to an existing residential subdivision , with the balance of the proposed PUD surrounded by agricultural uses. D. Section 6.4.2.6.4-The PUD Zone District shall be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in section Two (2) of the PUD Ordinance. Left Hand will be made available to serve the site, however only 124 units can be served within the first filing. E. Section 6.4.2.6.5 - The street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed Pud Zone District. The Weld County Public Works Department reviewed this application (See Condition of Approval 10E & 101). F. Section 6.4.2.6.6-An off-site road improvements agreement and an on-site improvements agreement proposal is in compliance with the Weld County Subdivision Ordinances, as amended and a road improvements agreement is complete and has been submitted. (This information has not been submitted, and will need to be submitted at the final plan. See 11A) G. Section 6.4.2.6.7 -There has been compliance with the applicable requirements contained in the Zoning Ordinance regarding overlay district, commercial mineral deposits, and soil conditions on the subject site. No overlay districts influence this site. (See Condition of Approval 10B for mineral extraction condition). RESOLUTION, Z-513 Floyd Oliver Page 5 H. Section 6.4.2.6.8-Consistency exists between the proposed Zone District(s), uses and the Specific Development Guide. The PUD is proposing a FLEX zoning area. This area will need further delineation on the plat as well as additional environmental investigation to meet the intent of the Development Guide. (See Condition of Approval 10G). 2. The submitted materials are in compliance with Section 6.3 of the Weld County Planned Unit Development Ordinance (Ordinance 197), as follows: A. Section 6.3.1 Environmental Impacts: The referral response received 6/4/98 from the Weld County Health Department indicates that the application materials have adequately addressed all of the potential impacts described in Section 6.3.1.2.1 of the Weld County Planned Unit Development Ordinance (Ordinance 197). B. Section 6.3.2 Service Provision Impacts: The applicant has satisfactorily addressed the majority of service provision impacts in the application materials. Additional requirements of the Weld County Public Works Department are addressed through the attached conditions of approval. C. Section 6.3.3 Landscaping Elements: The applicant has submitted a Landscape Plan in accordance with Section 9.3 of the Weld County Planned Unit Development Ordinance (Ordinance 197). See 11A which addresses on-going maintenance and planting schedules at the time of final plan submittal. D. Section 6.3.4 Site Design: The proposal takes into consideration the sites advantages and limitations, as well as the compatibility of the development with adjacent sites. (See Conditions of Approval 10C.) E. Section 6.3.5 Common Open Space Usage: The application proposes 29.9 acres of common open space, or 30%of the site. The applicant is establishing a homeowners organization in accordance with the requirements of Section 6.3.5 of the Weld County Planned Unit Development Ordinance (Ordinance 197). F. Section 6.3.6 Proposed Signage: The applicant is proposing signage with this application. Condition of approval 10K addresses future proposed signage. The signage is to include entrance signs, entrance walls, and identification walls. (see COA 10.0-4) G. Section 6.3.7 MUD Impacts: The proposed change of zone does lie within the Mixed Use Development area, and requires adherence to all MUD standards. H. Section 6.3.8 Intergovernmental Agreement Impacts:The proposed change of zone does not lie within any Intergovernmental Agreement area. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Planning Commission's recommendation for approval is conditional upon the following: 1. The change of zone plat map shall be submitted to the Department of Planning Services for recording within 30 days of approval by the Board of County Commissioners. 2. The site shall maintain compliance at all times with the requirements of the Weld County Public Works Department, Weld County Health Department, and the Weld County Department of Planning Services, and adopted Weld County ordinances and policies. 98a RESOLUTION, Z-513 Floyd Oliver Page 6 3. Installation of utilities shall comply with Section 12 of the Weld County Subdivision Ordinance. (Dept. of Planning Services) 4. Outdoor storage shall be screened from public rights of ways, and adjacent properties. (Dept. of Planning Services) 5. The Right To Farm Covenant as stated in the Weld County Comprehensive Plan shall be recognized at all times. (Dept. of Planning Services) 6. The applicant shall comply with Section 8.7 of the Weld County Planned Unit Development Ordinance. (Ordinance 197) 7. The applicant shall obtain water from Left Hand Water District and sewer service from St. Vrain Sanitation District. (W.C. Health) 8. In the event that more than five acres of the site is disturbed during construction activities, the applicant shall obtain a storm water discharge permit from the Water Quality Control Division of the Colorado Department of Public Health and the Environment. (W.C. Health) 9. Prior to recording the Change of Zone plat: A. The applicant shall submit a copy of an agreement with Energy Mineral Corporation stipulating that the oil and gas activities have adequately been incorporated into the design of the site. (DPS) B. The applicant shall submit evidence to the Dept. of Planning Services from St Vrain Valley School District indicating that a school service agreement has been reached.(DPS) C. All proposed street names shall be submitted to the Longmont Post Office for review of duplication of street names. Evidence shall be submitted to the DPS that a duplication of street names will not occur with this proposed subdivision. D. The applicant shall submit a proposed estimate for time of construction for all filings of the PUD. 10. The plat shall be amended to include the following: a) The current Right to Farm Covenant from the Weld County Comprehensive Plan. (DPS) b) The location of possible future oil and gas drill site locations (DPS- in accordance with Oil Goal 1 of the Weld County Comprehensive Plan.) c) The location of an opaque screen between adjoining properties to avoid conflict of uses. (2.6.2-Standard 4 MUD plan). d) At least 10%of the area of a parking lot must be landscaped if the lot contains 10 or more spaces(2.6.3 Mud Plan)and all parking and loading areas shall be paved and striped, these conditions need to be reflected. e) A delineation of an 80 foot road right of way for WCR 5.5 and WCR 26. f) The presence of an entrance onto the PUD on WCR 26. 9eaaa6 RESOLUTION, Z-513 Floyd Oliver Page 7 g) The "Flex Area" as proposed in the application shall be incorporated into the plat. A delineation of the most intense use shall be shown not to exceed 43 patio home lots and 17 single family lots. h) Lot and Block numbers shall be included on the plat. I) Those areas proposed for treated "concrete" sidewalk delineation shall be included on the plats as well as the path area shown in the open space area. Uses pertaining to equestrian use must be delineated. j) The design of the park area including park amenities shall be incorporated into the plat. k) All future signs including entrance signs shall be delineated on the plat and shall require building permits. I) A delineation of the proposed filings. m) To show the typical cross sections redrawn to meet County MUD standards. n) The correct legal description of the property shall be included throughout the plat. The correct legal description is described in the deed. o) Inconsistency in the development narrative shall reflect: 1.) Patio homes on 4000 square foot lots. 2.) Street narratives shall delineate Weld Count MUD standards. 3.) Residential structural and architectural character shall be corrected to show the number of proposed lots for first filling at 124 total units within a breakdown of patio homes and single family units. A total build out not to exceed a total of 224 units. 4.) Details on the entrance wall and identification walls shall be included. (These identification walls will be considered as signs and as such must meet the MUD sign code.) p) The land use designation on the vicinity map must indicate present MUD Structural land use classifications. 11. At the time of Final Plan submittal: A. The applicant shall submit an on-site improvements agreement which addresses open space maintenance and landscaping in accordance with Section 6.3.3.2. (DPS) B. Final Plan submittal will require an updated traffic analysis. (Weld County Public Works) 98 )-G RESOLUTION, Z-513 Floyd Oliver Page 8 Motion seconded by Stephan Mokray. VOTE: For Passage Against Passage Stephan Mokray Marie Koolstra Cristie Nicklas Jack Epple Michael Miller Fred Walker Bruce Fitzgerald The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioners for further proceedings. CERTIFICATION OF COPY I, Wendi Inloes, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution, is a true copy of the Planning Commission of Weld County, Colorado, adopted on August 18, 1998. Dated the 18th of gust 1998. Wendi Inloes Secretary 98aaac SITE SPECIFIC DEVELOPMENT PLAN DEVELOPMENT STANDARDS FLOYD OLIVER-THE ELMS Z-513 1. The site specific development plan is for a PUD change of zone from agricultural to PUD Residential, as indicated in the application materials on file in the Department of Planning Services and subject to Development standards stated hereon. 2. Approval of this plan may create a vested property right pursuant to Section 90 of the Weld County Zoning Ordinance, as amended. 3. The property owner shall be responsible for compiling with the Performance of Section 2 of the PUD Ordinance. 4. The property owner shall be responsible for complying with Supplemental Procedures and Requirements of Section 8 of the PUD Ordinance. 5. The property owner shall be responsible for complying with policies, goals, standards and regulations of the MUD Ordinance, as amended. 6. Personnel from the Weld County Health and Planning Departments shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County Regulations. 7. The permitted area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County Regulations. Substantial change from the submitted development guide or plan will require additional review of the Final Plan by the Board of County Commissioners at a public hearing. 8. The parking lot area shall maintain compliance with Section 41. Of the Weld County Zoning Ordinance as amended and 2.6.3 Landscaping Requirement for Parking Lots of the MUD Plan as amended. 9. The property owner shall be responsible for maintaining compliance with Section 2.8 Design Standards of the Weld County MUD Ordinancne, as amended 10. The property owner shall be responsible for maintaining compliance with Section 2.9 Utility, Infrastructure, and Public Facility Regulations of the Weld County MUD Ordinance amended. 11. The property owner shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 12. No development activity shall commence on the property, nor shall any building permits be issued on the property until the final plan as been approved and recorded. 13. The property owner shall be responsible for maintaining compliance with the signage requirement of 42.2 of the Weld County Zoning Ordinance and Section 2.8 Of the MUD Plan. 14. The property will maintain compliance with Section 2.8.2.5 B of the MUD Plan, stating that motor vehicles, trailers or portable bases with wheels or to which wheels may be readily affixed shall not be used as a sign structure for any signs within the MUD area . 15. The applicant shall obtain water from Left Hand Water District,and sewer service from the St. Vrain Sanitaiton District. Hello