Loading...
HomeMy WebLinkAbout970256.tiffINVENTORY OF ITEMS SUBMITTED FOR CONSIDERATION Applicant: Western Dairymen Cooperative, Inc. 1. P.C. Resolution 2. Comments a. Staff Recommendation (5 pages) b. Letter to applicant c. field check 3. Legals 4. Application (78 pages) 5. Plat ( 24"x36" sheets) 6. Referrals W/O Comments a. Referral list & letter b. Left Hand Water District c. Longmont SCS d. Weld County Health Dept. 7. Referrals W/Comments a. Weld County Public Works Dept. b. Weld County Building Inspection c. St. Vrain School District d. Colorado Geological Survey (2 pages) e. City of Longmont (3 pages) f. Mountain View Fire Protection Dist. 8. DPS Maps Prepared by Planning Technician (3 pages) 9. SPO's (10 pages) Case Number: Z-503 Submitted or Prepared Prior to Hearing X X X X X X X X X X X X X X X X X X X X At Hearing I hereby certify that the 9 items identified herein were submitted to the Department of Planning Services at or prior to the scheduled Planning Commission hearing. I further certify that these items were forwarded to the Attorney's office on December 31, 199 Todd A. Hodges C !rent Planner II STATE OF COLOPLTIO ) COUNTY OF WELD SUBSCRIBED AND SWORN TO BEFORE ME THIS �/Sday of 19. SEAL U/111,Atthild-642 RRYPUBLIC/ My Commission Expires 3-1-97 970256 'l`ve COLORADO Change of Zone Administrative Recommendation PLANNER: Todd Hodges Hearing Date: December 17, 1996 CASE NUMBER: Z-503 NAME: Western Dairymen Cooperative, Inc. c/o: Pickett Engineering Company 1240 Main Street Longmont, Co. 80501 REQUEST: A Change of Zone from A (Agricultural) to PUD allowing C-3 and I-1 uses. LEGAL DESCRIPTION: A tract of land located in the N/2 of Section 10, T2N, R68W of the 6th P.M. Weld County, Colorado. LOCATION: South of and adjacent to State Highway 119; approximately 1/2 mile west of Interstate 25. SIZE OF PARCEL: 55 acres, more or less. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 28.5 of the Weld County Zoning Ordinance, as amended. 2. The submitted materials are in compliance with Section 28.7 of the Weld County Zoning Ordinance as follows: 28.71.2 A. The proposed change of zone is consistent with the intent of the Weld County Comprehensive Plan, as amended, including Planned Unit Development, Mixed Use Development Area, Commercial and Industrial Development Goals and Policies. 1. I.Goal 4 states: "Promote industrial development that is appropriately located in relation to surrounding land uses, and that meets necessary environment standards." This proposal for (C-3) and light industrial uses (I-1) is compatible with surrounding land uses. Directly north of the site is 97025S Recommendation; Z-503 Western Dairymen Cooperative, Inc. Page 2 property designated as regional commercial and employment center in the Weld County Comprehensive Plan which would allow for commercial and industrial uses, with residential and commercial properties to the east of the site. Other surrounding land uses include agricultural to the south and reclaimed gravel pits to the west and southwest. The western edge of the site lies within the 100 year floodplain as defined by FEMA mapping. The applicant has designated this portion of the site as open space with a maximum of 25% being developed. The applicant will need to address common open space further in the Final PUD Plan submittal. 2. C.Goal 1 states: "Encourage the expansion and diversification of the commercial economic base." This proposal includes Commercial (C-3) uses which will provide economic opportunity for county residents as well as aid in diversifying the county's commercial economic base. 3. C.Goal 3 states: "Ensure that adequate public services and facilities are available to serve the commercial development or district." The development will be serviced by the St. Vrain Sanitation District for sewage disposal. Left Hand Water District will provide an adequate water supply. The development lies within the Mountain View Fire Protection District. 4. MUD.Goal 1 states: "To plan and to manage growth within the 1-25 Mixed Use development area and Urban Development Nodes so as to balance relevant fiscal, environmental, aesthetic, and economic components of the area." The applicant has designed this development to consist of both commercial (C-3) and industrial (I-1) uses which is compatible with the surrounding land uses and proposed land uses. The development will be encouraged to utilize innovative siting and design features to preserve the portions of the property located within the floodplain and to use the reclaimed gravel pits as an enhancement to the development. All landscaping shall adhere to the landscaping requirements in proposed Ordinance 191. 28.zi.3 B. That the uses which would be allowed in the proposed Planned Unit Development will conform with the Performance Standards of the Planned Unit Development District contained in Section 35.5 of this Ordinance. 28.7.1.4 C. The uses which would be permitted shall be compatible with the existing or future development of the surrounding area which include agricultural production, residential, gravel mining, commercial and industrial developments. In addition, through the PUD Final Plan and Site Plan Review processes, design standards 970256 Recommendation; Z-503 Western Dairymen Cooperative, Inc. Page 3 (landscaping, parking, signage, etc) will be adequately evaluated. 28.7.1.5 D. That adequate water and sewer service will be made available to the site to serve the uses permitted within the proposed Planned Unit Development District. The development will be serviced by the St. Vrain Sanitation District for sewage disposal. The Left Hand Water District will provide water service. 28.7.1.6 E. That street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone district. The applicant will need to address street and highway facilities which provide access to the development as well as the internal roadway system in relation to the standards set forth in proposed Ordinance 191. The applicant has indicated a willingness to meet all standards as set forth in proposed Ordinance 191 concerning the design of the roadways within the PUD District. The final design of the roadways will be addressed with the PUD Final Plan application review. 28.7.1.7 F. That there has been compliance with the applicable requirements contained in Section 21.5.1.5 of the Weld County Zoning Ordinance as follows: 1. The proposed development lies with the flood hazard overlay district. Conditions of approval address this issue. This development also lies within the Mixed Use Development area. The applicant is aware of the update plan, Ordinance 191, to this area. The applicant may be subject to additional requirements of the plan with its adoption by the Board of County Commissioners. 2. The proposed development does not contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. 3. Soil conditions on the site are not such that they present severe limitations to the construction of structures or facilities proposed for the site. The Colorado Geological Survey reviewed this proposal and made comments concerning the construction within the proposed PUD Zone District and the comments are addressed in the conditions of approval. This recommendation is based, on part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. 970256 Recommendation; Z-503 Western Dairymen Cooperative, Inc. Page 4 The PUD Change of Zone is conditional upon the following: 1. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within 30 days of approval by the Board of County Commissioners. 2. The submittal of the PUD Final Plan shall include all the information requested by Don Carrol of the Weld County Public Works Department in the memo dated November 27, 1996. 3. Prior to recording the Change of Zone plat: a. The Change of Zone plat shall meet all requirements of Sections 28.5.2 and 28.5.3 of the Weld County Zoning Ordinance. b. The applicant shall submit to the Colorado Geological Survey and the Department of Planning Services a drainage and grading plan for review and approval by the Colorado Geological Survey. 4. The PUD Change of Zone is conditional upon the following and that each be placed on the Change of Zone plat as notes prior to recording: a. The PUD District allows for Commercial (C-3) and Industrial (I-1) uses and shall comply with the PUD Zone District requirements as set forth in Section 28 of the Weld County Zoning Ordinance, as amended. The PUD shall consist of a maximum of 27 lots. The PUD District shall comply with the PUD Zone District requirements as set forth in Section 28 of the Weld County Zoning Ordinance. b. The PUD shall be serviced by Left Hand Water District and the St. Vrain Sanitation District. c. The site shall maintain compliance at all times with the requirements of Weld County Public Works, Mountain View Fire Protection District, Weld County Health Department, Colorado Department of Transportation, Department of the Army Corps of Engineers, Colorado Geological Survey, St. Vrain Sanitation District, Left Hand Water District and the Sheriffs Department. d. The site shall maintain compliance at all times with the Flood Hazard Overlay District standards. e. Installation of utilities shall comply with Section 12 of the Weld County Subdivision Ordinance. 970256 Recommendation; Z-503 Western Dairymen Cooperative, Inc. Page 5 f. Outdoor storage shall be screened from public rights -of -way and adjacent properties. g. The PUD Final Plan submittal shall adhere to all regulations/requirements in the approved MUD Ordinance 191. 9iCti5'S Wine COLORADO November 4, 1996 Kris Pickett Pickett Engineering Company 822 7th Street, Suite 210 Greeley, CO 80631 DEPARTMENT OF PLANNING SERVICES PHONE (970) 353-6100, EXT.3540 FAX (970) 352-6312 WELD COUNTY ADMINISTRATIVE OFFICES 1400 N. 17TH AVENUE GREELEY, COLORADO 80631 Subject: Z-503 - Request for a Planned Unit Development for a Change of Zone from A (Agricultural) to PUD C-3 (Commercial) and I-1 (Industrial) uses on a parcel of land described as a tract located in the N2 of Section 10, T2N, R68W of the 6th P.M., Weld County, Colorado. Dear Mr. Pickett: Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for December 17, 1996, at 1:30 p.m. This meeting will take place in the County Commissioners' Hearing Room, First Floor, Weld County Centennial Center, 915 10th Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the policy of Weld County to refer an application to any town or municipality lying within three miles of the property or if the property is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the City of Longmont and the Town of Mead Planning Commission for its review and comments. Please call Brien Schumacher, in Longmont, at (303) 651-8330, and Kelly Smith, in Mead, at (970) 535-4477 for further details regarding the date, time, and place of this meeting. It is recommended that you and/or a representative be in attendance at the Planning Commission meeting to answer any questions the Commission members may have with respect to your application. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four (24) hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services' office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully d Hodges Current Planner II d" -y- 1OV Noo6 E 5 970256 EXHIBIT a7. FILING NUMBER: Z-503 FIELD CHECK DATE OF INSPECTION: / / 1�- % c• APPLICANTS NAME: Western Dairymen Cooperative, Inc., do Pickett Engineering Company CURRENT PLANNER: Todd Hodges REQUEST: A Planned Unit Development for a Change of Zone from A (Agricultural) to PUD C-3 (Commercial) and I-1 (Industrial) uses. LEGAL DESCRIPTION: A tract located in the N2 of Section 10, T2N, R68W of the 6th P.M., Weld County, Colorado. LOCATION: South of and adjacent to State Highway 119; approximately 1/2 mile west of the 1-25 Frontage Road. LAND USE: N C u o4u E. E . E `t , scoXx w S W c 1J u 0 ZONING: N A (Agricultural) E A (Agricultural) S A (Agricultural) W A (Agricultural) COMMENTS: 970256 Hello