Loading...
HomeMy WebLinkAbout970234.tiffRESOLUTION RE: GRANT CHANGE OF ZONE #502 FROM A (AGRICULTURAL) TO PUD (PLANNED UNIT DEVELOPMENT) ALLOWING C-4, I-1, AND 1-2 USES - DEL CAMINO SOUTH, C/O DONALD PARK, PARK ENGINEERING CONSULTANTS WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, a public hearing was held on the 5th day of February, 1997, at 10:00 a.m. for the purpose of hearing the application of Del Camino South, c/o Donald Park, Park Engineering Consultants, 1240 Main Street, Longmont, Colorado 80501, for Change of Zone #502 from A (Agricultural) to PUD (Planned Unit Development) allowing C-4, I-1, and 1-2 uses, for a parcel of land located on the following described real estate, to -wit: Part of the N1/2 SW1/4 of Section 14, Township 2 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS, the applicant was represented by Donald Park, Park Engineering Consultants, and WHEREAS, Section 28.8 of the Weld County Zoning Ordinance provides standards for review of such a Change of Zone, and WHEREAS, the Board of County Commissioners heard all the testimony and statements of those present, studied the request of the applicant and the recommendations of the Weld County Planning Commission and, having been fully informed, finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 28.5 et seq., of the Weld County Zoning Ordinance. 2. The request is in conformance with Section 28.8 of the Weld County Zoning Ordinance as follows: A. The proposed Change of Zone is consistent with the intent of the Weld County Comprehensive Plan, including Planned Unit Development, Mixed Use Development Area, Commercial and Industrial Development Goals and Policies. 1. I.Goal 4 states: "Promote industrial development that is appropriately located in relation to surrounding land uses and that meets necessary environment standards." This proposal for Commercial Highway (C-4) and Light Industrial uses (I-1 and 1-2) is compatible with surrounding land uses. Directly north of the site is proposed Del Camino East PUD, Phase 2, which would allow for commercial and industrial uses, with residential to the northeast of the site. Other surrounding land uses include Del Camino Center PUD and Flatiron PUD to the northwest. PZ-J P40- ,4_J P/f9,< 970234 PL1070 CHANGE OF ZONE #502 - DEL CAMINO SOUTH, C/O PARK ENGINEERING PAGE 2 The eastern edge of the site lies within the 100 -year floodplain as defined by FEMA mapping. The applicant has designated this portion of the site as open space with a maximum of 25 percent being developed. The applicant will need to address common open space further in the Final PUD Plan submittal. 2. C.Goal 1 states: "Encourage the expansion and diversification of the commercial economic base." This proposal includes Commercial Highway (C-4) uses which will provide economic opportunity for County residents as well as aid in diversifying the County's commercial economic base. 3. C.Goal 3 states: "Ensure that adequate public services and facilities are available to serve the commercial development or district." The development will be serviced by the St. Vrain Sanitation District for sewage disposal. Central Weld County Water District will provide an adequate water supply. The development lies within the Frederick Fire Protection District and the Mountain View Fire Protection District. 4. MUD.Goal 1 states: "To plan and to manage growth within the 1-25 Mixed Use Development Area and Urban Development Nodes so as to balance relevant fiscal, environmental, aesthetic, and economic components of the area." The applicant has designed this development to consist of both Commercial (C-4) and Industrial (I-1 and 1-2) uses, which is compatible with the surrounding land uses. The development will be encouraged to utilize innovative siting and design features to enhance prime visual features such as the Godding Hollow drainage way. The applicant has submitted a landscaping plan for the development which shows landscaping along the 1-25 East Frontage Road. All landscaping shall adhere to the landscaping requirements in Ordinance No. 191. B. The uses which would be allowed in the proposed Planned Unit Development will conform with the Performance Standards of the Planned Unit Development District contained in Section 35.5 of this Ordinance. C. The uses which would be permitted shall be compatible with the existing or future development of the surrounding area, which include agricultural production, rural residences, and commercial and industrial developments. Surrounding zone districts include Del Camino Center PUD and Flatiron PUD to the northwest, Del Camino East PUD, Phase 2, to the north, and agricultural uses to the east. In addition, through the PUD Final Plan and Site Plan Review processes, design standards (landscaping, parking, signage, etc.) will be adequately evaluated. 970234 PL1070 CHANGE OF ZONE #502 - DEL CAMINO SOUTH, C/O PARK ENGINEERING PAGE 3 D. Adequate water and sewer service will be made available to the site to serve the uses permitted within the proposed Planned Unit Development District. The development will be serviced by the St. Vrain Sanitation District for sewage disposal. The Central Weld County Water District will provide water service. E. Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone district. The applicant will need to address street and highway facilities which provide access to the development, as well as the internal roadway system, in relation to the standards set forth in Ordinance No. 191. The local road for the internal roadway system is not, at this time, consistent with the roadway requirements for a Local Employment/Regional Commercial Roadway as displayed in Ordinance No. 191. The applicant will need to address this discrepancy and submit an off -site road improvements agreement at the Final PUD Plan submittal. F There has been compliance with the applicable requirements contained in Section 21.5.1.5 of the Weld County Zoning Ordinance as follows: 1. The proposed development lies within the Flood Hazard Overlay District. Conditions of Approval address this issue. This development also lies within the Mixed Use Development Area. The applicant is aware of the updated plan, Ordinance No. 191, to this area. The applicant may be subject to additional requirements of the plan upon its adoption by the Board of County Commissioners. 2. The proposed development will not permit the use of any area known to contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. 3. Soil conditions on the site are not such that they present moderate or severe imitations to the construction of structures or facilities proposed for the site. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Del Camino South, c/o Donald Park, Park Engineering Consultants, for Change of Zone #502 from A (Agricultural) to PUD (Planned Unit Development) allowing C-4, I-1, and 1-2 uses on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within 30 days of approval by the Board of County Commissioners. 970234 PL1070 CHANGE OF ZONE #502 - DEL CAMINO SOUTH, C/O PARK ENGINEERING PAGE 4 2. The applicant shall submit a traffic analysis performed by a qualified engineer at the time of Final PUD Plan submittal. The traffic analysis shall identify traffic generated by the development as well as the roadway improvements needed to mitigate the increased traffic. This analysis should reflect the future arterial proposed in Ordinance No. 191. 3. Prior to recording the Change of Zone plat: A. The Change of Zone plat shall meet all requirements of Sections 28.5.2 and 28.5.3 of the Weld County Zoning Ordinance. B. The Change of Zone plat shall show all requirements from the Central Weld County Water District, as stated in its referral dated October 31, 1996. 4. The PUD Change of Zone is conditional upon the following and that each be placed on the Change of Zone plat as notes prior to recording: A. The PUD District allows for Commercial (C-4) and Industrial (I-1 and 1-2) uses and shall comply with the PUD Zone District requirements as set forth in Section 28 of the Weld County Zoning Ordinance. The PUD shall consist of a maximum of 20 lots. The PUD District shall comply with the PUD Zone District requirements as set forth in Section 28 of the Weld County Zoning Ordinance. B. The PUD shall be serviced by Central Weld County Water District and the St. Vrain Sanitation District. C. The site shall maintain compliance at all times with the requirements of the Weld County Public Works Department, the appropriate fire protection district, Weld County Health Department, Colorado Department of Transportation, U. S. Army Corps of Engineers, Weld County Sheriff's Department, Colorado Geological Survey Department, St. Vrain Sanitation District, and Central Weld County Water District. D. The site shall maintain compliance at all times with the Flood Hazard Overlay District standards. E. Installation of utilities shall comply with Section 12 of the Weld County Subdivision Ordinance. F. The Final PUD Plan shall adhere to all regulations and requirements in the approved Ordinance No. 191. G. Outdoor storage shall be screened from public rights -of -way and adjacent property. 970234 PL1070 CHANGE OF ZONE #502 - DEL CAMINO SOUTH, C/O PARK ENGINEERING PAGE 5 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 5th day of February, A.D., 1997. e Board APPD AS ' RM: ounty A tor ey BOARD OF COUNTY COMMISSIONERS WELDACOUNTY, COLORADO "George . Baxter, Chair ro-Tem stance L. Harbert, Dale K. Hall EXCUSED Barbara J. Kirkmeyer vtd .W4,12-17 Webster 970234 PL1070 Hello